Prefiled testimony

Witness: EDWARD DAVIS, KIMBERLY R. PARSONS, AMPARO NIETO

Files3

Search terms highlighted
Eversource rate increase is on 20 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
14 pages match
  1. Page 5 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 3 of 52 1 Q. Ms. Nieto, have you previously submitted testimony in this proceeding? 2 A. Yes. On July 14, 2026, I submitted direct testimonies to PURA on the Company’s 3 Allocated Cost of Service (“ACOS”) study, and separately on the Marginal Cost of 4 Service (“MCOS”) study. I led the development of both cost of service studies on 5 behalf of the Company, including the time-differentiation analysis. My direct testimony 6 also discussed the appropriate interpretation of the resulting marginal cost estimates to 7 guide the Company’s distribution rate design improvements for higher efficiency in 8 price signals, and cost rebalancing among rate components to address intra-class cross- 9 subsidies, subject to gradualism needs and other constraints. My direct, pre-filed 10 testimonies were designated as Exhibits CLP-ACOS-1 and CLP-MCOS-1. 11 Q. What is the purpose of this panel’s joint rebuttal testimony? 12 A. The purpose of our testimony is to respond to various intervenors’ rate design and cost 13 of service study method recommendations and statements in response to our direct 14 testimonies. Specifically, this testimony responds to claims made by Mr. James R. 15 Dauphinais, on behalf of Connecticut Industrial Energy Consumers (“CIEC”); Ms. 16 Melissa Whited on behalf of the Office of Consumer Counsel (“OCC”); Mr. Juan Pablo 17 Velez on behalf of the Conservation Law Foundation (“CLF”); and Mr. Eben Perkins 18 on behalf of the University of Connecticut (“UCONN”), on issues regarding the
  2. Page 6 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 4 of 52 1 Company’s proposed EDR and alternative electric space heating rates, several aspects 2 of the ACOS study, and other rate design and tariff proposals. 1 3 4 Q. Did the above-listed intervenors have concerns with specific aspects of the proposed rates? 5 A. Yes. The intervenors listed above provided various recommendations on eligibility and 6 application that are discussed in more detail in this testimony. Overall, intervenor 7 testimony reflects broad stakeholder agreement that both an economic development 8 rider and heat pump rate could provide meaningful customer benefits. However, Mr. 9 Velez on behalf of CLF and Ms. Whited on behalf of OCC submitted testimony 10 recommending PURA reject the Company’s Rate 6 and direct a different design of the 11 heat pump rate. 12 several intervenors propose modifications to the design. This degree of agreement 13 supports moving forward with workable rate designs while addressing the specific 14 implementation concerns raised in testimony. No intervenor opposed the general concept of an EDR, however 15 Q. Are you presenting any exhibits as part of your rebuttal testimony? 16 A. Yes. Exhibit CLP-RATES-REBUTTAL-2 accompanies this testimony, presenting a 17 redlined version of the Company’s Performance-Based Multi-Year Rate Plan 18 (“PBMRP”) tariff. The Company does not respond to every issue raised in the intervenor testimonies. Silence on any issue should not be construed as agreement on any issue. 1
  3. Page 7 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 5 of 52 1 Q. How is your testimony organized? 2 A. Our testimony is organized into the following sections: 3 • Section I is the introduction. 4 • Section II discusses the Company’s response to the intervenors’ comments on EDR. 5 6 • Section III responds to certain aspects of the proposed alternate residential space heating rate (Rate 6) rate design comments. 7 8 9 • Section IV discusses specific comments from the intervenors on the ACOS study and their proposed alternative distribution plant classification and allocation methods. 10 • Section V responds to AMI cost classification comments and recommendations. 11 12 • Section VI addresses issues related to potential new distribution and transmission rate design for commercial and industrial (“C&I”) customers. 13 • Section VII provides a modified PBMRP Tariff to address intervenor issues. 14 • Section VIII is the conclusion. 