Prefiled testimony
Witness: James R. Dauphinais
Files1
26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
PDF · 1.9 MB · 130 pagesText searchable
Download 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdfRead the text of 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 1 of 130
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules ) ) ) ) ) ) Docket No. 26-05-10 Rebuttal Testimony and Exhibit of James R. Dauphinais On behalf of Connecticut Industrial Energy Consumers November 18, 2026 Project 12126Page 2 of 130
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules ) ) ) ) ) ) Docket No. 26-05-10 Table of Contents to the Rebuttal Testimony and Exhibit of James R. Dauphinais I. INTRODUCTION AND SUMMARY ....................................................................................... 1 II. RESPONSE TO OCC WITNESS WHITED ........................................................................... 4 A. Classification of AMI Meter Costs ............................................................................... 4 B. Minimum Distribution System Method ...................................................................... 10 C. Distribution Demand Allocation ................................................................................. 14 D. Economic Development Rider .................................................................................. 16 1. Data Center Exclusion ......................................................................................... 18 2. Mandatory TOU Rate .......................................................................................... 20 3. Discount Cap ....................................................................................................... 24 III. RESPONSE TO CLF-SC WITNESS VELEZ ....................................................................... 26 A. Mr. Velez’s Proposed Rate HP ................................................................................. 26 B. The Claimed “Overcharge” Is a Contribution to Embedded Costs ............................ 27 C. Rate HP Is Not Revenue Neutral .............................................................................. 31 D. Winter Load Affects CL&P’s Transmission Costs ..................................................... 34 E. Winter Distribution Costs Will Not Remain Near Zero .............................................. 36 F. Recommendations .................................................................................................... 37 IV. RESPONSE TO UCONN WITNESS PERKINS .................................................................. 38 Exhibit JRD-4: CL&P, CLF-SC and OCC Responses to Data Requests Cited by Mr. Dauphinais BRUBAKER & ASSOCIATES, INC.Page 3 of 130
James R. Dauphinais Page 1 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules ) ) ) ) ) ) Docket No. 26-05-10 Rebuttal Testimony of James R. Dauphinais I. INTRODUCTION AND SUMMARY 1 2 Q PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 3 A James R. Dauphinais. My business address is 16690 Swingley Ridge Road, Suite 140, 4 5 Chesterfield, MO 63017. Q 6 7 ARE YOU THE SAME JAMES R. DAUPHINAIS WHO PREVIOUSLY FILED TESTIMONY IN THIS PROCEEDING? A Yes. I filed Direct Testimony on behalf of the Connecticut Industrial Energy Consumers 8 (“CIEC”) on October 21, 2026. CIEC’s members are commercial and industrial 9 organizations, including but not limited to traditional manufacturers, that purchase a 10 substantial amount of electric delivery service from The Connecticut Light and Power 11 Company d/b/a Eversource Energy (“CL&P,” “Eversource,” or “Company”). BRUBAKER & ASSOCIATES, INC.Page 4 of 130
James R. Dauphinais Page 2 1 Q ARE YOU SPONSORING ANY EXHIBITS WITH YOUR REBUTTAL TESTIMONY? 2 A Yes. I am sponsoring Exhibit JRD-4, which contains copies of by CL&P’s, Conservation 3 Law Foundation and Sierra Club’s (“CLF-SC”), and Office of Consumer 4 Counsel’s (“OCC”) responses to the data requests cited in my rebuttal testimony. 5 Q WHAT IS THE PURPOSE OF YOUR REBUTTAL TESTIMONY? 6 A My rebuttal testimony responds to specific positions taken in the direct testimony of: 7 (i) OCC Witness Melissa Whited regarding CL&P’s Allocated Cost of Service 8 Study (“ACOSS”) and CL&P’s proposed Economic Development Rider (“EDR”); 9 (ii) CLF-SC Witness Juan-Pablo Velez regarding his proposed residential heat pump 10 rate (“Rate HP”); and (iii) University of Connecticut (“UConn”) Witness Eben Perkins 11 regarding his proposed Coincident Peak Transmission (“CPT”) rate option and 12 distribution rate design study for large customers. My rebuttal testimony is organized 13 by witness. 