Prefiled testimony
Witness: JOHN P. DIPAOLA-TROMBA, SEAN D. REDDING, AND JENNA TURNER
Files3
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-VMP-REBUTTAL-1.pdf
PDF · 288 KB · 17 pagesText searchable
Download Exhibit CLP-VMP-REBUTTAL-1.pdfRead the text of Exhibit CLP-VMP-REBUTTAL-1.pdf
Exhibit CLP-VMP-REBUTTAL-2.pdf
PDF · 1.7 MB · 17 pagesText searchable
Download Exhibit CLP-VMP-REBUTTAL-2.pdfRead the text of Exhibit CLP-VMP-REBUTTAL-2.pdf
Page 5 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 3 of 15 1 (Defever Testimony at 33). 2 He contends that the Company has not sufficiently 2 justified its proposed level of expense given that “costs declined from 2023-2025,” and 3 that the Company has allegedly “budgeted a further decrease in 2026” – which is also 4 not a correct characterization (id. at 35). 3 Mr. Defever further claims the Company has 5 not provided adequate supporting documentation for the increased program costs or the 6 proposed shift from partially capitalizing vegetation management costs to expensing 7 all such expenditures (id. at 35-37). He also claims that the Company has not accounted 8 for potential storm restoration savings resulting from increased vegetation management 9 (id. at 34). 10 management costs to the 2025 capitalized and expensed amounts ($60,560), less 11 Frontier’s 15% share of expensed amounts, while rejecting the Company’s proposal to 12 eliminate the capitalization of VMP work on a going forward basis (id. at 37). 13 Mr. Defever asserts that his recommendation would reduce the rate year “expense” 14 level by $50.939 million in the cost of service, which is factually correct. However, in 15 practice, his recommendations would have the effect of reducing overall VMP 16 spending by only $16 million, while committing customers to pay the revenue As a result, Mr. Defever recommends limiting rate year vegetation 2 For this proposition, Mr. Defever cites to Schedule C-3.31 of the Company’s SFRs. However, Schedule C-3.31 is an Operating Income Schedule that does not include capitalized amounts spent in the test year on vegetation-management expense. The Company’s total VMP spending in the test year was approximately $60 million, constituting an increase in VMP spending of only about $16 million, net of Frontier’s responsibility. 3 The “budgeted” reduction shown in Mr. Defever’s testimony (on page 35) for 2026 is a function of the fact that the Company is changing the nature of its VMP work, eliminating work that may be capitalized. In fact, his table shows that the budgeted expense for VMP work in 2026 is increased from 2025 by over $1.3 million, which also has the effect of increasing the contribution owed by Frontier as an offset to 2026 program costs.Page 6 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 4 of 15 1 requirement (including depreciation expense, income taxes, property taxes and a rate 2 of return) on vegetation management work that the Company does not view as cost- 3 efficient or operationally beneficial to the system at this point. 4 5 Q. What is your response to Mr. Defever’s argument that PURA should hold VMP spending at 2025 levels because spending declined between 2023 and 2025? 6 A. The purpose of a Test Year is to establish a reasonable approximation of a utility’s 7 future operating expenses. Mr. Defever’s recommendations expressly limit the 8 Company to the VMP activities and expenditures that took place in 2025, rather than 9 aligning with changes in the VMP program that the Company needs to make to achieve 10 a higher level of cost efficiency and operational effectiveness going forward. Utilities 11 are permitted to adjust Test Year expenses for known and measurable changes affecting 12 costs and revenues in the period that rates will be in effect. 13 recommendations entirely overlook the change in VMP work that the Company is 14 recommending that it needs to make for the next VMP term, 2027 through 2030. 15 In making his recommendations, Mr. Defever places considerable weight on the fact 16 that vegetation management expenditures lowered between 2023 and 2025, positing 17 that the Company should be held to 2025 spending levels because the Company’s 18 requested rate year increase “is not known and measurable” (Defever Testimony at 37). 19 However, the Company’s historical expenditures do not reflect the nature of the 20 vegetation-management work that is required to maintain a safe and reliable electric 21 distribution system during the PBMRP term, which includes a four-year stay-out Mr. Defever’sPage 7 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 5 of 15 1 commitment. Vegetation management needs on the electric distribution system have 2 not declined and are not declining. The table presented in Mr. Defever’s testimony 3 shows that the Company’s decline in VMP expenditures over the years 2023 to 2025 4 was primarily in relation to capitalized work – reflecting the fact that the type of work 5 that the Company is conducting is shifting away from the strategies that have been 6 utilized over the past 10 years to push back vegetation from the trim zone. Now that 7 this work is done, the Company’s focus is shifting to strategies that will maintain the 8 trim zone in a cost efficient and effective manner. 