  1. Page 45 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 43 of 68 1 produced misleading efficiency estimates and excessively demanding efficiency 2 requirements for certain distribution utilities.75 3 Austria’s electricity regulator also evaluated SFA for determining utility-specific 4 efficiency targets but concluded that the available sample was insufficient for reliable 5 application of the methodology. Specifically, the commissioned experts concluded that the 6 available sample of distribution utilities was too small to support reliable SFA estimation. 76 7 LEI’s index-based analysis directly addresses historical industry OM&A productivity 8 growth, while its separate unit-cost and econometric benchmarking analyses evaluate 9 CL&P’s relative cost performance. Those analyses provide empirical evidence relevant to 10 the proposed X-Factor and Consumer Dividend without requiring PURA to adopt a 11 fundamentally different approach to determining the productivity adjustment. The index- 12 based approach is an established and widely used methodology for measuring historical 13 industry productivity trends in North American utility regulation. A study prepared by 14 Pacific Northwest National Laboratory (“PNNL”) for the U.S. Department of Energy 15 describes index-number methods as a preferred approach for North American 16 performance-based regulation, while discussing their data, transparency, and sensitivity- 17 testing requirements. 77 The Alberta Utilities Regulator relied on an aggregate index-based 18 approach in establishing the industry productivity factor for electricity distributors since 75 Association of Energy Cities, “Statement on the Consultation Regarding the Draft Regulatory Methodologies for Electricity Distribution Network Operations for the Regulatory Periods 2024–2027 and 2028–2031,” November 10, 2023, section “Efficiency Incentive,” <https://energiakaupungit.fi/energiakaupungit-ryn-lausunto-kuuleminenvahvistuspaatosluonnoksesta-sahkon-jakeluverkkotoimintojen-valvontamenetelmiksi-valvontajaksoilla-2024-2027-ja-20282031/.> 76 E-Control, Regulatory Regime for the Third Regulatory Period: Electricity Distribution System Operators, 1 January 2014–31 December 2018 (2014), 18–19, 55. <https://www.econtrol.at/documents/1785851/1811582/Regulierungssystematik%2BStrom%2B3.%2BPeriodeengl_clean_en_14037_final.pdf/8bf86184-095a-4eb1-811d-b682d146f709. 77 Brittany Tarufelli and Mark Weimar, Total Factor Productivity Studies in the Electricity Sector: An Overview of Methodologies and Best Practices, PNNL-33001 (Richland, WA: Pacific Northwest National Laboratory, June 2022).
  2. Page 46 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 44 of 68 1 2012 for its first-generation PBR framework; studies for electric utilities in New 2 Hampshire, Hawaii, Massachusetts, and Ontario have also used index-based 3 methodologies. 78 4 As explained in my direct testimony 79, LEI selected the index method because the principal 5 objective is to measure historical changes in productivity across the electric distribution 6 industry. The method directly measures changes in industry output relative to real input 7 quantities from reported cost and operating data, does not require specification of a 8 particular production or cost function, and can be applied consistently across a broad 9 industry sample. 10 11 12 13 Q. Dr. Taylor recommends additional sensitivities. Ms. Wilson and Mr. Tully also request additional sensitivity analyses and testing of alternative scenarios. 80 How should PURA evaluate these requests in relation to setting the Company’s OM&A XFactor? 14 A. Sensitivity analyses can provide useful information about the effects of alternative 15 assumptions and the robustness of productivity estimates. Indeed, LEI’s Industry TFP 16 Study already examined alternative historical periods, a Northeast regional sample, 17 electricity sales as an alternative output measure, and an alternative capital depreciation 18 methodology. LEI also conducted additional analyses during discovery. However, I believe 19 that the additional requests of the intervenors’ witnesses are not necessary and, in some 20 cases, are impossible or methodologically unsound. 78 Brittany Tarufelli and Mark Weimar, Total Factor Productivity Studies in the Electricity Sector: An Overview of Methodologies and Best Practices, PNNL-33001 (Richland, WA: Pacific Northwest National Laboratory, June 2022), ii; LEI, Industry TFP Study, Exhibit CLP-PBR-2, 18–21. 79 Frayer, Direct Testimony, 25-27. 80 Taylor, Direct Testimony, 13–15; Wilson and Tully, Direct Testimony, 39–41.
