    Exhibit JRD-4 Page 24 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-RATES-3 at page 186 (Transmission Adjustment Clause), which refers to “the transmission costs of acquiring such services.” a. Please identify the billing determinants ISO-NE uses to assess Regional Network Service and Local Network Service charges to the Company, including whether those charges are based on the Company’s network load at the time of the monthly peak. b. Please provide the Company’s monthly network load used to determine Regional Network Service charges for each month from January 2023 through the most recent month available. c. Please provide the Company’s estimate of the change in its annual Regional Network Service charges that would result from a 1 MW increase in its network load at the time of the monthly peak in each of the months of November through March. Response: a. CL&P's monthly regional network load reported to ISO-NE is derived from its network load at the time of the monthly transmission peak. Both the Regional Network Service (RNS) and Local Network Service (LNS) charges use this peak-load billing determinant multiplied by the applicable RNS and LNS rates applied to calculate the respective charges each month. b. The following table provides the monthly network load used to determine Regional Network Service charges for January 2023 to September 2026.
  2. Page 68 of 130Match

    Exhibit JRD-4 Page 25 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 2 of 2 c. Based on the annual RNS rate, a 1 MW increase in CL&P’s monthly network load would increase the RNS charges as follows: x 2023: $11,804 per month. x 2024: $12,863 per month. x 2025: $15,440 per month. x 2026: $14,802 per month.
  3. Page 69 of 130

    Exhibit JRD-4 Page 26 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-051 Page 1 of 2 Date Filed: November 13, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez and Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the MCOS Direct Testimony at page 6, lines 9-14; page 18, lines 4-13; and page 19, lines 1-4. a. Please provide any analysis or forecast the Company has of when its system, or individual bulk or distribution substations, would become winter peaking as a result of heat pump adoption, including for years after 2031. b. Please identify the bulk substations that experienced an annual peak load in December or January in any of the years 2022 through 2025. c. Please provide the heat pump adoption assumptions used in the MCOS study’s analysis of load shapes through 2031. d. Please explain the statement at page 19, lines 3-4, that “[i]n the longer-term, additional electrification will shift more cost responsibility to the winter evening hours,” including the time frame the Company expects. Response: a. The Company has not developed a substation-level forecast that identifies when its system or individual substations would transition to winter peaking as no such transition is currently projected to occur within the 10-year forecast horizon. However, starting with the 2028 vintage forecast, the Company is planning to develop a stand-alone substationlevel winter coldest day load forecast. b. The Company currently has only one substation where winter and summer peak are on par and no substations where the winter peak exceeds the summer. The station in question is in Waterbury. c. Ms. Nieto used ISO-NE’s 2026 CELT Report assumptions of heat pump winter peak MW additions for the state of CT (tab 1.7, Table 3 Winter Peak). ISO-NE estimates a winter peak load impact of 224 MW by 2030/31. The MCOS used 80% of that value (179.2 MW) reflecting the portion of the state load that is in Eversource’s service area, as the highest hourly electrification load expected in Eversource by the 2030/31 winter. d. Ms. Nieto’s referenced statement in her direct testimony is alluding to the expected impact of increased adoption of heat pumps for space heating on hourly load shapes over time. The load profile for space heating used in the MCOS analysis assumes electric space
  4. Page 70 of 130

    Exhibit JRD-4 Page 27 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-051 Page 2 of 2 heating will increase winter loads in all 24 hours, but more markedly in the morning, between 5 and 8 am, followed by a less noticeable but still impactful increase in the evening hours after about 5 pm. The referenced statement in her testimony emphasizes the winter evening hours because the focus of her analysis is the next five years, and currently the highest winter loads occur in the evening of the coldest winter months of December and January. In the near term, the winter evening loads will hold higher cost responsibility relative to the winter morning, though this situation will begin to reverse after 2031.
  5. Page 71 of 130

