Utility Dockets and Filings

Prefiled testimony

Witness: EDWARD DAVIS, KIMBERLY R. PARSONS, AMPARO NIETO

Files3

Search terms highlighted
Eversource rate increase is on 20 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
14 pages match
  1. Page 33 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 31 of 52 1 months of June through September. 36 This means that increases in load in the summer 2 months drive investment expansion needs, and particularly within the period of 3pm to 3 8pm. There is not a meaningful hourly marginal cost difference across hours from a 4 distribution-wide system perspective outside of the non-summer months, less than 1 5 percent of probability of peak. Time-differentiation of distribution costs would warrant 6 a differentiated distribution price signal in the summer, if the focus was to adopt a fully 7 cost-reflective rate. For a rate primarily focused on incentivizing beneficial building 8 electrification growth, the higher growth potential is winter electric space heating, 9 which does not require TOU rate differentiation in the winter. In other words, even 10 though residential space heating usage is expected to peak in the morning hours, from 11 5am to 7am primarily and then again from 5pm to 10pm, these hours do not carry a 12 meaningful probability of driving distribution investment needs over the next five to 13 six years. The incremental supply costs and the incremental transmission costs do vary 14 by time of day during the winter, in alignment with regional conditions, and this would 15 justify winter TOU price differentiation for those components of service. Chart 1, 16 below, shows the marginal hourly distribution cost by month based on my analysis to 17 demonstrate this effect. 36 Exhibit CLP-MCOS-1.
  2. Page 34 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 32 of 52 Table 1. Hourly marginal distribution substation and trunkline feeder cost, served at secondary, Weekdays, 2026$ 1 2 3 4 5 6 Q. Does this mean that the Company’s proposed blocked rate structure, which does not differentiate the transmission component by time of day is inconsistent with sending efficient price signals based on marginal costs? 7 A. No. There are several adequate methods to introduce marginal cost differences that 8 lead to more economically efficient usage decisions, including load expansion. Rate 6 9 provides seasonally-differentiated distribution price signals via a block rate structure 10 that recognizes the lower marginal cost in winter. The benefit of a block structure is 11 that it ensures recovery of the majority of existing costs of the system in the initial or 12 baseline monthly usage, while the second winter block is lowered to reflect more 13 closely the incremental costs in the winter. This helps encourage customer heat pump 14 adoption and improve system utilization in winter months. In choosing between a
  3. Page 35 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 33 of 52 1 block rate and a non-block TOU structure, the Company has considered all factors; 2 most importantly, customer acceptance and gradualism in implementation of 3 rebalancing cost recovery across rate components. A TOU structure layered on a block 4 rate structure tends to be very confusing to customers, as they do not know when the 5 change in TOU price takes place, which is a function of cumulative usage up until the 6 point of the decision in the month. Directionally, the Company’s proposed Rate 6 is in 7 alignment with the incremental cost pricing principles in two major ways; it departs 8 from a year-round uniform energy rate, recognizing underlying seasonal marginal cost 9 differences, and at the same time, increases the monthly customer charge relative to 10 Rate 1 to recover in full the marginal customer costs. These costs would otherwise 11 remain in the energy charges and contribute to cross-subsidies within the rate. 12 If the Company were to propose a rate without a block structure intended to encourage 13 beneficial electrification, it would require shifting a much larger share of the class 14 revenue target to the fixed component of the rate, so that the TOU per-kWh charges 15 can be further lowered towards distribution and transmission marginal costs. A higher 16 customer charge might make the rate unappealing to the average customer. This was a 17 major factor that drove the Company not to propose an unblocked TOU rate at this 18 stage. In the future, once more heat pumps have been adopted and it has its own class 19 revenue target, it may be possible to consider offering an alternative rate TOU 20 differentiation.
  4. Page 36 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 34 of 52 1 2 3 Q. Ms. Nieto, based on your expertise on marginal cost studies, and use for rate design, do you agree with Mr. Velez's proposal to reflect the time-differentiated marginal cost of transmission in the proposed Rate 6? 4 A. I do not find that Mr. Velez’s proposed approach to compute the marginal regional bulk 5 transmission cost is appropriate for purposes of rate design. Mr. Velez’s application of 6 the PoP method to the transmission annual loads to calculate a time-differentiated 7 marginal cost to hours and months conceptually works well in estimating incremental 8 transmission investment needed to meet incremental transmission load in any given 9 hour. However, this ignores the fact that the Company serves electricity within ISO- 10 NE region and as a distribution company is subject to payment of the ISO RNS 11 transmission rate, which is calculated based on each month’s coincident peak, as 12 discussed earlier. The cost basis that is relevant for purposes of calculating the 13 marginal transmission component should be based on what drives the payment that the 14 Company makes to ISO-NE for transmission service as part of RNS tariff, not the 15 “resource” marginal cost approach that would normally be helpful to consider value of 16 peak-load shaving resources to the transmission system. 17 Mr. Velez conducted a probability of peak for bulk transmission loads, by replicating 18 the method that Company witness Nieto developed for the Company’s distribution 19 hourly probability of peak. He then applies the results to propose a marginal regional 20 transmission cost allocation to all hours on the transmission system, which falls on the 21 summer coincident peak loads. Theis marginal transmission cost, corresponding to the 22 regional pool transmission facilities (“PTF”) that Mr. Velez uses is an estimate of the
