Exhibit JRD-4 Page 75 of 87 entire system, and society at large; accordingly, it may well make sense to allocate AMI costs to all utility customers—including wholesale customers.” Thus, the commission stated that it would no longer give preference to the traditional method of treating customer costs as customer-related and instead “Minnesota Power will have to analyze how AMI meters are associated with customer costs as well as energy costs and demand costs—or, in the alternative, conduct its class cost-ofservice study using the premise that AMI costs are allocated equally to customer, demand, and energy factors.” See: Minnesota Power’s 2021 rate case order in Docket E015/GR-21-335, Feb. 28, 2023, at 61.) e. Ben Havumaki of Synapse proposed such a classification in Consumers Energy’s most recent rate case (U-22070). The outcome of this case has not yet been decided.Page 119 of 130
Exhibit JRD-4 Page 76 of 87 CIEC-10 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 2 Date Submitted: November 11, 2026 CIEC-10 Please refer to Whited Direct Testimony at page 4, lines 7-10, and page 18, lines 8-21. a. Please confirm that in the 24-10-04 Decision (at 198), in response to OCC’s recommendation of the basic customer method, the Authority stated that “it is not clear that the basic customer method is a superior alternative” and found that “[t]he MSS approach is a just and reasonable approach to cost classification.” b. Please confirm that in the 22-08-08 Decision (at 227-228), the Authority found the minimum system methodology “generally acceptable” and accepted its use. c. Please explain why Ms. Whited’s testimony cites the 24-10-04 Decision for the loadcarrying capacity adjustment (page 17, lines 11-15) but does not address the Authority’s rejection of the basic customer method in that same decision. d. Please identify any facts, data or analysis specific to CL&P, or developed since the 24-1004 Decision, that Ms. Whited contends warrant a different result in this proceeding. Response: a. Confirmed. b. Confirmed. c. While the Authority did not accept the basic customer approach in docket 24-10-04, the Authority also did not provide blanket acceptance of the minimum system approach. Rather, the Authority acknowledged OCC’s concerns with the minimum system approach and stated that it accepted the MSS approach “in this proceeding.” Further, the Authority stated that the MSS approach was an imperfect proxy for geographic dispersion and, on page 200 of its decision, directed UI to “explore the use of proxies that align more closely with geographic dispersion as a cost driver, rather than defaulting to MSS…” My testimony in this proceeding responds directly to these concerns and recommends the basic customer method be implemented only until a customer density analysis can be performed. d. Because CL&P has not conducted a customer density analysis, the Authority must choose between two imperfect cost allocation methods in the interim: the minimum system approach and the basic customer method. While the Authority accepted the minimum system approach in docket 24-10-04, it limited its acceptance to that particular proceeding. The adoption of the basic customer method in this proceeding would be reasonable given the magnitude of the Company’s proposed rate increase and the affordability concerns that this raises, particularly for lower-income customers, since the basic customer methodPage 120 of 130
Exhibit JRD-4 Page 77 of 87 would reduce the costs allocated to the residential class (as shown on Table 3 of Ms. Whited’s testimony.)Page 121 of 130
Exhibit JRD-4 Page 78 of 87 CIEC-11 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-11 Please refer to Whited Direct Testimony at page 15, lines 6-16. a. Please confirm that the “additional distribution system poles and wires” that a new rural customer “may require” in order “to extend service to the customer’s residence” (lines 1214) would be required even if that customer’s demand were negligible, and are therefore not caused by that customer’s peak demand. b. Under the basic customer method Ms. Whited recommends, would the cost of those poles and wires be classified as demand-related and allocated to rate classes based on class NCP demand? If so, explain how that result is consistent with cost causation. c. Please confirm that the costs of the poles and wires required to connect customers vary with the number and geographic dispersion of customers rather than with their peak demand. Response: a. Confirmed. b. Yes, under the basic customer method, the costs of poles and wires are classified as demand-related and allocated based on class NCP. Please see the response to CIEC-10 (c)(d). Ms. Whited acknowledges that both the minimum system method and the basic customer method are imperfect proxies for geographic dispersion. For this reason, Ms. Whited recommends that the basic customer method be implemented only until a better allocator is developed. c. Confirmed.Page 122 of 130
