Prefiled testimony
Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY
Files2
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-METRICS-REBUTTAL-1.pdf
PDF · 418 KB · 39 pagesText searchable
Download Exhibit CLP-METRICS-REBUTTAL-1.pdfRead the text of Exhibit CLP-METRICS-REBUTTAL-1.pdf
Page 21 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 19 of 37 1 must perform near or significantly above performance targets to have an opportunity to 2 earn an incentive. Simply, improving significantly in just one component while 3 underperforming in other areas as a practical matter will not result in an earned incentive. 4 For example, below is a hypothetical example demonstrating that if the Company were to 5 significantly underperform in one component but improve performance in the remaining 6 components, including significant improvements in two components, the Company would 7 still not come close to meeting the incentive threshold for the Customer PIM Suite. 8 9 Similarly, even if the Company performs near the target for some components, it would 10 need to perform unrealistically above the target in a single component to even 11 mathematically achieve the incentive threshold for the Customer PIM Suite. 12Page 22 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 20 of 37 1 To achieve an incentive under the Customer PIM Suite, as a practical matter, the Company 2 will need sustained efforts to maintain and improve customer service across the range of 3 components to even be eligible for an incentive. 4 5 6 Q. Does the Company agree with the OCC’s recommendation to revise the Digital Engagement component to focus on customer use and sharing of data from AMI similar to the RE02 Customer Data Engagement metric? 7 A. No, the proposed Digital Customer Engagement metric is distinct from the Customer Data 8 Engagement metric set forth in the draft decision in RE02. 9 The Customer Data Engagement metric tracks customer engagement with AMI energy 10 usage data measuring the number and percentage of residential and commercial customers 11 that have viewed or enabled third parties to use their usage data. By contrast, the Digital 12 Customer Engagement metric measures the full breadth of customer transactions across all 13 digital platforms, including bill payment, outage reporting, service requests, and alert 14 notifications, not just AMI data access. 15 As discussed above, the Company’s proposed Customer PIM Suite is intended to provide 16 transparency and accountability to maintain and improve a broad range of customer 17 service-related functions within the Company’s control. Specifically, the Digital Customer 18 Engagement component provides quantifiable, actionable insights into customer behavior 19 and the Company’s ability to meet evolving customer expectations and security needs as 20 digital channels increasingly play a part in providing a strong customer experience. 21 Improving use of digital platforms also is a cost-effective method of allowing customers toPage 23 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 21 of 37 1 complete transactions with the Company and obtain information, which aligns with the 2 objectives of the PBMRP. 3 The Customer Data Engagement metric supported by witnesses Wilson and Tully does not 4 assess the Company’s actions and how they benefit customers. Rather, the Customer Data 5 Engagement metric simply provides insights into whether customers find value in viewing 6 and sharing energy usage data on a more real time basis. With AMI, the Company will be 7 fully accountable for creating and managing the data-sharing capabilities, but third-party 8 suppliers must present compelling value propositions to convince customers to actually 9 share their data. This metric is distinct from the Digital Customer Engagement metric that 10 seeks to demonstrate the success of the Company’s efforts to encourage use of a variety of 11 digital platforms as cost-effective alternatives to more burdensome methods of conducting 12 transactions or providing information to customers. 13 It is also premature to adopt the Customer Data Engagement metric given that AMI is not 14 fully deployed as discussed in Exhibit CLP-AMI-1. The Company has proposed a set of 15 measures to assess the success of AMI deployment as part of the Company’s AMI 16 Deployment and Implementation Plan (Exhibit CLP-AMI-2, at 87-89). Accordingly, the 17 Company respectfully requests that PURA reject OCC’s proposal to revise the Digital 18 Customer Engagement component to a different, premature metric focused on the narrow 19 issue of whether customers use AMI energy usage data. 20Page 24 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 22 of 37 1 2 3 Q. Does the Company agree with the OCC’s recommendation to include a NWS Shared Savings Mechanism based on PURA’s ongoing redesign of the NWS process in the PBMRP? 4 A. No. As witnesses Wilson and Tully acknowledge, PURA is currently investigating and 5 revisiting the NWS program (Wilson and Tully Testimony at 67-68). PURA has 6 acknowledged that the NWS program suffers from significant structural and 7 methodological limitations and initiated a docket to redesign the NWS process (Docket 8 No. 26-08-08). It is inappropriate to incorporate a performance incentive mechanism tied 9 to a program that PURA itself has determined requires fundamental redesign before it can 10 function effectively. 11 The Company is committed to providing least-cost solutions to customers and NWS 12 projects provided they are feasible, reliable, and more cost-effective than traditional 13 infrastructure solutions. 14 15 16 Q. Does the Company agree with the OCC’s recommendation to revise the Cost Efficiency metrics to incorporate the sub-metrics identified in the RE02 draft decision? 17 A. The Company respectfully disagrees with the OCC’s recommendation to implement the 18 proposed RE02 Cost Efficiency Scorecard with six sub-metrics and instead maintains that 19 the Company's proposed four reporting measures appropriately balance transparency with 20 practical implementation. 