Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Prefiled testimony

Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 24 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 22 of 37 1 2 3 Q. Does the Company agree with the OCC’s recommendation to include a NWS Shared Savings Mechanism based on PURA’s ongoing redesign of the NWS process in the PBMRP? 4 A. No. As witnesses Wilson and Tully acknowledge, PURA is currently investigating and 5 revisiting the NWS program (Wilson and Tully Testimony at 67-68). PURA has 6 acknowledged that the NWS program suffers from significant structural and 7 methodological limitations and initiated a docket to redesign the NWS process (Docket 8 No. 26-08-08). It is inappropriate to incorporate a performance incentive mechanism tied 9 to a program that PURA itself has determined requires fundamental redesign before it can 10 function effectively. 11 The Company is committed to providing least-cost solutions to customers and NWS 12 projects provided they are feasible, reliable, and more cost-effective than traditional 13 infrastructure solutions. 14 15 16 Q. Does the Company agree with the OCC’s recommendation to revise the Cost Efficiency metrics to incorporate the sub-metrics identified in the RE02 draft decision? 17 A. The Company respectfully disagrees with the OCC’s recommendation to implement the 18 proposed RE02 Cost Efficiency Scorecard with six sub-metrics and instead maintains that 19 the Company's proposed four reporting measures appropriately balance transparency with 20 practical implementation. 21 The Company's proposed Cost Efficiency metric approach provides meaningful 22 transparency while maintaining practical implementation. Core Operating Expense is 23 defined objectively by the expenses included in the calculation, providing a consistent and
  2. Page 25 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 23 of 37 1 transparent metric throughout the plan term. The metrics utilize readily available data, 2 such as FERC Form 1 and existing regulatory reporting requirements, ensuring accuracy 3 and consistency. The Company's proposal strikes a balance between the benefits of 4 increased transparency and accountability made possible by additional reporting, and the 5 validity, relevance and/or cost associated with that additional reporting. 6 The OCC witnesses, however, advocate for a broader set of sub-metrics under the Cost 7 Efficiency metric including operating expenditures, controllable operating expenditures, 8 authorized controllable operating expenditure, capital expenditures, capital cost, and total 9 cost (Wilson and Tully Testimony at 71-72). As the Company has explained in response 10 to proposals in RE02, using multiple, standalone sub-metrics does not capture the drivers 11 of costs because it splits costs into categories inconsistent with the integrated nature of 12 utility spending decisions (Docket No. 21-05-15RE02, EDCs Joint Exceptions at 21-22). 13 Isolating cost categories, as OCC recommends, may incentivize inefficient tradeoffs, such 14 as minimizing capital expenditures at the expense of recurring operational costs. 15 The Company’s proposal, on the other hand, provides transparency into costs that are 16 controllable by the Company and demonstrate the cost efficiencies sought through the 17 PBMRP as explained in Exhibit CLP-ELP-1, at 113-114. The OCC's concern about cost 18 shifting between categories is appropriately addressed through the Company's 19 comprehensive reporting approach without requiring additional sub-metric granularity.
