Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
8 pages match
  1. Page 32 of 130

    James R. Dauphinais Page 30 1 Q 2 3 HAS THE AUTHORITY ADDRESSED A SIMILAR QUESTION FOR INCREMENTAL COMMERCIAL AND INDUSTRIAL LOAD? A Yes. In approving UI’s EDR, the Authority required that revenue from incremental load 4 exceed the incremental cost to serve it and capped the discount at 50% of the projected 5 savings, so that “at least 50% of the benefit from the incremental or new load is 6 allocated to existing ratepayers.”110 Rate HP takes the opposite approach. By setting 7 the incremental distribution and transmission charges for heat pump load equal to its 8 estimated marginal cost, Rate HP would leave essentially none of that load’s 9 contribution to fixed costs for the benefit of other customers. 10 Q DOES MR. VELEZ’S RELIANCE ON MARGINAL COST SUPPORT RATE HP? 11 A No. I agree that distribution and transmission fixed costs are driven principally by peak 12 demands rather than by energy consumption. That principle governs how embedded 13 costs are classified and allocated among and within classes. It does not mean that 14 embedded costs can go unrecovered. The residential class’s share of CL&P’s revenue 15 requirement is determined through the ACOSS and revenue allocation, and does not 16 decline because some residential customers are placed on Rate HP. If heat pump 17 customers pay less, other customers must pay more. 18 intra-class issue within the residential class, CL&P’s marginal cost witness identifies 19 the appropriate remedy: rebalancing cost recovery within the class from usage charges 20 toward fixed charges.111 That remedy does not require any other class to make up 21 revenue. 110 111 Docket No. 22-08-08, August 25, 2023 Decision at 250-251. Nieto MCOS Direct at 4, lines 20-22, and 5, lines 1-7. BRUBAKER & ASSOCIATES, INC. To the extent there is an
  2. Page 33 of 130

    James R. Dauphinais Page 31 1 C. Rate HP Is Not Revenue Neutral 2 Q IS RATE HP DESIGNED TO BE REVENUE NEUTRAL? 3 A No. Mr. Velez confirms that Rate HP is not designed to be revenue neutral with respect 4 to the residential class as a whole,112 and he expressly rejects a revenue-neutral 5 design. He states that a seasonal design that lowers the winter rate but raises the 6 summer rate “merely shifts the overpayment between seasons, defeating the entire 7 purpose of a heat pump rate,” and that neither season’s rates should be set higher than 8 those in Rate 1.113 He also states that no heat pump customer would be made worse 9 off by being placed on Rate HP.114 Mr. Velez recognizes that a revenue-neutral 10 redesign of the retail transmission charge would involve “lowering it in winter and raising 11 it in summer,”115 and that a lower rate available to all customers “would create a 12 revenue shortfall under heavy enrollment.”116 However, his direct testimony does not 13 quantify the revenue shortfall Rate HP itself would create or identify who would pay it. 14 In discovery, he states that he considered how that shortfall would be recovered 15 between rate cases “but did not address it in [his] testimony.”117 16 Q HOW LARGE COULD THAT REVENUE SHORTFALL BE? 17 A Mr. Velez has now quantified it. He estimates that automatically enrolling the 18 approximately 55,000 existing heat pump customers who have received Energize CT 19 rebates, as he recommends, would reduce CL&P’s revenue by $39.8 million in 20 distribution and $17.4 million in transmission, or about $57.2 million in total, in the first 112 CLF-SC Response to Data Request CIEC-2(a) of CIEC Set 2. Velez Direct at 101, lines 6-17. 114 Id. at 95, lines 1-4. 115 Id. at 83, footnote 75. 116 Id. at 95, lines 14-16. 117 CLF-SC Response to Data Request CIEC-2(d) of CIEC Set 2. 113 BRUBAKER & ASSOCIATES, INC.
  3. Page 34 of 130

