Exhibit JRD-4 Page 4 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 1 of 5 Date Filed: November 16, 2026 Witness: Jared A. Lawrence, Douglas P. Horton, Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the AMI Panel Testimony at page 19, lines 1-6, and Exhibit CLP-AMI-3 at pages 16-17 (Figure 6). a. Figure 6 shows $309.2 million of six-year capital for “Meters,” consisting of $302.4 million for Meters and $6.8 million of Undepreciated Meter Balance. Please separate the $302.4 million into (i) meter equipment and (ii) meter installation labor and other costs, and identify the amount the Company expects to record in FERC Account 370. b. For each cost category shown in Figure 6, please identify the FERC account or accounts in which the Company expects to record the capital investment. c. Please identify the VVO Enablement facilities (e.g., substation and line equipment, software) included in the $97.3 million of six-year VVO Enablement capital shown in Figure 6, and state whether the Company proposes to recover those costs through the PBMRP as AMI costs or through another mechanism, and how it proposes to classify and allocate those costs to rate classes. Response: a. A full breakdown of the six-year capital for meters is shown in the table below 1. Please refer to CLP-AMI-3 starting on page 108 for a complete breakdown of all capital. 6-Year Meters – Nominal Capital Cost Meters - Deployment External Labor – Deployment Internal Labor – Deployment Returns/Follow-ups Meters – Replacements Internal Labor - Replacements Corporate Overhead Contingency Total 1 Note: these are rounded figures. $208.8M $51.8M $7.0M $2.8M $1.1M $3.8M $27.1M $302.4MPage 48 of 130
Exhibit JRD-4 Page 5 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 2 of 5 The Company expects to record the full cost of the meter equipment, the cost to install, and all associated costs, including overhead costs and allocations, to FERC Utility Account 370 - Meters. Please see Table 1 below. b. For each cost category shown in Figure 6, please see Table 1 below, which provides the Plant FERC Utility Account in which the Company expects to record the capital investment, once it is placed in service and unitized (final as built) to FERC Account 101010 (Electric Plant in Service).Page 49 of 130
Exhibit JRD-4 Page 6 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 3 of 5 c. A listing of the VVO Enablement facilities is shown in the table below. As described in the Company’s response to CIEC-040 i, the Company expects that AMI meter costs will be properly classified as customer-related costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customersPage 50 of 130
Exhibit JRD-4 Page 7 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 4 of 5 consistent with allocation of costs and rate design allowed in this proceeding for distribution rates or another applicable rate mechanism. 6-Year VVO Enablement – Nominal Capital Cost Regulators $37.5M Capacitors $27.3M Transformer LTC Controller Upgrades $16.0M Integration - Software $0.5M Integration – External Labor $1.0M Integration – Internal Labor $0.5M Corporate Overhead $0.5M Contingency $8.3M AFUDC $5.7M Total $97.3M Prior Referenced Responses: i CIEC-040 Question: Please refer to the AMI Panel Testimony at page 20, lines 9-21. a. Please confirm that, as stated at lines 9-11, the Company must be able to accurately and timely bill customers for service, and metering infrastructure is necessary to that end. b. Please confirm that, as stated at lines 12-15, the Company expects to migrate to AMI as its existing AMR meters reach the end of their useful lives, regardless of the BCA results. c. Please explain the statement at lines 18-20, that “optionality in taking advantage of many AMI benefits will be within the customer’s control,” and identify the AMI benefits in Exhibit CLP-AMI-3, to which that statement applies. d. When AMI meter costs are reflected in base distribution rates, does the Company intend to continue classifying AMI meter costs as customer-related, consistent with its treatment of meter costs in the ACOS Direct Testimony at page 4, lines 5-7? If not, explain why not. CIEC-040 Response: a. b. c. Yes, the Company must always be in a position to bill customers for service on a timely and accurate basis and metering infrastructure is necessary to that end. However, the manner in which the Company achieves this objective can take several forms. Based on the information available to the Company today, and the expectation that PURA and stakeholders’ consideration of the AMI Implementation Plan would benefit from a comparison with an AMR lifecycle alternative approach, the Company presented an analysis of a hypothetical AMR end-of-life scenario in its BCA. Should PURA not grant approval of the Company’s proposed AMI Plan, the Company would develop and consider alternative scenarios using the best information at that time, including an AMR end-of-life approach, in view of any additional guidance PURA provides in its order. The quantified AMI benefits largely within customer control are associated with their choice of participation in Time-of-use/Time-varying Rates. The non-quantified benefits largely within customer control arise inPage 51 of 130
Exhibit JRD-4 Page 8 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-039 Page 5 of 5 d. relation to their election to receive outage restoration notifications; their receptiveness to detailed billing data and notifications; and their receptiveness to load disaggregation insights. Yes, the Company expects that AMI meter costs will be properly classified as customer-related costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customers consistent with allocation of costs allowed in this proceeding for distribution rates or another applicable rate mechanism.Page 52 of 130
