Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files4

Search terms highlighted
Eversource rate increase is on 33 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
9 pages match
  1. Page 51 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 49 of 68 1 2 Q. As discussed in Section X, Dr. Taylor throws out a number of alternative X Factor values with the purpose of pushing for a higher X-Factor. 89 What is your reaction? 3 A. As I discussed earlier, there is no data-informed justification for his alternative proposals. 4 I recommend retaining the empirically informed X-Factor (based on the OM&A PFP). Dr. 5 Taylor may have overlooked that the Company is adding a Consumer Dividend, with a 6 staring value of 0.30%, to the index-based revenue adjustment mechanism. So, in fact, 7 there is a bit of a “stretch” built into the Company’s PBMRP plan to address issues like 8 sharing of benefits of PBR with consumers and improve affordability. 90 9 Consistent with the approach contemplated in RE01 and deployed in other jurisdictions 10 with active PBR in North America, the appropriate X-Factor should be informed by 11 empirical productivity evidence and evaluated in the context of the costs covered by the 12 revenue adjustment mechanism, the inflation index, and other PBMRP components, 13 including the Consumer Dividend. 14 B. Historical Study Period and Treatment of Unusual Observations 15 16 17 18 Q. Ms. Wilson and Mr. Tully question whether the 2005–2024 study period adequately reflects industry productivity trends and suggest that using different periods could produce different results. 91 Why did LEI select the 2005–2024 period, and how do the productivity estimates change when alternative periods are used? 19 A. LEI selected the 2005–2024 study period to measure long-term industry productivity trends 20 while reflecting relatively recent operating conditions, as described in Section 2.4 of 21 Exhibit CLP-PBR-2. At the time of the study, 2024 was the latest year for which complete 22 data were available. The selected period includes 20 years of data and 19 annual 89 Wilson and Tully, Direct Testimony, 42–43; Taylor, Direct Testimony, 21–22. 90 Donald J. Scacco Jr., Digaunto Chatterjee, and Douglas P. Horton, Joint Direct Testimony, 86–87. 91 Wilson and Tully, Direct Testimony, 40–43.
  2. Page 52 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 50 of 68 1 productivity growth observations. A sufficiently long study period spreads the contribution 2 of individual annual observations over more years and captures both favorable and 3 unfavorable conditions, such as changes in weather, consumption, capital spending, and 4 labor costs. At the same time, the period should not extend so far into the past that it 5 captures industry conditions that may no longer be relevant. As discussed in the Company’s 6 response to OCC-445, selectively excluding particular observations could introduce bias if 7 unusual periods are entirely excluded, even though they may reflect a reoccurring set of 8 conditions. Excluding particular observations because of their value and impact on the 9 average can be tantamount to cherry picking the data. 10 LEI also examined alternative historical periods. Based on the LEI Industry TFP Study 11 results (with errata), average annual OM&A PFP growth was approximately −0.01% for 12 2005–2024, +0.32% for 2010–2024, and −0.31% for 2015–2024. These results 13 demonstrate that productivity estimates vary depending on the study period, but shortening 14 the period does not consistently produce a higher or lower estimate. Although Ms. Wilson 15 and Mr. Tully question the appropriateness of the 2005–2024 study period, they do not 16 identify a preferred alternative period or provide an empirical basis for concluding that 17 another period would be more representative of long-term industry productivity trends. 18 Accordingly, LEI considers the 2005–2024 period appropriate for measuring long-term 19 industry productivity trends, rather than selecting a period based on whether it produces a 20 positive or negative result.
  3. Page 53 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 51 of 68 1 2 3 4 Q. Ms. Wilson and Mr. Tully question whether historical productivity estimates provide an appropriate basis for the Company’s X-Factor given prospective changes in load, electrification, investment requirements, and labor conditions. 92 Why is historical industry productivity an appropriate starting point for a prospective X-Factor? 5 A. Historical industry productivity provides an objective, empirical basis for establishing a 6 prospective X-Factor because it reflects the industry’s actual productivity performance 7 under a range of economic and operating conditions. LEI’s Industry TFP Study covers 8 2005–2024, a 20-year period during which electric distribution utilities experienced 9 changes in electricity demand, labor costs, investment requirements, and operating 10 practices, including increased spending on grid modernization, reliability, and resilience. 11 By covering a sufficiently long period, the Industry TFP study captures both favorable and 12 unfavorable conditions and reduces the influence of unusual circumstances in any 13 individual year. 14 The changes identified by Ms. Wilson and Mr. Tully are therefore not entirely new to the 15 industry. While these developments may affect electric distribution operations in the future, 16 the magnitude and timing of their effects on industry OM&A productivity remain 17 uncertain. Ms. Wilson and Mr. Tully have not demonstrated that these developments would 18 materially change industry OM&A productivity during the proposed four-year PBMRP 19 term or provided an alternative productivity estimate reflecting their expected effects. 20 21 Q. 22 A. Ms. Wilson and Mr. Tully raise the absence of formal structural-break and outlier tests with respect to the Industry TFP Study. 93 Please comment on this concern. 23 92 Wilson and Tully, Direct Testimony, 42. 93 Wilson and Tully, Direct Testimony, 40–43.