14 My silence in this testimony with regard to any issue raised by these witnesses, 15 or any other witness in this proceeding, in direct testimony should not be construed as 16 an endorsement of their respective positions on that issue. 17 Q PLEASE SUMMARIZE YOUR REBUTTAL TESTIMONY CONCLUSIONS. 18 A For the reasons detailed in my testimony herein, I recommend that the Public Utilities 19 Regulatory Authority (“PURA” or “Authority”): 20 21 22 23 24 25 Reject OCC Witness Whited’s recommendation to classify Advanced Metering Infrastructure (“AMI”) meter costs as 38% customer-related, 47% demand-related and 15% energy-related based on projected AMI program benefits, just as the Authority rejected a similar OCC proposal for The United Illuminating Company (“UI”) in Docket No. 24-10-04, and continue to classify AMI meter costs as customer-related; 26 27 Reject OCC Witness Whited’s recommendation to replace CL&P’s minimum distribution system method with the “basic customer method,” which the BRUBAKER & ASSOCIATES, INC.Page 5 of 130
James R. Dauphinais Page 3 1 2 3 Authority declined to adopt for UI in Docket No. 24-10-04 and which, as Ms. Whited’s own testimony shows, would further reduce the already below-average rates of return of Rate 39 and Rate 57; 4 5 6 7 To the extent the Authority requires a load-carrying capability adjustment to CL&P’s minimum distribution system method, base it on the load-carrying capability of the specific minimum-sized facilities in CL&P’s study, as the Authority did for UI, rather than on generic values from other jurisdictions; 8 9 10 11 12 To the extent the Authority requires CL&P to prepare an equipment-level distribution allocation study for its next rate case as Ms. Whited proposes, treat it as a supplement to, not a replacement for, the conventional ACOSS, and require that it continue to differentiate costs by the voltage level at which customers take service; 13 14 15 16 17 Decline to adopt Ms. Whited’s proposed categorical exclusion of data center loads from the EDR or, if the Authority adopts such an exclusion, define it narrowly and objectively, such as by limiting it to facilities of at least 50 MW classified under NAICS code 518210, so that it does not exclude manufacturing or other industrial loads; 18 19 20 Reject Ms. Whited’s recommendation that EDR participants be required to take service under a time-of-use (“TOU”) rate, including but not limited to one that has yet to be designed or filed; 21 22 23 24 Clarify that, in applying any hurdle rate analysis and discount cap the Authority adopts for the EDR, costs the customer pays directly through a Contribution in Aid of Construction (“CIAC”) or otherwise are not counted again as costs of serving the incremental load; 25 26 27 28 29 30 31 Reject CLF-SC Witness Velez’s proposed Rate HP, which by his own estimate would reduce the distribution and transmission revenue CL&P collects by approximately $57.2 million per year from the automatic enrollment of existing heat pump customers alone, whose load is already on the system, and which, as he acknowledges, would shift approximately $28 million per year of that shortfall to non-residential customers through CL&P’s reconciling mechanisms until the next rate case; 32 33 34 35 36 Require that any heat pump rate the Authority approves be revenue neutral within the residential class, so that no revenue shortfall from that rate is shifted to other rate classes through revenue allocation, the Revenue Decoupling Mechanism (“RDM”), the Transmission Adjustment Clause (“TAC”) or any other mechanism; 37 38 39 40 41 42 Approve UConn Witness Perkins’ proposed CPT rate option on the voluntary, opt-in basis he proposes, because it aligns with how CL&P incurs transmission costs under the ISO New England Inc. Open Access Transmission Tariff, but reject any mandatory application of that rate, which could have severe unintended affordability consequences for customers that cannot control their load during the hours that determine their charges; and BRUBAKER & ASSOCIATES, INC.Page 6 of 130