  3. Page 26 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 24 of 37 1 Eversource's proposed four Cost Efficiency Metrics appropriately provide transparency 2 into both controllable operating and capital costs, and support holistic assessment of cost 3 efficiency sought during the PBMRP term. 4 5 Q. Does the Company agree with the OCC’s recommendation regarding including all proposed reporting metrics from the draft decision in RE02? 6 A. The Company’s proposed metrics are intended to provide transparency and accountability 7 during the PBMRP term and are designed to align with the objectives of the PBMRP as 8 discussed above. 9 performance. 10 A primary objective of the PBMRP is to achieve cost efficiencies that ultimately will result 11 in savings for customers. In the context of metrics, the Company proposes to streamline 12 the data provided under PBMRP and focus PIMs and metrics on items that are indicative 13 of the Company's performance while being mindful of the cost associated with that 14 additional reporting. Reporting data for reporting's sake or to satisfy the interest of a 15 narrow group of stakeholders is not aligned with the cost efficiency and affordability 16 objectives of the PBMRP. Instead, the Company’s proposed PIMs and metrics focus on 17 what information adds value and promotes actions aligned with the objectives of PBR. 18 As demonstrated throughout the Company’s initial filing, the Company has not arbitrarily 19 omitted metrics considered in RE02. Rather, the Company has selected metrics that align 20 with the objectives of the PBMRP, avoid duplicative reporting, and focus on areas where 21 the Company can meaningfully influence results. The metrics reflect a commitment to meaningful, actionable
  4. Page 27 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 25 of 37 1 Further, as previously addressed in Written Exceptions in Docket No. 21-05-15RE02, in 2 response to the first Proposed Final Decision, the Company does not support all the 3 scorecards and metrics under consideration in RE02. For example, the Company has 4 expressed the following concerns with some metrics: 5 6 7 8 • Peak Demand – This scorecard is an inaccurate and inappropriate basis for measuring the electric system’s efficiency given that many factors that would influence peak demand are entirely outside of the Company’s control (e.g. weather). 9 10 11 12 13 14 • Beneficial Electrification Data - The Company does not support this metric since the Company’s role in supporting EV adoption is limited to preparing the grid for EV charging stations. Customer adoption of EVs is subject to factors that are outside of the Company’s control (e.g. the EV market and customer conduct). Further, the Company does not track the EV registrations of its customers, or heat pump installations of all customers. 15 16 17 18 19 • Power Restoration After Major Storm Metric: The Company opposes this metric for the fundamental reason that a storm’s path, and which towns are impacted, is not within the EDC’s control. The Company responds to storm events in compliance with a PURA-approved Emergency Response Plan (“ERP”) that follows law and regulation. 20 21 22 23 24 • Environmental Justice Reliability Metric: For similar reasons, relating to storm restoration practices and circumstances outside the Company’s control, the Company opposes any metric on power restoration after major storms. In addition, such reporting would be duplicative with existing reporting post-major storms as well as with the Town Reliability Scorecards that the Company produces annually. 25 26 27 • Distribution System Losses: Although the Company supports the proposed methodology, it does not currently have models, resources, or processes in place to accurately calculate Technical Losses as envisioned in the RE02-PFD. 28 29 30 31 32 • DER Services (specific to the sub-metric for Total MW Enrolled - EV Managed Charging): The Company does not have a measure of MW enrolled because managed charging is a program to shift customer EV charging behavior to off-peak periods. The Company does not collect data on the EV charging demand at a residence. 33 34 • Time-Varying Rate (“TVR”) (specific sub-metric for Amount of Load Reduced by Customer Class as a Result of TVR Adoption): There is neither a baseline nor a
  5. Page 28 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 26 of 37 1 2 3 4 5 6 7 8 9 10 11 12 method established to determine the amount of load reduced by Customer Class due to TVR adoption. • Additional Accounts Receivable and Uncollectible sub-metrics: The additional sub-metrics include: (1) average residential monthly arrears; (2) residential customer accounts receivable; (3) actual write-offs for residential accounts; and (4) allowed uncollectible rate. Metrics (1), (2) and (3) are already reported annually in a separate docket, and metric (4) is established in the Company’s rate case proceeding and does not change until the time of the next base distribution rate case. Further, the current regulatory protections, discussed in Exhibit CLPCUSTOMER-1, at 44-45, limit the Company’s ability to collect and perform disconnections for non-payment. Therefore, the Company has limited ability to influence these sub-metrics. 13 Although the OCC witnesses argue that metrics and scorecards provide transparency even 14 where financial incentives are inappropriate (Wilson and Tully Testimony at 56), 15 transparency is most valuable when it illuminates meaningful performance indicators. As 16 discussed above and in the Company’s initial filing, the performance metric proposals 17 provide meaningful insight into performance and demonstrate whether the PBMRP’s 18 anticipated benefits are realized, while avoiding the administrative burden and potential 19 confusion of reporting metrics in multiple forums or that do not meaningfully provide 20 transparency of the Company’s achievement of the objectives of the PBMRP. 21 To the extent that OCC seeks general reporting metrics independent of any performance 22 based ratemaking proposal, discussion of that class of metrics should be determined 23 through the ongoing RE02 proceeding. However, the Company encourages PURA and 24 stakeholders to consider the cost of tracking and reporting data and how those costs align 25 with the objectives of promoting cost efficiencies.
