Prefiled testimony
Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON
Files2
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdf
PDF · 712 KB · 100 pagesText searchable
Download Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdfRead the text of Exhibit CLP-LEADERSHIP-REBUTTAL-1.pdf
Page 86 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 84 of 98 Event Forecasted Conditions MS24A (1/9/24) Forecasts called for a powerful, winter storm with moderate to heavy rainfall with snow in the northwest hills, and strong damaging winds expected to impact Connecticut beginning on or around January 9th and continuing into January 10th. Peak wind gusts were predicted to range from 45-50 mph, with higher gusts of up to 57 mph in the southeast coastal areas. MS24B (1/13/24) Forecasts called for a storm system with 1.5 to 2.5 inches of rain, strong wind gusts, with peak winds predicted from 50-55 mph, a chance for isolated thunderstorms, and flooding. MS24C (2/13/24) Forecasts called for a strong, fast-moving lowpressure system with strong winds, with peak gusts up to 45 mph, and heavy wet snow with totals ranging from 3 to 14 inches across Connecticut. MC24D (2/28/24) Forecasts called for a very strong cold front to move across Connecticut, bringing continuous widespread rainfall, rapidly falling temperatures, elevated sustained winds and hazardous wind gusts in the range of 40-55 mph. MS24H (6/30/24) Forecasts called for two rounds of strong-tosevere thunderstorms, predicted to form on the afternoon of June 30th and later that evening. Both events were predicted to bring high winds of up to 65 mph. MS24K (12/10/24) Forecasts called for a strong cold front to move across Connecticut on the evening of December 11th, with heavy, widespread rain and strong winds, with gusts up to 60 mph, ahead of that cold front. Record Citations Exhibits CLPSTORM-IMT-1, at 1; Exhibit CLP-STORMIMT-3 (Event 1MS24A), at 7-99 Exhibits CLPSTORM-IMT-1, at 45; Exhibit CLPSTORM-IMT-3 (Event 1-MS24B), at 8-40 Exhibits CLPSTORM-IMT-1, at 89; Exhibit CLPSTORM-IMT-3 (Event 1-MS24C), at 7-136 Exhibits CLPSTORM-IMT-1, at 10-11; Exhibit CLPSTORM-IMT-3 (Event 1-MS24D), at 7-65 Exhibits CLPSTORM-IMT-1, at 22; Exhibit CLP-STORMIMT-3 (Event 1MS24H), at 9-22 Exhibits CLPSTORM-IMT-1, at 27-29; Exhibit CLPSTORM-IMT-3 (Event 1-MS24K), at 4-88 1 Even this high-level summary plainly shows that each event posed a substantial risk of 2 damage to the Company’s electric distribution system. In particular, the forecasts for 3 all six events predicted hazardous wind conditions, with gusts expected between 40 and 4 65 mph. These conditions are a serious threat to the Company’s overheadPage 87 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 85 of 98 1 infrastructure, which is directly exposed to the elements. High winds can bring down 2 trees and large branches onto overhead lines, causing outages, breaking conductors, 3 and damaging or toppling utility poles. These risks increase further when combined 4 with heavy rainfall, which saturates the soil and increases the likelihood of trees 5 uprooting and falling onto electric distribution equipment. 6 The Company’s prudence must be evaluated based on the information available when 7 it made the decisions, rather than with the benefit of hindsight. The forecasts for these 8 six events provided advance notice of potentially severe weather, giving the Company 9 ample justification to anticipate significant impacts to its distribution system and to 10 prepare accordingly. The Company’s resource assessments, restoration records, and 11 contemporaneous communications document the reasonableness of its response as 12 conditions evolved and restoration needs emerged. 13 14 Q. Please explain why Mr. Balakumar’s use of cost-per-trouble spot as evidence of imprudence is flawed. 15 A. A comparison of cost per trouble spot does not establish whether the underlying costs 16 were imprudent or unreasonable. As explained above, every single storm is unique and 17 the factors affecting each particular trouble spot can differ greatly depending on the 18 equipment involved, the extent of damage, and the complexity of restoration required. 19 Additionally, the cost-per-trouble-spot ratio does not account for storm-specific factors 20 such as resource availability, storm geography, damage distribution and severity, 21 mobilization distances, and storm duration. It also fails to reflect the varying amountsPage 88 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 86 of 98 1 of labor, equipment, and time needed for different types of repairs. Without 2 considering the specific facts and circumstances that drive these costs, the cost-per- 3 trouble spot ratio does not, by itself, demonstrate that expenditures were excessive, 4 unreasonable, or imprudent. 5 4. Calculation of Annual Allowances 6 Q. Is inflation a known and measurable cost that should be applied to rate setting? 7 A. Yes. As the Connecticut Supreme Court has explained, ratemaking is a prospective 8 endeavor. PURA must make reasoned estimates to establish rates that will adequately 9 compensate the utility during the period those rates are in effect. Aquarion Water Co. 10 of Connecticut v. Pub. Utilities Regul. Auth., 352 Conn. 381, 390 (2025). The Court 11 further recognized that the test year may be adjusted to permit recovery of “definite, 12 ascertainable expenses maturing or certain to materialize” during the relevant period. 13 Id. at 391 (citing Connecticut Natural Gas Corp. v. Public Utilities Commission, 29 14 Conn. Supp. 379, 390–91 (1971)). An inflation adjustment is fully consistent with 15 these principles. 