Exhibit JRD-4 Page 19 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 1 of 3 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 22, lines 14-21. a. Please confirm that any shortfall in actual distribution revenue relative to the authorized revenue target, regardless of its cause, would be reconciled through the RDM. b. Please confirm that, as proposed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. For each of the Company’s last three RDM reconciliation filings, please provide the total RDM amount and the amount recovered from or credited to each rate class, including Rate 39, Rate 57 and Rate 58. d. Please explain how a reduction in distribution revenue resulting from a heat pump rate, such as Rate 6 or Rate HP, would be recovered between rate cases, and identify the share that would be recovered from non-residential rate classes. Response: a. Differences in revenue between actual and target, and flow through of such differences for charges or credits through the RDM are subject to a prudence review and authorization by PURA. b. Yes, as proposed and as is currently designed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. Please refer to Table 1 for the requested information, which has been provided in previous RAM filings: Table 1 Rate 1 Rate 5 Rate 7 Rate 18 Rate 27 2024 2025 2026 (DN 24-01-03) (DN 25-01-03) (DN 26-01-03) $15,426,873 $7,990,329 $870,234 $3,256,347 $1,686,621 $183,691 $10,701 $5,543 $604 $1,443 $748 $81 $165,744 $85,847 $9,350Page 63 of 130
Exhibit JRD-4 Page 20 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 2 of 3 Rate 29 Rate 30 Rate 35 Rate 37 Rate 40 Rate 41 Rate 55 Rate 56 Rate 57 Rate 58 Rate 115 Rate 116 Rate 117 Rate 39 Rate 119 Total $5,296 $6,662,626 $1,188,616 $2,299,083 $196,280 $29,925 $1,211,754 $3,534,218 $1,638,061 $3,291,659 $105,636 $150,310 $60,300 $534,357 $13,940 $39,783,171 $2,743 $3,450,898 $615,642 $1,190,807 $101,663 $15,500 $627,627 $1,830,544 $848,431 $1,704,911 $54,714 $77,853 $31,232 $276,770 $7,220 $20,605,642 $299 $375,840 $67,050 $129,692 $11,072 $1,688 $68,355 $199,366 $92,403 $185,683 $5,959 $8,479 $3,402 $30,143 $786 $2,244,179 d. Please refer to the Company’s response to OCC-473 i. The Company has not proposed a Rate HP. Please refer to Table 2 below for the allocation percentage of the RDM rate based on billing determinants currently in effect. Table 2 Rate 1 5 7 18 27 29 30 35 37 40 41 55 56 57 58 Allocation % 38.8% 8.2% 0.03% 0.0% 0.4% 0.01% 16.7% 3.0% 5.8% 0.5% 0.1% 3.0% 8.9% 4.1% 8.3%Page 64 of 130
Exhibit JRD-4 Page 21 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 3 of 3 115 116 117 39 119 Total 0.3% 0.4% 0.2% 1.3% 0.04% 100.0% Prior Referenced Response: i OCC-473 Question: (Rate 6 – Residential Space Heating Rate) Refer to Exhibit CLP-RATES-1, at 23-24. Please state whether the Revenue Decoupling Mechanism is designed to capture any revenue shortfall arising from Rate 6 enrollment diluting Rate 1 revenues. If so, explain how Rate 6-driven revenue loss will be treated under the RDM and which customer classes ultimately bear that cost. OCC-473 Response: The Revenue Decoupling mechanism is designed to reconcile differences in aggregated (i.e.,. total) actual vs. targeted revenues, and not specifically to capture such revenue shortfall that may occur. While the question does not define or explain what is meant by diluted revenues, if the context of an assumed difference in revenue is due to the migration of Rate 1 customers to Rate 6, such migration may in a given month result in higher revenue for first block kWh sales, and lower revenue for second block kWh sales, which potentially include both kWh sales that would otherwise have been charged under Rate 1 and kWh sales associated with incremental, new heat pump load. The Company does not agree that Rate 6 enrollment which reflects increased kWh sales would reduce overall revenue compared with revenue under Rate 1 which would exclude such increased kWh sales.Page 65 of 130
Exhibit JRD-4 Page 22 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-049 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-RATES-3 at pages 186-187 (Transmission Adjustment Clause). a. Please describe how the Company allocates its transmission revenue requirement among rate classes in setting retail Transmission Service Rates, and provide the allocation factors used for the rates proposed in this proceeding. b. Please explain the basis for the difference between the proposed Transmission Service Rates for Rate 5 and Rate 1. c. Please explain how any under-collection of transmission revenue from a particular rate schedule is recovered through the TAC reconciliation, and state whether it is recovered from all rate classes. d. Please explain how an under-collection of transmission revenue resulting from a 75% reduction in the winter (November through March) Transmission Service Rate for heat pump customers, as proposed for Rate HP, would be recovered. Response: a. Please refer to the Company’s response to UCONN-024 i for the requested information. b. The respective allocation of costs and rate design for these rate classes are dependent on their specific demand allocation factors and billing determinants, which in combination can result in a material difference in the rate per kWh of the Transmission service rates in each rate class. c. Please refer to the Company’s response to UCONN-024 for the requested information. d. The Company has not proposed a Rate HP. For its alternative space heating rate, Rate 6, the Company has not proposed a percentage reduction to transmission rate. The allocation of cost responsibility, and setting of the transmission rate for such service would be based on that class’s transmission cost allocation and rate design, as applied in developing the transmission rate for Rate 1.Page 66 of 130