  6. Page 29 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 27 of 37 1 2 Q. Does the Company agree with the OCC’s recommendation to develop a reporting dashboard for PIMs and metrics? 3 A. The Company proposes to report on the PBMRP PIMs and metrics through an annual filing 4 with PURA, thereby providing transparency and public access to the data. While the 5 Company appreciates that the OCC’s witnesses may prefer development of a dashboard, 6 the Company notes that developing and maintaining dashboards requires resources and 7 increases costs. PURA and stakeholders should carefully assess the costs and value of any 8 dashboard to customers when considering any directives for implementation of a particular 9 reporting method. 10 B. Acadia Center and Conservation Law Foundation Witness – Lindsay Griffin 11 12 Q. Please describe the position taken by the AC-CLF’s witness Ms. Griffin with respect to the Company’s proposed PIMs. 13 A. Ms. Griffin recommends that PURA reject the Company’s proposed PIMs and adopt the 14 PIM designs set forth in the proposed decision in RE02, but not the incentive designs 15 proposed in RE02 (Griffin Testimony at 62-63, 65-66). 3 16 Ms. Griffin claims that System Reliability PIM design “weaken the PIMs’ ability to provide 17 the data and performance measures PURA needs to assess the Company’s performance” 18 because the Company proposes (1) setting the threshold using 2022-2026, even though 19 2026 has not yet concluded, (2) recent SAIDI has been increasing, and (3) the proposed Ms. Griffin also recommends adjustments to the triggers and performance incentive pool (Griffin Testimony, at 63-66). The Company addresses these points in the Leadership Panel Rebuttal testimony jointly prepared by Company Witnesses Scacco, Horton and Chatterjee. 3
  7. Page 30 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 28 of 37 1 penalty does not reach the maximum level until two standard deviations (Griffin Testimony, 2 at 60-61). 3 Ms. Griffin also argues that the Customer Reliability PIM should be designed the same as 4 proposed in RE02 because the Company’s proposal does not include the percentage of 5 repeat customers (Griffin Testimony at 61). Ms. Griffin also claims that the Company 6 proposes to receive an incentive if performance is “up to one standard deviation worse than 7 the 5-year historical average” and instead the Company should receive no incentive for 8 improving CEMI-5 and CELID-6 reliability (Griffin Testimony at 63). 9 With respect to the Customer PIM Suite, similar to the OCC witnesses, Ms. Griffin argues 10 that the Level 1 DER Interconnection component should be a separate standalone PIM 11 because the witness is concerned that slow interconnection processing could be offset by 12 strong performance of other customer service metrics and interconnecting customers may 13 face delays (Griffin Testimony at 61). 14 Lastly, similar to the OCC witnesses, Ms. Griffin recommends that PURA adopt the NWS 15 Shared Savings Mechanism. 16 17 Q. Does the Company agree with Ms. Griffin’s conclusions and recommendation regarding the System Reliability PIMs? 18 A. No. The Company has proposed to use the most recent five years historical SAIDI and 19 SAIFI to establish the thresholds for the PIM, which is consistent with the proposed PIM 20 in RE02. The fact that 2026 data is not available at this time is not a flaw and does not by 21 default mean that the threshold will be easier to achieve as the AC-CLF witness suggests.
