Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 1 of 39

    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Docket No. 26-05-10 APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES JOINT REBUTTAL TESTIMONY OF DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS AND CLARE B. CONNOLLY Performance Based Multi-Year Rate Plan Metrics Panel On behalf of The Connecticut Light and Power Company d/b/a Eversource Energy November 18, 2026
  2. Page 2 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Table of Contents I. INTRODUCTION................................................................................................................ 1 II. PURPOSE OF TESTIMONY ............................................................................................. 1 III. BENEFITS OF THE COMPANY’S PIMS AND METRICS UNDER THE PBMRP .. 2 IV. RESPONSE TO INTERVENORS ..................................................................................... 5 V. A. OCC Witnesses – Gennelle Wilson and Oliver Tully .................................................... 5 B. Acadia Center and Conservation Law Foundation Witness – Lindsay Griffin ........ 27 CONCLUSION .................................................................................................................. 37
  3. Page 3 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 1 of 37 REBUTTAL TESTIMONY OF THE PERFORMANCE BASED MULI-YEAR RATE PLAN METRICS PANEL 1 I. INTRODUCTION 2 3 Q. Please identify the members of the Performance-Based Multi-Year Rate Plan Metrics Panel. 4 A. The members of the Performance-Based Multi-Year Rate Plan (“PBMRP”) Metrics Panel 5 are Douglas P. Horton, Lavelle A. Freeman, Dr. Elli Ntakou, Jess Cain, Jared A. Lawrence, 6 Andrew C. Belden, Marc J. Richards, and Clare B. Connolly. 7 8 Q. Have the members of the PBMRP Metrics Panel previously submitted testimony in this proceeding? 9 A. Yes. On July 14, 2026, we submitted direct, pre-filed testimony to the Public Utilities 10 Regulatory Authority (“PURA”) on behalf of Connecticut Light and Power Company, 11 d/b/a Eversource Energy (“CL&P,” “Eversource,” or “Company”) in support of its 12 application for approval of amended rate schedules. Mr. Horton is a co-sponsor of Exhibits 13 CLP-ELP-1 and CLP-AMI-1, including related attachments. Mr. Freeman and Dr. Ntakou 14 co-sponsored Exhibit CLP-TSP-1 and related attachments. Ms. Cain, Mr. Lawrence, and 15 Mr. Belden co-sponsored Exhibit CLP-CUSTOMER-1 and related attachments. Mr. 16 Richards and Ms. Connolly are co-sponsors of CLP-ENV-1 and related attachments. 17 II. PURPOSE OF TESTIMONY 18 Q. What is the purpose of your rebuttal testimony? 19 A. Our rebuttal testimony responds to the direct testimony submitted by Gennelle Wilson and 20 Oliver Tully on behalf of the Office of Consumer Counsel (“OCC”); and Lindsay J. Griffin 21 on behalf of the Acadia Center and Conservation Law Foundation (“AC-CLF”).
  4. Page 4 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 2 of 37 1 In particular, our rebuttal testimony responds to certain claims made by OCC and AC-CLF 2 regarding the efficacy of the Company’s PBMRP performance incentive mechanisms 3 (“PIMs”) and metric proposal. Collectively, our rebuttal to these claims demonstrates that 4 the Company’s proposed PIMs and metrics are appropriately designed to provide 5 transparency and accountability during the PBMRP term in a manner that allows the 6 Company to pursue cost efficiencies and meet its obligations for safe, reliable, resilient and 7 affordable electric service, as well as align with public-policy objectives. 1 8 Q. How is your rebuttal testimony organized? 9 A. Our testimony is organized as follows. Section I introduces the witnesses. Section II 10 provides the purpose and organization of our testimony. Section III discusses the purpose 11 of the PIMs and metrics under the PBMRP. Section IV provides rebuttal to specific 12 arguments raised in intervenor testimony. Section V is the conclusion. 13 III. BENEFITS OF THE COMPANY’S PIMS AND METRICS UNDER THE PBMRP 14 Q. Why has the Company proposed a four-year PBMRP Plan in this docket? 15 A. As discussed in Exhibit CLP-ELP-1, the primary purpose and benefit of a PBMRP 16 framework is to support the implementation of the 5-Year Targeted System Performance 17 Plan and to create strong incentives to reduce costs for customers by avoiding frequent rate 18 case filings and encouraging the Company to achieve operational efficiencies during the 19 PBMRP term. These efficiency gains are then passed on to customers as reduced costs in The Company does not respond to every issue raised in the intervenor testimonies. Silence on any issue should not be construed as agreement on any issue. 1
