Prefiled testimony
Witness: James R. Dauphinais
Files1
26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
PDF · 1.9 MB · 130 pagesText searchable
Download 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdfRead the text of 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 24 of 130
James R. Dauphinais Page 22 1 Q DOES A MANDATORY TOU RATE ADDRESS MS. WHITED’S CONCERN THAT 2 NEW LOAD ADDED DURING PEAK HOURS MAY REQUIRE NEW DISTRIBUTION 3 CAPACITY? 4 A No. Ms. Whited states that new load added primarily to peak hours “may necessitate 5 new investments in distribution capacity.”79 CL&P’s proposed EDR already addresses 6 that cost. The incremental distribution revenue must exceed the incremental cost to 7 serve, and the customer remains responsible for interconnection and system upgrade 8 costs.80 Ms. Whited does not claim CL&P’s test understates the distribution cost of 9 serving the incremental load. Her only criticism is that the test does not include 10 transmission and supply costs.81 11 Q 12 13 IS MS. WHITED’S CONCERN ABOUT TRANSMISSION AND SUPPLY COSTS SPECIFIC TO THE EDR? A No. A new or expanding Rate 57 or Rate 58 customer pays the same transmission 14 charges and supply costs whether or not it takes the EDR, because the EDR does not 15 discount either. Ms. Whited’s concern therefore applies to all new load on those rates, 16 not to EDR load in particular. It is not a reason to place conditions on EDR eligibility. 17 Her view that new load benefits the system most when it is added off-peak82 also favors 18 the high load factor industrial loads the EDR is meant to attract. Ms. Whited notes that 19 the on-peak period under Rate 57 and Rate 58 is eight hours long.83 Even if that period 20 applied every day of the year, a customer operating at a constant load would use 21 two-thirds of its energy in off-peak hours.84 79 Whited Direct at 40, lines 9-11. CL&P Response to Data Request OCC-464(a) and (b). 81 Whited Direct at 40, lines 12-15. 82 Whited Direct at 40, lines 16-19. 83 Id. at 41, lines 9-10. 84 16 off-peak hours ÷ 24 hours = 67%. 80 BRUBAKER & ASSOCIATES, INC.Page 25 of 130
James R. Dauphinais Page 23 1 Q ARE THERE OTHER PROBLEMS WITH MS. WHITED’S PROPOSAL? 2 A Yes. First, it would make EDR participation contingent on a rate that does not yet exist. 3 A customer evaluating whether to locate or expand in CL&P’s service territory could 4 not determine what its rates would be until the new TOU rate is filed and approved. 5 That is exactly the type of uncertainty that undermines an EDR’s ability to influence 6 siting and expansion decisions. 7 unavailable to customers until her proposed industrial TOU rates are approved, and 8 she has neither proposed an on-peak period for those rates nor analyzed their bill 9 impacts.85 Ms. Whited confirms that the EDR would be 10 Second, Ms. Whited states that, unless the incremental load is separately 11 metered, the TOU requirement would apply to the customer’s entire load.86 In that 12 case, an existing customer would have to move its existing load to a new and untested 13 rate as a condition of receiving a discount on its expansion, which would discourage 14 the very expansions the EDR is intended to attract. 15 Third, many industrial processes operate continuously or on production 16 schedules that cannot readily be shifted. A mandatory TOU rate would not change 17 those operations; it would simply change the customer’s bill. Ms. Whited recognizes 18 that new load improves system efficiency when the revenue the utility receives from it 19 is greater than its marginal cost to serve,87 which is what CL&P’s requirement that “the 20 incremental distribution revenue must exceed the incremental cost to serve” is 21 designed to ensure.88 The Authority did not impose a TOU requirement on participants 22 in UI’s EDR. Ms. Whited confirms this, is not aware of any jurisdiction that requires 23 economic development rate customers to take service under a TOU rate, and has not 85 OCC Responses to Data Requests CIEC-20(b) and CIEC-21(b)-(c). OCC Response to Data Request CIEC-20(a). 87 Whited Direct at 40, lines 7-8. 88 CL&P Response to Data Request OCC-464(a). 86 BRUBAKER & ASSOCIATES, INC.Page 26 of 130