Exhibit JRD-4 Page 79 of 87 CIEC-12 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-12 Please refer to Whited Direct Testimony at page 15, line 17, through page 16, line 2. a. Please confirm that, as described at page 15, lines 19-20, Professor Bonbright argued that the costs of the minimum system “should be excluded from demand-related costs.” b. Please explain how Ms. Whited’s recommendation to classify all costs in FERC Accounts 364-368 as demand-related (page 19, lines 8-9) is consistent with that view. c. Please provide a copy of pages 347-348 of Principles of Public Utility Rates (1961) as relied upon. Response: a. Confirmed. Bonbright argues that these costs cannot be classified as either customerrelated or demand-related. b. As noted above, both the minimum system method and the basic customer method are imperfect proxies for geographic dispersion, and neither is consistent with Bonbright’s observation that these costs should not be classified as either demand-related or customerrelated. However, CL&P has not yet conducted a customer density study, and thus a better allocator is not readily available. For this reason, Ms. Whited recommends that the basic customer method be implemented only until a better allocator is developed. c. Please see the attachment.Page 123 of 130
Exhibit JRD-4 Page 80 of 87 CIEC-13 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-13 Please refer to Whited Direct Testimony at page 4, lines 3-6; page 16, lines 3-11; and page 18, lines 15-21. a. Please provide a copy of any Ontario Energy Board decision or order (as distinct from the Board Staff Discussion Paper cited in footnote 27) that approved the density-based classification method Ms. Whited describes. b. Please identify each U.S. state regulatory commission of which Ms. Whited is aware that has adopted a customer density-based classification of distribution plant, and provide a copy of each relevant decision. c. Please confirm that, under the density-based approach Ms. Whited describes, a portion of distribution plant in each density category would still be classified as customer-related. d. Please identify the data the Company would need to develop the proposed density-based approach and whether, to Ms. Whited’s knowledge, the Company currently maintains those data. Response: a. Please refer to the attachment. b. Ms. Whited is not aware of any US jurisdiction that has approved a customer-density based classification of distribution plant. c. Confirmed. d. Please see the attachment for a description of the data and methods used to perform the density study for Hydro One in Ontario, including an overview of the customer, asset, and geographic data used on page 4. Note that the Company could conduct a Connecticut-based density study without strictly adhering to Hydro One’s methodology. Ms. Whited does not know whether similar data is currently maintained by the Company.Page 124 of 130
Exhibit JRD-4 Page 81 of 87 CIEC-14 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-14 Please refer to Whited Direct Testimony at page 16, line 12, through page 17, line 15, and page 19, lines 1-7. a. Please identify the specific per-customer load-carrying capacity values, by equipment type (e.g., primary and secondary poles, overhead and underground conductors, line transformers), that Ms. Whited recommends be used for CL&P, and provide all supporting workpapers. b. Please confirm that in the 24-10-04 Decision (at 197-199), the Authority adopted loadcarrying capacity values based on UI’s own minimum-sized equipment rather than the generic per-customer values of 0.4 kW and 1.5 kW that OCC presented, and found that omitting classes whose demands can “generally” be met by the minimum system “is too imprecise to be a reasonable approach.” c. Does Ms. Whited agree that any load-carrying capacity adjustment for CL&P should be calculated from the load-carrying capability of the specific minimum-sized facilities in the Company’s MDS study? If not, explain why not. d. Please explain how the proposed adjustment would be applied to classes, such as Rate 39, that take service at primary voltage and are not allocated the costs of secondary facilities. e. Please provide any quantification Ms. Whited has performed of the effect of her proposed adjustment on class rates of return, including for Rate 39 and Rate 57. Response: a. Ms. Whited requested that the Company provide these values in OCC-738 (b), but the Company stated that it has not performed such analysis and calculations. However, the Company provided the capacity of the minimum size equipment in response to OCC-728 (b). b. Confirmed. c. Ideally, the load-carrying capacity adjustment for CL&P should be calculated from the load-carrying capability of the specific minimum-sized facilities in the Company’s MDS study. Absent this data, it would be reasonable to adopt values from other utilities (such as those adopted in 24-10-04) until CL&P values can be developed. d. A class would receive a load-carrying credit for a component only if it is allocated the customer-related minimum system cost of that same component. e. Ms. Whited has not performed such analysis.Page 125 of 130
