Prefiled testimony
Witness: James R. Dauphinais
Files1
26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
PDF · 1.9 MB · 130 pagesText searchable
Download 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdfRead the text of 26-05-10 CIEC Rebuttal Testimony and Exhibit of James R. Dauphinais.pdf
Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 94 of 130
Exhibit JRD-4 Page 51 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-007 Page 1 of 4 Date Filed: November 16, 2026 Witness: Request from: Juan-Pablo Velez Connecticut Industrial Energy Consumers Question CIEC-7: Please refer to Velez Direct Testimony at page 15, lines 5-10; page 16, lines 1-5; and page 62, lines 1114. a. Please explain why Mr. Velez estimated marginal transmission cost using an avoided Pool Transmission Facility cost and the probability of the New England system peak, rather than the method by which regional and local network transmission costs are actually allocated to the Company. b. Please describe Mr. Velez’s understanding of how ISO New England Inc. allocates regional network transmission service costs to the Company, including whether that allocation depends on the Company’s load at the time of the peak in each month. c. Has Mr. Velez estimated the effect of heat pump adoption on the Company’s monthly peak loads during November through March, or on the transmission costs allocated to the Company? If so, provide the analysis. If not, explain why not. d. Please explain how the 75% reduction in the winter Transmission Service Rate under Rate HP would affect the Company’s recovery of its transmission costs, and identify who would pay any resulting under-recovery. Response: a. My testimony measures the cost of the new transmission facilities that a heat pump customer’s added usage requires. That is a marginal cost. The cost allocation method the question describes measures something else entirely: how the cost of facilities already built is divided among the customers who use them. It cannot tell us what new facilities added load requires.1 The Company did not compute a marginal cost of transmission in this rate case. 2 I therefore constructed one. An hourly marginal cost has two parts: an annual cost per kilowatt of peak load, and a method for allocating that annual cost to the hours of the year, in proportion to how likely each hour is to fall at the peak that drives new investment. For the annual cost, I used the standard regional estimate. For the allocation to hours, I used the same probability-of-peak method the Company used for its distribution marginal cost. Because the transmission and distribution schedules are built the same way, they can be added together into one hourly marginal delivery cost, which I compared with the delivery charges a heat pump customer pays for its added usage. 1 See Synapse Energy Economics, Avoided Energy Supply Components (AESC) in New England: 2024 Report (“AESC 2024”), at 285 (May 24, 2024) (the avoided transmission cost does “not include any impact of changes in the cost or cost allocation of already-built regional transmission facilities”), 286 (it “is the value of avoiding or deferring projects associated with load growth”). 2 CL&P Response to CLF-SC-026, at 1 (“The Marginal cost of transmission was not computed for this rate design.”).Page 95 of 130
Exhibit JRD-4 Page 52 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-007 Page 2 of 4 The regional estimate is the avoided Pool Transmission Facility cost of $69/kW-year from AESC 2024: the cost of deferring regional transmission investment by one year through a one-year reduction in peak load. 3 The Company sponsors that study and uses it to screen its own energy efficiency programs, valuing avoided Pool Transmission Facility cost at $70.0 per kW. 4 I inflated the value to 2026 dollars, the dollar year of the Company’s marginal cost of service study. 5 To allocate that cost to hours, I applied the Company’s method to New England system load rather than to the Company’s distribution substation load, 6 because Pool Transmission Facilities are regional: as AESC puts it, “the transmission system is built to reliably meet the total system peak, each year.” 7 b. Regional Network Service is how ISO New England charges for the region’s shared high-voltage transmission system, the Pool Transmission Facilities. ISO New England bills the Company for it every month, and each month’s bill depends on the Company’s load in a single peak hour of that month, including in November through March. 