  5. Page 5 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 3 of 37 1 the Company’s next distribution base rate proceeding. The proposed PBMRP Plan is 2 designed to strike a balance between ensuring adequate revenue support so the Company 3 can commit to a four-year stay-out period and fund necessary capital investments, while 4 also providing financial incentives and operational flexibility that promote greater 5 efficiency in both operations and capital investments for the benefit of customers. 6 7 Q. Please explain the relationship between the PBMRP and the Company’s proposed PIMs and metrics? 8 A. The proposed PBMRP PIMs and metrics are designed to provide transparency into the 9 Company’s operating performance in key areas during the term of the multi-year rate plan, 10 and ensure the Company maintains high-quality service while implementing efficiency 11 opportunities during the PBMRP term. The primary purpose of the proposed performance 12 based ratemaking framework is to create incentives for the Company to identify and 13 achieve cost efficiencies that will ultimately benefit customers by passing along achieved 14 savings. The cost efficiency incentive is inherent in the stay-out provision within the 15 overall PBMRP – not through PIMs or metrics. 16 The PIMs and metrics serve a different and equally important function within the PBMRP 17 framework. 18 Company to identify and implement short term and long-term cost savings through 19 operational efficiencies, the PBMRP could have the undesirable effect of encouraging a 20 utility to scale back on certain performance areas. Therefore, the PIMs and metrics are 21 intended to provide a counterbalance to the inherent cost efficiency incentives under the 22 PBMRP, while also providing customers with a line of sight to answer the question of Since the PBMRP fundamentally provides financial incentives for the
  6. Page 6 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 4 of 37 1 whether they are receiving the level of performance that they are paying for. The 2 counterbalancing PIMs and metrics are therefore targeted to key performance areas to 3 provide the right incentives for performance, while assuring customers that the 4 performance that matters most to them is locked in during the PBMRP term. In addition, 5 there are administrative costs associated with tracking, compiling and reporting new data 6 or even reporting similar data in multiple forums. Since the goal of the PBMRP is to drive 7 cost efficiencies leading to increasing affordability, the Company’s proposal was designed 8 following careful consideration of whether a potential metric was appropriate to provide 9 accountability and transparency in key performance areas rather than serve as data 10 reporting for limited stakeholder interests. 11 To that end, the Company has proposed PIMs that provide financial incentives for 12 exceptional improvements in key reliability and customer engagement metrics, or penalties 13 should the Company fall short of its expected performance. These PIMs are designed to 14 encourage the Company to undertake targeted investments in a cost-efficient manner 15 during the PBMRP term to continue efforts to maintain or improve system and customer 16 reliability, as well as customer satisfaction and engagement even while pursuing cost 17 savings. 18 In addition, the proposed reporting metrics related to receivables and greenhouse gas 19 emissions are targeted at providing transparency on affordability and emission reductions 20 consistent with the public policy objectives of the State. The Company also proposed
  7. Page 7 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 5 of 37 1 discrete cost efficiency reporting metrics to increase transparency on the Company’s 2 changes in controllable costs. 3 IV. RESPONSE TO INTERVENORS A. 4 OCC Witnesses – Gennelle Wilson and Oliver Tully 5 6 Q. What recommendations does the OCC’s witnesses make with respect to the Company’s proposed PIMS and metrics? 7 A. Witnesses Wilson and Tully recommend that PURA adopt a Performance Evaluation 8 System untethered to the PBMRP (Wilson and Tully Testimony at 51). Witnesses Wilson 9 and Tully also recommend that PURA approve a suite of PIMs and metrics that more 10 closely align with the draft proposal issued in July 2026 in Docket No. 21-05-15RE02 11 (“RE02”) (Wilson and Tully Testimony, at 52). Specifically, the OCC witnesses make the 12 following recommendations: 13 14 • Include planned outages in the calculation of the Blue-Sky SAIDI and SAIFI PIMs (Wilson and Tully Testimony at 56-58); 15 16 17 18 19 • Incorporate annual CEMI-5 and CELID-6 performance into the Customer Reliability PIM, while adding a weighting of the components to address the Company’s valid concern with how the magnitude of CEMI-5 and CELID-6 could disproportionately distort and drive the composite score (Wilson and Tully Testimony at 58-60); 20 21 22 • Modify the Customer PIM Suite so that the Level 1 DER Interconnection Processing metric is the only PIM and the other metrics are standalone reporting metrics (Wilson and Tully Testimony at 60-61); 23 24 25 26 27 • Revise the Digital Customer Engagement component from encouraging additional use of digital transactions that can increase cost efficiencies, to tracking whether customers view and share with third-parties their electricity usage data provided by advanced metering infrastructure (“AMI”) to provide insights into customer behavior (Wilson and Tully Testimony at 62-64);
