  1. Page 57 of 130

    Exhibit JRD-4 Page 14 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-043 Page 1 of 1 Date Filed: November 12, 2026 Witness: Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the ACOS Direct Testimony at page 6, lines 1-10. a. Please explain how the demand allocators for primary and secondary distribution facilities exclude the loads of customers that take service at primary or transmission voltage from the allocation of facilities at lower voltage levels. b. Please provide the class NCP demands used for each demand allocator, by voltage level. c. Please identify the number of Rate 39 customers served at each delivery voltage and the number of Rate 57 customers served at each delivery voltage. Response: a. The demand allocators for Primary facilities include the total distribution class NCP corresponding to each class. The demand allocators for the Secondary facilities exclude the portion of the NCP load associated with customers served at Primary; this is approximated using the ratio of secondary customers to total distribution customers in the class. All of the demand allocators refer to NCP of customers that take service at distribution level; no NCP for transmission-connected customers was included. b. The class NCP demands used for each demand allocator by voltage level are included in Exhibit CLP ACOS-2 Confidential, in tab "Appendix 1.B Allocator_Input". See rows 20 and 21, for allocators "NCP_P" and "NCP_S", respectively. c. The number of Rate 39 distribution customers is 3, all served at Primary. The number of Rate 57 distribution customers is 72, all served at Primary voltage
  2. Page 58 of 130

    Exhibit JRD-4 Page 15 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-045 Page 1 of 1 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 30, lines 6-12. a. Please identify each non-distribution component of the rates applicable to large commercial and industrial customers that the Company considers time-varying and that, as stated at lines 6-8, “provide additional incentive and opportunity for customer benefit through efficient utilization of electric service.” b. Please state the Company’s position on a requirement that EDR participants take service under a new TOU rate with time-differentiated distribution, transmission and generation charges that has not yet been designed or approved, and explain the basis for that position. c. Please state whether the Company’s billing system can currently bill an EDR participant’s incremental load under a different rate structure than the participant’s pre-existing load. Response: a. The transmission, non-bypassable FMCC, CTA and energy supply components of service are all priced on a time-varying (time-of-day) basis. While supply rates depend on whether a customer takes Last Resort Service or competitive supply, these time varying structures are mandatory for larger customers who would take service under the EDR (e.g., Rate 55Rate 58). b. To the extent such rate is a general service rate and is the only option compared with existing offerings (that would continue to be available or applicable in the future), it would seem, hypothetically, it would be inevitable that a future EDR participant would be on a time-differentiated rate offering, one way or another (noting, the context of the question contemplates distribution as a time-varying rate, which currently applies for only intermediate, large and MHD EV TOU rate customers). c. Billing capabilities are currently limited in this regard. The Company performs special handling (i.e., manual) billing for Rate 39 customers, where load is bifurcated, analyzed in detail, and billed under two different rate structures.
  3. Page 59 of 130

    Exhibit JRD-4 Page 16 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-046 Page 1 of 1 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 29, lines 1-12, and page 31, lines 5-6, and Exhibit CLP-RATES-3 at pages 38-40. a. Please identify any transmission or supply cost associated with an EDR participant’s incremental load that the Company expects would be borne by customers other than the EDR participant, and explain why. b. Please confirm that, under the Terms and Conditions for Electric Suppliers at pages 38-40 of Exhibit CLP-RATES-3, the hourly load of an EDR participant, including its coincident peak capacity values, would be assigned to the participant’s electric supplier (including Standard Service or Last Resort Service) for ISO-NE settlement. c. Please state whether interconnection, system upgrade or make-ready costs paid directly by an EDR participant (including through a contribution in aid of construction) would be included as a cost of serving the incremental load in determining whether revenues exceed incremental cost of service or in determining the discount cap. Response: a. The referenced Rates Panel Testimony on pages 29 and 31 refer to Distribution Service. The charges for transmission and supply for the incremental load of an EDR participant would be the responsibility of that participant, consistent with the applicable rate schedule for service to such participant, and with the applicable provisions of the Company’s terms and conditions of service, including those cited in Exhibit CLP-RATES-3. b. The Company expects that the future provisions of the referenced terms and conditions, and the application of those provisions in determining hourly load and electric supplier assignment would apply in a like manner as current practice, absent any changes in proposed terms and conditions relative to current terms and conditions, or to future practices as applied to an individual customer’s electric supplier service arrangement or in supplier load assignment methodologies. c. Yes. Determination of the portion of upfront costs paid by the EDR participant would be included in the evaluation to determine the level of discount. This can also be viewed as; the level of discount would have a bearing on the portion of such costs that would be paid directly by the participant.
  4. Page 60 of 130