16 Inflation is objectively measurable through established government indices. When 17 applied to identifiable expense categories and supported by verifiable calculations, 18 these indices provide a sound basis for determining known and measurable cost 19 adjustments. 20 reasonable and broad-based measure of changes in prices across the economy and, The Gross Domestic Product Price Index ("GDP-PI") provides aPage 89 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 87 of 98 1 accordingly, serves as an objective basis for escalating historical O&M expenses to the 2 Rate Year. 3 Because ratemaking is inherently forward-looking, the revenue requirement must 4 reflect reasonable estimates of revenues and expenses during the rate-effective period. 5 Accordingly, relying solely on historical expenses, without accounting for reasonably 6 ascertainable and measurable cost increases, would understate the revenue requirement 7 necessary to provide service during that future period. This problem is magnified under 8 a multi-year rate plan with a stay-out commitment, such as the one proposed in this 9 proceeding. In a single-year rate plan, a utility can seek a new rate adjustment if its 10 authorized revenue requirement no longer covers the actual costs of providing service. 11 By contrast, a multi-year rate plan locks in rates for a longer period, increasing the risk 12 that rates will become misaligned with the actual costs of service over time. The further 13 these rates extend into the future, the more pronounced the gap can become between 14 historical expenditures and the actual costs of providing service. To address this, an 15 inflation adjustment is necessary to set a revenue requirement that reasonably reflects 16 the costs of providing service throughout the authorized rate-effective period. The 17 principle is perhaps best summed up by the Virginia Supreme Court: “in exercising its 18 legislative function of fixing utility rates for the future, [a public utilities commission]Page 90 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 88 of 98 1 should not be blind to the future.” Commonwealth v. Virginia Elec. & Power Co., 211 2 Va. 758, 771 (1971). 3 4 5 Q. How do you respond to Mr. Defever’s argument that the Company should not have made an inflation adjustment when calculating the five-year average used to derive the Rate Year funding for non-catastrophic and prestaging expenses? 6 A. Mr. Defever’s recommendation to use an unadjusted average of the Company’s 2021 7 to 2025 non-catastrophic storm costs does appropriately account for inflation in labor, 8 contractor services, materials, equipment, and fuel. Eversource will incur these costs 9 for storm restoration at prevailing 2028 prices, not at the historical prices in the five- 10 year average (2021 – 2025). Accordingly, the Company adjusted its historical storm 11 costs for inflation to more accurately reflect expected costs during the rate-effective 12 period. While a five-year average without an inflation adjustment may smooth annual 13 fluctuations, it understates the cost of service for the rate-effective period. The 14 Company’s proposed adjustment, on the other hand, aligns historical cost data with 15 expected costs during the period in which rates will apply. 16 17 Q. Did the Company apply an inflation adjustment to any other components of its storm cost recovery proposal? 18 A. The Company seeks to establish a fair, balanced, and stable storm cost recovery 19 framework for catastrophic and non-catastrophic storms that reflects the costs 20 reasonably incurred to restore service to customers—an objective it believes all the 21 parties in this proceeding share. To that end, CL&P adjusted not only the proposed 22 base-rate funding but also the threshold for accessing the catastrophic storm reserve for 23 inflation. As explained in its revenue requirement testimony, the Company derived thePage 91 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 89 of 98 1 proposed $5.4 million catastrophic storm threshold by adjusting the current $4 million 2 threshold for inflation from 2018 through the Rate Year using the Gross Domestic 3 Product Price Index (“GDP-PI”) (Exh. CLP-REVREQ-1, at 104). 4 It is important to note that changes to the proposed catastrophic storm threshold, 5 whether upward or downward, affect the Company’s revenue requirement and the 6 required revenue increase. Consequently, if the threshold is adjusted, the Company 7 must adjust base rates to reflect the costs of storms that fall below the new, higher 8 threshold, ensuring that rates are designed to recover a representative level of costs 9 each year. To do otherwise would result in rates that are neither just nor reasonable. 10 IV. RESPONSE TO TESTIMONY REGARDING AMI DEPLOYMENT 11 Q. Please summarize Mr. Balakumar’s AMI testimony. 12 A. Mr. Balakumar characterizes AMI as a foundational investment critical to grid 13 modernization and the shift toward a flexible, cost-effective grid (Balakumar 14 Testimony at 74). He claims, however, that these benefits can only be realized if the 15 technology is fully leveraged and deployed expeditiously. Although he views the 16 Company’s proposal as a solid starting point, Mr. Balakumar claims several gaps must 17 be addressed as a condition to approval (id.). 