9 More specifically, the proposed 2027 VMP budget reflects changes in program scope, 10 timing and methodology that are not captured by simply carrying forward 2025 actual 11 expenditures. Specifically, the following programs reflect changes from 2025 Test 12 Year and the expenditures that follow from the test-year VMP work, driving the need 13 for the proposed 2027 budget: 14 15 16 17 18 19 20 21 22 23 24 • Roadside Schedule Maintenance: The Company’s 2027 VMP (and proposed increase in the program budget) reflects the estimated cost of a four-year scheduled maintenance cycle using updated contractor costs. The proposed plan shifts away from field assessment and prioritization for trim work to a system that will maintain entire circuits at once. This approach is driven by the results of a Light Detection and Ranging (“LiDAR”) pilot showing high levels of vegetation encroachment three years after trimming on circuits. The budget was developed using cost-per-mile estimates anticipating contractor rate increases. Actual costs are now validated by the Company’s request for proposals (“RFP”) process for 2027 to 2030 vegetation management work, as discussed further herein. 25 26 27 • Risk Tree Removal (“RTR”): The Company’s 2027 budget transfers funds previously allocated to Enhanced Tree Removal (“ETR”), which was capitalizable work, to the planned RTR work, which is expense work.Page 8 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 6 of 15 1 2 3 • Reliability Tree Work (“RTW”): The Company’s 2027 budget transfers funds previously allocated to Reliability Tree Removals (“REL”), which was capitalizable work, to the planned RTW work, which is expense work. 4 5 6 7 8 • Distribution Rights-of-Way (“D ROW”): The Company’s 2027 budget transfers funds previously allocated to Customer Focus Enhanced Tree Trimming (“ETT”), which was capitalizable work, to a distribution ROW cycle for side trimming and brush control, including maintenance ETT where the ETT specification was achieved. This is expense work. 9 10 11 12 13 14 • Emergency: This is a planned budget to cover blue-sky emergency tree contractor call-outs for outage and non-outage tree OMS events. Although the proposed 2027 budget exceeds 2025 actual expenditures, the budget has remained steady at $2,000,000 for several years. Emergency program spending is highly weather dependent and the budget must account for years with greater emergency response needs. 15 16 17 18 • Vines: The budget was increased to allow two years of backbone circuit miles to be treated instead of one. Circuit backbones that are not due for Mid-Cycle or scheduled maintenance will be treated for vines each year, ensuring that all backbone miles are covered annually. 19 20 21 22 • Emergent Work: The budget was increased to support the volume of customer and tree warden inquiries regarding dead and declining trees, as well as in anticipation of increased tree stress and mortality due to beech leaf disease and spotted lanternfly. 23 24 25 26 27 • Mid-Cycle: This historic program is being funded again based on the results of the LiDAR analysis, which shows encroachment across the system that should be addressed sooner due to consent limitations and varying tree growth rates. The program will support hot-spot trimming across approximately 1,000 to 1,200 miles of backbone each year. 28 29 • CT DOT Program: The program is moving from capital to expense and has increased due to projected increases in contractor costs. 30 31 32 33 34 • LiDAR: This new remote sensing program will facilitate annual ground-based LiDAR collection on the upcoming year’s scheduled maintenance circuits, as well as on off-cycle backbone miles for Mid-Cycle and RTW prioritization. This program was added following a successful ground-based LiDAR pilot that demonstrated that a data-driven approach can improve VMP prioritization.Page 9 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 7 of 15 1 2 3 • Other: The budget was increased to support Energy Saving Trees Arbor Day locations, right-tree and right-place education, transformer enclosure maintenance and other smaller programs. 4 (Exhs. RSR-016; OCC-102). 