  1. Page 4 of 130

    James R. Dauphinais Page 2 1 Q ARE YOU SPONSORING ANY EXHIBITS WITH YOUR REBUTTAL TESTIMONY? 2 A Yes. I am sponsoring Exhibit JRD-4, which contains copies of by CL&P’s, Conservation 3 Law Foundation and Sierra Club’s (“CLF-SC”), and Office of Consumer 4 Counsel’s (“OCC”) responses to the data requests cited in my rebuttal testimony. 5 Q WHAT IS THE PURPOSE OF YOUR REBUTTAL TESTIMONY? 6 A My rebuttal testimony responds to specific positions taken in the direct testimony of: 7 (i) OCC Witness Melissa Whited regarding CL&P’s Allocated Cost of Service 8 Study (“ACOSS”) and CL&P’s proposed Economic Development Rider (“EDR”); 9 (ii) CLF-SC Witness Juan-Pablo Velez regarding his proposed residential heat pump 10 rate (“Rate HP”); and (iii) University of Connecticut (“UConn”) Witness Eben Perkins 11 regarding his proposed Coincident Peak Transmission (“CPT”) rate option and 12 distribution rate design study for large customers. My rebuttal testimony is organized 13 by witness. 14 My silence in this testimony with regard to any issue raised by these witnesses, 15 or any other witness in this proceeding, in direct testimony should not be construed as 16 an endorsement of their respective positions on that issue. 17 Q PLEASE SUMMARIZE YOUR REBUTTAL TESTIMONY CONCLUSIONS. 18 A For the reasons detailed in my testimony herein, I recommend that the Public Utilities 19 Regulatory Authority (“PURA” or “Authority”): 20 21 22 23 24 25 Reject OCC Witness Whited’s recommendation to classify Advanced Metering Infrastructure (“AMI”) meter costs as 38% customer-related, 47% demand-related and 15% energy-related based on projected AMI program benefits, just as the Authority rejected a similar OCC proposal for The United Illuminating Company (“UI”) in Docket No. 24-10-04, and continue to classify AMI meter costs as customer-related; 26 27 Reject OCC Witness Whited’s recommendation to replace CL&P’s minimum distribution system method with the “basic customer method,” which the BRUBAKER & ASSOCIATES, INC.
  2. Page 5 of 130

    James R. Dauphinais Page 3 1 2 3 Authority declined to adopt for UI in Docket No. 24-10-04 and which, as Ms. Whited’s own testimony shows, would further reduce the already below-average rates of return of Rate 39 and Rate 57; 4 5 6 7 To the extent the Authority requires a load-carrying capability adjustment to CL&P’s minimum distribution system method, base it on the load-carrying capability of the specific minimum-sized facilities in CL&P’s study, as the Authority did for UI, rather than on generic values from other jurisdictions; 8 9 10 11 12 To the extent the Authority requires CL&P to prepare an equipment-level distribution allocation study for its next rate case as Ms. Whited proposes, treat it as a supplement to, not a replacement for, the conventional ACOSS, and require that it continue to differentiate costs by the voltage level at which customers take service; 13 14 15 16 17 Decline to adopt Ms. Whited’s proposed categorical exclusion of data center loads from the EDR or, if the Authority adopts such an exclusion, define it narrowly and objectively, such as by limiting it to facilities of at least 50 MW classified under NAICS code 518210, so that it does not exclude manufacturing or other industrial loads; 18 19 20 Reject Ms. Whited’s recommendation that EDR participants be required to take service under a time-of-use (“TOU”) rate, including but not limited to one that has yet to be designed or filed; 21 22 23 24 Clarify that, in applying any hurdle rate analysis and discount cap the Authority adopts for the EDR, costs the customer pays directly through a Contribution in Aid of Construction (“CIAC”) or otherwise are not counted again as costs of serving the incremental load; 25 26 27 28 29 30 31 Reject CLF-SC Witness Velez’s proposed Rate HP, which by his own estimate would reduce the distribution and transmission revenue CL&P collects by approximately $57.2 million per year from the automatic enrollment of existing heat pump customers alone, whose load is already on the system, and which, as he acknowledges, would shift approximately $28 million per year of that shortfall to non-residential customers through CL&P’s reconciling mechanisms until the next rate case; 32 33 34 35 36 Require that any heat pump rate the Authority approves be revenue neutral within the residential class, so that no revenue shortfall from that rate is shifted to other rate classes through revenue allocation, the Revenue Decoupling Mechanism (“RDM”), the Transmission Adjustment Clause (“TAC”) or any other mechanism; 37 38 39 40 41 42 Approve UConn Witness Perkins’ proposed CPT rate option on the voluntary, opt-in basis he proposes, because it aligns with how CL&P incurs transmission costs under the ISO New England Inc. Open Access Transmission Tariff, but reject any mandatory application of that rate, which could have severe unintended affordability consequences for customers that cannot control their load during the hours that determine their charges; and BRUBAKER & ASSOCIATES, INC.
  3. Page 6 of 130