21 The Company's proposed Cost Efficiency metric approach provides meaningful 22 transparency while maintaining practical implementation. Core Operating Expense is 23 defined objectively by the expenses included in the calculation, providing a consistent andPage 25 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 23 of 37 1 transparent metric throughout the plan term. The metrics utilize readily available data, 2 such as FERC Form 1 and existing regulatory reporting requirements, ensuring accuracy 3 and consistency. The Company's proposal strikes a balance between the benefits of 4 increased transparency and accountability made possible by additional reporting, and the 5 validity, relevance and/or cost associated with that additional reporting. 6 The OCC witnesses, however, advocate for a broader set of sub-metrics under the Cost 7 Efficiency metric including operating expenditures, controllable operating expenditures, 8 authorized controllable operating expenditure, capital expenditures, capital cost, and total 9 cost (Wilson and Tully Testimony at 71-72). As the Company has explained in response 10 to proposals in RE02, using multiple, standalone sub-metrics does not capture the drivers 11 of costs because it splits costs into categories inconsistent with the integrated nature of 12 utility spending decisions (Docket No. 21-05-15RE02, EDCs Joint Exceptions at 21-22). 13 Isolating cost categories, as OCC recommends, may incentivize inefficient tradeoffs, such 14 as minimizing capital expenditures at the expense of recurring operational costs. 15 The Company’s proposal, on the other hand, provides transparency into costs that are 16 controllable by the Company and demonstrate the cost efficiencies sought through the 17 PBMRP as explained in Exhibit CLP-ELP-1, at 113-114. The OCC's concern about cost 18 shifting between categories is appropriately addressed through the Company's 19 comprehensive reporting approach without requiring additional sub-metric granularity.Page 26 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 24 of 37 1 Eversource's proposed four Cost Efficiency Metrics appropriately provide transparency 2 into both controllable operating and capital costs, and support holistic assessment of cost 3 efficiency sought during the PBMRP term. 4 5 Q. Does the Company agree with the OCC’s recommendation regarding including all proposed reporting metrics from the draft decision in RE02? 6 A. The Company’s proposed metrics are intended to provide transparency and accountability 7 during the PBMRP term and are designed to align with the objectives of the PBMRP as 8 discussed above. 9 performance. 10 A primary objective of the PBMRP is to achieve cost efficiencies that ultimately will result 11 in savings for customers. In the context of metrics, the Company proposes to streamline 12 the data provided under PBMRP and focus PIMs and metrics on items that are indicative 13 of the Company's performance while being mindful of the cost associated with that 14 additional reporting. Reporting data for reporting's sake or to satisfy the interest of a 15 narrow group of stakeholders is not aligned with the cost efficiency and affordability 16 objectives of the PBMRP. Instead, the Company’s proposed PIMs and metrics focus on 17 what information adds value and promotes actions aligned with the objectives of PBR. 18 As demonstrated throughout the Company’s initial filing, the Company has not arbitrarily 19 omitted metrics considered in RE02. Rather, the Company has selected metrics that align 20 with the objectives of the PBMRP, avoid duplicative reporting, and focus on areas where 21 the Company can meaningfully influence results. The metrics reflect a commitment to meaningful, actionablePage 27 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 25 of 37 1 Further, as previously addressed in Written Exceptions in Docket No. 21-05-15RE02, in 2 response to the first Proposed Final Decision, the Company does not support all the 3 scorecards and metrics under consideration in RE02. For example, the Company has 4 expressed the following concerns with some metrics: 5 6 7 8 • Peak Demand – This scorecard is an inaccurate and inappropriate basis for measuring the electric system’s efficiency given that many factors that would influence peak demand are entirely outside of the Company’s control (e.g. weather). 9 10 11 12 13 14 • Beneficial Electrification Data - The Company does not support this metric since the Company’s role in supporting EV adoption is limited to preparing the grid for EV charging stations. Customer adoption of EVs is subject to factors that are outside of the Company’s control (e.g. the EV market and customer conduct). Further, the Company does not track the EV registrations of its customers, or heat pump installations of all customers. 15 16 17 18 19 • Power Restoration After Major Storm Metric: The Company opposes this metric for the fundamental reason that a storm’s path, and which towns are impacted, is not within the EDC’s control. The Company responds to storm events in compliance with a PURA-approved Emergency Response Plan (“ERP”) that follows law and regulation. 20 21 22 23 24 • Environmental Justice Reliability Metric: For similar reasons, relating to storm restoration practices and circumstances outside the Company’s control, the Company opposes any metric on power restoration after major storms. In addition, such reporting would be duplicative with existing reporting post-major storms as well as with the Town Reliability Scorecards that the Company produces annually. 25 26 27 • Distribution System Losses: Although the Company supports the proposed methodology, it does not currently have models, resources, or processes in place to accurately calculate Technical Losses as envisioned in the RE02-PFD. 28 29 30 31 32 • DER Services (specific to the sub-metric for Total MW Enrolled - EV Managed Charging): The Company does not have a measure of MW enrolled because managed charging is a program to shift customer EV charging behavior to off-peak periods. The Company does not collect data on the EV charging demand at a residence. 