James R. Dauphinais Page 24 1 analyzed the load profiles, load factors or load flexibility of Rate 57 and Rate 58 2 customers.89 3 Finally, the design of Rate 57 and Rate 58, including the length of their on-peak 4 periods, affects all customers on those rates. Changes to that design should be 5 considered in a rate design proceeding in which all affected customers have notice and 6 an opportunity to participate, not imposed only on EDR participants as a condition of 7 eligibility. 8 Q WHAT DO YOU RECOMMEND? 9 A The Authority should reject Ms. Whited’s proposal to require EDR customers to take 10 service under a new TOU rate. If CL&P develops a TOU option for large commercial 11 and industrial customers, EDR participants should be free to choose it, but it should not 12 be a condition of EDR eligibility. 13 3. Discount Cap 14 Q HOW DOES MS. WHITED PROPOSE TO CALCULATE THE EDR DISCOUNT CAP? 15 A Ms. Whited recommends “a discount cap equal to 50 percent of the net present value 16 of the incremental distribution revenues, accounting for the cost of connecting the 17 customer and any other electric infrastructure investments made to serve the 18 incremental load.”90 In her summary of recommendations, she describes the cap as 19 “50 percent of the net present value of incremental revenues.”91 89 OCC Response to Data Request CIEC-20(d)-(f). Whited Direct at 44, lines 9-12. 91 Id. at 5, lines 12-13. 90 BRUBAKER & ASSOCIATES, INC.Page 27 of 130
James R. Dauphinais Page 25 1 Q DO YOU HAVE ANY CONCERNS WITH THIS FORMULATION? 2 A Only one. For UI, the Authority required a hurdle rate analysis of each application to 3 ensure that the net present value of the revenue stream over the term, inclusive of the 4 discount, exceeds the incremental cost to serve, “inclusive of any connection and any 5 other electric-related infrastructure improvements required.” It capped the discount at 6 “50% of the difference between the standard rate revenues over the Term for the 7 additional load, less the incremental cost to serve.”92 Ms. Whited confirms that her 8 formulation is meant to replicate the UI cap and hurdle rate analysis,93 and I do not 9 object to the Authority adopting the UI structure for CL&P. However, CL&P has stated 10 that EDR customers “would be responsible for all costs associated with the installation 11 of a new service pursuant to the Company’s new business policies.”94 Costs that the 12 customer pays directly, through a CIAC or otherwise, are not costs CL&P incurs to 13 serve the incremental load. The Authority should clarify that such costs are not counted 14 again as a cost of serving the incremental load in the hurdle rate analysis or the 15 discount cap. Ms. Whited’s own numerical example counts any CIAC as revenue while 16 counting the connection cost as a cost, so that the two offset.95 CL&P, however, states 17 only that the portion of upfront costs paid by the participant would be included in the 18 evaluation of the discount, without saying whether the payment would also be 19 credited.96 92 Docket No. 22-08-08, August 25, 2023 Decision at 250-251 and 255 (Table 86). OCC Response to Data Request CIEC-22(b). 94 CL&P Response to Data Request OCC-932(a). 95 OCC Response to Data Request CIEC-22(a) and (d). 96 CL&P Response to Data Request CIEC-046(c). 93 BRUBAKER & ASSOCIATES, INC.Page 28 of 130
James R. Dauphinais Page 26 III. RESPONSE TO CLF-SC WITNESS VELEZ 1 2 A. Mr. Velez’s Proposed Rate HP 3 Q PLEASE SUMMARIZE MR. VELEZ’S PROPOSED RATE HP. 4 A Mr. Velez proposes a new residential rate schedule, Rate HP, for customers with heat 5 pumps. During the winter months of November through March, Rate HP would reduce 6 the distribution energy charge by approximately 71% and the transmission service rate 7 by approximately 75% compared with Rate 1. Summer rates, generation rates and the 8 customer charge would remain at Rate 1 levels.97 All known existing heat pump 9 customers and all customers newly installing heat pumps would be automatically 10 enrolled.98 11 Q WHAT IS THE BASIS FOR MR. VELEZ’S PROPOSAL? 12 A Mr. Velez claims that fossil fuel-heated customers who install heat pumps are 13 “overcharged” by an average of $1,040 per year for distribution and transmission, 14 because their distribution and transmission charges under Rate 1 increase by about 15 $1,051 per year while, in his estimation, the incremental marginal distribution and 16 transmission costs caused by the heat pump load are only about $10 per year.99 17 Rate HP is designed to reduce the distribution and transmission revenue collected from 18 heat pump customers so that their incremental charges equal his estimate of their 19 incremental marginal cost.100 97 Velez Direct at 6, lines 15-23, 7, lines 1-2, and 81, lines 10-16. Id. at 7, lines 3-8. 99 Velez Direct at 20, lines 5-8, and 23, lines 2-10. 100 Id. at 81, lines 17-23, and 82, lines 1-3. 98 BRUBAKER & ASSOCIATES, INC.Page 29 of 130