  3. Page 47 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 45 of 68 1 First, several of Dr. Taylor’s proposed sensitivities, including gross or net plant, the capital 2 benchmark year, and capital-cost smoothing, appear to relate to capital productivity. 3 Changes to these assumptions would affect capital PFP or total TFP but would not affect 4 OM&A PFP if the OM&A inputs, output measure, sample, and study period remain 5 unchanged. Accordingly, these tests are not relevant to determining the Company’s 6 proposed OM&A-only X-Factor. 7 Second, LEI has already examined alternative assumptions that directly affect OM&A PFP. 8 In response to UPA-049(b) and UPA-051, the Company reported average annual OM&A 9 PFP estimates of approximately +0.20% using winsorization and +0.03% using GDP-PI 10 instead of GDP-FSDP, respectively, compared with the originally filed estimate of 11 −0.03%. 81 Although LEI performed these requested tests, I believe PURA should give 12 limited weight to the alternative results for purposes of determining the X-Factor because 13 neither alternative has been demonstrated to provide a more reliable or economically 14 appropriate measure of long-term industry OM&A productivity. Winsorization replaces 15 unusually high or low productivity observations with adjusted values, moving the analysis 16 away from actual reported data and changing the result for the productivity trend without 17 demonstrating that those high and low observations are erroneous or should be disregarded. 18 In particular, the resulting modified growth series no longer preserves the cumulative 19 productivity change reflected in LEI’s original chained index. 82 20 Similarly, GDP-PI 83 is less appropriate than GDP-FSDP for measuring non-labor input 21 prices because GDP-FSDP better reflects prices paid by domestic purchasers, including the 81 CL&P, responses to UPA-049(b) and UPA-051 (sensitivities using the originally filed dataset). 82 See CL&P, response to UPA-049(b), Docket No. 26-05-10. 83 The Company also conducted a test using GDP-PI to measure non-labor input prices as one of the scenarios in its response to UPA-082.
  4. Page 48 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 46 of 68 1 effects of changes in import prices. GDP-PI measures price changes in goods and services 2 produced in the United States, including exports, but does not directly reflect changes in 3 import prices. In contrast, GDP-FSDP measures prices of final goods and services 4 purchased by U.S. residents, including imported goods and services, while excluding 5 exports. 84 6 For example, EDCs may incur maintenance expenses associated with repairing 7 transformers, circuit breakers, and other distribution equipment using imported 8 components. Changes in the prices of imported components can therefore affect utilities’ 9 operating costs, even though these import-price changes are not directly captured by GDP- 10 PI. Conversely, GDP-PI incorporates price changes for domestically produced goods sold 11 to foreign purchasers, such as U.S.-manufactured aircraft exported overseas, which have 12 little direct relationship to the operating and maintenance costs of domestic EDCs. Because 13 GDP-FSDP excludes exports, it does not directly incorporate those export-price 14 changes. 8586 15 Third, Dr. Taylor recommends testing alternative expense classifications and aggregation 16 weights but does not identify which labor or distribution expenses should be included or 84 U.S. Bureau of Economic Analysis (“BEA”), “Gross Domestic Product (GDP) Price Index,” BEA Glossary, < https://www.bea.gov/help/glossary/gross-domestic-product-gdp-price-index>; BEA, “Final Sales to Domestic Purchasers,” BEA Glossary, https://www.bea.gov/help/glossary/final-sales-domestic-purchasers; BEA, “BEA Provides Easier Access to Important Economic Measures,” December 12, 2012,< https://www.bea.gov/news/blog/2012-12-12/bea-provides-easieraccess-important-economic-measures.> 85 BEA, “Gross Domestic Product (GDP) Price Index”; U.S. Census Bureau, U.S. International Trade in Goods and Services, December and Annual 2025, Exhibit 6, “U.S. Exports of Goods by End-Use Category and Commodity,” <https://www.census.gov/foreign-trade/Press-Release/ft900/final_2025.pdf>
  5. Page 49 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 47 of 68 1 excluded, propose alternative OM&A weights, or demonstrate any deficiencies in LEI’s 2 existing methodology. 87 LEI’s analysis relies on consistently defined FERC expense 3 accounts, which utilities report in accordance with FERC’s Uniform System of Accounts, 4 prescribed under 18 CFR Part 101. Specifically, LEI obtains OM&A expenses from the 5 Electric Operation and Maintenance Expenses schedule in FERC Form 1 and salaries and 6 wages from the Distribution of Salaries and Wages schedule. LEI calculated utility- 7 specific labor and non-labor cost shares derived from these reported data. Changing these 8 classifications or weights without identifying a methodological deficiency or providing an 9 economically justified alternative would introduce arbitrary adjustments that could 10 undermine the reliability of the industry productivity estimates. 11 In my opinion, the intervenors’ proposed additional sensitivities do not establish a 12 deficiency in LEI’s methodology or provide a more reliable alternative for determining the 13 Company’s OM&A X-Factor. PURA should therefore retain LEI’s preferred methodology 14 rather than adopt alternative specifications that are either irrelevant to OM&A productivity 15 or lack sufficient economic and empirical justification. 16 17 18 19 Q. Dr. Taylor recommends using the 62nd percentile of capital productivity performance, rather than the industry average, in calculating capital PFP and total TFP, citing CL&P’s favorable historical capital-cost benchmarking results. 88 Do your benchmarking results support his proposed adjustment to your TFP calculation? 20 A. No. Dr. Taylor is mixing apples and oranges when he recommends using CL&P’s historical 21 capital-cost benchmarking results to justify selecting a higher percentile of capital 22 productivity growth in LEI’s Industry TFP Study. LEI’s Industry TFP Study and the 23 Benchmarking Cost Study measure different aspects of utility performance (evaluating 87 Taylor, Direct Testimony, 22, 36–37. 88 Taylor, Direct Testimony, 36–38.