Exhibit JRD-4 Page 23 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-049 Page 2 of 2 Prior Referenced Response: i UCONN-024 Question: (Affordability & Customer Engagement) Refer to Exhibit CLP-ELP-1 at pp. 25-26 which states that “transmission costs are shared across the region” and are “proportionally allocated” to Connecticut. Exhibit CLP-RATES-3 at pp. 186-187 describes the overall calculation of the total Transmission Adjustment Clause (“TAC”). a. b. c. Please explain the formula and methodology used to apportion the total costs of transmission across customer classes in the Connecticut service territory. Please explain how this methodology is consistent with cost-causation and fairness principles. For each of Rates 55, 56, 57, and 58, please provide (i) the percentage of total TAC revenue allocated to each rate class, and (ii) the total dollar amount of TAC revenue collected from each rate class, in each case for the most recent TAC reconciliation period. UCONN-024 Response: a. Please refer to UCONN-024, Attachment 1, for the Transmission exhibits provided in the Company’s most recent RAM filing, Docket No. 26-01-03. • • • • Page 1 shows the determination of the average Transmission rate on line 31. Page 2 shows the time-of-use breakout for applicable rate classes. Page 3 shows a comparison versus the current and proposed Transmission rates by rate class. Page 4 shows the Transmission Allocation. The Transmission Revenue Target (cell F13) is calculated by multiplying the average Transmission rate from page 1 by the Rate Year total sales. This Revenue Target is allocated to each rate class based on a 12 CP kW Demand Allocator (Columns C and D). b. The Company uses a 12 coincident peak (“12 CP”) allocation factor to assign transmission revenue requirements to rate schedules. This methodology is designed to reflect the methodology used in the development of the NEPOOL OATT revenue requirement and the resulting charges billed to the Company for transmission service under that tariff. From this perspective, the allocation is a “financial” nature, in that it is based only on the amount billed to the EDC’s (noting, it is the amount billed first to the transmission service customer and then allocated to CL&P that is used for determining the corresponding class allocation. Despite the diversity of customer loads that make up the monthly peak, or the load levels or utilization of the transmission system by individual customers throughout all other hours of a given month, where such demands may be greater than during the system peak, it is only the single monthly peak that is applied using this allocation method). Unlike with a resource-based distribution cost allocation, the billed transmission charge is what is being allocated. Under the current paradigm, the allocated charges and coincidence of demand for determining the share of load contributing to such charges provides a reasonable basis for allocation of costs. To the extent consideration is given to alternative approaches for class cost allocation, a review of underlying costs and consideration of utilization of the system that such charges represent might be of interest with regarding to equitable allocation, along with other rate design principals to evaluate. c. Please refer to UCONN-024, Attachment 1, for the requested information.Page 67 of 130
Exhibit JRD-4 Page 24 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-RATES-3 at page 186 (Transmission Adjustment Clause), which refers to “the transmission costs of acquiring such services.” a. Please identify the billing determinants ISO-NE uses to assess Regional Network Service and Local Network Service charges to the Company, including whether those charges are based on the Company’s network load at the time of the monthly peak. b. Please provide the Company’s monthly network load used to determine Regional Network Service charges for each month from January 2023 through the most recent month available. c. Please provide the Company’s estimate of the change in its annual Regional Network Service charges that would result from a 1 MW increase in its network load at the time of the monthly peak in each of the months of November through March. Response: a. CL&P's monthly regional network load reported to ISO-NE is derived from its network load at the time of the monthly transmission peak. Both the Regional Network Service (RNS) and Local Network Service (LNS) charges use this peak-load billing determinant multiplied by the applicable RNS and LNS rates applied to calculate the respective charges each month. b. The following table provides the monthly network load used to determine Regional Network Service charges for January 2023 to September 2026.Page 68 of 130
Exhibit JRD-4 Page 25 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 2 of 2 c. Based on the annual RNS rate, a 1 MW increase in CL&P’s monthly network load would increase the RNS charges as follows: x 2023: $11,804 per month. x 2024: $12,863 per month. x 2025: $15,440 per month. x 2026: $14,802 per month.Page 69 of 130