15 II. PROPOSED ECONOMIC DEVELOPMENT RIDER 16 17 Q. Please summarize the Company’s proposal regarding the introduction of an Economic Development Rider. 18 A. The fundamental components of the EDR include a provision for determining customer 19 eligibility and qualification, a schedule of discounts and term of service and discount, 20 as well as reference to a Service Agreement. The EDR as proposed is a form of rider 21 which can be utilized for establishing a schedule of discounted rates and charges for 22 customers with incremental new or expanded service requirements. The EDR is 23 intended to be applied to rates applicable to serving the incremental load of qualifying 24 large commercial and industrial customers. A schedule of discounted rates would be 25 determined on a customer-specific basis, pursuant to a service agreement entered into
  4. Page 8 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 6 of 52 1 under the rider. Consistent with established regulatory principles, the EDR is intended 2 first and foremost to benefit ratepayers through improved system economics and 3 affordability, while also supporting broader economic development objectives. 4 The EDR shall be available to new and existing large commercial and industrial 5 customers that demonstrate incremental load growth. A New Customer is a customer 6 establishing electric service within the service territory that has not taken service within 7 the prior twelve months. An Existing Customer is a customer that expands operations 8 and demonstrates measurable incremental load above a defined baseline. 9 As proposed, eligibility is limited to customers taking service on the Company’s large 10 general service rates — Rate 57 for manufacturing customers and Rate 58 for non- 11 manufacturing customers — with demand generally exceeding one megawatt (“MW”). 12 The proposed EDR is limited to incremental (i.e., new or expanded) load only, and 13 discounts shall not be available relative to existing load. The EDR is not available to 14 any other service class or for load retention purposes. Of note, there are a limited 15 number of Rate 39 customers, and only three of whom receive distribution level 16 service. No new customers are authorized to participate in Rate 39. Rate 39 is a 17 somewhat dynamic rate that allows incremental load, above an interruptible contract 18 demand level, to be served under a firm service rate. This incremental load may be 19 eligible for enrollment under the EDR. This demonstrates the need for case by case 20 analysis of eligibility for the EDR, including but not limited to an examination of (1) 21 the differentiation and extent of firm service load, (2) specific electric service analysis
  5. Page 9 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 7 of 52 1 and review to ensure physical requirements and determination of any upgrades, 2 equipment, etc. are identified and the economics and customer contributions, if any, 3 relative to the level of discount and costs of any construction work are established up 4 front. Further, in order to qualify, the Company proposes that a customer must as a 5 minimum demonstrate that its project: (i) involves new or expanded operations 6 resulting in incremental load 2 that supports system efficiency; (ii) provides economic 7 value to customers within its service territory, including job creation or capital 8 investment; and (iii) is designed, further, to support regulatory policy objectives, and 9 to provide value during the term of project participation in the EDR. Customers looking 10 to qualify will also be required to provide the Company with information describing 11 why electric load is increasing, anticipated investment, and changes in employment 12 levels or jobs expected to be created, as well as a narrative describing what impact the 13 EDR had on the customer’s expansion or decision to add new load. 14 The Company also proposes a declining, time-limited discount applied to incremental 15 load over a five-year term, consistent with the declining structure proposed in the 16 Company’s prior economic development rate. 17 Q. Do the intervening parties support the introduction of an EDR? 18 A. Yes. Mr. Dauphinais on behalf of CIEC and Ms. Whited on behalf of the OCC 19 submitted testimony expressing support for the introduction of the EDR, subject to Incremental load is defined as usage above a defined baseline for existing customers; and as total new usage associated with the project for new customers. 2