8 The bill is built in three steps. 1. One regional cost pool and one rate. Each year, the transmission owners’ revenue requirements for the Pool Transmission Facilities are added together into a single New England total. That total is divided by the region’s load at monthly peaks, averaged over the twelve months of the year, to give a rate per kilowatt-year. 9 2. One hour per month. For billing, the tariff divides New England into zones it calls Local Networks, each covering the transmission systems of one transmission owner or group of affiliated owners. 10 The Company is in Eversource’s zone, which also includes Eversource’s systems in western Massachusetts and New Hampshire. 11 Each month, ISO New England finds the hour when 3 Direct Testimony of Juan-Pablo Velez on behalf of Conservation Law Foundation and Sierra Club (“Velez Direct”), at 15:6–9 (Oct. 21, 2026); AESC 2024 at 283 (the $69 per kW-year is “the cost of deferring the PTF investment by one year as a result of a one-year reduction in peak load”). 4 AESC 2024 at 4 (listing “Eversource (Connecticut Light and Power . . .)” among the sponsors); CL&P et al., 2025–2027 Conservation & Load Management Plan, at 178 (“The electric and fossil fuel avoided costs are based on a regional avoided energy supply cost study completed in 2024 for New England (‘2024 AESC’)”) and 181 (Figure 62 lists “Pooled Transmission Facilities” at “$70.0” per kW, sourced to “2024 AESC,” on a “Connecticut counterfactual 1 using a 15-year levelized basis; all values are in 2024 dollars”) (Nov. 1, 2024). 5 Ex. JPV-2, Section 3, Step 1. 6 Velez Direct at 15:9–16:3; Ex. JPV-2, Section 3, Step 2; CL&P Response to CLF-SC-033, at 1 (reprinting the Company’s response to OCC-733, which fit the method on “historical hourly Substation Loads from January 2022, to December 2025”). 7 AESC 2024 at 283. 8 CL&P Response to CLF-SC-031, at 1 (the costs of “transmission service provided (i.e., billed) to the distribution company . . . are determined on a monthly peak demand basis, at rates determined on a 12-month average peak demand”). 9 ISO New England, Open Access Transmission Tariff, Section II, at Schedule 9, Lines 1–3 and notes (b)–(c) (the revenue requirement “equals the aggregate of the ATRRs of the PTOs,” and the denominator is “[t]he average for the twelve months of the calendar year on which the rate is based of the sum of the coincident Monthly Peaks for all Local Networks”). 10 Id. at Attachment E (listing each “Local Network of” a named transmission owner or group of companies) (effective Jan. 1, 2023, FERC Docket No. ER23-16-000). 11 Attachment E lists the zone as “[t]he Local Network of the Northeast Utilities companies,” Eversource’s former name. Id. ISO New England, Open Access Transmission Tariff, Schedule 21-ES (Part A), at Section 1.5 (the “Eversource Companies” are “The Connecticut Light and Power Company, NSTAR Electric Company (West), and Public Service Company of New Hampshire”) (effective Jan. 1, 2022, FERC Docket No. ER20-2054-001).Page 96 of 130
Exhibit JRD-4 Page 53 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-007 Page 3 of 4 the combined load of that zone is highest. That is the only thing the zone does in the calculation: it fixes the hour in which the Company’s load is measured. 12 3. The Company’s bill. The Company’s load in that hour, times the rate, divided by 12, is its bill for the month. 13 The monthly peaks therefore decide how the regional cost pool is shared, not how large it is. If the Company’s load in a January peak hour rises, the Company pays a larger share of the same pool, and the other utilities in New England pay a smaller one. c. No, for two reasons. First, an estimate of the transmission costs allocated to the Company would not measure what my testimony measures. My testimony measures the cost of the new transmission facilities that a customer’s added load requires (part (a)). A change in the Company’s allocation adds no new facilities. As part (b) describes, load at a monthly peak changes the Company’s share of the embedded cost of existing facilities. Second, even if heat pump adoption raised the Company’s November–March peak loads, its allocation would not necessarily grow. The Company’s share is a ratio: its load at its monthly peaks, divided by the sum of all New England transmission customers’ loads at their own monthly peaks. That share rises only if the Company’s peak load grows faster, in percentage terms, than the region’s. If peak load elsewhere grows as fast or faster, the Company’s share stays the same or falls, because the same revenue requirement is spread over more kilowatts. And winter peak load is indeed forecast to grow across all of New England: ISO New England forecasts heat pumps adding to the winter peak in every New England state, 1,600 MW across the region by 2030, of which 224 MW is in Connecticut and 322 MW in Maine. 