Prefiled testimony
Witness: James R. Dauphinais
Files1
26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
PDF · 1.9 MB · 130 pagesText searchable
Download 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdfRead the text of 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 44 of 130
Exhibit JRD-4 Page 1 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-08 Date Issued October 26, 2026 CIEC-036 Page 1 of 1 Date Filed: November 09, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: With reference to the Panel’s response to OCC-464, explain whether: a. The term “large-scale computational loads” includes only data centers, or if it also may be applied to other non-residential loads. b. There are specific criteria that Eversource uses to define what constitutes a “data center”? If the answer is in the affirmative, provide and explain the criteria. Response: a. The Company’s response relied on “data center” as the context for what is meant by the term “large scale computational load” referred to. b. There may be many different types of customers and loads whose characteristics fall within the classification of a data center. The State of Connecticut’s Office of Legislative research report, “Data Center Energy Impacts and State Responses” refers to a description of a data center as, generally, “a physical facility that houses and runs large computer systems.” The report further provides: “A data center typically contains multiple computer servers, data storage devices, and network equipment to store, manage, process, and transmit large amounts of data”. 1 The term “large-scale” provides additional specificity regarding what might be attributable to a specific data center. As stated in response to OCC-464, the Company believes the appropriate treatment of such loads, including whether a specific rate or customer-specific terms are warranted should be determined through deliberations with state agencies when that load materializes. 1 “Data Center Energy Impacts and State Responses”, Connecticut General Assembly, Office of Legislative Research, 2025-R-0164, Mary Fitzpatrick, October 14, 2025.Page 45 of 130
Exhibit JRD-4 Page 2 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-038 Page 1 of 2 Date Filed: November 12, 2026 Witness: Jared A. Lawrence, Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the AMI Panel Testimony at page 15, lines 12-21. a. Please provide the number of meters the Company expects to replace with AMI meters, by rate class (including Rate 39, Rate 57 and Rate 58). b. Please provide the number of Rate 39, Rate 57 and Rate 58 customers whose existing meters record interval demand or energy data, and identify the type of meter installed for those customers. c. Please state whether the meters of Rate 39, Rate 57 and Rate 58 customers that already record interval data will be replaced with AMI meters under the AMI Implementation Plan. If so, explain why replacement is necessary for those customers. d. Please provide the average installed cost per meter, by rate class, of (i) the existing meters and (ii) the AMI meters the Company plans to install. Response: a. The table below presents the Company’s best estimate of the number of meters that will be eligible for replacement with an AMI meter, disaggregated by rate class. These numbers are expected to change slightly based on population growth and technical limitations that prevent AMI meters for certain customer configurations that are not easily discernable from the rate class alone (such as the use of KYZ pulses or the need for real-time data). Rate 01 05 07 11 12 18 19 27 29 30 35 Count 1,089,364 137,777 842 315 381 173 3 524 232 109,281 1,276Page 46 of 130
Exhibit JRD-4 Page 3 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-038 Page 2 of 2 37 39 40 41 55 56 57 58 70 71 72 73 87 1,772 1 1,739 13 330 877 74 67 70 37 38 4 22,724 b. The table below lists the counts and various meter types on Rate 39, 57, and 58 that record interval data. There is some overlap between the meters on the table below and meters listed on the first table above because some interval meters will be eligible to move to AMI. Rate 39 39 57 57 57 58 58 58 Meter Type A3 Meter ION Meter A3 Meter ION Meter KV2C Meter A3 Meter ION Meter KV2C Meter Count 1 2 71 4 1 65 2 1 c. The Company will pursue installing AMI meters wherever possible for the Company and the customer to realize the benefits of AMI. With that said, these rates represent some of the largest electric delivery points that commonly include additional metering complexities such as totalization, KYZ pulses, real time data, or other contractual obligations. At a later date, the Company will evaluate all complex metering customers on a case-by-case basis to determine if AMI meters can meet the specific needs of each site/customer. d. Please refer to CIEC-038 Attachment 1, CONFIDENTIAL, for the requested pricing information.Page 47 of 130
Exhibit JRD-4 Page 4 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 1 of 5 Date Filed: November 16, 2026 Witness: Jared A. Lawrence, Douglas P. Horton, Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the AMI Panel Testimony at page 19, lines 1-6, and Exhibit CLP-AMI-3 at pages 16-17 (Figure 6). a. Figure 6 shows $309.2 million of six-year capital for “Meters,” consisting of $302.4 million for Meters and $6.8 million of Undepreciated Meter Balance. Please separate the $302.4 million into (i) meter equipment and (ii) meter installation labor and other costs, and identify the amount the Company expects to record in FERC Account 370. b. For each cost category shown in Figure 6, please identify the FERC account or accounts in which the Company expects to record the capital investment. c. Please identify the VVO Enablement facilities (e.g., substation and line equipment, software) included in the $97.3 million of six-year VVO Enablement capital shown in Figure 6, and state whether the Company proposes to recover those costs through the PBMRP as AMI costs or through another mechanism, and how it proposes to classify and allocate those costs to rate classes. Response: a. A full breakdown of the six-year capital for meters is shown in the table below 1. Please refer to CLP-AMI-3 starting on page 108 for a complete breakdown of all capital. 6-Year Meters – Nominal Capital Cost Meters - Deployment External Labor – Deployment Internal Labor – Deployment Returns/Follow-ups Meters – Replacements Internal Labor - Replacements Corporate Overhead Contingency Total 1 Note: these are rounded figures. $208.8M $51.8M $7.0M $2.8M $1.1M $3.8M $27.1M $302.4MPage 48 of 130
