Prefiled testimony
Witness: MATTHEW NELSON AND MICHAEL GOLDMAN
Files2
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-IAP-REBUTTAL-1.pdf
PDF · 336 KB · 26 pagesText searchable
Download Exhibit CLP-IAP-REBUTTAL-1.pdfRead the text of Exhibit CLP-IAP-REBUTTAL-1.pdf
Search terms highlighted
Eversource rate increase is on 10 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 10 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 8 of 24 1 provides only a pathway via a rate-case cycle, then the utilities will avail themselves of 2 that option as frequently as they can manage. 3 As a result, the statement that the Company will file on an 18-month cycle without a 4 multi-year rate plan in place is not a threat, but rather a description of the alternative 5 ratemaking model that the parties and intervenors are recommending. The Company’s 6 revenue requirement witness has modeled this alternative under rolling cost-of-service 7 cases, filed as often as Connecticut law allows, with the first taking effect July 1, 2027, 8 and subsequent increases on January 1, 2029, July 1, 2030, and January 1, 2032 — with 9 a bill impact in the range of 2.5 percent, as compared to about 1.5 percent a year under 10 the plan (response to Interrogatory UPA-82, Attachment 7). A company whose costs 11 rise at the utility construction index and whose rates are set to actual cost through the 12 traditional rate case cycle that takes 12 months to conduct, will return to PURA as soon 13 as the gap becomes foreseeable. Conversely, the stay-out term is designed so that, for 14 four years, the utility cannot return to PURA and must do the best it can with what rates 15 allow, sparing all stakeholders with the need to focus resources on repeated rate cases 16 and driving stability and efficiency for customers. 17 III. THE AFFORDABILITY FRAMEWORK 18 19 20 Q. What are your concerns with how Mr. Balakumar describes the increment in the capital plan above its historical level as “discretionary,” and that the Three B’s framework does not provide an amount for the level of investment? 21 A. The Three B’s framework is a method and was not designed to derive or determine a 22 dollar figure. The Three B’s framework asks what the system requires and whatPage 11 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 9 of 24 1 meeting that need will cost (Budget); what that cost means to customers in terms of the 2 level of rates and the stability of those rates (Burden); and whether the two can be 3 reconciled and, where they cannot, which gives and on what evidence (Balance). As 4 the Company explained to PURA, underinvestment is spending less than the system 5 requires given its age, condition, weather exposure and obligations. The Company’s 6 response to UPA-025 and UPA-26 sets out the criteria a reviewer applies instead of a 7 threshold – project benefit-cost results, reliability and asset condition, the composition 8 of spending, and cost benchmarking, with the signs that distinguish insufficient from 9 calibrated from over-investment. On those criteria, the record leaning toward the 10 under-investment side of a calibrated framework and needing an increase in annual 11 investment levels, based on the following: 12 13 • Capital spending about 14 percent below LEI’s benchmark (UPA-025, citing Ex. CLP-PBR-3, pp. 9, 16–17); 14 15 • Blue-sky SAIDI at 77.5 minutes in 2025 against a 2021–2025 average of 71.1 (UPA-026, citing Ex. CLP-TSP-1, p. 76, Table 1); 16 17 • Emergent failures diverting resources from proactive replacement (Ex. CLPTSP-1, p. 22, ll. 14–16); 18 19 • A 2025 capital plan reduced for “regulatory recovery risk” (Ex. CLPADDITIONS-12, p. 167, quoted at Balakumar Direct, p. 19); and 20 21 • The asset condition the Company’s reliability witnesses describe (Ex. CLPELP-1, pp. 42, 48–49; Ex. CLP-TSP-1, p. 35). 22 The increment Mr. Balakumar calls “discretionary” (Balakumar Direct, pp. 5, 35) is 23 the output of the Company’s benefit-cost review of system conditions. The Company’s 24 reliability witnesses have testified to what continuing at historical levels means forPage 12 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 10 of 24 1 system performance (Ex. CLP-ELP-1, pp. 42, 48–49). Our direct testimony addressed 2 the other side of the same question, i.e., what deferral of investment costs for customers 3 when the bill comes due. The cases in Section III.D of Exhibit CLP-IAP-1 (pp. 37–44) 4 show the pattern: deferred asset-condition work surfaces later as emergency restoration, 5 casualty exposure, after-the-fact cost recovery and repriced capital, and the customer 6 cost arrives late and exceeds the savings it followed, if any (Exh. CLP-IAP-1, p. 36). 7 We presented those cases as a record of how the pattern has unfolded elsewhere, not as 8 a prediction for Connecticut, and we do so again here. 9 10 11 Q. Ms. Griffin states that the Company produced no analysis comparing customer outcomes under its design with those under PURA’s Proposed Final Decisions. Is that accurate? 