  6. Page 50 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 48 of 68 1 productivity trend over time versus estimating productivity level at a specific point in time), 2 focus on different applications (industry level TFP versus firm-specific cost 3 benchmarking), look over different time periods (20-year TFP versus 10-year 4 Benchmarking) and were created for different purposes (setting the X-Factor versus 5 informing the Consumer Dividend). 6 Cost benchmarking measures CL&P’s costs relative to other utilities or a model-predicted 7 benchmark, while capital PFP measures changes in output over time relative to real capital 8 inputs. Therefore, CL&P’s historically favorable capital-cost performance does not 9 necessarily mean that it should be required to achieve capital productivity growth at the 10 62nd percentile of the industry. Indeed, if a utility has been found to be very efficient, 11 logically there may not be as much low hanging fruit to take advantage of in order to 12 accelerate its productivity growth over time. 13 Also, Dr. Taylor does not demonstrate how the reported capital-cost deviations translate 14 into the proposed 62nd percentile of capital productivity growth or establish why that 15 percentile would provide a more appropriate measure of industry productivity. Such an 16 adjustment would require an empirically supported relationship between relative cost 17 levels and productivity growth. 18 Finally, Dr. Taylor’s recommendation concerns capital PFP and total TFP, which is 19 irrelevant to the Company’s proposed PBMRP, where the indexation applies only to 20 OM&A. Accordingly, his proposed capital productivity adjustment would not directly 21 affect the productivity measure underlying the Company’s proposed X-Factor.
  7. Page 51 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 49 of 68 1 2 Q. As discussed in Section X, Dr. Taylor throws out a number of alternative X Factor values with the purpose of pushing for a higher X-Factor. 89 What is your reaction? 3 A. As I discussed earlier, there is no data-informed justification for his alternative proposals. 4 I recommend retaining the empirically informed X-Factor (based on the OM&A PFP). Dr. 5 Taylor may have overlooked that the Company is adding a Consumer Dividend, with a 6 staring value of 0.30%, to the index-based revenue adjustment mechanism. So, in fact, 7 there is a bit of a “stretch” built into the Company’s PBMRP plan to address issues like 8 sharing of benefits of PBR with consumers and improve affordability. 90 9 Consistent with the approach contemplated in RE01 and deployed in other jurisdictions 10 with active PBR in North America, the appropriate X-Factor should be informed by 11 empirical productivity evidence and evaluated in the context of the costs covered by the 12 revenue adjustment mechanism, the inflation index, and other PBMRP components, 13 including the Consumer Dividend. 14 B. Historical Study Period and Treatment of Unusual Observations 15 16 17 18 Q. Ms. Wilson and Mr. Tully question whether the 2005–2024 study period adequately reflects industry productivity trends and suggest that using different periods could produce different results. 91 Why did LEI select the 2005–2024 period, and how do the productivity estimates change when alternative periods are used? 19 A. LEI selected the 2005–2024 study period to measure long-term industry productivity trends 20 while reflecting relatively recent operating conditions, as described in Section 2.4 of 21 Exhibit CLP-PBR-2. At the time of the study, 2024 was the latest year for which complete 22 data were available. The selected period includes 20 years of data and 19 annual 89 Wilson and Tully, Direct Testimony, 42–43; Taylor, Direct Testimony, 21–22. 90 Donald J. Scacco Jr., Digaunto Chatterjee, and Douglas P. Horton, Joint Direct Testimony, 86–87. 91 Wilson and Tully, Direct Testimony, 40–43.