5 As these examples demonstrate, Mr. Defever’s comparison of the Company’s proposed 6 expenditures to historical spending does not account for the underlying changes in the 7 scope, timing and operating model of the VMP. His comparison is therefore not apples- 8 to-apples and does not establish that 2025 actual expenditures are an appropriate level 9 of funding for the program proposed for the PBMRP term. 10 In summary, Mr. Defever does not demonstrate or even suggest that the Company’s 11 2025 expenditure level is sufficient to meet its future vegetation management 12 requirements, nor does he account for the potential long-term consequences to system 13 reliability and safety of holding the Company’s spending at 2025 levels. Instead, he 14 substitutes a historical spending figure for an analysis of the Company’s actual 15 operating requirements and proposed VMP. Ratemaking is not simply a matter of 16 carrying forward amounts expended in the Test Year. Those amounts must be adjusted 17 for known and measurable changes so that they reflect an appropriate and sufficient 18 level of funding for the period during which rates will be in effect. 19 20 21 Q. What is your response to Mr. Defever’s claim that PURA should hold VMP spending at 2025 levels because the Company has not provided cost documentation supporting increased vendor costs? 22 A. The Company recognizes the importance of supporting its proposed vegetation 23 management expense with appropriate documentation. As the Company has discussedPage 10 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 8 of 15 1 at length in testimony and discovery responses, it is entering a new four-year cycle, 2 with costs subject to the results of a competitive solicitation that the Company 3 commenced earlier this year (see, Exhs. CLP-VMP-1, at 6, 11, 39; OCC-840; RSR- 4 022; EOE-145). 5 solicitation and has received approval from the CL&P Board of Directors to execute 6 the new contracts. The Company is pleased to report that the program pricing obtained 7 through the RFP solicitation initially came in slightly higher than what the Company 8 had estimated for the purposes of its initial filing on July 14, 2026; however, the 9 Company was able to negotiate those proposals down to align with the pricing that the 10 Company has estimated for PURA’s approval. With this pricing, the Company expects 11 the cost of the program to align with the Company’s proposal in this case, subject to 12 modest variations up or down to follow the work, as allowed by the new contracts. 13 Exhibit CLP-VMP-REBUTTAL-2 provides a copy of the presentation made to the 14 CL&P Board of Directors supporting contract execution. The Company expects to 15 spend the next few weeks finalizing the new contracts with the program vendors and 16 will submit the new contracts to the record as soon as the contracts are executed. As of this date, the Company has concluded its competitive 17 Q. Would you provide some background on the scope of the RFP process? 18 A. Yes. Eversource commenced a competitive solicitation for VMP contractor services 19 in early 2026, inviting the participation of eleven vendors performing tree work across 20 New England. The Company included a total 16,650 overhead distribution miles in 21 the 4-year cycle bid scope and circuit maps were provided for the 2027 and 2028Page 11 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 9 of 15 1 scheduled maintenance plan for contractor review. Pricing was requested for all four 2 years. All eleven vendors submitted bid proposals to the Company and ten vendors 3 were awarded contracts, with five contractors receiving full-service Area Work Center 4 (AWC) awards. Second-round pricing negotiations lowered roadside maintenance 5 costs by 5.3% ($9.9M). 6 For cost control purposes, bids were required to include unit-cost-per-mile pricing for 7 scheduled maintenance miles, as well as rates for time, equipment and materials for 8 emergent work and unit tree removal costs based on diameters of trees. An effort was 9 also made to achieve an outcome where multiple vendors would be available to the 10 Company to provide vegetation-management coverage during weather events. Each 11 contractor’s ability to obtain significant outsource storm crew resources was considered 12 in the RFP evaluation. Lastly, all vegetation-management work was planned and bid 13 under two scenarios: (1) the VMP funding level requested from PURA; and (2) a scaled 14 down program scope should PURA decline to approve the Company’s VMP plan, as 15 proposed. 16 At the conclusion of the process, the Company selected vendors and allocated work to 17 each vendor based on a comprehensive evaluation of commercial pricing, operational 18 capabilities, workforce availability, safety performance, storm response capabilities, 19 and overall ability to support the Company's long-term reliability objectives. The 20 competitive process included multiple rounds of negotiations and resulted in significant 21 cost savings through best and final pricing submissions while maintaining operationalPage 12 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 10 of 15 1 capability and service quality. The allocation of work across the selected vendors is 2 shown in Exhibit CLP-VMP-REBUTTAL-2, at slide 8 of the presentation to the Board 3 of Directors. 4 5 6 Q. How do you respond to Mr. Defever’s claim that the Company has not adequately justified its “request to expense all vegetation management costs? (Defever Testimony at 36). 