    James R. Dauphinais Page 4 1 2 3 4 5 Treat any study of time-differentiated distribution demand charges and the distribution demand ratchet that the Authority directs in response to Mr. Perkins as informational, and require that any resulting proposal be supported by classand customer-specific bill impact analysis and considered in a future rate proceeding. II. RESPONSE TO OCC WITNESS WHITED 6 7 A. Classification of AMI Meter Costs 8 Q WHAT 9 10 DOES MS. WHITED RECOMMEND WITH RESPECT TO THE CLASSIFICATION OF AMI METER COSTS? A Ms. Whited recommends that AMI meter costs be classified as 38% customer-related, 11 47% demand-related and 15% energy-related, rather than 100% customer-related.1 12 She derives these percentages by assigning each category of benefit in CL&P’s AMI 13 benefit-cost analysis to a classification of her choosing and weighting each category by 14 its net present value.2 As she acknowledges, the “[c]lassification is my own.”3 15 Q 16 17 HAS THE AUTHORITY PREVIOUSLY ADDRESSED A PROPOSAL TO CLASSIFY AMI METER COSTS BASED ON AMI BENEFITS? A Yes. In UI’s most recent rate case, Docket No. 24-10-04, OCC proposed that AMI 18 costs be “classified proportionally according to the benefits in the customer, demand, 19 and energy categories.”4 CIEC opposed that proposal on the grounds that “allocating 20 AMI costs based on the benefits of AMI technology does not constitute cost-based 21 allocation.”5 The Authority agreed with CIEC and affirmed UI’s “classification of AMI 22 meters as 100% customer-related, which is consistent with cost causation principles.”6 1 Whited Direct at 4, lines 11-15, and 12, lines 1-4 (Table 1). Id. at 11, lines 3-15, and 12, line 1 (Table 1). 3 Id. at 12, line 2. 4 Docket No. 24-10-04, October 28, 2025 Decision at 197. 5 Id. at 196, footnote 117. 6 Id. at 198. 2 BRUBAKER & ASSOCIATES, INC.
  4. Page 7 of 130

    James R. Dauphinais Page 5 1 Ms. Whited does not mention that determination. In discovery, she confirmed it and 2 stated that her only basis for a different result is that CL&P, unlike UI, has quantified 3 AMI benefits.7 But the Authority affirmed UI’s classification because it is “consistent 4 with cost causation principles,” not for lack of benefit data. Quantifying the benefits of 5 AMI does not change what causes the cost of a meter. 6 Q 7 8 WHY IS IT INAPPROPRIATE TO CLASSIFY AMI METER COSTS BASED ON PROJECTED AMI BENEFITS? A Cost classification is intended to identify what causes a cost to be incurred. The cost 9 of an AMI meter is incurred because each customer must be metered in order to be 10 served and billed, and that cost varies with the number and type of meters installed, 11 not with the customer’s peak demand or energy usage. That is why the National 12 Association of Regulatory Utility Commissioners (“NARUC”) Electric Utility Cost 13 Allocation Manual (“NARUC Manual”) states that meters “are generally classified on a 14 customer basis,” with any demand component intended “to show that larger-usage 15 customers require more expensive metering equipment.”8 CL&P’s ACOSS follows that 16 approach by allocating meter plant using a weighted meter cost allocator that reflects 17 the relative installed cost of the meters serving each class.9 Ms. Whited’s approach 18 would instead classify meter costs according to who she believes benefits from the AMI 19 program, which is a value-of-service concept rather than cost causation. 20 21 Ms. Whited herself agrees that “[c]lassifying traditional meters as customer-related is reasonable, because their primary function is to measure each 7 OCC Response to Data Request CIEC-9(a)-(c). Copies of the data request responses cited in my rebuttal testimony are provided in alphanumeric order by responding part in Exhibit JRD-4. 8 NARUC Manual at 96. 9 CL&P Witness Nieto ACOS Direct (Exhibit CLP-ACOS-1) at 6, lines 21-25. BRUBAKER & ASSOCIATES, INC.
  5. Page 8 of 130