  8. Page 8 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 6 of 37 1 2 3 • Include a Non-Wires Solutions (“NWS”) Shared Savings Mechanism based on PURA’s ongoing redesign of the NWS process (Wilson and Tully Testimony at 6768); 4 5 • Revise the Cost Efficiency reporting metrics to adopt the preliminary metrics contemplated in RE02 (Wilson and Tully Testimony at 71-72); and 6 7 • Incorporate all other proposed RE02 metrics into the PBMRP and develop a publicly accessible PBR dashboard (Wilson and Tully Testimony at 70-71, 74-77). 8 Witnesses Wison and Tully also make various recommendations regarding the proposed 9 incentive and penalty levels for proposed PIMs, which the Company addresses in the 10 Leadership Panel Rebuttal testimony, jointly prepared by Company Witnesses Scacco, 11 Horton and Chatterjee. 12 13 Q. Does the Company agree with the OCC’s recommendation to include planned outages in the calculation of SAIDI and SAIFI for the purposes of PIMs under the PBMRP? 14 A. No, the Company disagrees with this recommendation. The OCC witnesses argue that 15 calculation of SAIDI and SAIFI for the purpose of PIMs should more closely align with 16 IEEE’s methodology (Wilson and Tully Testimony at 57). However, this argument fails 17 to recognize important distinctions in the purpose of IEEE benchmarking and PIMs, and 18 how incorporating planned outages in a PIM could have unintended consequences. 19 IEEE annually benchmarks reliability performance of utilities across the nation. IEEE has 20 developed a standardized methodology for creating a comparison across utilities 21 nationally. This is unlike the proposed PIM, which is designed to penalize the Company 22 if its reliability falls below a threshold established based on the Company’s own historical 23 performance. The purpose of the PIM is therefore to encourage the Company to make cost 24 effective investments to maintain system level reliability during the PBMRP term while
  9. Page 9 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 7 of 37 1 the Company pursues cost efficiencies. The Company’s proposed calculation of SAIDI 2 and SAIFI is designed to measure whether system reliability due to the Company’s 3 decisions on whether repairs or upgrades are necessary results in declining reliability 4 during the PBMRP term. Distorting these metrics to align with the IEEE method would 5 lose the critical measurement purpose of this metric. 6 Planned outages are known, isolated outages typically necessitated to enable critical 7 reliability improvements, infrastructure replacements and system modernization that 8 directly benefit customers through improved long-term reliability and reduced unplanned 9 outages. Including planned outages in the calculation of SAIDI and SAIFI as OCC 10 proposes could drive fluctuations in year-over-year performance that have nothing to do 11 with the reliability of service delivered by the Company and, rather, are associated with 12 work undertaken by the Company to improve reliability or provide service. 13 Company’s construction work on the system routinely requires service interruptions that 14 the Company handles by notifying customers in advance of the planned work and keeping 15 the outage windows as narrow as possible. The Company also manages the timing and 16 duration of planned outages to minimize customer impacts and inconveniences. Including 17 planned outages would distort the performance results in a given year because the metric 18 would capture outages that have nothing to do with the ability of the system to deliver 19 reliable power and withstand events that drive customer outages. Including planned 20 outages in the metric could also encourage a utility to delay implementation of beneficial 21 system-reliability projects in order to avoid triggering a penalty threshold. The
  10. Page 10 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 8 of 37 1 Excluding planned outages from the calculation of SAIDI and SAIFI ensures the metric 2 reflects changes in the reliability and resiliency of the electric distribution system driven 3 by failed equipment, rather than necessary system improvements. Since planned outages 4 represent proactive system improvements that benefit customers through enhanced long- 5 term reliability and service, not performance deficiencies that warrant penalties, they 6 should be excluded from the calculation of SAIDI and SAIFI for the purpose of PIMs. 7 8 Q. Does the Company agree with the OCC’s recommendation regarding expansion of the proposed Customer Reliability PIM to include annual CEMI-5 and CELID-6? 9 A. No, as witnesses Wilson and Tully acknowledge, there are significant flaws in including 10 annual CEMI-5 and CELID-6 in a Customer Reliability PIM, including valid issues with 11 the disproportionate impact these metrics could have on the PIM. 12 reasonable to focus on repeat customers as the Company proposes (Wilson and Tully 13 Testimony at 59). As explained in response to OCC-525, the frequency and/or duration of 14 interruptions for CEMI-5 and/or CELID-6 customers in a particular year can be due to one- 15 off events without repeat in a subsequent year. Since the purpose of a PIM should be to 16 motivate beneficial actions by the Company, including annual CEMI-5 and CELID-6 as a 17 component of a PIM would drive capital investments to prevent one-off events, potentially 18 increasing costs to customers with minimal benefits. The Company’s proposed Customer 19 Reliability PIM focuses on customers that experience long duration or frequent service 20 interruptions in multiple years, which are circumstances that should be addressed by the 21 Company, since these situations are more likely to be due to systemic issues. Therefore, it is

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY [26-05-10]

This filing on the current system (opens in a new tab)