14 d. Rate HP would not affect whether the Company recovers its transmission costs. The Transmission Adjustment Clause reconciles the Company’s transmission revenue against its actual transmission costs, and carries any difference into the next year’s rate (CIEC-2(d)). 15 Who would pay any under-recovery depends on which customers enroll, and other responses already answer it: • New heat pump customers cause no under-recovery. Even at the lower winter Transmission Service Rate, each would pay the Company $8.08 a year more in transmission than it paid before installing its heat pump (CIEC-1(a) and CIEC-6(b)). 12 ISO New England, Open Access Transmission Tariff, Section II, at Section II.21.2 (a customer’s billing load is “its hourly load . . . coincident with the coincident aggregate load of all Network Customers served in each Local Network in the hour in which the coincident load is at its maximum for the month (‘Monthly Peak’)”) (effective Sep. 1, 2021, FERC Docket No. ER21-2337002). 13 Id. at Section II.21.1 (each customer pays “an amount equal to its Monthly Regional Network Load for the month times the applicable Local Network RNS Rate”), Schedule 9 (“Amount to be Paid = ((RNS Rate per kilowatt-year) x (Transmission Customers [sic] Monthly Network Load (a)) x (1/12))”). 14 ISO New England, Final 2026 Heat Pump Forecast, at 8 (annual additions to the heat pump stock in each of the six states), 24 (Winter 50/50 Peak Demand by Load Zone: 224 MW for CT, 322 MW for ME and 1,600 MW for ISONE in 2030) (May 1, 2026). 15 Davis-Parsons Direct, Exhibit CLP-RATES-3 at 409 (the TAC recovers “the difference between the Company’s TAC revenue and the Company’s TAC costs from the prior period”).Page 97 of 130
Exhibit JRD-4 Page 54 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-007 Page 4 of 4 • Existing heat pump customers would each pay $316.73 a year less in transmission (CIEC-1(a)). I recommend that other residential customers bear that reduction (CIEC-2(b)), and CIEC-3(c) estimates the resulting increase in Rate 1 charges. Although the Transmission Adjustment Clause is reset every year, what changes each year is the dollars: each annual filing divides each class’s share of transmission costs by sales from a fixed past rate year, currently “RY 2020 Billed Sales,” not current sales. 16 If the billing determinants approved in this rate case place existing heat pump customers’ load on Rate HP, Rate 1’s transmission rate is set high enough to cover their reduction, and no shortfall arises. If they do not, the reduction becomes a shortfall each year until the next rate case, and each year’s true-up would spread part of it to non-residential classes, unless the Authority directs the Company to recover that shortfall from the residential class only, as I recommend in CIEC-2(d). 16 RAM Exhibit 4 at 4:11–18; see also CL&P, Docket No. 25-01-03, Attachment 1, Exhibits 1–11, to Dave Thompson Rates Testimony, Exhibit 2 at 4 (the same “RY 2020 Billed Sales” a year earlier) (Feb. 14, 2025).Page 98 of 130
Exhibit JRD-4 Page 55 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 1 of 6 Date Filed: November 16, 2026 Witness: Request from: Juan-Pablo Velez Connecticut Industrial Energy Consumers Question CIEC-8: Please refer to Velez Direct Testimony at page 83, lines 3-16, and page 84, lines 1-12 and footnote 76. a. Please explain Mr. Velez’s understanding of the basis for the difference between the Rate 5 and Rate 1 Transmission Service Rates, and state whether he contends that difference reflects marginal transmission cost. b. Please explain Mr. Velez’s understanding of whether the winter transmission charges in the Massachusetts heat pump rates he describes were designed to recover a winter transmission revenue requirement