Exhibit JRD-4 Page 26 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-051 Page 1 of 2 Date Filed: November 13, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez and Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the MCOS Direct Testimony at page 6, lines 9-14; page 18, lines 4-13; and page 19, lines 1-4. a. Please provide any analysis or forecast the Company has of when its system, or individual bulk or distribution substations, would become winter peaking as a result of heat pump adoption, including for years after 2031. b. Please identify the bulk substations that experienced an annual peak load in December or January in any of the years 2022 through 2025. c. Please provide the heat pump adoption assumptions used in the MCOS study’s analysis of load shapes through 2031. d. Please explain the statement at page 19, lines 3-4, that “[i]n the longer-term, additional electrification will shift more cost responsibility to the winter evening hours,” including the time frame the Company expects. Response: a. The Company has not developed a substation-level forecast that identifies when its system or individual substations would transition to winter peaking as no such transition is currently projected to occur within the 10-year forecast horizon. However, starting with the 2028 vintage forecast, the Company is planning to develop a stand-alone substationlevel winter coldest day load forecast. b. The Company currently has only one substation where winter and summer peak are on par and no substations where the winter peak exceeds the summer. The station in question is in Waterbury. c. Ms. Nieto used ISO-NE’s 2026 CELT Report assumptions of heat pump winter peak MW additions for the state of CT (tab 1.7, Table 3 Winter Peak). ISO-NE estimates a winter peak load impact of 224 MW by 2030/31. The MCOS used 80% of that value (179.2 MW) reflecting the portion of the state load that is in Eversource’s service area, as the highest hourly electrification load expected in Eversource by the 2030/31 winter. d. Ms. Nieto’s referenced statement in her direct testimony is alluding to the expected impact of increased adoption of heat pumps for space heating on hourly load shapes over time. The load profile for space heating used in the MCOS analysis assumes electric spacePage 70 of 130
Exhibit JRD-4 Page 27 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-051 Page 2 of 2 heating will increase winter loads in all 24 hours, but more markedly in the morning, between 5 and 8 am, followed by a less noticeable but still impactful increase in the evening hours after about 5 pm. The referenced statement in her testimony emphasizes the winter evening hours because the focus of her analysis is the next five years, and currently the highest winter loads occur in the evening of the coldest winter months of December and January. In the near term, the winter evening loads will hold higher cost responsibility relative to the winter morning, though this situation will begin to reverse after 2031.Page 71 of 130
Exhibit JRD-4 Page 28 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-464 Page 1 of 2 Date Filed: September 15, 2026 Witness: Edward A. Davis, Kimberly R. Parsons, Matthew Nelson and Michael Goldman Request from: Office of Consumer Counsel Question: (Economic Development Rate Rider) Please clarify whether the following customer types would be able to qualify for the proposed EDR: a. Customers with large-scale computational loads (i.e., data center); b. Customers connected to the transmission system; c. Customers switching from natural gas to electricity, such as for process heating load. Response: a. Customers with large-scale computational loads (i.e., data centers) are not categorically excluded from the Economic Development Rate (“EDR”), nor are they categorically eligible. Any customer seeking to participate in the EDR will be evaluated to determine if they meet the requirements to qualify for service under the EDR and to ensure that their participation continues to provide affordability benefits to customers. Part of future considerations would be whether a specific rate for data centers makes sense or whether it may be beneficial to consider customer-specific characteristics when determining rates for potential data center customers. The load must be new or incremental, the incremental distribution revenue must exceed the incremental cost to serve, the discount is subject to the cap tied to incremental distribution revenue, and the customer remains responsible for interconnection and system upgrade costs. As previously noted in OCC-465, there are currently no active requests or firm commitments for data center load on the Company’s distribution system. The Company recognizes that large computational loads raise broader policy questions, and if there are future requests for data centers to take service from the Company, the Company would work closely with the state on potential rates specific to large-scale computational loads. Understanding that there are larger policy implications associated with data centers, the Company believes it is best to carefully deliberate, with input from the relevant state agencies and stakeholders, on how to determine a rate for data centers that is mutually beneficial for the state, the interconnecting customer, and the Company, and ensures that existing customers are not harmed.
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]