  4. Page 54 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 52 of 68 1 Annual productivity growth can fluctuate because of changes in economic conditions, 2 operating expenditures, capital investment cycles, and other factors. Therefore, identifying 3 an unusually large annual change, or differences in average productivity growth across 4 selected historical periods, does not by itself demonstrate that the industry’s longer-term 5 productivity trend has permanently changed. 6 LEI employed an index-based approach to measuring industry productivity, a numerical 7 technique which allowed for the calculation of changes in productivity using observed 8 changes in industry outputs and inputs. Unlike an econometric regression model, an index- 9 based TFP study does not rely on estimating statistical relationships or regression 10 parameters. The TFP index links successive annual changes to measure cumulative 11 productivity growth over the study period, with each observation contributing to the 12 historical trend. Simply removing an observation because it exhibits an unusually large 13 positive or negative change or shortening the historical period without a sound economic 14 logic could introduce subjectivity into the analysis and potentially distort the resulting 15 productivity trend. 16 LEI’s approach is also consistent with other regulatory productivity studies that used 17 continuous historical periods substantially overlapping LEI’s 2005–2024 Industry TFP 18 study period. For example, the NSTAR Electric study covered 2006–2020, the FortisBC 19 industry O&M PFP study covered 2007–2022, and the PSNH study covered 2000–2022. 20 Alberta’s third-generation PBR proceeding also considered productivity studies extending 21 through 2021. These examples demonstrate that the use of continuous, long-term historical 22 periods is an established approach in regulatory productivity studies. 23 Therefore, I do not agree that the absence of formal structural-break or outlier tests 24 undermines the validity of LEI’s Industry TFP Study. The relevant consideration is whether
  5. Page 55 of 70Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 53 of 68 1 the historical period provides a reasonable and representative measure of industry 2 productivity. Ms. Wilson and Mr. Tully do not provide economic justification for excluding 3 particular observations or treating a selected period differently. 4 5 6 7 Q. Dr. Taylor identifies the 2019–2020 OM&A PFP observation as an outlier and calculates an alternative X-Factor of approximately 0.675% after excluding that year-over-year observation from LEI’s original results. 94 Do you agree with his exclusion and resulting re-estimate of the OM&A PFP? 8 A. No, I do not agree with Dr. Taylor’s approach of identifying an outlier and then excluding 9 it from a long-term average or the value that he derived. LEI’s originally filed Industry 10 TFP Study reported a 12.72% decline in OM&A PFP in 2019–2020, followed by a 7.21% 11 increase in 2020–2021. Dr. Taylor’s approach removes the large negative observation 12 while retaining the subsequent positive observation. His suggestion to exclude the 2019– 13 2020 annual growth rate appears to have been made without adequately investigating the 14 underlying expenditure drivers (despite having access to LEI’s workpapers) or considering 15 the methodological implications of selectively excluding an observation from a 16 productivity series constructed using the chained Fisher Ideal methodology. Importantly, 17 identifying an observation as a statistical outlier does not, in itself, provide an economic 18 justification for excluding it from a long-term productivity trend. This is particularly 19 relevant given that the underlying maintenance expenditures exhibit a persistent increase, 20 rather than an isolated, short-term deviation, as I explain further below. 21 LEI’s Industry TFP Study uses the chained Fisher Ideal methodology, under which annual 22 changes in output and input quantities are calculated using data from consecutive years. 23 These annual changes are linked by multiplying each year’s growth factor by the preceding 94 Taylor, Direct Testimony, 16–17, 21–22.