James R. Dauphinais Page 4 1 2 3 4 5 Treat any study of time-differentiated distribution demand charges and the distribution demand ratchet that the Authority directs in response to Mr. Perkins as informational, and require that any resulting proposal be supported by classand customer-specific bill impact analysis and considered in a future rate proceeding. II. RESPONSE TO OCC WITNESS WHITED 6 7 A. Classification of AMI Meter Costs 8 Q WHAT 9 10 DOES MS. WHITED RECOMMEND WITH RESPECT TO THE CLASSIFICATION OF AMI METER COSTS? A Ms. Whited recommends that AMI meter costs be classified as 38% customer-related, 11 47% demand-related and 15% energy-related, rather than 100% customer-related.1 12 She derives these percentages by assigning each category of benefit in CL&P’s AMI 13 benefit-cost analysis to a classification of her choosing and weighting each category by 14 its net present value.2 As she acknowledges, the “[c]lassification is my own.”3 15 Q 16 17 HAS THE AUTHORITY PREVIOUSLY ADDRESSED A PROPOSAL TO CLASSIFY AMI METER COSTS BASED ON AMI BENEFITS? A Yes. In UI’s most recent rate case, Docket No. 24-10-04, OCC proposed that AMI 18 costs be “classified proportionally according to the benefits in the customer, demand, 19 and energy categories.”4 CIEC opposed that proposal on the grounds that “allocating 20 AMI costs based on the benefits of AMI technology does not constitute cost-based 21 allocation.”5 The Authority agreed with CIEC and affirmed UI’s “classification of AMI 22 meters as 100% customer-related, which is consistent with cost causation principles.”6 1 Whited Direct at 4, lines 11-15, and 12, lines 1-4 (Table 1). Id. at 11, lines 3-15, and 12, line 1 (Table 1). 3 Id. at 12, line 2. 4 Docket No. 24-10-04, October 28, 2025 Decision at 197. 5 Id. at 196, footnote 117. 6 Id. at 198. 2 BRUBAKER & ASSOCIATES, INC.Page 7 of 130
James R. Dauphinais Page 5 1 Ms. Whited does not mention that determination. In discovery, she confirmed it and 2 stated that her only basis for a different result is that CL&P, unlike UI, has quantified 3 AMI benefits.7 But the Authority affirmed UI’s classification because it is “consistent 4 with cost causation principles,” not for lack of benefit data. Quantifying the benefits of 5 AMI does not change what causes the cost of a meter. 6 Q 7 8 WHY IS IT INAPPROPRIATE TO CLASSIFY AMI METER COSTS BASED ON PROJECTED AMI BENEFITS? A Cost classification is intended to identify what causes a cost to be incurred. The cost 9 of an AMI meter is incurred because each customer must be metered in order to be 10 served and billed, and that cost varies with the number and type of meters installed, 11 not with the customer’s peak demand or energy usage. That is why the National 12 Association of Regulatory Utility Commissioners (“NARUC”) Electric Utility Cost 13 Allocation Manual (“NARUC Manual”) states that meters “are generally classified on a 14 customer basis,” with any demand component intended “to show that larger-usage 15 customers require more expensive metering equipment.”8 CL&P’s ACOSS follows that 16 approach by allocating meter plant using a weighted meter cost allocator that reflects 17 the relative installed cost of the meters serving each class.9 Ms. Whited’s approach 18 would instead classify meter costs according to who she believes benefits from the AMI 19 program, which is a value-of-service concept rather than cost causation. 20 21 Ms. Whited herself agrees that “[c]lassifying traditional meters as customer-related is reasonable, because their primary function is to measure each 7 OCC Response to Data Request CIEC-9(a)-(c). Copies of the data request responses cited in my rebuttal testimony are provided in alphanumeric order by responding part in Exhibit JRD-4. 8 NARUC Manual at 96. 9 CL&P Witness Nieto ACOS Direct (Exhibit CLP-ACOS-1) at 6, lines 21-25. BRUBAKER & ASSOCIATES, INC.Page 8 of 130
James R. Dauphinais Page 6 1 customer’s usage for billing.”10 2 additional capabilities do not change why the meter is installed or what drives its cost. 3 Moreover, most of those capabilities produce benefits only if CL&P takes further action 4 (such as deploying Volt/VAR Optimization (“VVO”)) or customers respond to price 5 signals, and the time-varying and demand-based rate designs Ms. Whited associates 6 with AMI were in use long before AMI. 7 Q 8 9 An AMI meter performs that same function. Its DO THE BENEFITS MS. WHITED RELIES UPON CORRESPOND TO THE COST OF AMI METERS? A No. First, the benefits Ms. Whited uses are the benefits of CL&P’s entire AMI program, 10 which includes a new customer information system, a meter data management system, 11 a communications network and VVO enablement, not just the meters.11 For example, 12 she classifies $163.8 million of VVO benefits as energy and demand, $106.2 million 13 and $57.6, respectively, and $96.4 million of “Asset Optimization” benefits as 14 demand-related.12 CL&P’s benefit-cost analysis separately includes $212.3 million (net 15 present value) of VVO enablement costs, and the “Asset Optimization” benefit consists 16 of the line sensors that AMI would allow CL&P to avoid “as part of the VVO build-out.”13 17 Those benefits are attributable to the VVO investment at least as much as to the 18 meters, yet Ms. Whited uses them to reclassify the cost of the meters. 19 $97.3 million of six-year VVO enablement capital consists of regulators, capacitors, 20 transformer load tap changer controller upgrades and related integration costs, none 21 of which are meters.14 Ms. Whited concedes that the VVO benefits also require other 10 CL&P’s Whited Direct at 9, lines 13-14. CL&P Witnesses Lawrence and Horton Direct (Exhibit CLP-AMI-1) at 4, lines 14-20, and 5, lines 1-4; Exhibit CLP-AMI-3 at 17-18, Figure 7. 12 Whited Direct at 12, line 1 (Table 1). 13 Exhibit CLP-AMI-3 at 17, Figure 7, and 47. 14 CL&P Response to Data Request CIEC-039(c). 11 BRUBAKER & ASSOCIATES, INC.Page 9 of 130