    James R. Dauphinais Page 32 1 rate year and by approximately the same amount every year thereafter.118 He agrees 2 that these customers’ load is already on CL&P’s system and already reflected in the 3 sales used to set rates in this proceeding, and that enrolling them in Rate HP would 4 produce no new load and no reduction in CL&P’s costs.119 5 therefore a pure revenue reduction. Mr. Velez estimates that recovering it solely from 6 the residential class would raise Rate 1 distribution and transmission charges by about 7 0.61¢ per kWh, or about $4.24 per month for the average residential customer not on 8 Rate HP.120 The $57.2 million is 9 Q WHO WOULD PAY THE SHORTFALL? 10 A Mr. Velez’s direct testimony does not say. In discovery, he states that it should be paid 11 by other residential customers, but he acknowledges that CL&P’s reconciling 12 mechanisms would not produce that result.121 13 $19.7 million per year of the distribution shortfall would be recovered from 14 non-residential classes through the RDM, and approximately $8.3 million per year of 15 the transmission shortfall through the TAC, each year until the next rate case.122 16 CL&P’s description of those mechanisms confirms this. Between rate cases, any 17 shortfall in distribution revenue relative to CL&P’s authorized revenue target would be 18 recovered through the RDM, and CL&P proposes that the RDM rate “be set at a flat 19 kWh rate across all rate classes.”123 Rate 39 and Rate 57 are both subject to the RDM 20 per-kWh charge.124 CL&P confirms that the RDM rate would be a single per-kWh rate 118 He estimates that approximately CLF-SC Response to Data Request CIEC-1(a) and (b) and CIEC-12(c) of CIEC Set 2. $39.8 million + $17.4 million = $57.2 million. 119 CLF-SC Response to Data Request CIEC-12(a) and (b) of CIEC Set 2. 120 CLF-SC Response to Data Request CIEC-3(c) and CIEC-6(c) of CIEC Set 2. 121 CLF-SC Response to Data Request CIEC-2(b) and (d) of CIEC Set 2. 122 Id. 123 Davis and Parsons Direct at 22, lines 16-21. 124 Exhibit CLP-RATES-3 at 87 and 109. BRUBAKER & ASSOCIATES, INC.
  4. Page 35 of 130

    James R. Dauphinais Page 33 1 applied to all rate classes, including Rate 39, Rate 57 and Rate 58.125 Based on current 2 billing determinants, Rate 1 bears only 38.8% of any RDM charge, while Rates 39, 57 3 and 58 together bear 13.7%.126 4 revenues billed to customers against CL&P’s transmission costs “on a fully reconciling 5 basis,” applies to all customers taking delivery service, and, as proposed, is determined 6 by dividing the transmission revenue requirement and any true-up by anticipated kWh 7 sales.127 8 requirement, including any true-up, among rate class groups in proportion to their 9 demands coincident with CL&P’s twelve monthly system peaks, and only then converts 10 each group’s share to a per-kWh rate.128 In other words, the distribution revenue that 11 Rate HP fails to collect from heat pump customers would be recovered from all 12 customers, including CIEC’s members, on a per-kWh basis, which falls most heavily 13 on high load factor industrial customers. The transmission revenue that Rate HP fails 14 to collect would likewise be recovered from all rate classes, including those in which 15 CIEC’s members take service, in proportion to their demands at CL&P’s monthly 16 system peaks. Similarly, the TAC reconciles the transmission In practice, however, CL&P first allocates the transmission revenue 17 CIEC’s members and other non-residential customers should not be required 18 to fund a discount whose stated purpose is to address what Mr. Velez characterizes as 19 a cross-subsidy “within the residential customer class.”129 Mr. Velez agrees. He states 20 that no portion of the revenue reduction should be recovered from customers outside 21 the residential class, and that he “would welcome” a requirement that it be recovered 125 CL&P Response to Data Request CIEC-048(b) and (d) (Table 2). 1.3% + 4.1% + 8.3% = 13.7%. 126 Id. 127 Exhibit CLP-RATES-3 at 186-187. 128 CL&P Response to Data Request UCONN-024(a)-(b), as referenced in CL&P Response to Data Request CIEC-049(a); CLF-SC Response to Data Request CIEC-2(d) and CIEC-8(a) of CIEC Set 2. 129 Velez Direct at 5, lines 10-13. BRUBAKER & ASSOCIATES, INC.
  5. Page 36 of 130

