James R. Dauphinais Page 12 1 the utility’s system.”37 It identifies two methods for determining the customer 2 component of these accounts: the minimum-size method and the minimum-intercept 3 (zero-intercept) method.38 The basic customer method does not determine a customer 4 component of poles, conductors and line transformers at all. It simply assumes there 5 is none. 6 Ms. Whited’s own example illustrates why that assumption is wrong. She 7 explains that a new customer located in a rural area “may require investments in 8 additional distribution system poles and wires to extend service to the customer’s 9 residence.”39 Those costs are incurred to connect the customer, and would be incurred 10 even if the customer’s demand were negligible. They are not incurred to meet its 11 demand. Ms. Whited confirmed this in discovery, and she also confirmed that the costs 12 of the poles and wires required to connect customers vary with the number and 13 geographic dispersion of customers rather than with their peak demand.40 Classifying 14 them as demand-related, as the basic customer method would, assigns them to classes 15 based on their peak demands even though peak demand is not what caused them. 16 Her argument that customer density affects these costs goes to how much 17 customer-related cost each customer causes, not to whether the cost is caused by 18 demand. 19 Q 20 21 22 DOES THE BONBRIGHT DISCUSSION MS. WHITED CITES SUPPORT CLASSIFYING THESE COSTS AS DEMAND-RELATED? A No. As Ms. Whited describes it, Professor Bonbright argued that the costs of the minimum system “should be excluded from demand-related costs” and treated as “a 37 NARUC Manual at 90. Id. at 90-95. 39 Whited Direct at 15, lines 12-14. 40 OCC Response to Data Request CIEC-11(a) and (c). 38 BRUBAKER & ASSOCIATES, INC.Page 15 of 130
James R. Dauphinais Page 13 1 strictly unallocable portion of total costs.”41 Ms. Whited’s recommendation does the 2 opposite: it classifies all of those costs as demand-related. Whatever the merits of 3 Professor Bonbright’s view, it does not support the basic customer method. Ms. Whited 4 concedes that the basic customer method is not consistent with it.42 5 Q 6 7 WHAT WOULD BE THE EFFECT OF THE BASIC CUSTOMER METHOD ON CL&P’S LARGE INDUSTRIAL RATE CLASSES? A Ms. Whited’s Table 3 shows that, at current rates, the basic customer method would 8 reduce the rate of return for Rate 39 from negative 3.5% to negative 4.4%, and for 9 Rate 57 from negative 0.8% to negative 2.2%, while increasing the rate of return for 10 Rates 1 and 7 from 0.4% to 1.2%.43 In other words, it would shift additional distribution 11 costs to the two large industrial classes whose rates of return are already well below 12 the 1.05% system average return at current rates. 13 Q 14 15 HOW SHOULD THE AUTHORITY ADDRESS MS. WHITED’S RECOMMENDATION FOR A LOAD-CARRYING CAPABILITY ADJUSTMENT? A In Docket No. 24-10-04, the Authority required a load-carrying capacity adjustment to 16 UI’s minimum system study. In doing so, it used the load-carrying capacity of the 17 specific minimum-sized poles, conductors and line transformers in UI’s own study, 18 rather than the generic per-customer values of 0.4 kW and 1.5 kW from other 19 jurisdictions that OCC had presented, and it found that excluding classes whose 20 demands can “generally” be met by the minimum system “is too imprecise to be a 21 reasonable approach.”44 The Authority also directed that further refinement of the 41 Whited Direct at 15, lines 19-20, and 16, lines 1-2. OCC Response to Data Request CIEC-12(b). 43 Whited Direct at 20, line 1 (Table 3). 44 Docket No. 24-10-04, October 28, 2025 Decision at 197-199. 42 BRUBAKER & ASSOCIATES, INC.Page 16 of 130
James R. Dauphinais Page 14 1 adjustment occur through a stakeholder process, and clarified that the final adjustment 2 value “should not be dictated solely by OCC.”45 3 Ms. Whited does not propose any specific adjustment values for CL&P. She 4 agrees that, ideally, any adjustment should be calculated from the load-carrying 5 capability of the specific minimum-sized facilities in CL&P’s study, and she has not 6 quantified the effect of her proposed adjustment on any class.46 If the Authority requires 7 an adjustment here, it should be calculated on the same basis as for UI, using the 8 load-carrying capability of the specific minimum-sized facilities in CL&P’s MDS study 9 and applied only to the demand allocators for those facilities. Any customer density 10 study the Authority directs CL&P to prepare should similarly be developed through a 11 stakeholder process, as the Authority directed for UI, with the MDS method remaining 12 in place unless and until the Authority approves a demonstrably better alternative. 