  8. Page 52 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 50 of 68 1 productivity growth observations. A sufficiently long study period spreads the contribution 2 of individual annual observations over more years and captures both favorable and 3 unfavorable conditions, such as changes in weather, consumption, capital spending, and 4 labor costs. At the same time, the period should not extend so far into the past that it 5 captures industry conditions that may no longer be relevant. As discussed in the Company’s 6 response to OCC-445, selectively excluding particular observations could introduce bias if 7 unusual periods are entirely excluded, even though they may reflect a reoccurring set of 8 conditions. Excluding particular observations because of their value and impact on the 9 average can be tantamount to cherry picking the data. 10 LEI also examined alternative historical periods. Based on the LEI Industry TFP Study 11 results (with errata), average annual OM&A PFP growth was approximately −0.01% for 12 2005–2024, +0.32% for 2010–2024, and −0.31% for 2015–2024. These results 13 demonstrate that productivity estimates vary depending on the study period, but shortening 14 the period does not consistently produce a higher or lower estimate. Although Ms. Wilson 15 and Mr. Tully question the appropriateness of the 2005–2024 study period, they do not 16 identify a preferred alternative period or provide an empirical basis for concluding that 17 another period would be more representative of long-term industry productivity trends. 18 Accordingly, LEI considers the 2005–2024 period appropriate for measuring long-term 19 industry productivity trends, rather than selecting a period based on whether it produces a 20 positive or negative result.
  9. Page 53 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 51 of 68 1 2 3 4 Q. Ms. Wilson and Mr. Tully question whether historical productivity estimates provide an appropriate basis for the Company’s X-Factor given prospective changes in load, electrification, investment requirements, and labor conditions. 92 Why is historical industry productivity an appropriate starting point for a prospective X-Factor? 5 A. Historical industry productivity provides an objective, empirical basis for establishing a 6 prospective X-Factor because it reflects the industry’s actual productivity performance 7 under a range of economic and operating conditions. LEI’s Industry TFP Study covers 8 2005–2024, a 20-year period during which electric distribution utilities experienced 9 changes in electricity demand, labor costs, investment requirements, and operating 10 practices, including increased spending on grid modernization, reliability, and resilience. 11 By covering a sufficiently long period, the Industry TFP study captures both favorable and 12 unfavorable conditions and reduces the influence of unusual circumstances in any 13 individual year. 14 The changes identified by Ms. Wilson and Mr. Tully are therefore not entirely new to the 15 industry. While these developments may affect electric distribution operations in the future, 16 the magnitude and timing of their effects on industry OM&A productivity remain 17 uncertain. Ms. Wilson and Mr. Tully have not demonstrated that these developments would 18 materially change industry OM&A productivity during the proposed four-year PBMRP 19 term or provided an alternative productivity estimate reflecting their expected effects. 20 21 Q. 22 A. Ms. Wilson and Mr. Tully raise the absence of formal structural-break and outlier tests with respect to the Industry TFP Study. 93 Please comment on this concern. 23 92 Wilson and Tully, Direct Testimony, 42. 93 Wilson and Tully, Direct Testimony, 40–43.
  10. Page 54 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 52 of 68 1 Annual productivity growth can fluctuate because of changes in economic conditions, 2 operating expenditures, capital investment cycles, and other factors. Therefore, identifying 3 an unusually large annual change, or differences in average productivity growth across 4 selected historical periods, does not by itself demonstrate that the industry’s longer-term 5 productivity trend has permanently changed. 6 LEI employed an index-based approach to measuring industry productivity, a numerical 7 technique which allowed for the calculation of changes in productivity using observed 8 changes in industry outputs and inputs. Unlike an econometric regression model, an index- 9 based TFP study does not rely on estimating statistical relationships or regression 10 parameters. The TFP index links successive annual changes to measure cumulative 11 productivity growth over the study period, with each observation contributing to the 12 historical trend. Simply removing an observation because it exhibits an unusually large 13 positive or negative change or shortening the historical period without a sound economic 14 logic could introduce subjectivity into the analysis and potentially distort the resulting 15 productivity trend. 16 LEI’s approach is also consistent with other regulatory productivity studies that used 17 continuous historical periods substantially overlapping LEI’s 2005–2024 Industry TFP 18 study period. For example, the NSTAR Electric study covered 2006–2020, the FortisBC 19 industry O&M PFP study covered 2007–2022, and the PSNH study covered 2000–2022. 20 Alberta’s third-generation PBR proceeding also considered productivity studies extending 21 through 2021. These examples demonstrate that the use of continuous, long-term historical 22 periods is an established approach in regulatory productivity studies. 23 Therefore, I do not agree that the absence of formal structural-break or outlier tests 24 undermines the validity of LEI’s Industry TFP Study. The relevant consideration is whether
22 pages match
2 pages match

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: Julia Frayer [26-05-10]

This filing on the current system (opens in a new tab)