or were instead set at an estimate of marginal transmission cost. c. Please identify any jurisdiction of which Mr. Velez is aware that has set the retail transmission charges for a heat pump rate at an estimate of marginal transmission cost, and provide a copy of the relevant decision or tariff. d. For each Massachusetts heat pump rate Mr. Velez describes, please explain his understanding of how any reduction in distribution or transmission revenue resulting from the rate is recovered, including whether any portion is recovered from non-residential customers. Response: a. The difference between the Rate 5 and Rate 1 Transmission Service Rates comes from the method the Company uses to divide its transmission costs among its rate class groups. It does not reflect marginal transmission cost, and I do not contend that it does. The Company has not computed a marginal cost of transmission. 1 The Company allocates transmission costs by “rate class group.” A rate class group is either a single rate class, such as Rate 5, or several rate classes combined. 2 Rate 5 (Residential Electric Heating Service) serves homes that use electricity as their primary source of space heat and has been closed to new 1 2 CL&P Response to CLF-SC-026, at 1 (“The Marginal cost of transmission was not computed for this rate design.”). Docket No. 26-01-03, PURA Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company, CL&P Rates Filing, Attachment 1, Exhibit 4 (“RAM Exhibit 4”), at 4:11–20 (Feb. 17, 2026) (column headed “12 CP kW Demands by Rate Class,” listing Rate 1, Rate 7 and Rate 5 separately); Joint Direct Testimony of Edward Davis and Kimberly R. Parsons on behalf of The Connecticut Light and Power Company d/b/a Eversource Energy (“Davis-Parsons Direct”), Exhibit CLP-RATES-3, at 429 (July 14, 2026) (table of allocators by “Rate Class Group,” including “Rate 1 & Rate 7” and “Rate 5”).Page 99 of 130
Exhibit JRD-4 Page 56 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 2 of 6 applicants since December 21, 2006. 3 For transmission, Rate 5 is a rate class group of its own, and Rates 1 and 7 are combined into another. 4 The Company sets each rate class group’s Transmission Service Rate in two steps, in its annual Reconciling Adjustment Mechanism filing:5 1. A share of the Company’s transmission costs. The Company divides its total transmission revenue requirement among its rate class groups in proportion to each group’s average demand at the Company’s twelve monthly system peaks. This follows the way ISO New England bills the Company for regional transmission, based on its load at the peak hour of each month (CIEC-7(b)). 2. A rate per kWh. Each rate class group’s share is divided by the group’s annual sales, taken from a fixed past rate year (CIEC-7(d)), and grossed up for the gross earnings tax. The Rate 5 and Rate 1 rates differ because the two groups’ demand at the monthly peaks differs relative to their sales. 6 Rate HP would not be a separate rate class group with its own share of transmission costs, as Rate 5 is. It would sit within the Rate 1 and Rate 7 rate class group, and would change how that group’s share is divided among the customers in it (see CIEC-2(c)), not the size of the share relative to other rate class groups, including non-residential customer groups. Existing heat pump customers take service under Rate 1 today, so their demand at the monthly peaks is already counted in the group’s share; moving them to Rate HP would leave that demand in the share. New heat pump customers’ added demand would count toward the group’s share in the same way, whether they took service under Rate 1 or Rate HP. Moreover, rate classes within the same group can already have different Transmission Service Rates. Rate 7 is in the same group as Rate 1, but instead of Rate 1’s 5.050¢/kWh in every hour, Rate 7 customers pay 11.741¢/kWh on-peak and 2.525¢/kWh off-peak. 7 b. My testimony cites Massachusetts as precedent for a commission directing winter transmission reductions in heat pump rates. 8 The Massachusetts winter transmission charges were designed to recover a winter transmission revenue requirement. They were not set at an estimate of marginal transmission cost. 9 3 Davis-Parsons Direct, Exhibit CLP-RATES-3 at 246 (“This rate is not available to new applicants after December 21, 2006”; available “only to customers who use electric energy as the primary space heating source”). 