    James R. Dauphinais Page 6 1 customer’s usage for billing.”10 2 additional capabilities do not change why the meter is installed or what drives its cost. 3 Moreover, most of those capabilities produce benefits only if CL&P takes further action 4 (such as deploying Volt/VAR Optimization (“VVO”)) or customers respond to price 5 signals, and the time-varying and demand-based rate designs Ms. Whited associates 6 with AMI were in use long before AMI. 7 Q 8 9 An AMI meter performs that same function. Its DO THE BENEFITS MS. WHITED RELIES UPON CORRESPOND TO THE COST OF AMI METERS? A No. First, the benefits Ms. Whited uses are the benefits of CL&P’s entire AMI program, 10 which includes a new customer information system, a meter data management system, 11 a communications network and VVO enablement, not just the meters.11 For example, 12 she classifies $163.8 million of VVO benefits as energy and demand, $106.2 million 13 and $57.6, respectively, and $96.4 million of “Asset Optimization” benefits as 14 demand-related.12 CL&P’s benefit-cost analysis separately includes $212.3 million (net 15 present value) of VVO enablement costs, and the “Asset Optimization” benefit consists 16 of the line sensors that AMI would allow CL&P to avoid “as part of the VVO build-out.”13 17 Those benefits are attributable to the VVO investment at least as much as to the 18 meters, yet Ms. Whited uses them to reclassify the cost of the meters. 19 $97.3 million of six-year VVO enablement capital consists of regulators, capacitors, 20 transformer load tap changer controller upgrades and related integration costs, none 21 of which are meters.14 Ms. Whited concedes that the VVO benefits also require other 10 CL&P’s Whited Direct at 9, lines 13-14. CL&P Witnesses Lawrence and Horton Direct (Exhibit CLP-AMI-1) at 4, lines 14-20, and 5, lines 1-4; Exhibit CLP-AMI-3 at 17-18, Figure 7. 12 Whited Direct at 12, line 1 (Table 1). 13 Exhibit CLP-AMI-3 at 17, Figure 7, and 47. 14 CL&P Response to Data Request CIEC-039(c). 11 BRUBAKER & ASSOCIATES, INC.
  6. Page 9 of 130

    James R. Dauphinais Page 7 1 investments, that “it would be reasonable to only attribute a portion of these benefits to 2 the meters themselves,” and that “it is unclear what proportion should be attributed to 3 the meters themselves.”15 Her classification nonetheless attributes all of them to the 4 meters. 5 Second, the benefits in CL&P’s analysis do not even equal its costs. On a net 6 present value basis, CL&P’s benefit-cost analysis shows total AMI benefits of 7 $1,205.4 million, a net benefit of negative $351.9 million, and a benefit-cost ratio of 8 0.77.16 A classification derived from projected benefits is therefore not a measure of 9 the costs being classified. Ms. Whited also acknowledges that her classification would 10 change whenever the estimated or actual benefits change,17 even though the meters 11 and their cost would not. 12 Third, the assignment of benefits to classifications is subjective. For example, 13 Ms. Whited classifies $162.4 million of “Improved Restoration – Significant Storms” 14 benefits as demand-related.18 That single category accounts for about 42% of the 15 $388.2 million of benefits she classifies as demand-related.19 Yet CL&P bases that 16 benefit on reduced storm restoration expense and on the value of reduced customer 17 outage time, which it describes as “a savings benefit realized directly by customers,” 18 and it acknowledges that the realized avoided cost “will be nearly impossible to 19 calculate.”20 CL&P has since confirmed that $157.2 million of the $162.4 million is 20 avoided storm restoration expense, and that its ACOSS allocates storm restoration 21 costs to rate classes on total rate base, so that their classification between demand 22 and customer “implicitly followed the same classification as the sum of the components 15 OCC Response to Data Request CIEC-4(a)-(b). Exhibit CLP-AMI-3 at 17-18, Figure 7. 17 OCC Response to Data Request CIEC-6(b). 18 Whited Direct at 12, line 1 (Table 1). 19 $162.4 million / $388.2 million = 41.8%. 20 Exhibit CLP-AMI-3 at 66-67. 16 BRUBAKER & ASSOCIATES, INC.
  7. Page 10 of 130