7 A. Mr. Defever claims that PURA should reject the Company’s plan to move away from 8 the capitalization of vegetation-management work but does not cite any specific 9 deficiencies in the Company’s rationale or explain why the proposed treatment would 10 be inappropriate, claiming only that the Company did not submit “sufficient 11 documentation” of this decision (Defever Testimony at 36-37). 12 Company has thoroughly substantiated the reasons for its change in VMP strategy with 13 the framework of that decision documented in testimony and discovery. 14 By way of background, in Docket No. 17-10-46, PURA approved a rate settlement that 15 resolved the Company’s base distribution rate request (the “2018 Rate Settlement”). 16 The 2018 Rate Settlement established two funding mechanisms for VMP: (1) annual 17 recovery of $29.8 million for VMP expenses; and (2) separate recovery of ETT costs 18 as capital investment. 19 The capital treatment of ETT was based on the significant, one-time system 20 improvements achieved by standardizing eight-foot clearances along thousands of 21 miles of backbone circuits and laterals across the Company’s Connecticut service 22 territory. In that regard, this program was not designed, nor intended, to be permanent However, thePage 13 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 11 of 15 1 vegetation-management strategy, given that once the clearances are achieved – 2 maintenance of those clearances is that objective. As the Company completed the 3 major ETT work, the incremental benefits of further program extension were 4 diminishing, as fully expected with the design of the program. The Company’s current 5 vegetation management needs now center on ongoing maintenance of those clearances, 6 addressing previously inaccessible areas and targeting ongoing reliability concerns tied 7 to vegetation. For example, newer equipment enables the Company to reach tree 8 canopies that could not be addressed during the initial ETT efforts. 9 The Company’s planned changes to the VMP also eliminate inefficiencies stemming 10 from the need to maintain separate capital and O&M vegetation management activities. 11 Currently, the Company may require separate crews to perform maintenance and tree 12 removal in the same areas, resulting in redundant mobilizations. By treating the VMP 13 as a unified program, the same crews can efficiently perform work as they progress 14 along a circuit, reducing unnecessary repeat visits and duplicative traffic control costs. 15 In short, the Company’s vegetation management work has shifted from large-scale, 16 one-time system improvements to ongoing maintenance and targeted reliability efforts, 17 dictating the expense treatment in compliance with applicable accounting standards. 18 The Company cannot simply choose to capitalize or expense the cost of the work it is 19 performing. The VMP team is informed by the Company’s accounting team that the 20 accounting follows the nature of the work performed on the system and this is what isPage 14 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-VMP-REBUTTAL-1 November 18, 2026 Page 12 of 15 1 driving the change from capitalization to expense treatment. Mr. Defever does not 2 account for that fact with his recommendations. 3 4 5 Q. How do you respond to Mr. Defever’s argument that the Company has not demonstrated that increased vegetation management spending will produce storm restoration savings? 6 A. At least three factors make it difficult, if not impossible, to quantify the direct 7 relationship between vegetation management spending and storm restoration savings. 8 First, the unpredictable frequency timing, and severity of future weather events make 9 it difficult to estimate how much vegetation management will reduce storm restoration 10 costs (Exh. OCC-378). Second, the primary benefit of vegetation management is 11 preventing damage that never occurs, which leaves no direct record of avoided tree- 12 related outages from which to quantify that counter-factual. Third, other reliability 13 initiatives, such as pole replacements, equipment upgrades, and system hardening also 14 contribute to storm restoration cost reductions, making it difficult for the Company to 15 isolate the impact of its vegetation management activities. 16 Although the Company cannot assign a precise dollar value to future savings, the 17 reliability benefits of vegetation management are demonstrable and the Company has 18 provided record evidence of those benefits (Exh. OCC-378). 19 Company has provided two studies from the University of Connecticut demonstrating 20 that enhanced vegetation management produces meaningful reductions in tree-related 21 outages, including reductions of up to 63.8 percent during lower-severity storms and 22 37.3 percent during the most severe events studied (Exhs. OCC-099; OCC-102; Specifically, the
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: JOHN P. DIPAOLA-TROMBA, SEAN D. REDDING, AND JENNA TURNER [26-05-10]