4 CL&P Response to CLF-SC-035, at 1 (“Rate 7 is included in the cost allocation and overall revenue requirement along with Rate 1”); RAM Exhibit 4 at 4:16–20 (Rates 1 and 7 combined, Rate 5 on its own). 5 RAM Exhibit 4 at 4:11–20, 60 (each rate class group’s share of the “Transmission & TAC Revenue Target” is its share of “12 CP kW Demands by Rate Class,” defined as “Average rate class KW demands coincident to the Company’s 12 monthly system peaks,” and the rate is that share divided by “RY 2020 Billed Sales,” plus gross earnings tax). 6 RAM Exhibit 4 at 4:18, 20 (Rates 1 and 7 combined: 1,652,552.5 kW, $372,620 thousand, 7,916,705 MWh, 5.050¢/kWh with gross earnings tax; Rate 5: 338,287.6 kW, $76,278 thousand, 1,669,921 MWh, 4.901¢/kWh). 7 Davis-Parsons Direct, Exhibit CLP-RATES-3 at 256; RAM Exhibit 4 at 2:17, 34 (Rate 7’s “Transmission Target” of 5.050¢/kWh, divided into off-peak and on-peak rates using on-peak and off-peak shares of sales that are “set at Rate 1 percentages”: 27.4% × 11.741¢ + 72.6% × 2.525¢ = 5.050¢). 8 Direct Testimony of Juan-Pablo Velez on behalf of Conservation Law Foundation and Sierra Club (“Velez Direct”), at 84:3–12 (Oct. 21, 2026). 9 D.P.U. 25-08-A, Inquiry by the Department of Public Utilities on its own Motion into a Seasonal Heat Pump Rate, Order on Seasonal Heat Pump Rates (“D.P.U. 25-08-A Order”), at 19 n.4 (“‘cost-based’ means that the winter transmission charges were structured to be revenue neutral, recovering the capital costs embedded in the transmission service revenue requirement throughPage 100 of 130
Exhibit JRD-4 Page 57 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 3 of 6 The way they recover that revenue requirement, however, rests on the same premise as Rate HP: that the added winter electricity a heat pump uses adds little or no transmission cost. NSTAR Electric’s method, which the DPU later directed National Grid and Unitil to follow, has four steps: 10 1. Hold the residential class’s transmission revenue target constant. 2. Estimate how much electricity the class would use if every residential customer heated with a heat pump. For NSTAR Electric, this nearly tripled winter usage, to 2.86 times its actual level, and slightly reduced summer usage, because heat pumps cool more efficiently than central air conditioners. 3. Set the summer rate so that summer still collects the same revenue as before. Because estimated summer usage is slightly lower, the summer rate rises slightly, from 4.545¢ to 4.890¢/kWh. 4. Divide the revenue that winter collected before by the much larger estimated winter usage. In other words, the same winter dollars are spread over nearly three times as many kilowatt-hours, so the winter rate falls to about a third of the standard rate. NSTAR Electric’s figures show this. Its standard transmission rate was 4.545¢/kWh, and its winter heat pump rate was 1.590¢/kWh, almost exactly 4.545¢ divided by 2.86. 11 Consider a gas-heated home that uses 1,000 kWh in the winter months and pays $45.45 in transmission charges on the standard rate. If it installs a heat pump and its winter usage rises to 2,860 kWh, it pays $45.47 on the heat pump rate: almost exactly the same transmission bill as before, despite nearly three times the usage. For a typical heat pump household, then, the Massachusetts design adds nothing to the transmission bill for its added winter usage. Rate HP is more conservative: it charges a typical heat pump household the marginal cost of its incremental heat pump load. The reason for charging heat pump customers less for transmission in winter is also the same as mine: transmission costs are driven by the summer peak. NSTAR Electric explained that transmission costs “are generally set in relation to system peak demand which typically happens in the summer.” The DPU agreed that transmission costs are “well-suited to seasonal heat pump rate designs that reflect the timing and manner in which demand-related costs are incurred in a system that is currently summer peaking.” It concluded that lowering winter transmission charges in National Grid’s and Unitil’s heat pump rates “is appropriate based on cost-causation principles and the need to advance the Commonwealth’s climate and equity objectives.” 12 adjusted winter sales”), 21 (directing National Grid and Unitil to “recover the winter transmission revenue requirement over the adjusted winter sales”) (June 1, 2026); see also Velez Direct at 84 n.76 (quoting the same directive). 