    James R. Dauphinais Page 8 1 that make up the overall rate base.”21 CL&P does not treat those costs as 100% 2 demand-related. 3 demand-related is that the plant being restored would be 100% demand-related under 4 the basic customer method she proposes,22 which the Authority has declined to adopt, 5 as I discuss in Section II.B. 6 Q 7 8 Ms. Whited’s only support for classifying this benefit as ARE CL&P’S LARGE INDUSTRIAL CUSTOMERS THE REASON FOR THE AMI INVESTMENT? A No. CL&P’s large industrial customers are already billed under time-differentiated 9 demand rates. Rate 39 and Rate 57 both have defined on-peak and off-peak periods. 10 Rate 57 bills its distribution and transmission demand charges per kVA and sets its 11 customer charge based on the customer’s highest average 30-minute demand.23 12 Rate 39, Rate 57 and Rate 58 customers already have meters that record interval data, 13 and because these installations commonly involve metering complexities, CL&P will 14 evaluate them case by case to determine whether AMI meters can meet their needs at 15 all.24 Ms. Whited has not reviewed the metering capabilities of Rate 39 or Rate 57 16 customers.25 17 AMI-related costs describes the AMI deployment as replacing “existing traditional 18 non-interval metering infrastructure.”26 The capabilities Ms. Whited emphasizes, such 19 as time-varying rates and granular load data, are therefore primarily new capabilities 20 for residential and small commercial customers. Shifting AMI meter costs onto demand The Connecticut statute under which CL&P proposes to securitize 21 CL&P Response to Data Request CIEC-041(a) and (b). OCC Response to Data Request CIEC-5(a). 23 Exhibit CLP-RATES-3 at 89 and 108-109. 24 CL&P Response to Data Request CIEC-038(b) and (c). 25 OCC Response to Data Request CIEC-7. 26 Lawrence and Horton Direct at 31, lines 11-21 (quoting Conn. 16-245e(a)(21)(B)). 22 BRUBAKER & ASSOCIATES, INC. Gen. Stat. §
  8. Page 11 of 130

    James R. Dauphinais Page 9 1 and energy allocators would require large customers, whose more costly meters are 2 already reflected in the weighted meter cost allocator, to also subsidize the 3 replacement of meters for smaller customers. Ms. Whited’s own illustration shows the 4 magnitude. For every $1 million of AMI meter revenue requirement, her classification 5 would increase the amount allocated to Rate 39 about 17-fold (from $182 per million to 6 $3,118 per million), to Rate 57 about six-fold (from $3,090 per million to $18,276 per 7 million) and to Rate 58 about 7.5-fold (from $4,261 per million to $31,867 per million), 8 while reducing the amount allocated to Rate 1 by about $113,000 per million, or 17%.27 9 Q 10 11 DOES THE MARYLAND DECISION MS. WHITED CITES WARRANT A DIFFERENT CONCLUSION? A No. A single decision by another state commission ten years ago, based on the record 12 in that case, carries less weight than this Authority’s own determination for UI last year. 13 Moreover, the classification Ms. Whited proposes here (38% customer, 47% demand 14 and 15% energy) differs considerably from the one approved in Maryland 15 (25% customer, 37.5% demand and 37.5% energy),28 which illustrates how dependent 16 a benefits-based classification is on the analyst’s judgment and on the particular 17 benefit-cost analysis used. Furthermore, in response to discovery, Ms. Whited could 18 only identify two additional state commission decisions supporting a benefits-based 19 classification (Minnesota and Colorado) and, in the case of one of those (Colorado), 20 83% of AMI costs were classified as customer-related, more than twice the 38% 21 Ms. Whited proposes.29 27 OCC Response to Data Request CIEC-8(b), Attachment “Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx.” 28 Whited Direct at 12, lines 5-9. 29 OCC Response to Data Request CIEC-9(d); Colorado PUC Decision No. C24-0117, Proceeding No. 23AL-0243E, at 22-23, ¶¶ 61-64. BRUBAKER & ASSOCIATES, INC.
  9. Page 12 of 130