  6. Page 56 of 70Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 54 of 68 1 year’s index value, producing separate output and input indices that capture cumulative 2 changes over the full study period. The TFP index is then calculated as the ratio of the 3 chained output index to the chained input index. Simply excluding the 2019–2020 growth 4 rate would artificially improve measured industry productivity by disregarding a decline 5 that remains embedded in subsequent years of the chained index. As demonstrated in 6 Exhibit WOT-2, Dr. Taylor calculates his adjusted OM&A PFP estimate of 0.675% by 7 excluding the 2019–2020 annual growth rate of −12.72% from LEI’s published 8 productivity series and taking the arithmetic average of the remaining observations, 9 without reconstructing the underlying chained indices. However, both the 2019–2020 and 10 2020–2021 annual changes use 2020 data. 95 Removing the 2020 observation from the 11 underlying dataset would require recalculating the adjacent index links. For illustrative 12 purposes, excluding both annual growth rates from the arithmetic average produces an 13 average annual OM&A PFP growth rate of 0.29% across the remaining 17 annual changes, 14 rather than Dr. Taylor’s proposed 0.675%. However, this calculation does not represent a 15 valid measure of long-term productivity. 16 The industry TFP Study workpapers also provide important economic context for the 2019- 17 2020 productivity decline. LEI analyzed the data underlying its TFP study and found that 18 the industry sample experienced a significant increase in OM&A expenditures in 2020, 19 with nominal costs rising 14.4%, equivalent to a 14.7% increase in real terms. A large share 20 of the nominal increase was attributable to Pacific Gas & Electric (“PG&E”), Southern 21 California Edison (“SCE”), and San Diego Gas & Electric (“SDG&E”) (with additional 22 substantial increases observed at Niagara Mohawk Power, Jersey Central Power & Light, 23 PECO Energy, Commonwealth Edison, and Massachusetts Electric). For the California 95 Dr. William O. Taylor, Exhibit WOT-2: Outlier Calculation Notebook, p. 1, “OM&A Productivity Outlier Analysis.”
  7. Page 57 of 70Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 55 of 68 1 utilities, these increases coincided with fundamental changes in utility operating practices 2 following destructive wildfires and heightened regulatory requirements for wildfire 3 prevention. For example, in its 2020 Risk Spending Accountability Report, PG&E reported 4 that operating expenses exceeded its authorized spending levels by approximately $1.33 5 billion, primarily because of enhanced equipment inspections and associated repairs, 6 expanded vegetation management, and Public Safety Power Shutoff activities. 96 These 7 expenditures reflect an operational response to heightened risks, rather than simply higher 8 input prices or an unexplained increase in costs. PG&E’s subsequent regulatory filings 9 document the continuation of these activities through 2022 and describe ongoing 10 inspection, maintenance, and vegetation-management programs for 2023–2025, suggesting 11 that at least part of the expenditure increase reflected sustained operating requirements 12 rather than exclusively temporary costs. 97 13 While California utilities experienced the most pronounced initial increases, similar 14 pressures are evident among utilities in other jurisdictions, reflecting both wildfire 15 exposure and broader storm-related reliability and resilience requirements. These 16 challenges have become a significant area of concern across the utility industry, as reflected 17 in guidance published by the National Association of Regulatory Utility Commissioners 18 (“NARUC”) addressing resilience planning, wildfire risk mitigation, vegetation 19 management, grid hardening, and the evaluation of associated utility expenditures. 98 99 20 Portland General Electric attributed higher 2024 operating expenses partly to increased 96 CPUC. PACIFIC GAS AND ELECTRIC COMPANY’S (U39M) 2020 RISK SPENDING ACCOUNTABILITY REPORT. (2021). P. 1-4. 97 CPUC. 2023 General Rate Case, Exhibit PG&E-4, Electric Distribution. (2023). P. 2-24. 98 NARUC. Integrated System Resilience. (2026). 99 NARUC. Wildfire Workbook for Utility Regulators. (2026).
  8. Page 58 of 70Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 56 of 68 1 network maintenance, wildfire mitigation, vegetation management and storm restoration, 2 and subsequently forecast $53–57 million of wildfire-related OM&A for 2025. 100 Central 3 Maine Power explicitly confirmed that costs associated with major storms in 2023 were 4 recorded in FERC Account 593, Maintenance of Overhead Lines. 101 The Michigan Public 5 Service Commission reports that Consumers Energy increased the extent of its annual tree- 6 trimming activities by approximately 50% over 2020–2024 relative to its earlier 7 practices. 102 These examples are not intended to be exhaustive but do demonstrate how both 8 reactive restoration and proactive maintenance programs can produce sustained 9 expenditure pressures beyond California. 10 Climate change has also contributed to growing risks to electric distribution infrastructure, 11 including more severe wildfire conditions in the western United States, as documented by 12 National Oceanic and Atmospheric Administration (“NOAA”). 103 However, as the U.S. 13 Department of Energy recognizes, the need to strengthen grid resilience extends beyond 14 wildfires to a broader range of extreme weather events. 104 In the Northeast, where utilities 15 must contend with severe storms, including winter storms, this has placed greater emphasis 16 on vegetation management, storm preparedness, and system hardening to reduce damage 17 and improve reliability. This interpretation is consistent with independent industry and 18 academic evidence. S&P Global Ratings identifies wildfire risk as an increasingly 19 widespread concern affecting utilities beyond California, including in Texas and Colorado, 100 Portland General Electric. Portland General Electric announces 2024 financial results and initiates 2025 earnings guidance. (2025). 101 Central Maine Power. 2024 ISO New England Inc. Transmission, Markets and Services Tariff Docket No. ER20-2054. (2024). 102 MPSC. MPSC's Focus on Reliability and Resilience. (2026). 103 NOAA. The weather and climate influences on the January 2025 fires around Los Angeles. (2025). 104 DOE. Building a Better Grid: Addressing Climate Change and Bolstering Electric Grid Security Through Planning & Innovation. (2022).