    Exhibit JRD-4 Page 17 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-047 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 24, lines 18-22, and page 25, lines 1-8. a. Please state whether the Company has a definition of “data center” or “large-scale computational load” that it would use to determine whether a customer’s load is data center load. If so, provide it. b. Please identify the number of inquiries the Company has received since January 1, 2024 regarding new or expanded load from (i) data centers and (ii) manufacturing or other industrial customers, by size range. Response: a. Please see the Company’s response to CIEC-036 i. b. Such information is not readily available. Prior Referenced Response: i CIEC-036 Question: With reference to the Panel’s response to OCC-464, explain whether: a. b. The term “large-scale computational loads” includes only data centers, or if it also may be applied to other non-residential loads. There are specific criteria that Eversource uses to define what constitutes a “data center”? If the answer is in the affirmative, provide and explain the criteria. CIEC-036 Response: a. The Company’s response relied on “data center” as the context for what is meant by the term “large scale computational load” referred to. b. There may be many different types of customers and loads whose characteristics fall within the classification of a data center. The State of Connecticut’s Office of Legislative research report, “Data Center Energy Impacts and State Responses” refers to a description of a data center as, generally, “a physical facility that houses and runs large computer systems.” The report further provides: “A data center typically contains
  5. Page 61 of 130

    Exhibit JRD-4 Page 18 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-047 Page 2 of 2 multiple computer servers, data storage devices, and network equipment to store, manage, process, and transmit large amounts of data”. 1 The term “large-scale” provides additional specificity regarding what might be attributable to a specific data center. As stated in response to OCC-464, the Company believes the appropriate treatment of such loads, including whether a specific rate or customer-specific terms are warranted should be determined through deliberations with state agencies when that load materializes. 1 “Data Center Energy Impacts and State Responses”, Connecticut General Assembly, Office of Legislative Research, 2025-R-0164, Mary Fitzpatrick, October 14, 2025
  6. Page 62 of 130

    Exhibit JRD-4 Page 19 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 1 of 3 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 22, lines 14-21. a. Please confirm that any shortfall in actual distribution revenue relative to the authorized revenue target, regardless of its cause, would be reconciled through the RDM. b. Please confirm that, as proposed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. For each of the Company’s last three RDM reconciliation filings, please provide the total RDM amount and the amount recovered from or credited to each rate class, including Rate 39, Rate 57 and Rate 58. d. Please explain how a reduction in distribution revenue resulting from a heat pump rate, such as Rate 6 or Rate HP, would be recovered between rate cases, and identify the share that would be recovered from non-residential rate classes. Response: a. Differences in revenue between actual and target, and flow through of such differences for charges or credits through the RDM are subject to a prudence review and authorization by PURA. b. Yes, as proposed and as is currently designed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. Please refer to Table 1 for the requested information, which has been provided in previous RAM filings: Table 1 Rate 1 Rate 5 Rate 7 Rate 18 Rate 27 2024 2025 2026 (DN 24-01-03) (DN 25-01-03) (DN 26-01-03) $15,426,873 $7,990,329 $870,234 $3,256,347 $1,686,621 $183,691 $10,701 $5,543 $604 $1,443 $748 $81 $165,744 $85,847 $9,350
  7. Page 63 of 130

    Exhibit JRD-4 Page 20 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 2 of 3 Rate 29 Rate 30 Rate 35 Rate 37 Rate 40 Rate 41 Rate 55 Rate 56 Rate 57 Rate 58 Rate 115 Rate 116 Rate 117 Rate 39 Rate 119 Total $5,296 $6,662,626 $1,188,616 $2,299,083 $196,280 $29,925 $1,211,754 $3,534,218 $1,638,061 $3,291,659 $105,636 $150,310 $60,300 $534,357 $13,940 $39,783,171 $2,743 $3,450,898 $615,642 $1,190,807 $101,663 $15,500 $627,627 $1,830,544 $848,431 $1,704,911 $54,714 $77,853 $31,232 $276,770 $7,220 $20,605,642 $299 $375,840 $67,050 $129,692 $11,072 $1,688 $68,355 $199,366 $92,403 $185,683 $5,959 $8,479 $3,402 $30,143 $786 $2,244,179 d. Please refer to the Company’s response to OCC-473 i. The Company has not proposed a Rate HP. Please refer to Table 2 below for the allocation percentage of the RDM rate based on billing determinants currently in effect. Table 2 Rate 1 5 7 18 27 29 30 35 37 40 41 55 56 57 58 Allocation % 38.8% 8.2% 0.03% 0.0% 0.4% 0.01% 16.7% 3.0% 5.8% 0.5% 0.1% 3.0% 8.9% 4.1% 8.3%
  8. Page 64 of 130Match