    James R. Dauphinais Page 10 1 Q WHAT DO YOU RECOMMEND? 2 A Consistent with its determination for UI in Docket No. 24-10-04, the Authority should 3 reject Ms. Whited’s recommendation and direct that AMI meter costs continue to be 4 classified as customer-related. CL&P agrees. It expects to record the full cost of its 5 AMI meters, including installation, in FERC Account 370 (Meters), and expects that 6 AMI meter costs “will be properly classified as customer-related costs, consistent with 7 treatment of meter costs in the allocated cost-of-service study.”30 Consistent with my 8 direct testimony, those costs should be allocated using the weighted meter cost 9 allocator in CL&P’s ACOSS. 10 B. Minimum Distribution System Method 11 Q WHAT DOES MS. WHITED RECOMMEND WITH RESPECT TO CL&P’S MINIMUM 12 13 DISTRIBUTION SYSTEM METHOD? A Ms. Whited recommends that the Authority reject CL&P’s Minimum Distribution 14 System (“MDS”) method and instead adopt the “basic customer method,” under which 15 only meters, services, meter reading and billing costs would be classified as 16 customer-related, and all of the costs of poles, conductors and line transformers in 17 FERC Accounts 364 through 368 would be classified as demand-related.31 She also 18 recommends that CL&P develop a customer density-based classification approach for 19 its next rate case and, if the MDS method is retained, that each class’s Non-Coincident 20 Peak (“NCP”) demand be reduced by the load-carrying capability of the minimum 21 system.32 30 CL&P Response to Data Request CIEC-039(a) and CIEC-040(d). Whited Direct at 18, lines 8-17, and 19, lines 8-9. 32 Id. at 4, lines 3-10. 31 BRUBAKER & ASSOCIATES, INC.
  10. Page 13 of 130

    James R. Dauphinais Page 11 1 Q HAS THE AUTHORITY CONSIDERED THIS RECOMMENDATION BEFORE? 2 A Yes. OCC made the same recommendation in UI’s last two rate cases. In Docket 3 No. 22-08-08, the Authority found the minimum system method “generally acceptable” 4 and accepted its use.33 In Docket No. 24-10-04, OCC again proposed the basic 5 customer method. The Authority found that “it is not clear that the basic customer 6 method is a superior alternative,” explaining that “[c]osts classified as demand-related 7 under the basic customer method, such as poles and conductors, are unaffected by 8 changes in demand.” It accepted “the premise that the number of customers is an 9 acceptable, if imperfect, proxy for costs unrelated to demand,” and concluded that the 10 minimum system approach “is a just and reasonable approach to cost classification.”34 11 Ms. Whited cites the same decision for its load-carrying capacity adjustment,35 but does 12 not acknowledge that the Authority rejected the basic customer method in that decision. 13 In discovery, Ms. Whited confirmed both of those determinations. The reason she 14 offers for a different result here is that the basic customer method would reduce the 15 costs allocated to the residential class, given the size of CL&P’s proposed rate 16 increase.36 That is an argument about who should pay, not about what causes the 17 costs. 18 Q 19 20 IS THE AUTHORITY’S DETERMINATION IN DOCKET NO. 24-10-04 CONSISTENT WITH THE NARUC MANUAL? A Yes. The NARUC Manual explains that distribution plant Accounts 364 through 370 21 “involve demand and customer costs,” and that “the number of poles, conductors, 22 transformers, services, and meters are directly related to the number of customers on 33 Docket No. 22-08-08, August 25, 2023 Decision at 227-228. Docket No. 24-10-04, October 28, 2025 Decision at 198. 35 Whited Direct at 17, lines 11-15. 36 OCC Response to Data Request CIEC-10(a), (b) and (d). 34 BRUBAKER & ASSOCIATES, INC.