    James R. Dauphinais Page 34 1 solely from the residential class.130 That result, however, would require affirmative 2 action by the Authority, because, as Mr. Velez acknowledges, neither the RDM nor the 3 TAC “currently works this way.”131 By contrast, the seasonal TOU rate proposed by 4 OCC Witness Whited is designed to be revenue neutral with Rate 1.132 5 D. Winter Load Affects CL&P’s Transmission Costs 6 Q MR. VELEZ CONCLUDES THAT HEAT PUMP LOAD IN WINTER CAUSES 7 8 ESSENTIALLY NO TRANSMISSION COST. DO YOU AGREE? A No. Mr. Velez estimates marginal transmission cost by spreading an avoided 9 Pool Transmission Facility cost from the 2024 Avoided Energy Supply Components 10 study across hours based on the probability of the New England system peak, which 11 places that cost almost entirely in the summer.133 That is not how CL&P incurs the 12 transmission costs recovered through its retail transmission rates. As OCC Witness 13 Whited notes, ISO-NE allocates transmission costs based on monthly coincident peak 14 demand (“12CP”).134 Under a 12CP method, CL&P’s share of regional transmission 15 costs depends on its load at the time of the peak in each month, including each of the 16 five winter months in which Rate HP would reduce the transmission service rate by 17 75%. Heat pump load that increases CL&P’s monthly peak loads in the winter therefore 18 increases the transmission costs allocated to CL&P, and the TAC passes those costs 19 through to CL&P’s retail customers. CL&P confirms that its RNS and Local Network 20 Service charges are based on its network load at the time of each monthly peak, and 21 that each 1 MW increase in that load increased its 2026 RNS charges by 130 CLF-SC Response to Data Request CIEC-2(c), CIEC-3(b) and CIEC-16(b) of CIEC Set 2. CLF-SC Response to Data Request CIEC-2(d) of CIEC Set 2. 132 Whited Direct at 29, lines 6-13. 133 Velez Direct at 15, lines 5-10, and 16, lines 1-5. 134 Whited Direct at 34, lines 18-20. 131 BRUBAKER & ASSOCIATES, INC.
  6. Page 37 of 130

    James R. Dauphinais Page 35 1 $14,802 per month.135 Each MW of additional load at the monthly peaks of November 2 through March would therefore add approximately $74,000 per year in RNS charges 3 alone.136 CL&P also allocates its retail transmission revenue requirement among rate 4 classes using a 12CP allocator.137 Mr. Velez agrees that ISO-NE bills CL&P for 5 regional network service each month based on CL&P’s load in a single peak hour of 6 that month, “including in November through March,” and that if CL&P’s load in a 7 January peak hour rises, CL&P “pays a larger share” of regional transmission costs.138 8 He has not estimated the effect of heat pump adoption on CL&P’s November through 9 March monthly peak loads or on the transmission costs allocated to CL&P.139 10 Q 11 12 DOES THE MASSACHUSETTS PRECEDENT MR. VELEZ CITES SUPPORT HIS TRANSMISSION PROPOSAL? A No. According to the language Mr. Velez quotes, the Massachusetts Department of 13 Public Utilities directed National Grid and Unitil to calculate their winter transmission 14 charges “to recover the winter transmission revenue requirement over the adjusted 15 winter sales.”140 That is a cost recovery approach under which winter transmission 16 charges are designed to recover the transmission revenue requirement attributable to 17 the winter. It is not a reduction of winter transmission charges to an estimate of 18 marginal cost. Mr. Velez now concedes that the Massachusetts winter transmission 19 charges “were designed to recover a winter transmission revenue requirement” and 20 “were not set at an estimate of marginal transmission cost,” and that he is not aware of 135 CL&P Response to Data Request CIEC-050(a) and (c). $14,802 per month x 5 months = $74,010. 137 CL&P Response to Data Request UCONN-024(a)-(b), as referenced in CL&P Response to Data Request CIEC-049(a). 138 CLF-SC Response to Data Request CIEC-7(b) of CIEC Set 2. 139 CLF-SC Response to Data Request CIEC-7(c) of CIEC Set 2. 140 Velez Direct at 84, footnote 76. 136 BRUBAKER & ASSOCIATES, INC.
  7. Page 38 of 130