Exhibit JRD-4 Page 9 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-040 Page 1 of 2 Date Filed: November 13, 2026 Witness: Jared A. Lawrence, Douglas P. Horton, Edward A. Davis, Kimberly R. Parsons and Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the AMI Panel Testimony at page 20, lines 9-21. a. Please confirm that, as stated at lines 9-11, the Company must be able to accurately and timely bill customers for service, and metering infrastructure is necessary to that end. b. Please confirm that, as stated at lines 12-15, the Company expects to migrate to AMI as its existing AMR meters reach the end of their useful lives, regardless of the BCA results. c. Please explain the statement at lines 18-20, that “optionality in taking advantage of many AMI benefits will be within the customer’s control,” and identify the AMI benefits in Exhibit CLP-AMI-3, to which that statement applies. d. When AMI meter costs are reflected in base distribution rates, does the Company intend to continue classifying AMI meter costs as customer-related, consistent with its treatment of meter costs in the ACOS Direct Testimony at page 4, lines 5-7? If not, explain why not. Response: a. Yes, the Company must always be in a position to bill customers for service on a timely and accurate basis and metering infrastructure is necessary to that end. However, the manner in which the Company achieves this objective can take several forms. b. Based on the information available to the Company today, and the expectation that PURA and stakeholders’ consideration of the AMI Implementation Plan would benefit from a comparison with an AMR lifecycle alternative approach, the Company presented an analysis of a hypothetical AMR end-of-life scenario in its BCA. Should PURA not grant approval of the Company’s proposed AMI Plan, the Company would develop and consider alternative scenarios using the best information at that time, including an AMR end-of-life approach, in view of any additional guidance PURA provides in its order. c. The quantified AMI benefits largely within customer control are associated with their choice of participation in Time-of-use/Time-varying Rates. The non-quantified benefits largely within customer control arise in relation to their election to receive outagePage 53 of 130
Exhibit JRD-4 Page 10 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-040 Page 2 of 2 restoration notifications; their receptiveness to detailed billing data and notifications; and their receptiveness to load disaggregation insights. d. Yes, the Company expects that AMI meter costs will be properly classified as customerrelated costs, consistent with treatment of meter costs in the allocated cost-of-service study conducted and submitted in this docket as part of the Company’s Rate Application. The Company’s further expectation is that capital costs and expenses associated with AMI implementation would be collected from customers consistent with allocation of costs allowed in this proceeding for distribution rates or another applicable rate mechanism.Page 54 of 130
Exhibit JRD-4 Page 11 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-041 Page 1 of 3 Date Filed: November 16, 2026 Witness: Jared A. Lawrence, Douglas P. Horton, Edward A. Davis, Kimberly R. Parsons and Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-AMI-3 at pages 17-18 (Figure 7) and pages 65-67. a. Please separate the $162.4 million NPV “Improved Restoration – Significant Storms” benefit into (i) avoided Company storm restoration expense and (ii) the value of reduced customer outage time estimated with the interruption cost estimate calculator. b. For the benefit quantified in part (a)(i), please explain how storm restoration costs are classified and allocated to rate classes in the Company’s ACOSS or recovered through the Company’s storm cost recovery mechanisms. c. Please state whether the Company has quantified any of the benefits in Figure 7 by rate class. If so, provide the quantification, including for Rate 39, Rate 57 and Rate 58. d. Please identify any benefit in Figure 7 that the Company expects to be realized by Rate 39, Rate 57 or Rate 58 customers, and explain the basis for that expectation. Response: a) Out of the $162.4M NPV, an estimated $157.20M NPV is associated with avoided stormrestoration expenses and an estimated $5.18M NPV is associated with reduced customer outage time. This is broken down as Business-As-Usual Costs, Benefit Targets and Annual Benefit Calculation. Please refer to CLP-AMI-3, page 69, subsection (c) to see a breakdown of calculations - also shown below.Page 55 of 130
Exhibit JRD-4 Page 12 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-041 Page 2 of 3 For a full breakdown of “Improved Restoration – Significant Storms” please refer to CLP-AMI-3, page 65, Section (b)(6) – Early Outage Detection which explains the calculation methodology, inputs, and assumptions on how these figures are created. b) The average annual amortization expenses related to storm restoration (equal to $211.177 million for Rate year 1) were included in Exhibit ACOS CLP-Exhibit-2 (Confidential), Table 9. These costs were treated as the rest of other amortization expenses and were allocated to rate classes according to the allocations of total rate base by class. Therefore, classification between demand and customer-related implicitly followed the same classification as the sum of the components that make up the overall rate base. c) As provided in Exhibit CLP-AMI-3, including referenced sections and pages 85-92, the Company has quantified and provided descriptions of benefits on a customer-class levelPage 56 of 130
Exhibit JRD-4 Page 13 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-041 Page 3 of 3 and with respect to advanced rate design that would extend to various components of service at a rate class and individual customer level, but not for these specific rate classes. d) Please refer to the Company’s response in subpart (c).