10 D.P.U. 25-55, Direct Testimony of Richard D. Chin on behalf of NSTAR Electric Company d/b/a Eversource Energy (“Chin Direct”), Exhibit ES-HP-1, at 13:1–12 (winter sales adjusted by “2.86 times the original load,” summer by “a nominal adjustment reflecting some efficiency gains over central air conditioning usage”; “The revenue target for Rate R-1/R-2 is held constant to produce revenue neutral seasonal rates”; the current rate “is multiplied against test year sales for the summer period and then divided by the adjusted summer period sales to arrive at a new summer period base distribution rate”), 13:15–19 (transmission rates “calculated in similar fashion to base distribution rates”; the winter transmission price “is then calculated to collect the remaining revenue requirement over the adjusted winter period sales”) (Apr. 17, 2025); D.P.U. 25-55, Petition of NSTAR Electric Company, d/b/a Eversource Energy for Approval of Residential Seasonal Heat Pump Rates, Order, at 8 (July 29, 2025); D.P.U. 25-08-A Order at 21 (directing National Grid and Unitil to design winter transmission charges “consistent with the design of winter transmission charges approved for NSTAR Electric’s heat pump rates”). 11 Chin Direct, Exhibit ES-HP-1 at 10:8 (Table 2). 4.545¢ ÷ 2.86 = 1.589¢; 1,000 kWh × 4.545¢ = $45.45; 2,860 kWh × 1.590¢ = $45.47. 12 Chin Direct, Exhibit ES-HP-1 at 14:12–13; D.P.U. 25-08-A Order at 19, 20; compare Velez Direct at 16:4–5 (distribution and transmission marginal costs “are concentrated entirely in the summer”).Page 101 of 130
Exhibit JRD-4 Page 58 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 4 of 6 The results are similar too. NSTAR Electric’s winter transmission rate was 1.590¢/kWh when proposed, 65% below its annual rate of 4.545¢/kWh. Rate HP’s winter transmission rate would be 1.258¢/kWh, 75% below Rate 1’s 5.050¢/kWh. 13 c. I am not aware of any jurisdiction that has set a heat pump rate’s retail transmission charge at an estimate of marginal transmission cost. Nor do I propose that Rate HP do so. Rate HP’s winter Transmission Service Rate is not set at marginal cost. It is set so that a customer who switches from fossil fuel heating to a heat pump keeps paying the transmission bill they paid before (which continues to contribute to the embedded cost of the existing transmission system), plus the marginal cost of the load they add. 14 Only the added load is priced at marginal cost. d. Each Massachusetts heat pump rate was designed as if every customer who enrolled were what I call in CIEC-1(a) a “new heat pump customer”: a home that heats with fossil fuels, installs a heat pump, and enrolls at the same time. As described in part (b), each company estimated how much electricity its residential customers would use if every one of them switched from gas heating to a heat pump, and set its heat pump rates to collect the residential class’s existing revenue target from that usage.15 For a new heat pump customer, enrolling does not reduce revenue. Its winter usage rises by about the assumed amount, so it pays about what it paid before installing its heat pump (see the example in part (b)). This is essentially the same dynamic I describe for new heat pump customers under Rate HP in CIEC-1(a), except that under Rate HP they pay slightly more than before, because Rate HP also charges the marginal cost of their added load. In practice, though, many of the customers who enrolled in Massachusetts were what I call “existing heat pump customers” (CIEC-1(a)): they already had heat pumps under the default rate. Before NSTAR Electric’s rates launched, it automatically enrolled every customer who had received a Mass Save heat pump rebate since 2019. 16 National Grid likewise automatically enrolled customers who had previously received a Mass Save heat pump rebate. 17 NSTAR Electric’s net enrollment was 71,490 customers in the rate’s first month alone. 18 Unlike new heat pump customers, existing heat pump customers did not increase their usage when they enrolled, so they now pay less than they did on the standard residential rate. The Massachusetts companies did not raise their standard residential rates to make up that 13 Chin Direct, Exhibit ES-HP-1 at 10:8 (Table 2: Rate R-1/R-2 transmission of “$0.04545/kWh (Annual)”; heat pump rate transmission of “$0.01590/kWh (All other months)”); Velez Direct at 82 (Table 4). 