  6. Page 10 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 8 of 52 1 modifications to the eligibility criteria, schedule of discounts and term of service and 2 discount, and enrollment procedures applicable to the EDR. 3 4 Q. Please describe the recommendations presented by Mr. Dauphinais to modify the EDR as proposed by the Company. 5 A. Mr. Dauphinais recommends a number of modifications to PURA to replace the 6 provisions that leave eligibility to CL&P’s discretion with “clear, objective criteria,” 7 including an objective hurdle rate analysis, including setting a single minimum 8 incremental load threshold applicable to all participants rather than establishing that 9 threshold on a contract-by-contract basis. 3 Specifically, Mr. Dauphinais recommends 10 PURA direct the Company to: 11 12 13 14 15 16 1. Remove the requirement in Qualification 1(C) that a facility provide “added value to the Company’s service territory, as determined by the Company,” so that any C&I facility meeting the minimum incremental load threshold may qualify, subject to the same exception for customers directly participating in local commerce that PURA approved for the United Illuminating Company 4 (“UI”); 5 17 18 19 20 21 2. Replace the “satisfaction of the Company” standard in Qualification 3 with a requirement that the customer provide a narrative description of why its load is increasing or, for a new customer, the role of the EDR in its decision to locate in CL&P’s service territory, similar to the application requirement PURA approved for UI; 6 22 23 3. Remove Condition 1 (partial requirements refund provision) or in the alternative, direct the Company clarify that a customer’s choice of energy 3 Dauphinais at 7. See Decision, Aug. 25, 2023, Docket No. 22-08-08, Application of The United Illuminating Company to Amend Its Rate Schedule. 4 5 Dauphinais at 8. 6 Dauphinais at 10.
  7. Page 11 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 9 of 52 1 2 supplier does not affect its eligibility for the EDR or trigger any refund of discounts; 7 3 4 5 4. Replace Condition 2 with a requirement that the customer participate in at least one clean energy, grid modernization or energy efficiency program, as PURA required for UI; 8 6 7 5. Remove Condition 3, requiring an applicant seek other economic development assistance, as a condition of eligibility; 9 8 6. Replace Condition 4 with an objective hurdle rate analysis; 10 and 9 7. Remove Condition 7, requiring 10% removal. 11 10 Further, Mr. Dauphinais recommends PURA establish the EDR discount percentages 11 in this proceeding, specifically a discount that is fixed over the five-year term at 12 percentage levels no lower than the 15% base discount and 20% discount for Distressed 13 Municipalities and Environmental Justice Communities, as recently approved by 14 PURA for UI. 12,13 Mr. Dauphinais recommends the EDR be further revised to provide 15 participants one opportunity to extend the discount for an additional five-year term, 16 subject to an updated hurdle rate analysis showing that the revenue from the 7 Dauphinais at 11-12. 8 Dauphinais at 12. 9 Dauphinais at 12. 10 Dauphinais at 9-10. 11 Dauphinais at 12-13. PURA has previously rejected a defined tier system for determining discount levels. in Docket No. 2208-08. United Illuminating Company, Docket No. 22-08-08 (2023). Instead, UI ultimately developed an application process that includes asking potential customers about historic load levels, a narrative about why load is increasing, employee headcount, data regarding expected employment increases, data regarding expected capital investment, and any information regarding participation in energy efficiency, clean energy, or grid modernization programs. Id. It is then incumbent on UI to decide if the customer should be eligible for the rate. Id. The Company is seeking a similar degree of flexibility to confirm economic benefits and determine customer eligibility. Id. 12 13 Dauphinais at 14-16.