33 34 • Time-Varying Rate (“TVR”) (specific sub-metric for Amount of Load Reduced by Customer Class as a Result of TVR Adoption): There is neither a baseline nor aPage 28 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 26 of 37 1 2 3 4 5 6 7 8 9 10 11 12 method established to determine the amount of load reduced by Customer Class due to TVR adoption. • Additional Accounts Receivable and Uncollectible sub-metrics: The additional sub-metrics include: (1) average residential monthly arrears; (2) residential customer accounts receivable; (3) actual write-offs for residential accounts; and (4) allowed uncollectible rate. Metrics (1), (2) and (3) are already reported annually in a separate docket, and metric (4) is established in the Company’s rate case proceeding and does not change until the time of the next base distribution rate case. Further, the current regulatory protections, discussed in Exhibit CLPCUSTOMER-1, at 44-45, limit the Company’s ability to collect and perform disconnections for non-payment. Therefore, the Company has limited ability to influence these sub-metrics. 13 Although the OCC witnesses argue that metrics and scorecards provide transparency even 14 where financial incentives are inappropriate (Wilson and Tully Testimony at 56), 15 transparency is most valuable when it illuminates meaningful performance indicators. As 16 discussed above and in the Company’s initial filing, the performance metric proposals 17 provide meaningful insight into performance and demonstrate whether the PBMRP’s 18 anticipated benefits are realized, while avoiding the administrative burden and potential 19 confusion of reporting metrics in multiple forums or that do not meaningfully provide 20 transparency of the Company’s achievement of the objectives of the PBMRP. 21 To the extent that OCC seeks general reporting metrics independent of any performance 22 based ratemaking proposal, discussion of that class of metrics should be determined 23 through the ongoing RE02 proceeding. However, the Company encourages PURA and 24 stakeholders to consider the cost of tracking and reporting data and how those costs align 25 with the objectives of promoting cost efficiencies.Page 29 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 27 of 37 1 2 Q. Does the Company agree with the OCC’s recommendation to develop a reporting dashboard for PIMs and metrics? 3 A. The Company proposes to report on the PBMRP PIMs and metrics through an annual filing 4 with PURA, thereby providing transparency and public access to the data. While the 5 Company appreciates that the OCC’s witnesses may prefer development of a dashboard, 6 the Company notes that developing and maintaining dashboards requires resources and 7 increases costs. PURA and stakeholders should carefully assess the costs and value of any 8 dashboard to customers when considering any directives for implementation of a particular 9 reporting method. 10 B. Acadia Center and Conservation Law Foundation Witness – Lindsay Griffin 11 12 Q. Please describe the position taken by the AC-CLF’s witness Ms. Griffin with respect to the Company’s proposed PIMs. 13 A. Ms. Griffin recommends that PURA reject the Company’s proposed PIMs and adopt the 14 PIM designs set forth in the proposed decision in RE02, but not the incentive designs 15 proposed in RE02 (Griffin Testimony at 62-63, 65-66). 3 16 Ms. Griffin claims that System Reliability PIM design “weaken the PIMs’ ability to provide 17 the data and performance measures PURA needs to assess the Company’s performance” 18 because the Company proposes (1) setting the threshold using 2022-2026, even though 19 2026 has not yet concluded, (2) recent SAIDI has been increasing, and (3) the proposed Ms. Griffin also recommends adjustments to the triggers and performance incentive pool (Griffin Testimony, at 63-66). The Company addresses these points in the Leadership Panel Rebuttal testimony jointly prepared by Company Witnesses Scacco, Horton and Chatterjee. 3Page 30 of 39
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 28 of 37 1 penalty does not reach the maximum level until two standard deviations (Griffin Testimony, 2 at 60-61). 3 Ms. Griffin also argues that the Customer Reliability PIM should be designed the same as 4 proposed in RE02 because the Company’s proposal does not include the percentage of 5 repeat customers (Griffin Testimony at 61). Ms. Griffin also claims that the Company 6 proposes to receive an incentive if performance is “up to one standard deviation worse than 7 the 5-year historical average” and instead the Company should receive no incentive for 8 improving CEMI-5 and CELID-6 reliability (Griffin Testimony at 63). 9 With respect to the Customer PIM Suite, similar to the OCC witnesses, Ms. Griffin argues 10 that the Level 1 DER Interconnection component should be a separate standalone PIM 11 because the witness is concerned that slow interconnection processing could be offset by 12 strong performance of other customer service metrics and interconnecting customers may 13 face delays (Griffin Testimony at 61). 14 Lastly, similar to the OCC witnesses, Ms. Griffin recommends that PURA adopt the NWS 15 Shared Savings Mechanism. 16 17 Q. Does the Company agree with Ms. Griffin’s conclusions and recommendation regarding the System Reliability PIMs? 18 A. No. The Company has proposed to use the most recent five years historical SAIDI and 19 SAIFI to establish the thresholds for the PIM, which is consistent with the proposed PIM 20 in RE02. The fact that 2026 data is not available at this time is not a flaw and does not by 21 default mean that the threshold will be easier to achieve as the AC-CLF witness suggests.
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY [26-05-10]