    James R. Dauphinais Page 36 1 any jurisdiction that has set a heat pump rate’s retail transmission charge at an estimate 2 of marginal transmission cost.141 3 revenue shortfalls from heat pump rates are recovered through company-wide 4 reconciling mechanisms, so that part of them is paid by non-residential customers.142 5 Similarly, the fact that Rate 5 has a transmission service rate about 3% lower than that 6 of Rate 1143 does not show that a 75% winter reduction for heat pump customers is 7 cost-based. He also acknowledges that, in Massachusetts, 8 E. Winter Distribution Costs Will Not Remain Near Zero 9 Q IS IT REASONABLE TO ASSUME THAT WINTER HEAT PUMP LOAD WILL 10 11 CONTINUE TO CAUSE NEAR-ZERO DISTRIBUTION COSTS? A No. Mr. Velez’s conclusion depends on CL&P’s distribution system remaining summer 12 peaking with substantial winter headroom.144 CL&P’s marginal cost of service study, 13 on which he relies, finds that CL&P will remain summer peaking only “through year 14 2031, which is the study period covered by the analysis.”145 Although CL&P does not 15 currently project a transition to winter peaking within its ten-year forecast horizon, one 16 of its substations already has winter and summer peaks on par, and CL&P plans to 17 begin developing a substation-level winter peak load forecast with its 2028 forecast.146 18 CL&P’s marginal cost witness also cautions that “[i]n the longer-term, additional 19 electrification will shift more cost responsibility to the winter evening hours.”147 20 Rate HP, combined with automatic enrollment, would deeply discount the very winter 141 CLF-SC Response to Data Request CIEC-8(b) and (c) of CIEC Set 2. CLF-SC Response to Data Request CIEC-8(d) of CIEC Set 2. 143 Id. at 83, lines 13-14. (5.050 - 4.901) / 5.050 = 3.0%. 144 Velez Direct at 20, lines 9-12, 21, lines 1-8, and 22, lines 1-14. 145 Nieto MCOS Direct at 6, lines 9-14. 146 CL&P Response to Data Request CIEC-051(a) and (b). 147 Nieto MCOS Direct at 19, lines 3-4. 142 BRUBAKER & ASSOCIATES, INC.
  8. Page 39 of 130

    James R. Dauphinais Page 37 1 load that would drive that shift. Once winter loads begin to drive distribution investment, 2 heat pump customers would be paying winter distribution energy charges set at roughly 3 29% of Rate 1 levels for the load causing that investment.148 4 recommendation to recalibrate Rate HP in later proceedings149 does not address the 5 costs that would be shifted in the interim, and rate discounts that customers have come 6 to rely upon are difficult to unwind. Mr. Velez has not analyzed when CL&P’s system, 7 substations or feeders would become winter peaking, and he would not support a 8 requirement that Rate HP automatically expire if winter loads begin to drive distribution 9 capacity investment.150 Mr. Velez’s 10 F. Recommendations 11 Q WHAT DO YOU RECOMMEND WITH RESPECT TO MR. VELEZ’S PROPOSAL? 12 A The Authority should reject Rate HP. To the extent the Authority approves any heat 13 pump rate in this proceeding, whether Rate 6 as proposed by CL&P, the seasonal TOU 14 rate proposed by Ms. Whited, or another design, it should require that: (i) the rate be 15 designed to be revenue neutral within the residential class; (ii) any revenue shortfall 16 resulting from the rate be recovered solely from the residential class and not be shifted 17 to other rate classes through revenue allocation, the RDM, the TAC or any other 18 mechanism; and (iii) the transmission charges under the rate recover the transmission 19 costs attributable to the customers taking service under it. 148 100% - 71% = 29%. Velez Direct at 7, lines 9-12. 150 CLF-SC Response to Data Request CIEC-9(b) and (c) of CIEC Set 2. 149 BRUBAKER & ASSOCIATES, INC.
  9. Page 40 of 130

