  1. Page 38 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 36 of 52 1 through volumetric charges, customers with higher-than-average usage pay a greater 2 share of those fixed costs, effectively subsidizing the customers with lower-than- 3 average usage. However, for optional rates to be revenue-neutral, the class allocation 4 of revenue requirement is based on overall Rate 1 charge. Over time, when the optional 5 heat pump rate has customers on it, the revenue target will specifically be established 6 for that optional rate, and it will likely have a lower per-kWh embedded cost allocation 7 relative to Rate 1 which would retain lower usage customers. 8 9 10 Q. How do you respond to Mr. Velez’s statement the Company has not reduced the kWh charge of the winter block 2 enough, and that the gap between charges and actual marginal T&D costs needs to be eliminated or meaningfully reduced? 11 A. Consistent with what was explained above, I agree that the gap between incremental 12 per-kWh costs and incremental usage-related revenue should be reduced as much as 13 possible, to get closer to an economic cost-reflective price signal. When there is no 14 possibility of increasing the customer charge high enough to recover the residual share 15 of class revenue target associated with fixed or sunk costs, the volumetric charges must 16 continue to recover those costs. This would inevitably lead to higher-than-average 17 usage customers, paying a higher share of the embedded costs. The Company has 18 undertaken that step in the winter block 2 of Rate 6. Mr. Velez states that it should be 19 lowered more, much closer to marginal unit system-wide distribution marginal and 20 transmission resource marginal cost. Mr. Velez calculates the overpayment or gap by 21 calculating the marginal T&D cost from the MCOS, allocated hourly, for the heat pump 22 load usage and comparing these costs to the incremental T&D revenue collected under
  2. Page 39 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 37 of 52 1 the filed rates. This is a measure of the expected contribution of additional heat pump 2 usage to the recovery of the costs of the existing system. Even if setting lower rates 3 closer to time-differentiated per-kWh marginal costs, charges would still need to 4 recover a share of the overall allocated distribution revenue requirement for past 5 investments, which should not only be allocated to the summer months, but across all 6 hours throughout the year. 7 8 9 Q. What is your take regarding Mr. Velez’s statement that heat pump load does not increase the local facilities capacity required, and therefore block 2 charge should not include such a component? 10 A. Monthly marginal facilities costs, like transformers, primary lines and secondary cables 11 used to connect the customer premise to the grid, are marginal at the time of connecting 12 the customer, and therefore there is not strictly a direct correlation between ongoing 13 changes in usage and incremental transformer capacity. An optimal rate structure 14 recovers all facilities costs as a class-specific facilities charge outside of the volumetric 15 charges, or in the monthly customer charge, but when this is not considered acceptable, 16 it needs to be recovered in the kWh charges. 17 IV. ALLOCATED COST OF SERVICE STUDY 18 19 Q. Please summarize Ms. Whited’s position and recommendations regarding the Company’s ACOS. 20 A. Ms. Whited rejects the Company’s Minimum System (“MS”) study and proposes using 21 a classification that relies on the Basic Customer method. Under this method, the only 22 assets that are classified as customer-related are meters (FERC Account 370) and 23 services (FERC Account 369), while any other distribution plant assets; including
  3. Page 40 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 38 of 52 1 conductors and conduits (Acc. 365 - 367), poles, towers and fixtures (Acc. 364), and 2 line transformers (Acc. 368) are considered demand-related. In addition, Ms. Whited 3 proposes in her direct testimony that should the Company decided to retain the MS 4 method in this rate case, each class’s non-coincident peak demand should be adjusted 5 by the load-carrying capability of the minimum equipment, before allocating the 6 demand-related cost portion of the assets. Ms. Whited also proposes a different 7 classification of AMI meters, such that they are allocated partly to demand due to its 8 value to provide services helpful for several distribution services. 9 10 Q. What are the conceptual shortcomings of the basic customer approach that Ms. Whited proposes for this rate case? 11 A. Simply put, the use of Basic Customer approach in an embedded cost allocation 12 exercise is not fully cost-reflective. The demand allocation factors would allocate entire 13 distribution plant, including upstream, primary and secondary local facilities, other 14 than meters and services. This approach fails to consider the one-time impact of new 15 customer connections, where the Company chooses equipment separately for circuits, 16 poles and line transformers and relative differences in size across customer classes is 17 not entirely driven by actual variations in their expected maximum demand. It is not 18 uncommon that local facilities will be sized larger than strictly necessary to meet 19 expected customer demands, due to a combination of economies of scale that warrants 20 slightly larger standardized equipment sizes available to the Company. 37 An allocation 37 This is particularly evident in the context of rural or semi-rural areas with predominance of single homes.