  5. Page 37 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 35 of 52 1 avoided regional transmission cost of $69/kW-year, developed by Synapse in its 2024 2 Avoided Energy Supply Components study (Synapse 2024), inflated to 2026$. This 3 avoided cost estimate is inconsistent with the financial marginal transmission cost that 4 the Company faces as an unbundled utility, which is essentially the RNS rate, which 5 does not change by month. To find alignment between transmission payments to ISO- 6 NE, the applicable probability of peak should estimate how likely each hour of the 7 month is to include the month’s peak load and hourly factors would apply to the 8 monthly RNS rate. 9 The Company seeks to balance a number of rate design objectives, including stability 10 and reducing the risk of intra-class cross-subsidies. If customers using heat pumps for 11 space heating were to drive up the month’s transmission system peak, it would affect 12 the corresponding ISO-NE payment. If they pay transmission charges set at the near- 13 zero winter resource marginal transmission cost, the net revenue shortfall incurred by 14 the Company would need to be recovered from all customers to keep the Company 15 whole. 16 17 18 Q. Do you agree with Mr. Velez’s definition of cross-subsidies based on charging for existing transmission and distribution fixed costs in the winter to limit crosssubsidies? 19 A. Not entirely. The definition of cross-subsidy should include not just recovery of 20 incremental costs; each class should recover the corresponding marginal costs plus a 21 share of the fixed costs of the system, to reconcile with the embedded cost allocated to 22 the class in the ACOS study. Mr. Velez mentions that when fixed costs are recovered
  6. Page 38 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 36 of 52 1 through volumetric charges, customers with higher-than-average usage pay a greater 2 share of those fixed costs, effectively subsidizing the customers with lower-than- 3 average usage. However, for optional rates to be revenue-neutral, the class allocation 4 of revenue requirement is based on overall Rate 1 charge. Over time, when the optional 5 heat pump rate has customers on it, the revenue target will specifically be established 6 for that optional rate, and it will likely have a lower per-kWh embedded cost allocation 7 relative to Rate 1 which would retain lower usage customers. 8 9 10 Q. How do you respond to Mr. Velez’s statement the Company has not reduced the kWh charge of the winter block 2 enough, and that the gap between charges and actual marginal T&D costs needs to be eliminated or meaningfully reduced? 11 A. Consistent with what was explained above, I agree that the gap between incremental 12 per-kWh costs and incremental usage-related revenue should be reduced as much as 13 possible, to get closer to an economic cost-reflective price signal. When there is no 14 possibility of increasing the customer charge high enough to recover the residual share 15 of class revenue target associated with fixed or sunk costs, the volumetric charges must 16 continue to recover those costs. This would inevitably lead to higher-than-average 17 usage customers, paying a higher share of the embedded costs. The Company has 18 undertaken that step in the winter block 2 of Rate 6. Mr. Velez states that it should be 19 lowered more, much closer to marginal unit system-wide distribution marginal and 20 transmission resource marginal cost. Mr. Velez calculates the overpayment or gap by 21 calculating the marginal T&D cost from the MCOS, allocated hourly, for the heat pump 22 load usage and comparing these costs to the incremental T&D revenue collected under
  7. Page 39 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 37 of 52 1 the filed rates. This is a measure of the expected contribution of additional heat pump 2 usage to the recovery of the costs of the existing system. Even if setting lower rates 3 closer to time-differentiated per-kWh marginal costs, charges would still need to 4 recover a share of the overall allocated distribution revenue requirement for past 5 investments, which should not only be allocated to the summer months, but across all 6 hours throughout the year. 7 8 9 Q. What is your take regarding Mr. Velez’s statement that heat pump load does not increase the local facilities capacity required, and therefore block 2 charge should not include such a component? 10 A. Monthly marginal facilities costs, like transformers, primary lines and secondary cables 11 used to connect the customer premise to the grid, are marginal at the time of connecting 12 the customer, and therefore there is not strictly a direct correlation between ongoing 13 changes in usage and incremental transformer capacity. An optimal rate structure 14 recovers all facilities costs as a class-specific facilities charge outside of the volumetric 15 charges, or in the monthly customer charge, but when this is not considered acceptable, 16 it needs to be recovered in the kWh charges. 17 IV. ALLOCATED COST OF SERVICE STUDY 18 19 Q. Please summarize Ms. Whited’s position and recommendations regarding the Company’s ACOS. 20 A. Ms. Whited rejects the Company’s Minimum System (“MS”) study and proposes using 21 a classification that relies on the Basic Customer method. Under this method, the only 22 assets that are classified as customer-related are meters (FERC Account 370) and 23 services (FERC Account 369), while any other distribution plant assets; including