James R. Dauphinais Page 7 1 investments, that “it would be reasonable to only attribute a portion of these benefits to 2 the meters themselves,” and that “it is unclear what proportion should be attributed to 3 the meters themselves.”15 Her classification nonetheless attributes all of them to the 4 meters. 5 Second, the benefits in CL&P’s analysis do not even equal its costs. On a net 6 present value basis, CL&P’s benefit-cost analysis shows total AMI benefits of 7 $1,205.4 million, a net benefit of negative $351.9 million, and a benefit-cost ratio of 8 0.77.16 A classification derived from projected benefits is therefore not a measure of 9 the costs being classified. Ms. Whited also acknowledges that her classification would 10 change whenever the estimated or actual benefits change,17 even though the meters 11 and their cost would not. 12 Third, the assignment of benefits to classifications is subjective. For example, 13 Ms. Whited classifies $162.4 million of “Improved Restoration – Significant Storms” 14 benefits as demand-related.18 That single category accounts for about 42% of the 15 $388.2 million of benefits she classifies as demand-related.19 Yet CL&P bases that 16 benefit on reduced storm restoration expense and on the value of reduced customer 17 outage time, which it describes as “a savings benefit realized directly by customers,” 18 and it acknowledges that the realized avoided cost “will be nearly impossible to 19 calculate.”20 CL&P has since confirmed that $157.2 million of the $162.4 million is 20 avoided storm restoration expense, and that its ACOSS allocates storm restoration 21 costs to rate classes on total rate base, so that their classification between demand 22 and customer “implicitly followed the same classification as the sum of the components 15 OCC Response to Data Request CIEC-4(a)-(b). Exhibit CLP-AMI-3 at 17-18, Figure 7. 17 OCC Response to Data Request CIEC-6(b). 18 Whited Direct at 12, line 1 (Table 1). 19 $162.4 million / $388.2 million = 41.8%. 20 Exhibit CLP-AMI-3 at 66-67. 16 BRUBAKER & ASSOCIATES, INC.Page 10 of 130
James R. Dauphinais Page 8 1 that make up the overall rate base.”21 CL&P does not treat those costs as 100% 2 demand-related. 3 demand-related is that the plant being restored would be 100% demand-related under 4 the basic customer method she proposes,22 which the Authority has declined to adopt, 5 as I discuss in Section II.B. 6 Q 7 8 Ms. Whited’s only support for classifying this benefit as ARE CL&P’S LARGE INDUSTRIAL CUSTOMERS THE REASON FOR THE AMI INVESTMENT? A No. CL&P’s large industrial customers are already billed under time-differentiated 9 demand rates. Rate 39 and Rate 57 both have defined on-peak and off-peak periods. 10 Rate 57 bills its distribution and transmission demand charges per kVA and sets its 11 customer charge based on the customer’s highest average 30-minute demand.23 12 Rate 39, Rate 57 and Rate 58 customers already have meters that record interval data, 13 and because these installations commonly involve metering complexities, CL&P will 14 evaluate them case by case to determine whether AMI meters can meet their needs at 15 all.24 Ms. Whited has not reviewed the metering capabilities of Rate 39 or Rate 57 16 customers.25 17 AMI-related costs describes the AMI deployment as replacing “existing traditional 18 non-interval metering infrastructure.”26 The capabilities Ms. Whited emphasizes, such 19 as time-varying rates and granular load data, are therefore primarily new capabilities 20 for residential and small commercial customers. Shifting AMI meter costs onto demand The Connecticut statute under which CL&P proposes to securitize 21 CL&P Response to Data Request CIEC-041(a) and (b). OCC Response to Data Request CIEC-5(a). 23 Exhibit CLP-RATES-3 at 89 and 108-109. 24 CL&P Response to Data Request CIEC-038(b) and (c). 25 OCC Response to Data Request CIEC-7. 26 Lawrence and Horton Direct at 31, lines 11-21 (quoting Conn. 16-245e(a)(21)(B)). 22 BRUBAKER & ASSOCIATES, INC. Gen. Stat. §
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]