  4. Page 41 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 39 of 52 1 entirely made on the basis of demand using test year demands gives too much weight 2 to existing demands. The Company field engineers, deciding on secondary plant and 3 primary lines local to the customer, do not use today’s demands or test-year class rather 4 they consider connection standards involving: (a) how the equipment will be shared 5 (customer numbers expected to be served downstream of those facilities long-term) and 6 (b) those customers’ demands during the life of those facilities. In other words, an 7 allocation based entirely on class NCP which is test-year customer demands cannot 8 capture the effects of economies of scale that drives plant size requirements and 9 therefore allocating all lines or transformers fully on the basis of class demand is 10 problematic and introduces a bias than the MS study may help reduce. This is, in Ms. 11 Nieto’s view, is the main reason why the MS method has stronger precedent in ACOS 12 studies in the industry. 13 14 Q. Has the Minimum System classification approach been widely adopted in the country? 15 A. Yes, for ACOS studies, the Basic Customer price method is more scarcely adopted than 16 the MS study, for distribution plant. Examples of U.S. utilities where a MS study is 17 used include Alabama Power (AL), Georgia Power Company (GA), Central Hudson 18 Electric & Gas (NY), Central Maine Power (ME), Choctawhatchee Electric 19 Cooperative (FL), Con Edison (NY), Tampa Electric (FL), Connecticut Light & Power 20 (CT), Duke Energy Progress (NC), Gulf Power (FL), Jackson County REMC (IN), 21 Kentucky Utilities (KY), LG&E (KY), Madison Gas & Electric (WI), Mississippi 22 Power (MS), Northern States Power (MN), and Carolina Power & Light (NC).
  5. Page 42 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 40 of 52 1 Q. Does NARUC cost allocation manual endorses the MS study? 2 A. Yes. The NARUC Electric Utility Cost Allocation Manual 38 recognizes the minimum 3 system approach as one of the appropriate ACOS methods to determine classification 4 of accounts 364 through 368. The NARUC Manual clearly states that each distribution 5 plant account, 364 through 368, can be separately classified into a demand and 6 customer component. 39 It also adds that: “The customer component of distribution 7 facilities is that portion of costs which varies with the number of customers. Thus, the 8 number of poles, conductors, transformers, services, and meters are directly related to 9 the number of customers on the utility's system.” The only instance where the 10 NARUC’s Manual mentions a method similar to the Basic Customer approach is in the 11 context of the Marginal Cost methods, and this is irrelevant to the discussion of what 12 to use in an ACOS study for customer costs. 13 14 Q. What impact would the basic customer price alternative have for the embedded cost allocations if adopted in lieu of the MS study? 15 A. Ms. Nieto tested the specific impact of an allocation of distribution plant entirely based 16 on the ratio of residential class non-coincident peak demand (NCP) to total Class NCP 17 as part of the interrogatory phase of this Docket, and the main implication of the Basic 18 Customer method is that it shifts a larger share of plant costs to the commercial and 19 industrial customers. This is expected, due to the relatively higher per-customer National Association of Regulatory Utility Commissioners, Electric Utility Cost Allocation Manual, Jan 20, 1992. 38 39 90. See NARUC Electric Utility Cost Allocation Manual, January 20, 1992, Table 6-1 in page 87 and page
  6. Page 43 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 41 of 52 1 demand that commercial customers tend to have, but as explained above, it is a biased 2 result as it misses the fact that larger demands tend to make better use of local 3 transformer’s economies of scale, i.e., they exhibit higher utilization of line 4 transformer. 5 6 Q. What is your opinion regarding the use of modified demand allocation factors to exclude the minimum equipment size as proposed by Ms. Whited? 7 A. There is no doubt that the minimum equipment can serve a share of the load of the 8 customers in each class, and therefore intuitively, one would find reasonable to account 9 for that amount of equipment load serving capability in determining the net class NCP 10 demands for allocation of the demand-related share of the plant. However, a concern is 11 that this approach may add false precision because the class cost responsibility is not 12 entirely proportional to class demand ratios due to utilization of minimum equipment 13 once installed. The MS study does not capture all the nuances of customer density 14 effect in investment decisions. The risk is that such adjustments may lead to mis- 15 allocation of plant to the class with higher demand but also higher utilization per 16 customer. For any distribution plant other than substation and trunkline primary 17 feeders, investment decisions are largely driven by the numbers of customers served 18 and the sizes of the specific transformers and conductors are largely standardized. The 19 MS is a reasonable classification method by designating a minimum portion of the 20 equipment (in the case of line transformers, this is represented by the smaller 21 transformer installed today, which is 10 kVA) as customer-related, covering a 22 minimum load that tends to be only a share of the customer design demand. The