12 A. What is important here is that PURA’s PBR model has not reached a final decision 13 balancing the interests and concerns of all parties. Nor are we aware that PURA ever 14 reached a point where PURA was able to provide certainty on what that customer 15 outcome would be. From a customer perspective, it is valid to compare the Company’s 16 proposed PBMRP to the alternative reality of a traditional cycle of cost-of-service rate 17 cases using the same capital plan and the same return on equity to make the analysis 18 apples to apples. Under that comparison, the results show that customers pay about 1.5 19 percent more each year under the plan, versus increases of roughly 2.5 percent under 20 multiple rate cases, and $58 million less in total through 2032 — $344 million versus 21 $402 million (UPA-82, Attachments 8 and 9). In addition, the Company’s response to 22 Interrogatory UPA-82, Attachment 7 quantifies the one element that distinguishes the 23 plan from the RE01 design, the $133 million of return over the term on plant in servicePage 13 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 11 of 24 1 that the CT-Bar would withhold, and its response to UPA-82 explains why that design 2 fully prevented the Company from having any practical chance at staying out of a rate 3 case. Consequently, this response from the Company identifies the conundrum, which 4 is that the more that PURA’s PBR framework is tilted against the Company (in the 5 hopes of providing a greater benefit to customers than a balanced framework would), 6 the more unlikely it is that the utility can or will commit to a stay-out period, returning 7 the entire paradigm to a traditional rate-case cycle. 8 Griffin treats the $133 million as a cost of the Company’s design relative to the CT- 9 Bar (Griffin Direct, p. 69). However, this is the necessary return on plant that is in 10 service and used and useful for customers, regardless of the applicable ratemaking 11 framework. The CT-Bar does not eliminate the plant or its cost; it withholds the return 12 on it for the term, which is a non-starter for a stay-out term. More specifically, under 13 the RE01 design the revenue requirement “shall not include any return on investment” 14 on CT-Bar additions, and the Company “is not entitled to a return or carrying costs” on 15 them until the next rate case, when the plant enters rate base prospectively (RE01 PFD, 16 pp. 37, 40). The financial consequences of deferring return on in-service plant, without 17 taking into consideration the credit implication and downgrades for the Company’s 18 revenue requirement are (1) the $133 million is forfeited, not deferred — it is never 19 recovered (the Company’s response to Interrogatories UPA-82, OCC-435); 20 (2) customers receive a four-year pause on part of the cost of prudently approved plant 21 that is serving them, financed by the Company and shareholders, and then mustPage 14 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 12 of 24 1 shoulder four years of additions entering rate base at once in the next case (with an 2 aggregate return not already in rates, increasing the rate shock for customers at that 3 interval); (3) costs are shifted from today’s customers to future customers, who will 4 have their own new costs and new policies to pay for; and (4) the design is one-way: a 5 prudent addition earns nothing during the term, while an addition found imprudent is 6 refunded with carrying charges (RE01 PFD, p. 40). A utility in that position will make 7 different decisions on investment. Deferred replacement in an aging system becomes 8 a failure-driven, replacement-based system, which in the long run costs more and drives 9 outages and lower service levels (Ex. CLP-TSP-1, p. 22, ll. 14–16) – leaving customers 10 in an abyss where they endure higher costs and lower levels of service. 11 12 IV. RESPONSES TO MR. BALAKUMAR ON BEHALF OF OFFICE OF CONSUMER COUNSEL 13 Q. What is the Company’s position on the affordability test set forth in RE08? 14 A. The affordability test put forward by PURA in RE08 without any comment or 15 participation by the parties is invalid. An inflation-escalated historical average cannot 16 stand alone as the measure of what is affordable for capital investment on an aging 17 system. The Company stated this in direct testimony and in discovery (Exh. CLP-IAP- 18 1, at 23; Exh. CLP-IAP-7, at 1; Response to Interrogatory OCC-565). As written, the 19 test indicates to PURA only whether the Company proposes to spend more than priorPage 15 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 13 of 24 1 years; it does not tell PURA whether the Company proposes to spend what the system 2 needs, nor does it offer an analysis of the long-term costs of deferred maintenance. 3 3 A ten-year average assumes that the past decade’s spending is a fair sample of the 4 system’s ongoing requirements, when it is not for an electric distribution system 5 operating in the current industry environment. This is a dynamic that PURA did not 6 examine in putting forward this measure. For a system that has the bulk of its assets 7 installed in concentrated periods and reaching the end of useful life together, a 8 historical view does not take into account current realities. Most distribution assets last 9 far longer than ten years, so a ten-year window sees only a fraction of any asset’s life 10 — and if the window falls in the middle of that life, it records little replacement 11 spending and sets a baseline that cannot anticipate the replacement wave that follows. 