  8. Page 31 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 29 of 37 1 Using the most recent five years, including 2026, establishes the system’s most recent 2 performance to assess whether the Company has achieved improvements in system 3 reliability during the PBMRP; rather than basing whether to assess a penalty on system 4 conditions more remote in time. 5 Further, while SAIDI in 2025 was comparatively higher than the prior four years, SAIFI in 6 2025 was comparatively lower than prior years (Exhibit CLP-TSP-1, at 76). Accordingly, 7 while SAIDI’s five-year average may be higher due to 2025 performance, SAIFI’s five- 8 year average is lower due to the same year’s performance. This dichotomy demonstrates 9 that seeking to establish a baseline based on preferred levels as AC-CLF suggests is 10 arbitrary and futile. Using the most recent five-years of data prior to the start of the PBMRP 11 term, however, establishes a fair representative baseline of the system to assess whether 12 the Company under the PBMRP has improved system reliability. 13 As discussed above in response to OCC’s recommendations, the Company’s proposed 14 System Reliability PIMs are designed to assess whether the Company takes steps to 15 improve system reliability under the PBMRP. The proposed baseline (2022-2026) and 16 methodology to exclude planned outages is tailored to appropriately assess the Company’s 17 efforts and penalize the Company for failing to meet the PIM threshold. 18 With respect to the sliding scale penalty, the Company respectfully disagrees with Ms. 19 Griffin’s suggestion that the maximum penalty should be assessed as soon as the PIM 20 threshold is met. The Company’s proposed sliding scale has some significant advantages 21 over the binary approach AC-CLF proposes. First, the sliding scale encourages the
  9. Page 32 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 30 of 37 1 Company to minimize degradation in system performance even if the PIM threshold will 2 be met. Under a binary approach, once the threshold is achieved, the Company will be 3 assessed the full penalty and the degree to which the Company exceeded the threshold is 4 immaterial. By implementing a sliding scale penalty structure, the Company has an 5 incentive to minimize the extent of decline in reliability even if it is unable to avoid meeting 6 the threshold in the first place. Accordingly, the Company respectfully urges PURA to 7 reject the AC-CLF proposal to assess the maximum penalty for simply triggering the 8 System Reliability PIM. 9 10 Q. Does the Company agree with Ms. Griffin’s conclusions and recommendation regarding the Customer Reliability PIM? 11 A. As discussed in Exhibit CLP-TSP-1 and above, the Company’s proposed Customer 12 Reliability PIM does differ from the PIM under consideration, but not approved, in RE02. 13 The proposed RE02 PIM includes, as Ms. Griffin notes, a sub-metric for percent repeat 14 CEMI-5 or CELID-6 customers divided by the total number of CEMI-5 or CELID-6 15 customers which could have unintended consequences. Adopting these sub-metrics could 16 reward the Company simply if the number of unique CEMI-5 and CELID-6 customers 17 increases, even if the number of repeat CEMI-5 and CELID-6 customers remains 18 unchanged (see Exhibit CLP-TSP-1, at 82-83). This would be counter to even Ms. Griffin’s 19 stated goal to focus “specifically on repeat appearances by the same customers year over 20 year to identify chronically underserved customers.” (Griffin Testimony at 80). 21 Further, as OCC’s witnesses concede, there is a legitimate flaw in the proposed RE02 22 composite PIM due to the disproportionate scale of the sub-metrics (Response to
  10. Page 33 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-METRICS-REBUTTAL-1 November 18, 2026 Page 31 of 37 1 OCC-525). The percent of repeat CEMI-5 and repeat CELID-6 are numerically much 2 smaller than the other sub-metrics and do not meaningfully impact the value of the 3 composite metric. Therefore, the proposed customer reliability PIM in the RE02 Proposed 4 Final Decision would be driven by annual CEMI-5 and CELID-6 customers, rather than 5 repeat customers. The Company’s historical data shows that annual CEMI-5 and CELID-6 6 customer counts are orders of magnitude higher than repeat CEMI-5/CELID-6 customers 7 and therefore will dwarf the impact of repeat customers within the PIM. Accordingly, the 8 Company did not include the percent of repeat CEMI-5 and repeat CELID-6 in the 9 proposed Customer Reliability PIM. 10 The Company’s proposed metric instead focuses on reducing repeat customers that 11 experience long-duration interruptions and/or frequent interruptions (Response to 12 OCC-525). The Company chose to focus on repeat customers because the frequency and/or 13 duration of interruptions for CEMI-5 and/or CELID-6 customers in a particular year can 14 be due to one-off events without repeat in a subsequent year. In other words, while CEMI-5 15 and CELID-6 represent edge cases of performance, isolated events that result in CEMI-5 16 or CELID-6 customers should not all be actionable as those events would drive investment 17 to resolve largely isolated or infrequent events. However, customers that experience long 18 duration or frequent service interruptions in multiple years should be addressed by the 19 Company, since these situations are more likely to be due to systemic issues. Accordingly, 20 the Company has designed the PIM to focus on repeat CEMI-5 and CELID-6 customers.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: DOUGLAS P. HORTON, LAVELLE A. FREEMAN, DR. ELLI NTAKOU, JESS CAIN, JARED A. LAWRENCE, ANDREW C. BELDEN, MARC J. RICHARDS, AND CLARE B. CONNOLLY [26-05-10]

This filing on the current system (opens in a new tab)