Exhibit JRD-4 Page 5 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 2 of 5 The Company expects to record the full cost of the meter equipment, the cost to install, and all associated costs, including overhead costs and allocations, to FERC Utility Account 370 - Meters. Please see Table 1 below. b. For each cost category shown in Figure 6, please see Table 1 below, which provides the Plant FERC Utility Account in which the Company expects to record the capital investment, once it is placed in service and unitized (final as built) to FERC Account 101010 (Electric Plant in Service).Page 49 of 130
Exhibit JRD-4 Page 6 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 3 of 5 c. A listing of the VVO Enablement facilities is shown in the table below. As described in the Company’s response to CIEC-040 i, the Company expects that AMI meter costs will be properly classified as customer-related costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customersPage 50 of 130
Exhibit JRD-4 Page 7 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 4 of 5 consistent with allocation of costs and rate design allowed in this proceeding for distribution rates or another applicable rate mechanism. 6-Year VVO Enablement – Nominal Capital Cost Regulators $37.5M Capacitors $27.3M Transformer LTC Controller Upgrades $16.0M Integration - Software $0.5M Integration – External Labor $1.0M Integration – Internal Labor $0.5M Corporate Overhead $0.5M Contingency $8.3M AFUDC $5.7M Total $97.3M Prior Referenced Responses: i CIEC-040 Question: Please refer to the AMI Panel Testimony at page 20, lines 9-21. a. Please confirm that, as stated at lines 9-11, the Company must be able to accurately and timely bill customers for service, and metering infrastructure is necessary to that end. b. Please confirm that, as stated at lines 12-15, the Company expects to migrate to AMI as its existing AMR meters reach the end of their useful lives, regardless of the BCA results. c. Please explain the statement at lines 18-20, that “optionality in taking advantage of many AMI benefits will be within the customer’s control,” and identify the AMI benefits in Exhibit CLP-AMI-3, to which that statement applies. d. When AMI meter costs are reflected in base distribution rates, does the Company intend to continue classifying AMI meter costs as customer-related, consistent with its treatment of meter costs in the ACOS Direct Testimony at page 4, lines 5-7? If not, explain why not. CIEC-040 Response: a. b. c. Yes, the Company must always be in a position to bill customers for service on a timely and accurate basis and metering infrastructure is necessary to that end. However, the manner in which the Company achieves this objective can take several forms. Based on the information available to the Company today, and the expectation that PURA and stakeholders’ consideration of the AMI Implementation Plan would benefit from a comparison with an AMR lifecycle alternative approach, the Company presented an analysis of a hypothetical AMR end-of-life scenario in its BCA. Should PURA not grant approval of the Company’s proposed AMI Plan, the Company would develop and consider alternative scenarios using the best information at that time, including an AMR end-of-life approach, in view of any additional guidance PURA provides in its order. The quantified AMI benefits largely within customer control are associated with their choice of participation in Time-of-use/Time-varying Rates. The non-quantified benefits largely within customer control arise inPage 51 of 130
Exhibit JRD-4 Page 8 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 5 of 5 d. relation to their election to receive outage restoration notifications; their receptiveness to detailed billing data and notifications; and their receptiveness to load disaggregation insights. Yes, the Company expects that AMI meter costs will be properly classified as customer-related costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customers consistent with allocation of costs allowed in this proceeding for distribution rates or another applicable rate mechanism.Page 52 of 130
Exhibit JRD-4 Page 9 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-040 Page 1 of 2 Date Filed: November 13, 2026 Witness: Jared A. Lawrence, Douglas P. Horton, Edward A. Davis, Kimberly R. Parsons and Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the AMI Panel Testimony at page 20, lines 9-21. a. Please confirm that, as stated at lines 9-11, the Company must be able to accurately and timely bill customers for service, and metering infrastructure is necessary to that end. b. Please confirm that, as stated at lines 12-15, the Company expects to migrate to AMI as its existing AMR meters reach the end of their useful lives, regardless of the BCA results. c. Please explain the statement at lines 18-20, that “optionality in taking advantage of many AMI benefits will be within the customer’s control,” and identify the AMI benefits in Exhibit CLP-AMI-3, to which that statement applies. d. When AMI meter costs are reflected in base distribution rates, does the Company intend to continue classifying AMI meter costs as customer-related, consistent with its treatment of meter costs in the ACOS Direct Testimony at page 4, lines 5-7? If not, explain why not. Response: a. Yes, the Company must always be in a position to bill customers for service on a timely and accurate basis and metering infrastructure is necessary to that end. However, the manner in which the Company achieves this objective can take several forms. b. Based on the information available to the Company today, and the expectation that PURA and stakeholders’ consideration of the AMI Implementation Plan would benefit from a comparison with an AMR lifecycle alternative approach, the Company presented an analysis of a hypothetical AMR end-of-life scenario in its BCA. Should PURA not grant approval of the Company’s proposed AMI Plan, the Company would develop and consider alternative scenarios using the best information at that time, including an AMR end-of-life approach, in view of any additional guidance PURA provides in its order. c. The quantified AMI benefits largely within customer control are associated with their choice of participation in Time-of-use/Time-varying Rates. The non-quantified benefits largely within customer control arise in relation to their election to receive outagePage 53 of 130
Exhibit JRD-4 Page 10 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-040 Page 2 of 2 restoration notifications; their receptiveness to detailed billing data and notifications; and their receptiveness to load disaggregation insights. d. Yes, the Company expects that AMI meter costs will be properly classified as customerrelated costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customers consistent with allocation of costs allowed in this proceeding for distribution rates or another applicable rate mechanism.
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]