James R. Dauphinais Page 27 1 B. The Claimed “Overcharge” Is a Contribution to Embedded Costs 2 Q IS THE $1,040 PER YEAR THAT MR. VELEZ CHARACTERIZES AS AN 3 4 “OVERCHARGE” ACTUALLY AN OVERCHARGE? A No. CL&P’s rates are set to recover its embedded cost revenue requirement, which 5 consists predominantly of the fixed costs of facilities already in service. Mr. Velez 6 acknowledges that this existing infrastructure “does need to be paid for.”101 Marginal 7 cost, on the other hand, measures only the cost of serving additional load. Where the 8 system has spare capacity, the marginal cost of serving additional load will be well 9 below the embedded cost per unit. 10 embedded cost-based rates are overcharged. It means that their usage is contributing 11 to the recovery of existing fixed costs that would otherwise have to be recovered from 12 other customers. 13 Mr. Velez confirms the point. He agrees that the approximately $1,055 per year by 14 which the average fossil fuel-heated customer’s distribution and transmission charges 15 exceed its marginal cost before it installs a heat pump is that customer’s “contribution 16 to the embedded costs of the existing system,” and that his testimony “does not call 17 that contribution an overpayment.”102 Yet he contends that “incremental heat pump 18 load should not contribute to embedded T&D costs” at all.103 The same excess of 19 charges over marginal cost cannot be a legitimate contribution to fixed costs before a 20 customer installs a heat pump and an “overcharge” afterward. That does not mean that customers paying The $1,040 Mr. Velez calls an overcharge is that contribution. 21 CL&P has explained that keeping incremental heat pump load “priced above 22 the marginal cost of serving it” places “downward pressure on average rates for all 101 Velez Direct at 13, line 23, and 14, lines 1-2. CLF-SC Response to Data Request CIEC-4(b) and (c) of CIEC Set 2. 103 CLF-SC Response to Data Request CIEC-17(a) of CIEC Set 2. 102 BRUBAKER & ASSOCIATES, INC.Page 30 of 130
James R. Dauphinais Page 28 1 customers over time” by “spreading fixed costs over a larger sales base.”104 That is a 2 benefit of load growth that is shared with all customers, not an inequitable 3 cross-subsidy. 4 Q 5 6 DOES CL&P’S MARGINAL COST OF SERVICE STUDY SUPPORT SETTING HEAT PUMP CUSTOMERS’ CHARGES AT MARGINAL COST? A No. Mr. Velez relies on CL&P’s Marginal Cost of Service (“MCOS”) study to conclude 7 that heat pump load causes near-zero winter distribution costs.105 CL&P, however, 8 presented that study “to be used as a guide for rate design.”106 CL&P’s class revenue 9 targets “are decided primarily on the basis of the Company’s allocated cost of service 10 study (ACOS).” The MCOS results are used only to ensure that each rate class pays 11 “at least the corresponding marginal costs of service.”107 That is the proper role of a 12 marginal cost study: to inform rate design and to serve as a floor. It should not 13 determine how embedded costs are allocated or how much of those costs any group 14 of customers pays. Rate HP departs from that role. It treats marginal cost as the full 15 measure of what heat pump load should pay for distribution and transmission, so that 16 load would make essentially no contribution to CL&P’s embedded costs. The Authority 17 should limit the use of the MCOS study to informing rate design, and should not use it 18 to allocate embedded costs or to exempt any customer’s load from contributing to them. 104 Velez Direct at 31, lines 15-17, and 60, lines 1-4 (quoting CL&P Response to Data Request CLF-003(a)). 105 Velez Direct at 20, lines 11-12. 106 CL&P Witness Nieto MCOS Direct (Exhibit CLP-MCOS-1) at 2, lines 13-15. 107 Id. at 6, lines 17-21. BRUBAKER & ASSOCIATES, INC.Page 31 of 130
James R. Dauphinais Page 29 1 Q 2 3 HOW DOES RATE HP COMPARE WITH CL&P’S PROPOSED RATE 6 IN THIS RESPECT? A The two differ in three important ways. First, CL&P priced the Rate 6 winter block 4 “based on, but above marginal cost to ensure positive contribution to distribution costs.” 5 Rate HP would set incremental charges at Mr. Velez’s estimate of marginal cost. 6 Second, under Rate 6, “a customer must add new heat pump load not already included 7 in the underlying revenue requirement.” Rate HP would automatically enroll existing 8 heat pump customers whose load is already reflected in CL&P’s revenue requirement. 