    James R. Dauphinais Page 38 IV. RESPONSE TO UCONN WITNESS PERKINS 1 2 Q PLEASE SUMMARIZE MR. PERKINS’ RECOMMENDATIONS. 3 A Mr. Perkins makes two recommendations. First, he recommends that the Authority 4 require CL&P to introduce a voluntary, opt-in CPT rate option for customers taking 5 service under Rates 55, 56, 57 and 58.151 6 transmission demand charge would be based on its average 60-minute kW demand 7 during CL&P’s monthly peak load hour in the prior month, as determined for reporting 8 Regional Network Service (“RNS”) loads to ISO-NE. The customer’s distribution, public 9 benefits and supply charges would retain their existing billing determinants.152 Second, 10 he recommends that the Authority direct CL&P to examine time-of-day and seasonal 11 differentiation of distribution demand charges for large customers.153 I respond to each 12 recommendation below. A participating customer’s monthly 13 Q WHAT IS YOUR RESPONSE TO MR. PERKINS’ PROPOSED CPT RATE OPTION? 14 A I support the CPT rate option on the voluntary, opt-in basis Mr. Perkins proposes. As 15 Mr. Perkins explains, and as I discuss in Section III.D, ISO-NE allocates regional 16 transmission costs to CL&P based on its monthly coincident peak load, and CL&P’s 17 RNS charges equal the annual RNS rate multiplied by its Monthly Regional Network 18 Load.154 A transmission charge based on a customer’s demand during CL&P’s monthly 19 peak hour mirrors how CL&P actually incurs the transmission costs it recovers from its 20 customers. It also gives customers that are able to reduce their load during those hours 21 a price signal to do so. Those reductions can lower the transmission costs allocated 151 UConn Witness Perkins Direct at 15, lines 7-14, and 17, lines 4-10. Id. at 27, lines 5-11, and 28, lines 1-7. 153 Id. at 15, lines 15-17. 154 Perkins Direct at 11, line 19, through 12, line 2, and 19, lines 13-14; see also Whited Direct at 34, lines 18-20. 152 BRUBAKER & ASSOCIATES, INC.
  10. Page 41 of 130Match

    James R. Dauphinais Page 39 1 to CL&P and, in turn, the transmission costs recovered from all customers through the 2 TAC. Offered as an option, the rate lets customers that can respond to that price signal 3 do so, without forcing a change on customers that cannot. 4 However, I oppose any mandatory application of the CPT rate option, whether 5 in this proceeding or a future one. Mr. Perkins suggests that the option should remain 6 voluntary only “[u]ntil Eversource provides its RNS data publicly.”155 Better data would 7 not solve the underlying problem. A CPT rate concentrates a customer’s transmission 8 charges on its load during just twelve hours each year. Many customers cannot control 9 their load in those hours. Manufacturing processes that must run continuously or on 10 fixed production schedules, facilities whose loads peak on the same hot summer 11 afternoons or cold winter evenings that drive the monthly system peaks, and operations 12 dictated by their own customers’ demands would all see their transmission charges 13 determined largely by circumstances beyond their control. 14 mandatory application could produce severe and unexpected bill increases, as well as 15 transmission charges that swing from year to year depending on the timing of a few 16 hours of load. 17 requirement, any reduction in charges to customers that can shift load would be made 18 up by customers that cannot. Those consequences could be severe enough to affect 19 whether some customers can continue operating in Connecticut, which would in turn 20 harm affordability for the customers who remain. 21 For such customers, Because the rate would recover the same transmission revenue The Massachusetts precedent Mr. Perkins cites does not support mandatory 22 application either. 23 Eversource’s Rate T-5 in Western Massachusetts, which is limited to customers with 24 maximum demands above 2,500 kW.156 That rate design was proposed by those large 155 156 The only CPT rate he describes that applies automatically is Perkins Direct at 29, lines 12-14. Perkins Direct at 31, lines 9-17. BRUBAKER & ASSOCIATES, INC.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]

This filing on the current system (opens in a new tab)