18 First, the witness recommends several changes to the Company’s customer data access 19 platform. While Mr. Balakumar considers the Green Button Connect and API-based 20 architecture a strong foundation, he urges the Company to provide access not only to 21 billing-quality data, but also to raw meter usage data and enrolled-program informationPage 92 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 90 of 98 1 (id. at 74, 80). He further recommends that the Company track and publicly report 2 additional performance metrics, including the number of registrants, average 3 registration approval time, and platform uptime (id. at 74-75). Mr. Balakumar also 4 asserts that the platform should become a one-stop shop for future data access— 5 including system data and rates or tariff information—to better support distributed 6 energy resource (“DER”) integration (id. at 75-76). 7 Second, Mr. Balakumar argues that the Company’s AMI proposal lacks sufficient detail 8 regarding key implementation elements. For instance, Mr. Balakumar recommends 9 enabling 8760 profiles at both the feeder and substation levels as AMI is deployed (id. 10 at 65, 71, 75, 77-78). 11 deployment in areas with DER and load constraints (id. at 64, 78). Additionally, Mr. 12 Balakumar urges the Company to propose a concrete distributed intelligence pilot with 13 specific use cases within one year of AMI deployment approval (id. at 79). Finally, he 14 requests that the Company assess whether AMI can defer or replace other sensor 15 investments and report on its findings (id. at 80). 16 Mr. Balakumar recommends that PURA approve the Company’s AMI investment, 17 conditioned on the Company meeting these requirements. He also recommends that the Company prioritize AMI 18 Q. What is the Company’s general response to Mr. Balakumar’s AMI testimony? 19 A. The Company appreciates Mr. Balakumar’s general support for its proposed AMI 20 investment and agrees with him that AMI is a foundational investment critical to grid 21 modernization and the shift toward a flexible, cost-effective grid. Regarding hisPage 93 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 91 of 98 1 suggested conditions for approval, the Company can evaluate and address these 2 capabilities as deployment progresses. The AMI proposal is a six-year, systemwide 3 initiative, with benefits accruing in stages as the meters, communications 4 infrastructure, and operational systems are implemented. Mr. Balakumar himself 5 recognizes that the proposal is a solid starting point, and that some capabilities will 6 emerge at the outset while others will only be fully realized after full deployment. Mr. 7 Balakumar’s recommendation to condition approval on a fixed set of additional 8 deliverables is needlessly heavy-handed and risks delaying the very deployment he 9 urges the Company to expedite. 10 Q. What is the Company’s response to Mr. Balakumar’s specific recommendations? 11 A. The Company’s response to Mr. Balakumar’s specific recommendations is as follows: 12 1. Raw meter usage data, enrolled programs, and additional platform metrics 13 The Company intends to track both the number of platform users and the platform’s 14 availability/reliability. 15 Estimation, and Editing (“VEE”) process and available in the Green Button data 16 sharing portal within 12 hours of actual consumption—the Company believes that this 17 satisfies all reasonable use cases and minimizes discrepancies between data subject to 18 sharing and data used for bill calculations. 19 2. Commitment to a “one-stop shop” including system and rates/tariff data 20 Eversource agrees that data access is important to DER integration. However, it does 21 not follow that the Company must commit now to a particular scope for a platform that Usage data will be subjected to the initial Validation,Page 94 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 92 of 98 1 has not yet been built. Additionally, the Company notes that the Green Button Connect 2 data sharing platform is intended to empower customers to control which third-party 3 may receive their usage data, as well as data related to other attributes of their service, 4 such as their specific rate selection and bill components. The following is the list of 5 data fields that will be available for customer-authorized data sharing via the platform. Field Account Number Account Address / Premise Address Premise ID Customer Name Customer Email Address Customer Phone Commodity Customer Rate Code / Tariff Overall Consumption Last Period Overall Consumption This Period Billing Period Bill Amount Customer Charge Energy Service Charge Fixed Peak Demand (for current bill period) Consumption Tax Meter Number Quality of Reading Interval Reading Start Date and Time Interval Duration Interval Reading ValuePage 95 of 100
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-LEADERSHIP-REBUTTAL-1 November 18, 2026 Page 93 of 98 Interval Reading Quality Interval Reading Quality Interval Reading Quality Interval Reading Quality Interval Reading Quality Interval Reading Quality Interval Reading Quality Generation Service Charge Distribution Charge Transition Charge Transmission Charge Net Meter Recovery Surcharge Revenue Decoupling Charge Distributed Solar Charge Renewal Energy Charge Energy Efficiency Charge Electric Vehicle Program 1 The Company does not consider it cost-efficient for the AMI program to fund the 2 integration of a customer data sharing platform with non-customer-specific rate 3 information or system data, because the non-proprietary elements of that data are 4 already available in other repositories. 5 3. Iterative 8760 profiles at feeders and substations 6 As part of the RE03 IDSP proceedings, the Company has outlined its fundamental 7 concerns with 8760 forecasts and reiterates that 8760 forecast data does not create 8 incremental value for designing a system that can address peak system demand. 9 However, the Company understands the stakeholders’ and PURA’s interest in
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DONALD J. SCACCO, JR., DIGAUNTO CHATTERJEE AND DOUGLAS P. HORTON [26-05-10]