9 Third, under Rate 6, “[p]ricing for other components of service including transmission, 10 public benefits and supply are unchanged relative to Rate 1.” Rate HP would reduce 11 the winter transmission rate by 75%.108 12 Q 13 14 WHY DOES THE AUTOMATIC ENROLLMENT OF EXISTING HEAT PUMP CUSTOMERS MATTER? A For a customer that already has a heat pump, Rate HP would not attract any new load. 15 It would simply reduce the revenue collected from load that is already on CL&P’s 16 system and already contributing to its fixed costs. The Authority has recognized this 17 type of risk. In Docket No. 24-10-04, the Authority approved a load retention special 18 contract policy for UI that is limited to customers whose load is at risk of being lost, and 19 even then it expressed concern about free ridership. Under that policy, discounts are 20 negotiated on a case-by-case basis, are subject to the Authority’s approval, and are 21 subject to a price floor based on long-run marginal distribution cost.109 Rate HP would 22 provide marginal-cost pricing automatically to every enrolled heat pump customer, 23 without any showing that the discount is needed to cause or retain any load. 108 109 CL&P Response to Data Request OCC-475(a); Velez Direct at 6, line 20, through 7, line 8. Docket No. 24-10-04, October 28, 2025 Decision at 229-231. BRUBAKER & ASSOCIATES, INC.Page 32 of 130
James R. Dauphinais Page 30 1 Q 2 3 HAS THE AUTHORITY ADDRESSED A SIMILAR QUESTION FOR INCREMENTAL COMMERCIAL AND INDUSTRIAL LOAD? A Yes. In approving UI’s EDR, the Authority required that revenue from incremental load 4 exceed the incremental cost to serve it and capped the discount at 50% of the projected 5 savings, so that “at least 50% of the benefit from the incremental or new load is 6 allocated to existing ratepayers.”110 Rate HP takes the opposite approach. By setting 7 the incremental distribution and transmission charges for heat pump load equal to its 8 estimated marginal cost, Rate HP would leave essentially none of that load’s 9 contribution to fixed costs for the benefit of other customers. 10 Q DOES MR. VELEZ’S RELIANCE ON MARGINAL COST SUPPORT RATE HP? 11 A No. I agree that distribution and transmission fixed costs are driven principally by peak 12 demands rather than by energy consumption. That principle governs how embedded 13 costs are classified and allocated among and within classes. It does not mean that 14 embedded costs can go unrecovered. The residential class’s share of CL&P’s revenue 15 requirement is determined through the ACOSS and revenue allocation, and does not 16 decline because some residential customers are placed on Rate HP. If heat pump 17 customers pay less, other customers must pay more. 18 intra-class issue within the residential class, CL&P’s marginal cost witness identifies 19 the appropriate remedy: rebalancing cost recovery within the class from usage charges 20 toward fixed charges.111 That remedy does not require any other class to make up 21 revenue. 110 111 Docket No. 22-08-08, August 25, 2023 Decision at 250-251. Nieto MCOS Direct at 4, lines 20-22, and 5, lines 1-7. BRUBAKER & ASSOCIATES, INC. To the extent there is anPage 33 of 130
James R. Dauphinais Page 31 1 C. Rate HP Is Not Revenue Neutral 2 Q IS RATE HP DESIGNED TO BE REVENUE NEUTRAL? 3 A No. Mr. Velez confirms that Rate HP is not designed to be revenue neutral with respect 4 to the residential class as a whole,112 and he expressly rejects a revenue-neutral 5 design. He states that a seasonal design that lowers the winter rate but raises the 6 summer rate “merely shifts the overpayment between seasons, defeating the entire 7 purpose of a heat pump rate,” and that neither season’s rates should be set higher than 8 those in Rate 1.113 He also states that no heat pump customer would be made worse 9 off by being placed on Rate HP.114 Mr. Velez recognizes that a revenue-neutral 10 redesign of the retail transmission charge would involve “lowering it in winter and raising 11 it in summer,”115 and that a lower rate available to all customers “would create a 12 revenue shortfall under heavy enrollment.”116 However, his direct testimony does not 13 quantify the revenue shortfall Rate HP itself would create or identify who would pay it. 14 In discovery, he states that he considered how that shortfall would be recovered 15 between rate cases “but did not address it in [his] testimony.”117 16 Q HOW LARGE COULD THAT REVENUE SHORTFALL BE? 17 A Mr. Velez has now quantified it. He estimates that automatically enrolling the 18 approximately 55,000 existing heat pump customers who have received Energize CT 19 rebates, as he recommends, would reduce CL&P’s revenue by $39.8 million in 20 distribution and $17.4 million in transmission, or about $57.2 million in total, in the first 112 CLF-SC Response to Data Request CIEC-2(a) of CIEC Set 2. Velez Direct at 101, lines 6-17. 114 Id. at 95, lines 1-4. 115 Id. at 83, footnote 75. 116 Id. at 95, lines 14-16. 117 CLF-SC Response to Data Request CIEC-2(d) of CIEC Set 2. 113 BRUBAKER & ASSOCIATES, INC.
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]