  8. Page 12 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 10 of 52 1 incremental load at the discounted rate will continue to exceed the incremental cost to 2 serve that load. 14 He also recommends that the phrase “at any service location” should 3 be clarified so that it does not prevent a separate, later expansion at the same service 4 location from qualifying for its own EDR discount. 15 While Mr. Dauphinais does not 5 oppose review of eligibility on a contract by contract basis, he recommends the 6 Company be required to provide a written explanation to any customer whose EDR 7 application is denied, and report annually to PURA the number of EDR inquiries, 8 applications, approvals and denials, similar to the information PURA required UI to 9 include in its annual EDR report. 16 10 Last, Mr. Dauphinais recommends PURA direct CL&P to adopt a load retention special 11 contract policy substantially similar to the policy PURA approved for UI in Docket No. 12 24-10-04. 17 13 14 Q. Please describe the recommendations presented by Ms. Whited to modify the EDR as proposed by the Company. 15 A. Similar to Mr. Dauphinais, Ms. Whited also recommends the Company be required to 16 establish fixed discount levels for the EDR, specifically a 1) 20 percent discount for 17 facilities sited in an Environmental Justice Community and a 2) 15 percent discount for 18 facilities sited in other communities, with a discount cap of 50 percent of the net present 14 Dauphinais at 16. 15 Dauphinais at 16. 16 Dauphinais at 10, 18. 17 Dauphinais at 18-26.
  9. Page 13 of 54

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 11 of 52 1 value of incremental revenues. 18 Additionally, Ms. Whited recommends PURA require 2 EDR customers to take service on an enhanced time-of-use (“TOU”) rate, to be filed 3 by Eversource within six months of a final decision in this proceeding. 19 Last, Ms. 4 Whited recommends PURA require the EDR exclude data centers from qualifying for 5 the rider. 6 7 Q. Do you agree with the recommended changes regarding eligibility criteria to receive the EDR rate proposed by Mr. Dauphinais? 8 A. Overall, no. We reiterate that establishing criteria for qualification for the EDR can be 9 complex, and potentially carry significant administrative obligations, particularly 10 regarding the process for qualification and implementation. As part of the review of 11 this proposal in this proceeding, the Company intends to seek further review with 12 PURA regarding the administrative process and support needed for reviewing and 13 qualifying applications and ongoing administration, as well as opportunities for rider 14 design and qualification that can bring efficiencies to the process of accepting and 15 enrolling prospective customers as rider participants. 16 In order to effectively implement the EDR, the Company will need to evaluate each 17 application on a case-by-case basis. However, Mr. Dauphinais, in his testimony, seeks 18 to create bright-line standards of objective criteria, as well as remove barriers, for 19 customers to qualify for the EDR. Specifically, Mr. Dauphinais requests removal of 18 Whited at 42-45. 19 Whited at 40-41.
  10. Page 14 of 54Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-RATES-REBUTTAL-1 November 18, 2026 Page 12 of 52 1 the criterion of “added value to the Company’s service territory, as determined by the 2 Company” as well as replacement of the requirement of “satisfaction of the Company” 3 with a narrative description of why its load is increasing or, for a new customer, the 4 role of the EDR in its decision to locate in CL&P’s service territory in Qualification 5 3. 20 6 It is necessary for the Company to retain flexibility to approve certain customers for 7 eligibility of the EDR. The Company is proposing the EDR in this case because of the 8 beneficial economics of such a rate and its potential positive impact on affordability. 9 Bringing new, incremental electric load online would be expected to help put 10 downward pressure on rates by providing more variable units over which to spread 11 fixed costs. From a rate perspective, this can be achieved when the economic 12 development rate is set above the marginal cost to serve the new load. The Company 13 considers the results from its most recent marginal cost study as a guide and basis on 14 which to set the economic development rate so that it has the intended positive 15 affordability impacts. 16 The Company will require an applicant to describe in writing and demonstrate during 17 the term of service that receiving a discount under the EDR is a decisive factor in their 18 decision to add new or incremental load during the term of service under the EDR. An Qualification 3 requires a customer demonstrate to the satisfaction of the Company that concessions provided by the EDR, either alone or in conjunction with concessions from others provide a significant incentive to cause the Customer to add the Incremental Load in the Company's service area. 20
6 pages match

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: EDWARD DAVIS, KIMBERLY R. PARSONS, AMPARO NIETO [26-05-10]

This filing on the current system (opens in a new tab)