  7. Page 44 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 42 of 52 1 transformer plant required per residential customer is actually larger than the average 2 residential customer’s actual demand. The cost per kVA may also be smaller in any 3 case for a commercial-serving transformer, given the economies of scale of larger 4 transformers. 5 6 Q. Do you agree with Ms. Whited’s proposed reclassification of AMI meters based on customer and demand to be more cost-reflective? 7 A. AMI meters do serve an important role in distribution operations, remote disconnects, 8 and support of demand response programs and tariffs. However, given that AMI meters 9 are practically the new standard in today’s modern utility, and the fact that there is no 10 direct correlation between demand growth and AMI meter need, the cost driver should 11 be the customer additions as in the current ACOS study filed by the Company. 12 V. ADVANCED METERING INFRASTRUCTURE 13 14 Q. Did the Rates Panel submit testimony as part of the Company’s initial filing regarding the proposed Advanced Metering Infrastructure (“AMI”) project. 15 A. No. As part of the Company’s initial filing, Company witnesses Jared Lawrence and 16 Douglas Horton provided testimony regarding the technology and implementation of 17 advanced metering infrastructure, as well as regarding a new cost recovery framework 18 for technology and implementation costs. However, Ms. Whited, on behalf of OCC, 19 recommends that, as part of the AMI implementation, PURA direct the Company to 20 (1) retain hourly interval data from AMI meters in a form suitable for equipment-level 21 aggregation, and (2) in its next base rate case, file an equipment-level allocation study 22 alongside its conventional class cost of service study, so the Authority can compare the
  8. Page 45 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 43 of 52 1 results before adopting a new method. 40 Ms. Whited argues that the Company’s 2 demand allocation method for distribution system infrastructure does not reflect 3 localized variance in cost causation. 41 4 Further, Mr. Dauphinais on behalf of CIEC, recommends, to the extent PURA allows 5 CL&P to recover AMI costs, whether through the PBMRP or another mechanism, that 6 PURA reject CL&P’s proposal to allocate those costs on the basis of class distribution 7 revenue and instead, AMI costs should be separately identified and allocated on a cost 8 basis by using the weighted meter cost allocator used in CL&P’s ACOS to allocate 9 Account 370 meter plant. 42 Mr. Dauphinais argues that allocating AMI costs on the 10 basis of class distribution revenue shifts AMI costs to classes whose share of 11 distribution revenue is large relative to the number and cost of their meters, which are 12 primarily the larger commercial and industrial classes. 43 13 Mr. Dauphinais further recommends that PURA direct CL&P to use the same cost- 14 based allocation for the deferred AMI-related O&M expense and stranded AMR meter 15 costs when it seeks recovery of those costs, unless CL&P demonstrates that a different 16 cost-based method is more appropriate. 44 40 Whited at 8, 20-22. 41 Id. 42 Dauphinais at 29-31. 43 Id. 44 Id.
  9. Page 46 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 44 of 52 1 2 Q. Do you agree with Mr. Dauphinais’s recommendations regarding allocation of AMI costs? 3 A. For purposes of cost of service analysis, the Company expects that AMI meter costs 4 will be properly classified as customer-related costs, consistent with treatment of meter 5 costs in the allocated cost-of-service study conducted and submitted in this docket as 6 part of the Company’s rate application. The Company’s further expectation is that 7 capital costs and expenses associated with AMI implementation would be collected 8 from customers consistent with allocation of costs allowed in this proceeding for 9 distribution rates or another applicable rate mechanism. While we agree with Mr. 10 Dauphinais in that the classification of costs as customer-related is appropriate, we 11 disagree not necessarily on what the cost-of-service study produces, but that the 12 proposed allocation of such costs and their recovery through the PBMRP, or otherwise 13 as determined by PURA, is appropriate. Please see also the following rebuttal to Ms. 14 Whited’s recommendation. 15 16 Q. Do you agree with Ms. Whited’s recommendation regarding the AMI implementation? 17 A. Similarly, for purposes of cost-of-service analysis, the Company expects AMI meter 18 costs to be properly classified as customer-related costs. The results of the allocated 19 cost of service study serve as a guide to inform the allocation of costs and design of 20 rates. Additionally, there are specific ratemaking requirements and methodologies that 21 perhaps Ms. Whited is not aware of which derive key data from properly classified 22 customer costs in the cost-of-service study. For example, the MMRC calculation for
  10. Page 47 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 45 of 52 1 determining the residential Rate 1 customer charge, designated per statute and 2 regulation, requires the use of the cost of a meter, among other customer related costs, 3 in its development. With regard to class cost of service (i.e., revenue) allocation, PURA 4 determines the ultimate allocation of revenue among classes, along with the portion of 5 such revenue attributable to customer charges and to demand charges (which are 6 assimilated through volumetric or demand charges, depending on the class). These 7 allocations do not match precisely to the cost-of-service study and further, the portion 8 of customer and demand revenue within each class do not match precisely the 9 respective customer and demand allocations of costs within the allocated cost-of- 10 service study. 11 Therefore, regarding AMI implementation, the Company disagrees with Ms. Whited’s 12 recommendation. The Company’s expectation is that AMI costs would properly be 13 classified as customer costs, and that capital costs and expenses associated with AMI 14 implementation would be collected from customers consistent with allocation of costs 15 allowed in this proceeding for distribution rates or another applicable rate mechanism. 16 The proposed allocation of AMI implementation costs to each class through the 17 PBMRP would be based on such authorized distribution rate revenue, which notably 18 includes both customer and demand components.