13 Ms. Whited is not aware of any U.S. jurisdiction that has adopted a density-based 14 classification of distribution plant, and she confirms that such an approach would still 15 classify a portion of distribution plant as customer-related.47 16 C. Distribution Demand Allocation 17 Q WHAT DOES MS. WHITED RECOMMEND WITH RESPECT TO THE ALLOCATION 18 19 OF DEMAND-RELATED DISTRIBUTION COSTS? A Ms. Whited recommends that CL&P retain hourly AMI interval data in a form suitable 20 for equipment-level aggregation and file, in its next rate case, an equipment-level 21 allocation study “alongside its conventional class cost of service study, so the Authority 22 can compare the results before adopting a new method.”48 45 Id. at 199-200 and footnote 118. OCC Response to Data Request CIEC-14(a), (c) and (e). 47 OCC Response to Data Request CIEC-13(b) and (c). 48 Whited Direct at 21, line 20, through 22, line 10. 46 BRUBAKER & ASSOCIATES, INC.Page 17 of 130
James R. Dauphinais Page 15 1 Q DO YOU OBJECT TO THAT RECOMMENDATION? 2 A Not to the filing of such a study alongside the conventional ACOSS, as Ms. Whited 3 describes it. The Authority directed UI to develop similar alternative allocators, and UI 4 reported that the results were “very similar” to its NCP and coincident peak allocators.49 5 In that case the Authority adopted the alternative allocator only for distribution 6 substations and retained NCP allocators, adjusted for load-carrying capacity, for poles, 7 conductors and line transformers.50 8 similarly be evaluated against the conventional ACOSS before any change is adopted. 9 Any such study should also continue to recognize the voltage level at which 10 customers take service, so that the loads of customers served at primary or 11 transmission voltage are excluded from the allocation of facilities they do not use, as 12 the NARUC Manual directs.51 CL&P’s current ACOSS already applies this principle by 13 excluding customers served from customer-owned transformers from the allocation of 14 line transformers.52 That feature should be preserved in any alternative allocation 15 study. All of CL&P’s distribution-level Rate 39 and Rate 57 customers take service at 16 primary voltage.53 17 alongside, not in place of, the conventional ACOSS; would exclude the loads of 18 customers served at primary or transmission voltage from the allocation of 19 lower-voltage facilities; would preserve the exclusion of customers served from 20 customer-owned transformers; and would directly assign substations or feeders 21 dedicated to a single customer.54 Any equipment-level study for CL&P should Ms. Whited confirmed that her proposed study would be filed 49 Docket No. 24-10-04, October 28, 2025 Decision at 200. Id. at 201. 51 NARUC Manual at 97. 52 Nieto ACOS Direct at 6, lines 8-10. 53 CL&P Response to Data Request CIEC-043(c). 54 OCC Response to Data Request CIEC-16(a)-(c) and (f). 50 BRUBAKER & ASSOCIATES, INC.Page 18 of 130
James R. Dauphinais Page 16 1 The Authority should also be cautious in adopting any new allocator because a 2 change in allocation method, by itself, can shift substantial costs among rate classes 3 even though CL&P’s total costs and customers’ use of the system are unchanged. 4 Ms. Whited herself counsels caution, recommending that the equipment-level study be 5 filed alongside the conventional study “so the Authority can compare the results before 6 adopting a new method.”55 Large commercial and industrial customers, such as those 7 served under Rate 39 and Rate 57, compete in regional, national and global markets, 8 and a significant increase in their delivery rates can affect whether they remain, expand 9 or curtail operations in Connecticut. If those customers reduce load or leave the 10 system, the fixed costs they now pay must be recovered from the customers who 11 remain, worsening affordability for every class. Before adopting any new allocator, the 12 Authority should therefore require that the study quantify the resulting change in each 13 class’s revenue requirement and typical bills. If a new method is adopted, the Authority 14 should phase in any material cost shifts gradually. 15 D. Economic Development Rider 16 Q WHAT DOES MS. WHITED RECOMMEND WITH RESPECT TO CL&P’S 17 18 PROPOSED EDR? A Ms. Whited recommends that the Authority reject CL&P’s proposed EDR and instead 19 adopt an EDR based on the one approved for UI, with modifications that would: 20 (i) exclude data center loads; (ii) require EDR customers to take service on an 21 “enhanced TOU rate” to be filed by CL&P within six months of the Authority’s decision; 22 and (iii) adopt fixed discounts of 20% for facilities sited in an Environmental Justice 55 Whited Direct at 22, lines 9-10. BRUBAKER & ASSOCIATES, INC.Page 19 of 130