    Exhibit JRD-4 Page 28 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-464 Page 1 of 2 Date Filed: September 15, 2026 Witness: Edward A. Davis, Kimberly R. Parsons, Matthew Nelson and Michael Goldman Request from: Office of Consumer Counsel Question: (Economic Development Rate Rider) Please clarify whether the following customer types would be able to qualify for the proposed EDR: a. Customers with large-scale computational loads (i.e., data center); b. Customers connected to the transmission system; c. Customers switching from natural gas to electricity, such as for process heating load. Response: a. Customers with large-scale computational loads (i.e., data centers) are not categorically excluded from the Economic Development Rate (“EDR”), nor are they categorically eligible. Any customer seeking to participate in the EDR will be evaluated to determine if they meet the requirements to qualify for service under the EDR and to ensure that their participation continues to provide affordability benefits to customers. Part of future considerations would be whether a specific rate for data centers makes sense or whether it may be beneficial to consider customer-specific characteristics when determining rates for potential data center customers. The load must be new or incremental, the incremental distribution revenue must exceed the incremental cost to serve, the discount is subject to the cap tied to incremental distribution revenue, and the customer remains responsible for interconnection and system upgrade costs. As previously noted in OCC-465, there are currently no active requests or firm commitments for data center load on the Company’s distribution system. The Company recognizes that large computational loads raise broader policy questions, and if there are future requests for data centers to take service from the Company, the Company would work closely with the state on potential rates specific to large-scale computational loads. Understanding that there are larger policy implications associated with data centers, the Company believes it is best to carefully deliberate, with input from the relevant state agencies and stakeholders, on how to determine a rate for data centers that is mutually beneficial for the state, the interconnecting customer, and the Company, and ensures that existing customers are not harmed.
  6. Page 72 of 130

    Exhibit JRD-4 Page 29 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-464 Page 2 of 2 b. The EDR discount applies to charges for the Distribution component of service (Exhibit CLPRATES-1, at 30). Customers connected at the transmission voltage take minimal distribution service, and the EDR therefore may have little practical applicability to such customers. The Company has not proposed discounts to transmission, supply, or public benefits components of service, and transmission service to such customers would continue under otherwise applicable retail rates. c. Customers switching from natural gas to electricity, such as for process heating load, may be eligible for this rate but would be evaluated on a case-by-case basis if the load is new or incremental and the customer satisfies all other requirements of the rider. Fuel switching may be an appropriate criterion to evaluate for consideration in discounted distribution rates, and is one potential scenario where the customer may be bringing new, incremental electric load to the system and would be applied to a fuel-switching customer on the same basis as any other applicant. Note that the primary evaluation contemplated in the proposed EDR is on the distribution service requirement and corresponding cost to provide such service.
  7. Page 73 of 130

    Exhibit JRD-4 Page 30 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-465 Page 1 of 1 Date Filed: September 08, 2026 Witness: Edward A. Davis, Kimberly R. Parsons and Gerhard Walker Request from: Office of Consumer Counsel Question: (Economic Development Rate Rider) Please provide the anticipated capacity of data center load additions in the Company’s service territory each year for the next 10 years. a. Provide separate estimates for load requests and firm commitments. b. Provide any analysis the Company has conducted on the extent to which the anticipated data center load impacts system costs and customer bills. Include associated workpapers in live Excel format with all formulas intact. Response: a. There are currently no active requests or firm commitments for data center load additions within the Company’s distribution system. With regards to “Requests,” while Eversource does record requests for future customer connected loads, these include significant speculative inquiries by customers, the Company does not include them in any forecasts for substation capacity needs and has not budgeted any funds in direct support of these projects until a signed workorder is in-hand and design deposits have been made. Based on the Company’s historical experience many of these projects fail to materialize and, to avoid unnecessary costs and inefficiency, the Company does not dedicate or plan capacity for these projects until such time as a firm commitment is received from the customer. Requests or firm commitments for data center load additions within the transmission system are excluded. b. This is not applicable as there are currently no active requests or firm commitments for data center load additions within the Company’s distribution system. Such calculations are not feasible until the project specifics are known, including costs to interconnect and revenue credits -- all off which are highly dependent on a given project.
  8. Page 74 of 130