14 Velez Direct at 85:2–7. 15 Chin Direct, Exhibit ES-HP-1 at 13:4–5; D.P.U. 23-150, Petition of Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid, pursuant to G.L. c. 164, § 94 and 220 CMR 5.00, for Approval of a General Increase in Base Distribution Rates for Electric Service, a Performance-Based Ratemaking Plan, and a Capital Recovery Mechanism, National Grid, Exhibit HP-1, Residential Heat-Pump Rate Implementation Plan (“National Grid Exhibit HP-1”), at 4 (Dec. 30, 2024). 16 D.P.U. 25-08, NSTAR Electric Company Response to Information Request DPU-2-4 (Jan. 23, 2026) (“Before the launch of the rate on November 1, 2025, the Company automatically enrolled all customers who had received a heat pump from a Mass Save Sponsor after January 1, 2019.”). 17 National Grid Exhibit HP-1 at 8 (“all customers who previously received a Mass Save heat-pump incentive through the Company or Boston Gas (before the Heat-Pump Rate becomes effective) will be automatically enrolled into the Heat-Pump Rate”). 18 D.P.U. 26-143, NSTAR Electric Company d/b/a Eversource Energy, Revenue Decoupling Adjustment Factor Filing for Effect January 1, 2027 (“NSTAR 2026 RDAF Filing”), at 6 (Oct. 30, 2026; pending) (net enrollment of 71,490 in November 2025; “Customers who enrolled in a heat pump rate may have pre-existing heat pump installations in their homes.”).Page 102 of 130
Exhibit JRD-4 Page 59 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 5 of 6 difference, as I propose doing with Rate 1’s rates for Rate HP (CIEC-2(c) and CIEC-3(c)). Instead, the difference goes into decoupling. National Grid, for example, states that any shortfall “will be included in the Company’s Revenue Decoupling Mechanism.”19 How the difference is recovered. Like CL&P’s Revenue Decoupling Mechanism and Transmission Adjustment Clause (CIEC-2(d)), the Massachusetts companies’ reconciling mechanisms work at the level of the company as a whole, so a portion of the difference is recovered from non-residential customers: • Distribution. All three companies’ decoupling mechanisms compare actual base distribution revenue with the target for the company as a whole, then allocate the total over- or under-recovery to every rate class using fixed allocators set in the last rate case. Unitil computes the difference class by class, but then sums the differences “to develop a total Company shortfall or surplus” before allocating it. The allocators assign 39.4% of any shortfall to non-residential classes at National Grid, 49.2% at NSTAR Electric, and 38.8% at Unitil. 20 • Transmission. National Grid and Unitil each track the transmission over- or under-recovery for the company as a whole, add it to the next year’s cost forecast, and spread the total across all rate classes by their share of the system peak. National Grid’s $44.4M under-recovery for October 2024 through September 2025 was allocated this way, with 46.4% going to non-residential classes. Unitil’s 2027 transmission balances are spread the same way, with 54.9% going to non-residential classes. NSTAR Electric’s tariff folds any over- or under-recovery into the next annual factor and does not limit it to the class that produced it. National Grid’s new Heat Pump Transmission Service Charge changes how residential customers are billed, but nothing in its tariff keeps a shortfall in that charge with heat pump customers.21 What the DPU has done about it. The DPU anticipated that shortfalls could occur and that they would run through decoupling. 22 It now requires each company to report, in its annual decoupling filing, heat 19 National Grid Exhibit HP-1 at 4. 20 National Grid, Revenue Decoupling Mechanism Provision, M.D.P.U. No. 1635, at 1 (Distribution Revenue Allocator of “Rate R-1/R-2 60.6%”), 3 (“The amount of over- or under-recovery shall be allocated to the rate classes by applying the Distribution Revenue Allocator”) (effective Oct. 1, 2026); NSTAR Electric, Revenue Decoupling Adjustment Mechanism, M.D.P.U. No. 60N, at 4 (the revenue requirement “shall be allocated to all rate class groups by applying the Base Distribution Revenue Allocator,” Residential 50.795%) (effective Feb. 1, 2026); Fitchburg Gas and Electric Light Company d/b/a Unitil, Revenue Decoupling Adjustment Clause (Schedule RDAC), M.D.P.U. No. 500, at Sheet 4 (“The RDAF shall be calculated by comparing the difference between Annual Target Revenue to Actual Base Revenue for each rate class with the resulting differences summed to develop a total Company shortfall or surplus.”), Sheet 6 (allocators approved in D.P.U. 26-39: RD-1/RD-2 61.18%, with HPRES and HP-RES IE in the Residential group) (effective Nov. 1, 2026). 