Exhibit JRD-4 Page 82 of 87 CIEC-16 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-16 Please refer to Whited Direct Testimony at page 4, lines 16-22, and page 21, line 11, through page 22, line 10. a. Please confirm that Ms. Whited proposes that the equipment-level allocation study be filed alongside, and not in place of, the Company’s conventional class cost of service study in its next rate case, and that she is not recommending that the Authority adopt the equipmentlevel method in this proceeding. b. Please confirm that, under Ms. Whited’s proposal, the loads of customers taking service at primary or transmission voltage would be excluded from the allocation of facilities at lower voltage levels that they do not use, consistent with the NARUC Manual at 97. c. Please confirm that Ms. Whited would preserve the Company’s current exclusion of customers served from customer-owned transformers from the allocation of Account 368 line transformer costs (Exhibit CLP-ACOS-1 at 6, lines 8-10). d. Please confirm that in the 24-10-04 Decision (at 200-201), UI reported that its alternative substation and feeder allocators were “very similar” to its NCP and 1CP allocators, and that the Authority retained NCP allocators, adjusted for load-carrying capacity, for poles, conductors and line transformers. e. Please provide any estimate Ms. Whited has made of the cost to the Company of retaining, aggregating and analyzing hourly AMI data at the substation, feeder and line transformer level. f. Please explain how the proposed study would allocate the costs of substations or feeders dedicated to serving a single customer. Response: a. Confirmed. b. Confirmed. c. Confirmed. d. Confirmed. e. Ms. Whited has not developed such an estimate. f. These would be directly allocated to the customer.Page 126 of 130
Exhibit JRD-4 Page 83 of 87 CIEC-17 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-17 Please refer to Whited Direct Testimony at page 5, line 6, and page 39, lines 18-20. a. Please provide the precise tariff definition of “data center loads” that Ms. Whited proposes for the EDR exclusion. b. Please state whether the proposed exclusion would include a minimum size threshold and, if so, what that threshold would be. c. Please state whether the exclusion would apply to a manufacturing facility with significant on-site computing, automation or process control load, and explain how such a facility would be distinguished from a data center. d. Please state whether the exclusion would apply to incremental load resulting from the electrification of industrial processes, such as process heating. e. Please explain how the exclusion would apply to a facility that combines data center and non-data center operations. Response: a. The exclusion from the EDR should apply to facilities that classified under the North American Industry Classification System (NAICS) code 518210 (Data Processing, Hosting, and Related Services). b. The minimum size threshold should be temporarily set at 50 MW, before a permanent threshold can be determined in a dedicated proceeding on data center tariffs. c. See answer to subpart (a) above. d. No. The exclusion would not apply to incremental load resulting from the electrification of industrial processes such as process heating. e. See answer to subpart (a) above.Page 127 of 130
Exhibit JRD-4 Page 84 of 87 CIEC-18 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-18 Please refer to Whited Direct Testimony at page 38, lines 3-19, and page 39, lines 3-10. a. Please confirm that the EDR approved for UI in the 22-08-08 Decision (at 252) is “available to all C&I customers, without any cap on participation,” subject only to an exception for C&I customers directly participating in local commerce, and does not exclude data center loads. b. Please identify any generation or transmission cost that Ms. Whited contends would be borne by other customers as a result of a discount applied only to the distribution charges of a data center customer. c. Please provide any Connecticut-specific evidence that the siting decisions of data center developers are insensitive to the level of distribution rates. Response: a. Confirmed. b. Ms. Whited has not identified any generation or transmission cost that would be borne by other customers as a result of a distribution charge discount. c. Ms. Whited is not aware of Connecticut-specific evidence that data center siting decisions are insensitive to utility rates. The statement indicates that data center developments tend to prioritize speed over cost reflects national trends. See: x “For data center developers, speed-to-power far outweighs other factors like the price of power or access to land.” Center for Strategic & International Studies. 2025. The Electricity Supply Bottleneck on U.S. AI Dominance. https://www.csis.org/analysis/electricity-supply-bottleneck-us-ai-dominance x “While 24/7 power availability is a central goal for data centers and hyperscalers, the top priority remains speed to market.” Ascend Analytics. 2026. Data Centers and Power: Speed, Reliability, and Tradeoffs. https://www.ascendanalytics.com/blog/data-centers-energy-tradeoffs-speedreliability x “Power, not location or cost, will be the primary site selection criteria due to multiyear wait times for a grid connection.” JLL. 2026. 2026 Global Data Center Market Outlook. https://www.jll.com/en-us/insights/market-outlook/data-centeroutlook