    Exhibit JRD-4 Page 21 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 3 of 3 115 116 117 39 119 Total 0.3% 0.4% 0.2% 1.3% 0.04% 100.0% Prior Referenced Response: i OCC-473 Question: (Rate 6 – Residential Space Heating Rate) Refer to Exhibit CLP-RATES-1, at 23-24. Please state whether the Revenue Decoupling Mechanism is designed to capture any revenue shortfall arising from Rate 6 enrollment diluting Rate 1 revenues. If so, explain how Rate 6-driven revenue loss will be treated under the RDM and which customer classes ultimately bear that cost. OCC-473 Response: The Revenue Decoupling mechanism is designed to reconcile differences in aggregated (i.e.,. total) actual vs. targeted revenues, and not specifically to capture such revenue shortfall that may occur. While the question does not define or explain what is meant by diluted revenues, if the context of an assumed difference in revenue is due to the migration of Rate 1 customers to Rate 6, such migration may in a given month result in higher revenue for first block kWh sales, and lower revenue for second block kWh sales, which potentially include both kWh sales that would otherwise have been charged under Rate 1 and kWh sales associated with incremental, new heat pump load. The Company does not agree that Rate 6 enrollment which reflects increased kWh sales would reduce overall revenue compared with revenue under Rate 1 which would exclude such increased kWh sales.
  9. Page 65 of 130

    Exhibit JRD-4 Page 22 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-049 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-RATES-3 at pages 186-187 (Transmission Adjustment Clause). a. Please describe how the Company allocates its transmission revenue requirement among rate classes in setting retail Transmission Service Rates, and provide the allocation factors used for the rates proposed in this proceeding. b. Please explain the basis for the difference between the proposed Transmission Service Rates for Rate 5 and Rate 1. c. Please explain how any under-collection of transmission revenue from a particular rate schedule is recovered through the TAC reconciliation, and state whether it is recovered from all rate classes. d. Please explain how an under-collection of transmission revenue resulting from a 75% reduction in the winter (November through March) Transmission Service Rate for heat pump customers, as proposed for Rate HP, would be recovered. Response: a. Please refer to the Company’s response to UCONN-024 i for the requested information. b. The respective allocation of costs and rate design for these rate classes are dependent on their specific demand allocation factors and billing determinants, which in combination can result in a material difference in the rate per kWh of the Transmission service rates in each rate class. c. Please refer to the Company’s response to UCONN-024 for the requested information. d. The Company has not proposed a Rate HP. For its alternative space heating rate, Rate 6, the Company has not proposed a percentage reduction to transmission rate. The allocation of cost responsibility, and setting of the transmission rate for such service would be based on that class’s transmission cost allocation and rate design, as applied in developing the transmission rate for Rate 1.
  10. Page 66 of 130

    Exhibit JRD-4 Page 23 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-049 Page 2 of 2 Prior Referenced Response: i UCONN-024 Question: (Affordability & Customer Engagement) Refer to Exhibit CLP-ELP-1 at pp. 25-26 which states that “transmission costs are shared across the region” and are “proportionally allocated” to Connecticut. Exhibit CLP-RATES-3 at pp. 186-187 describes the overall calculation of the total Transmission Adjustment Clause (“TAC”). a. b. c. Please explain the formula and methodology used to apportion the total costs of transmission across customer classes in the Connecticut service territory. Please explain how this methodology is consistent with cost-causation and fairness principles. For each of Rates 55, 56, 57, and 58, please provide (i) the percentage of total TAC revenue allocated to each rate class, and (ii) the total dollar amount of TAC revenue collected from each rate class, in each case for the most recent TAC reconciliation period. UCONN-024 Response: a. Please refer to UCONN-024, Attachment 1, for the Transmission exhibits provided in the Company’s most recent RAM filing, Docket No. 26-01-03. • • • • Page 1 shows the determination of the average Transmission rate on line 31. Page 2 shows the time-of-use breakout for applicable rate classes. Page 3 shows a comparison versus the current and proposed Transmission rates by rate class. Page 4 shows the Transmission Allocation. The Transmission Revenue Target (cell F13) is calculated by multiplying the average Transmission rate from page 1 by the Rate Year total sales. This Revenue Target is allocated to each rate class based on a 12 CP kW Demand Allocator (Columns C and D). b. The Company uses a 12 coincident peak (“12 CP”) allocation factor to assign transmission revenue requirements to rate schedules. This methodology is designed to reflect the methodology used in the development of the NEPOOL OATT revenue requirement and the resulting charges billed to the Company for transmission service under that tariff. From this perspective, the allocation is a “financial” nature, in that it is based only on the amount billed to the EDC’s (noting, it is the amount billed first to the transmission service customer and then allocated to CL&P that is used for determining the corresponding class allocation. Despite the diversity of customer loads that make up the monthly peak, or the load levels or utilization of the transmission system by individual customers throughout all other hours of a given month, where such demands may be greater than during the system peak, it is only the single monthly peak that is applied using this allocation method). Unlike with a resource-based distribution cost allocation, the billed transmission charge is what is being allocated. Under the current paradigm, the allocated charges and coincidence of demand for determining the share of load contributing to such charges provides a reasonable basis for allocation of costs. To the extent consideration is given to alternative approaches for class cost allocation, a review of underlying costs and consideration of utilization of the system that such charges represent might be of interest with regarding to equitable allocation, along with other rate design principals to evaluate. c. Please refer to UCONN-024, Attachment 1, for the requested information.

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]