21 National Grid, Exhibit PP-8, at 1 (single company-wide balance, ending Sept. 2025 under-recovery of $44.4M), and Exhibit PP-9, at 1, lines 2 (adding the under-recovery to the 2026 forecast), 5 and 6 (allocating the total by coincident-peak share, R-1/R2 at 53.6%), both filed in D.P.U. 26-02; National Grid, Transmission Service Cost Adjustment Provision, M.D.P.U. No. 1640, at 1 (“The Company shall allocate the forecast of transmission costs and the balance of any over- or under-recoveries to its rate classes”) (effective Nov. 1, 2026); Unitil, Schedule SED-3, at 3, lines 4, 10 and 12–18, and Schedule SED-4, at 3, lines 18, 22 and 28–34 (prior-year reconciliation added to costs, then allocated to class groups by 12-CP; RD-1/RD-2 at 45.15%) (D.P.U. 26154, filed Nov. 2, 2026; pending); NSTAR Electric, Transmission Service Cost Adjustment, M.D.P.U. No. 48A, at 1 (“a full reconciliation and adjustment for any over- or under-recoveries occurring under the prior year’s adjustment”) (effective Jan. 1, 2025). 22 D.P.U. 23-150, Order, at 512 n.230 (Sep. 30, 2024) (“the Department expects there to be a reduced chance of significant revenue shortfalls . . . through the revenue decoupling mechanism”).Page 103 of 130
Exhibit JRD-4 Page 60 of 87 Conservation Law Foundation and Sierra Club PURA Docket No. 26-05-10 Set CIEC-02 Date Issued: October 29, 2026 CIEC-008 Page 6 of 6 pump customers’ billed revenue alongside what they would have been billed on the standard rate. 23 In NSTAR Electric’s first report, its heat pump rate customers were billed $10.3 million in base distribution revenue from their enrollment through April 2026, compared with $33.2 million on the standard rate for the same usage. 24 That comparison overstates the revenue the company lost, however, because it mixes existing and new heat pump customers — both of which were and are auto-enrolled across the state — and only existing heat pump customers reduce revenue (CIEC-1(a)). New heat pump customers enrolled on the heat pump rate at the same time they increased their winter usage, so enrolling did not reduce the revenue they paid. In short, Massachusetts produces an estimate of the shortfall, and an overestimate at that, but recovers the shortfall entirely through its reconciling mechanisms, so part of it is paid by nonresidential customers. How Rate HP improves on this. Connecticut can learn from Massachusetts’s experience in two ways. First, Rate HP plans for existing heat pump customers. When rates are set, the revenue they would no longer pay (for example, after a one-time mass auto-enrollment of Energize CT rebate recipients, as described in CIEC-1(a) and CIEC-1(b)) is built into Rate 1’s rates, within the same rate class group (part (a) and CIEC-2(c)). The Massachusetts companies, by contrast, did not raise their standard residential rates to make up the revenue that the existing heat pump customers they auto-enrolled no longer pay. Second, for any shortfall that arises between rate cases, for example because enrollment differs from the forecast, I recommend that the Authority adopt Massachusetts’s reporting requirement and go one step further: direct the Company to recover the shortfall from residential customers only (CIEC-2(d)). Together, these would keep Rate HP’s effect within the residential class, a result the Massachusetts rates do not achieve. 23 D.P.U. 25-08-A Order at 2, 41 (directing the companies to report “the billed revenues recorded from heat pump customers in their annual revenue decoupling filings and to compare those revenues to the amounts that would have been billed if those customers had not enrolled in the heat pump rates”). 24 NSTAR 2026 RDAF Filing at 6 (billed winter base distribution revenue from each customer’s enrollment through April 2026 of $10,320,004 on the heat pump rate and $33,211,094 on the non-heat pump rate; “[t]he underlying usage used for the revenue comparison is the same”).
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: James R. Dauphinais [26-05-10]