  9. Page 59 of 70Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 57 of 68 1 and emphasizes the need for continuing mitigation expenditure. 105 S&P Global Ratings also 2 highlights the broader financial and operational pressures associated with extreme weather 3 events, including hurricanes, severe storms, and winter weather, which have contributed to 4 increased utility expenditures on infrastructure repair, system hardening, and resilience 5 measures. 106 Fitch Ratings similarly identifies increasing wildfire and hurricane activity as 6 an ongoing utility-sector credit concern, contributing to rating actions in 2024. 107 7 Furthermore, Huang and Kahn (2024), using FERC Form 1 data, find statistically 8 significant positive relationships between natural-disaster exposure, particularly hurricanes 9 and fires, and utility maintenance expenditures. 108 Accordingly, while individual disasters 10 can generate exceptional costs, the evidence indicates that they can also trigger lasting 11 changes in utility operating and maintenance requirements. The resulting expenditures 12 represent genuine and increasingly widespread industry cost pressures and should not be 13 excluded from an industry productivity assessment merely because the initial increase was 14 concentrated in a particular year or geographic region. 15 In summary, Dr. Taylor’s analysis falls short on both the mechanics and rationale for why 16 excluding the observation produces a more representative measure of long-term industry 17 productivity. 105 S&P Global. Credit FAQ: The Burning Questions: North America's Investor-Owned Utility Wildfire Risks. (2025). 106 S&P Global. A Storm Is Brewing: Extreme Weather Events Pressure North American Utilities' Credit Quality. (2023). 107 EEI. Q4 2024 Credit Ratings. (2024). P. 7. 108 Robert Huang and Matthew E. Kahn. United States Electric Utility Adaptation to Natural Hazards and Green Power Mandates. (2024). P. 277-278.
  10. Page 60 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-PBR-REBUTTAL-1 November 18, 2026 Page 58 of 68 C. Choice of Output Measures 1 2 3 4 5 6 Q. Ms. Wilson and Mr. Tully question customer count as the output measure and recommend considering peak demand and multiple output metrics in the Industry TFP Study. 109 Dr. Taylor also probes whether customer count adequately reflects reliability and decarbonization responsibilities. 110 What are your thoughts on this subject matter? 7 A. The output index used to calculate the X-Factor must be consistent with the way the 8 regulatory formula determines allowable revenue growth and customer count is the 9 appropriate measure to use in the Industry TFP study. Customer count provides an 10 objective and consistently available measure of the scale of electric distribution service that 11 is a readily available data point across time and across firms. EDCs must connect customers 12 and maintain the capacity to serve them regardless of their annual electricity consumption. 13 As explained in my direct testimony, distribution service provides access to the network 14 and the ability to receive electricity; annual energy deliveries do not fully capture that 15 function. 111 16 In contrast, electricity sales can fluctuate with weather, economic activity, energy 17 efficiency, and customer usage without corresponding changes in the resources required to 18 maintain distribution service. 112 In my professional judgement, customer count is therefore 19 a more useful measure for measuring productivity trends for electric distribution sector, as 20 well as comparing across utilities and years. 109 Wilson and Tully, Direct Testimony, 39–41 110 Taylor, Direct Testimony, 15, 30–31, 41. 111 Frayer, Direct Testimony, 34–36; LEI, Industry TFP Study, Exhibit CLP-PBR-2, 38. 112 LEI nevertheless examined TFP trends for the industry with electricity sales as the defined output. The national OM&A PFP result is −0.97% using sales, compared with −0.01% using customer count (these are the results with the errata adjustments). Sales-based OM&A PFP is more negative because electricity sales have grown more slowly than customer counts, reflecting energy efficiency improvements, behind-the-meter generation, and greater sensitivity to weather and economic conditions. These factors reduce electricity consumption without necessarily reducing the costs of operating and maintaining the distribution network. See: EIA. Electric Power Annual. (2026).
22 pages match
2 pages match

As listed on the current system

Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: Julia Frayer [26-05-10]

This filing on the current system (opens in a new tab)