James R. Dauphinais Page 17 1 Community and 15% for facilities sited elsewhere, with a discount cap of 50% of the 2 net present value of incremental revenues.56 3 Q DO YOU AGREE WITH ANY OF THESE RECOMMENDATIONS? 4 A Yes. Ms. Whited’s recommendation that the discount be fixed over the five-year term, 5 rather than negotiated and declining, is consistent with my direct testimony, although I 6 recommended discounts no lower than 15% and 20%, with the 20% level also applying 7 in Distressed Municipalities, as the Authority approved for UI. 8 Q 9 10 WHAT SHOULD THE AUTHORITY KEEP IN MIND IN EVALUATING MS. WHITED’S PROPOSED MODIFICATIONS TO THE EDR? A The EDR is meant to attract new and expanded operations that bring jobs and capital 11 investment to Connecticut, and the conditions placed on it should not undermine that 12 objective. Under CL&P’s proposal, a qualifying project must provide “economic value 13 to customers within its service territory, including job creation or capital investment.” 14 Applicants must describe the “changes in employment levels or jobs expected to be 15 created.”57 Ms. Whited herself recognizes “the economic benefits (including jobs) of 16 new load.”58 In approving UI’s EDR, the Authority found that “the discount must not 17 only provide substantial benefits to existing ratepayers, but sufficient incentive to attract 18 incremental load as well.”59 19 Ms. Whited describes the primary objective of the EDR as improving 20 affordability.60 That objective and job creation are complementary. Incremental load 56 Whited Direct at 5, lines 4-13. CL&P Witnesses Davis and Parsons Direct (Exhibit CLP-RATES-1) at 26, lines 12-13, and 27, lines 1-2. 58 Whited Direct at 44, lines 5-7. 59 Docket No. 22-08-08, August 25, 2023 Decision at 250. 60 Whited Direct at 39, lines 1-2. 57 BRUBAKER & ASSOCIATES, INC.Page 20 of 130
James R. Dauphinais Page 18 1 that would not otherwise locate in CL&P’s service territory that produces revenue above 2 the incremental cost to serve it puts downward pressure on rates for existing 3 customers, but only if the load actually comes. An EDR weighed down by conditions 4 that add cost, complexity or uncertainty for prospective participants will attract fewer 5 projects, and so will deliver neither the jobs nor the rate benefits intended by the 6 incentive. Each of Ms. Whited’s proposed modifications should therefore be judged by 7 whether it is needed to protect existing customers, given the protections already in the 8 EDR, or whether it would simply discourage the projects the EDR is meant to attract. I 9 respond below to her proposed data center exclusion, her proposed TOU requirement, 10 and the calculation of her proposed discount cap. 11 1. Data Center Exclusion 12 Q SHOULD THE AUTHORITY ADOPT A CATEGORICAL EXCLUSION OF DATA 13 14 CENTER LOADS FROM THE EDR? A It is not necessary. Ms. Whited’s concern is that data center loads can require new 15 generation, transmission and distribution investments that increase costs for existing 16 customers.61 The EDR, however, discounts only distribution charges. CL&P has 17 explained that it has not proposed discounts to transmission, supply or public benefits 18 charges; that customers connected at transmission voltage take minimal distribution 19 service, so the EDR “may have little practical applicability” to them; that the incremental 20 distribution revenue must exceed the incremental cost to serve; and that the customer 21 “remains responsible for interconnection and system upgrade costs.”62 CL&P has also 22 stated that there are currently no active requests or firm commitments for data center 61 62 Whited Direct at 38, lines 3-19, and 39, lines 1-2. CL&P Response to Data Request OCC-464(a) and (b). BRUBAKER & ASSOCIATES, INC.Page 21 of 130
James R. Dauphinais Page 19 1 load additions on its distribution system.63 Ms. Whited has not identified any generation 2 or transmission cost that would be borne by other customers as a result of a discount 3 applied only to distribution charges.64 These protections address the cost concerns 4 Ms. Whited raises without singling out one type of customer by its end use. 5 Notably, the UI EDR on which Ms. Whited proposes to model CL&P’s EDR 6 contains no such exclusion. The Authority made that EDR “available to all C&I 7 customers, without any cap on participation,” subject only to an exception for customers 8 directly participating in local commerce, and relied instead on a hurdle rate analysis of 9 each application to protect existing customers.65 Ms. Whited’s other concern, that a 10 discount is unlikely to influence a data center’s siting decision,66 applies equally to any 11 applicant whose decision would not be affected by the EDR. Ms. Whited confirms that 12 the UI EDR does not exclude data center loads, and she is not aware of any 13 Connecticut-specific evidence that data center siting decisions are insensitive to utility 14 rates.67 The Authority addressed that concern for UI by requiring each applicant to 15 provide a narrative description of why its load is increasing or, if new load, why the 16 discount is a prerequisite for locating in the service territory,68 not by excluding an entire 17 category of customers. 