  8. Page 40 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 38 of 52 1 conductors and conduits (Acc. 365 - 367), poles, towers and fixtures (Acc. 364), and 2 line transformers (Acc. 368) are considered demand-related. In addition, Ms. Whited 3 proposes in her direct testimony that should the Company decided to retain the MS 4 method in this rate case, each class’s non-coincident peak demand should be adjusted 5 by the load-carrying capability of the minimum equipment, before allocating the 6 demand-related cost portion of the assets. Ms. Whited also proposes a different 7 classification of AMI meters, such that they are allocated partly to demand due to its 8 value to provide services helpful for several distribution services. 9 10 Q. What are the conceptual shortcomings of the basic customer approach that Ms. Whited proposes for this rate case? 11 A. Simply put, the use of Basic Customer approach in an embedded cost allocation 12 exercise is not fully cost-reflective. The demand allocation factors would allocate entire 13 distribution plant, including upstream, primary and secondary local facilities, other 14 than meters and services. This approach fails to consider the one-time impact of new 15 customer connections, where the Company chooses equipment separately for circuits, 16 poles and line transformers and relative differences in size across customer classes is 17 not entirely driven by actual variations in their expected maximum demand. It is not 18 uncommon that local facilities will be sized larger than strictly necessary to meet 19 expected customer demands, due to a combination of economies of scale that warrants 20 slightly larger standardized equipment sizes available to the Company. 37 An allocation 37 This is particularly evident in the context of rural or semi-rural areas with predominance of single homes.
  9. Page 41 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 39 of 52 1 entirely made on the basis of demand using test year demands gives too much weight 2 to existing demands. The Company field engineers, deciding on secondary plant and 3 primary lines local to the customer, do not use today’s demands or test-year class rather 4 they consider connection standards involving: (a) how the equipment will be shared 5 (customer numbers expected to be served downstream of those facilities long-term) and 6 (b) those customers’ demands during the life of those facilities. In other words, an 7 allocation based entirely on class NCP which is test-year customer demands cannot 8 capture the effects of economies of scale that drives plant size requirements and 9 therefore allocating all lines or transformers fully on the basis of class demand is 10 problematic and introduces a bias than the MS study may help reduce. This is, in Ms. 11 Nieto’s view, is the main reason why the MS method has stronger precedent in ACOS 12 studies in the industry. 13 14 Q. Has the Minimum System classification approach been widely adopted in the country? 15 A. Yes, for ACOS studies, the Basic Customer price method is more scarcely adopted than 16 the MS study, for distribution plant. Examples of U.S. utilities where a MS study is 17 used include Alabama Power (AL), Georgia Power Company (GA), Central Hudson 18 Electric & Gas (NY), Central Maine Power (ME), Choctawhatchee Electric 19 Cooperative (FL), Con Edison (NY), Tampa Electric (FL), Connecticut Light & Power 20 (CT), Duke Energy Progress (NC), Gulf Power (FL), Jackson County REMC (IN), 21 Kentucky Utilities (KY), LG&E (KY), Madison Gas & Electric (WI), Mississippi 22 Power (MS), Northern States Power (MN), and Carolina Power & Light (NC).
  10. Page 42 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 40 of 52 1 Q. Does NARUC cost allocation manual endorses the MS study? 2 A. Yes. The NARUC Electric Utility Cost Allocation Manual 38 recognizes the minimum 3 system approach as one of the appropriate ACOS methods to determine classification 4 of accounts 364 through 368. The NARUC Manual clearly states that each distribution 5 plant account, 364 through 368, can be separately classified into a demand and 6 customer component. 39 It also adds that: “The customer component of distribution 7 facilities is that portion of costs which varies with the number of customers. Thus, the 8 number of poles, conductors, transformers, services, and meters are directly related to 9 the number of customers on the utility's system.” The only instance where the 10 NARUC’s Manual mentions a method similar to the Basic Customer approach is in the 11 context of the Marginal Cost methods, and this is irrelevant to the discussion of what 12 to use in an ACOS study for customer costs. 13 14 Q. What impact would the basic customer price alternative have for the embedded cost allocations if adopted in lieu of the MS study? 15 A. Ms. Nieto tested the specific impact of an allocation of distribution plant entirely based 16 on the ratio of residential class non-coincident peak demand (NCP) to total Class NCP 17 as part of the interrogatory phase of this Docket, and the main implication of the Basic 18 Customer method is that it shifts a larger share of plant costs to the commercial and 19 industrial customers. This is expected, due to the relatively higher per-customer National Association of Regulatory Utility Commissioners, Electric Utility Cost Allocation Manual, Jan 20, 1992. 38 39 90. See NARUC Electric Utility Cost Allocation Manual, January 20, 1992, Table 6-1 in page 87 and page
6 pages match

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: EDWARD DAVIS, KIMBERLY R. PARSONS, AMPARO NIETO [26-05-10]

This filing on the current system (opens in a new tab)