    Exhibit JRD-4 Page 31 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-475 Page 1 of 2 Date Filed: September 08, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (Rate 6 – Residential Space Heating Rate) Refer to Exhibit CLP-RATES-1, at 35-36, which acknowledges that incremental load from EV charging can also benefit from the Rate 6 discount for usage above 700 kWh. a. Was the discount sized to account for this “free rider” effect? If so, how? If not, why not? b. What percentage of Rate 6 enrollees does the Company expect to also have EV charging load? c. Has the Company modeled the revenue impact if a significant share of Rate 6 bill savings is attributable to EV charging rather than heat pump load? If so, provide the associated workpapers in live Excel format with all formulas intact. If not, why not? Response: a. Yes. The Winter Block 2 rate for Rate 6 is based on marginal distribution costs and a reconciling adjustment that effectively marks up the rate on an average load basis to ensure an additional share of demand related distribution costs are charged to incremental load (please refer to the Company’s response to OCC-474 i). As a prerequisite to the rate, a customer must add new heat pump load not already included in the underlying revenue requirement applied in the rate design for Rate 1. By moving fixed cost recovery into the customer charge and the “tier 1” volumetric rates for Distribution, the Winter Block 2 rate that applies to incremental load, whether primarily for the heat pump load or secondarily any other incremental load, we are pricing that block based on, but above marginal cost to ensure positive contribution to distribution costs. Pricing for other components of service including transmission, public benefits and supply are unchanged relative to Rate 1. This helps mitigate the free rider effect. b. The Company does not have such an estimate. c. The Company has not conducted such an analysis. The workpapers provided in Exhibit CLP-RATES-6 may be utilized to estimate bill impacts for various levels of usage, which may be assumed to include incremental heat pump and EV charging load.
  9. Page 75 of 130

    Exhibit JRD-4 Page 32 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-10 Date Issued August 25, 2026 OCC-475 Page 2 of 2 Prior Referenced Response: i OCC-474 Question: (Rate 6 – Residential Space Heating Rate) Please explain how the two volumetric discount levels (4.7 cents/kWh for heating season usage above 700 kWh and 2.8 cents/kWh for all other usage) were derived. Specifically: a. b. Were the discounts calibrated to the incremental cost of serving heat pump load? If so, please provide the calculation and workpapers in live Excel format with all formulas intact. If not, why not? Did the Company consider other discount levels? If so, explain the alternatives considered and why they were ruled out. If not, why not? OCC-474 Response: a. Please refer to Exhibit CLP-RATES-6, at page 2. An Excel version of that exhibit was provided as part of the Company’s filing. Costs and the associated proposed incremental load rate is calibrated with the marginal cost of providing service, as detailed on page 2 of the exhibit. b. Please note, the Company did not develop the 2.8 cents/kWh rate as a discount from the 4.7 cents/kWh rate, so no other level of discount was considered. Rather, the Winter Block 2 Rate is based on the marginal cost of service and reconciling adjustments that allocate a proportional share of the corresponding volumetric rate, as detailed in Exhibit CLP-RATES-6, at page 2.
  10. Page 76 of 130

    Exhibit JRD-4 Page 33 of 87 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-932 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis, Steven Lamontagne and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 29. a. Please explain what equipment is included in the “interconnection, system upgrade, or make-ready costs” for which EDR customers would be responsible (e.g., substations, transformers, conductors, etc.). b. If upgrades to shared infrastructure, such as substations, are required, explain how the costs of the upgrades are recovered. Response: a. Customers would be responsible for all costs associated with the installation of a new service pursuant to the Company’s new business policies. These costs are determined when such applications are made to the Company and would vary depending on the site conditions and work required for each location. Discounted revenues contemplated under the term of an EDR would be considered in the context of any CIAC or similar evaluation for a prospective EDR applicant. b. Such upgrades and the recovery of costs would be considered pursuant to the Company’s new business policy guidelines and any other considerations at the time of application for service.