63 CL&P Response to Data Request OCC-465(a). OCC Response to Data Request CIEC-18(b). 65 Docket No. 22-08-08, August 25, 2023 Decision at 250-252. 66 Whited Direct at 39, lines 3-10. 67 OCC Response to Data Request CIEC-18(a) and (c). 68 Docket No. 22-08-08, August 25, 2023 Decision at 252. 64 BRUBAKER & ASSOCIATES, INC.Page 22 of 130
James R. Dauphinais Page 20 1 Q 2 3 IF THE AUTHORITY NONETHELESS ADOPTS A DATA CENTER EXCLUSION, HOW SHOULD IT BE DEFINED? A Ms. Whited’s testimony does not define “data center loads,” and CL&P has no definition 4 of its own.69 In discovery, Ms. Whited proposed that the exclusion apply to facilities 5 classified under North American Industry Classification System (“NAICS”) code 518210 6 (Data Processing, Hosting, and Related Services), with an interim minimum size of 7 50 MW, and stated that it would not apply to load from the electrification of industrial 8 processes.70 Many manufacturing facilities include significant computing, automation 9 and process control loads, and some industrial customers may add load by electrifying 10 processes such as process heating, which CL&P has indicated may be eligible for the 11 EDR.71 Any exclusion should therefore be defined narrowly and objectively in the EDR 12 tariff, for example by limiting it to NAICS code 518210 facilities of at least 50 MW, as 13 Ms. Whited proposes, and expressly excluding load from process electrification, so that 14 it does not exclude manufacturing or other industrial facilities. 15 2. Mandatory TOU Rate 16 Q WHAT DOES MS. WHITED PROPOSE WITH RESPECT TO TOU RATES FOR EDR 17 18 CUSTOMERS? A Ms. Whited recommends that CL&P file TOU rates for industrial customers within 19 six months of the Authority’s decision, with time-differentiated distribution, transmission 20 and generation charges and a shorter on-peak period, and that EDR customers be 21 required to take service under those rates.72 Her rationale is that CL&P’s marginal cost 69 CL&P Responses to Data Requests CIEC-036 and CIEC-047(a). OCC Response to Data Request CIEC-17(a), (b) and (d). 71 CL&P Response to Data Request OCC-464(c). 72 Whited Direct at 41, lines 16-20. 70 BRUBAKER & ASSOCIATES, INC.Page 23 of 130
James R. Dauphinais Page 21 1 test for the EDR considers only distribution costs and does not account for the impact 2 of incremental load on transmission and supply costs.73 3 Q IS THAT CONCERN WELL FOUNDED? 4 A No. The EDR discount applies only to the distribution component of service. 5 Transmission service to the incremental load “would continue under otherwise 6 applicable retail rates.”74 An EDR customer would therefore pay full transmission 7 charges on its incremental load, including the on-peak transmission demand charge 8 that Ms. Whited acknowledges already applies under Rate 57 and Rate 58.75 The EDR 9 customer would also pay for the supply serving its incremental load. Under CL&P’s 10 Terms and Conditions for Electric Suppliers, each customer’s hourly load, including its 11 coincident peak capacity values, is assigned to the customer’s electric supplier 12 (including Standard Service or Last Resort Service) for settlement in the ISO New 13 England Inc. (“ISO-NE”) wholesale market.76 The energy and capacity costs of the 14 incremental load are therefore borne by the supplier serving it and passed through to 15 the EDR customer. Because the EDR does not discount any of those charges, it does 16 not shift transmission or supply costs to other customers. CL&P confirms that the 17 transmission and supply charges for an EDR participant’s incremental load would be 18 the participant’s responsibility.77 19 non-distribution charges for these customers are already priced on a time-of-day basis, 20 and those time-varying structures are mandatory for the large customers who would 21 take service under the EDR.78 Moreover, the transmission, supply and other 73 Id. at 40, lines 7-22. CL&P Response to Data Request OCC-464(b). 75 Whited Direct at 41, lines 3-9. 76 Exhibit CLP-RATES-3 at 38-40. 77 CL&P Response to Data Request CIEC-046(a). 78 CL&P Response to Data Request CIEC-045(a). 74 BRUBAKER & ASSOCIATES, INC.