12 Consider a sub-transmission line whose poles were set in the same construction 13 program. For decades, the line requires little capital. Then the poles reach the end of 14 their service lives together, and the line is rebuilt once, in a few years, at a cost that no 15 average of the preceding decade would predict. The ten-year test would call that 16 rebuild unaffordable, but the system would call it overdue. The Company’s system has 17 that profile across major asset classes — poles, direct-buried cable, substation 18 transformers — with large shares at or beyond design life (Ex. CLP-ELP-1, pp. 42, 48– 19 49; Ex. CLP-TSP-1, p. 35; Ex. CLP-TSP-3, slide 58). A system in that condition has 3 The Company’s response to Interrogatory OCC-565 explains why the GDP deflator and the BLS PPI, which LEI used for a different purpose in its productivity study, are not the appropriate escalators for this test.Page 16 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 14 of 24 1 a different budget than the same system did a decade ago, even before construction 2 costs are considered, and no escalator applied to past spending recovers that fact. 3 The RE08 Decision describes the historical test as “a rebuttable presumption” (Ex. 4 CLP-IAP-7, p. 1). In this case, application of the RE08 “unaffordable” test is rebutted 5 by the quantification the RE08 Decision requires at page 47. Additionally, RE08 6 expressly provides that a utility “may also propose a different affordability definition” 7 (RE08 Decision, p. 46; Application of the United Illuminating Company to Amend its 8 Rate Schedule, Docket No. 24-10-04, at 42 (Oct. 28, 2025) (“UI 2025 Decision”)). The 9 Budget, Burden and Balance framework in Exhibit CLP-IAP-1 is that definition. The 10 Balance review provides a framework for weighing the challenges of overspending 11 against the long-term negative affordability and reliability consequences of 12 underspending. 13 Q. Is the historical test a cap on capital? 14 A. No. It is a check that triggers scrutiny, not a rule that sets the budget. The structure of 15 the RE08 Decision makes this clear. A plan above the escalated baseline is not rejected; 16 it must be justified by quantified benefits (RE08 Decision, p. 47). The mirror case 17 shows the same thing. If the Company had proposed a plan below its escalated history, 18 the RE08 Framework would not have required it to spend more. A benchmark that 19 binds in neither direction is a reference point for review, not a determination of need. 20 And once PURA sets rates in this proceeding, the approved plan — not a ten-year 21 average — governs what the Company builds and what customers pay. Mr. BalakumarPage 17 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 15 of 24 1 treats the baseline as the ceiling and the quantification as an afterthought (Balakumar 2 Direct, pp. 3, 34, 38), which inverts the RE08 Decision. Instead, the baseline is the 3 trigger for the analysis, and the analysis is what PURA weighs based on evidence 4 presented in this case. 5 Q. Which escalation index is appropriate for the RE08 test? 6 A. If the RE08 affordability test is used, it should be used only as a reference point, and 7 the Handy-Whitman index of public utility construction costs should be used as the 8 applicable inflation index. PURA itself has said that: “the HW Index better reflects 9 costs of utilities doing business, while the GDP Deflator reflects costs from the 10 consumer’s perspective” (UI 2025 Decision, at 43). The affordability test seeks to 11 understand whether the utility’s reliability spending has grown faster than the cost of 12 doing the work, and Handy-Whitman measures that cost — by FERC plant account, 13 for northeast utilities. The GDP deflator measures the price of the economy’s output 14 as a whole. Although the GDP deflator is an appropriate index for what customers can 15 bear in bills (the Burden review, addressing low-income discount rates), it is the wrong 16 measure of what the work costs to maintain reliability (the Budget). PURA recorded 17 how far the two have diverged. As of 2024, Handy-Whitman had risen 35 percent since 18 2022 against 5 percent for the deflator (UI 2025 Decision, at 43). Under Handy- 19 Whitman, the Company’s reliability plan averages 93 percent of its escalated ten-year 20 history (Ex. CLP-IAP-7, Tables 3–4).Page 18 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 16 of 24 1 2 Q. Mr. Balakumar applies the escalated baseline to the Company’s total distribution capital. Is that how the “affordability” test works? 3 A. No, in RE08, PURA did not apply the escalated baseline to the Company’s total 4 distribution capital. The RE08 test asks the utility to identify the reliability-related 5 portion of its capital plan, and Exhibit CLP-IAP-7, Table 1, does that component by 6 component. PURA confirmed in the UI 2025 Decision that new customer connections 7 and customer projects “are exempt from the affordability analysis in the 17-12-03RE08 8 Decision” because they are “not planned … to address system reliability or operational 9 needs but are done to meet specific customer needs” (UI 2025 Decision, at 42, citing 10 RE08 Decision, p. 46). Mr. Balakumar’s Table 1 includes New Customer Additions, 11 at 1.9 times their historical level, in a comparison he presents as the RE08 baseline test 12 (Balakumar Direct, Table 1). The comparison should be restated without the exempt 13 category before PURA gives it any weight. 14 15 Q. Mr. Balakumar also relies on the Company’s 2025 capital plan reduction and on a chart of SAIDI against spending. How should PURA read this information? 16 A. On the SAIDI comparison he writes: “I am not suggesting that reliability capital 17 produced no benefit, or that a single year’s result proves anything. Weather and other 18 factors affect annual reliability results” (Balakumar Direct, p. 21). The Company 19 agrees. His testimony does not state the level of investment he contends is justified, 20 and therefore he does not say what would satisfy the gap he is allegedly identifying, 21 which provides no basis for PURA to set a decision on capital allowance.Page 19 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 17 of 24 1 V. RESPONSES TO OCC WITNESSES MS. WILSON AND MR. TULLY 2 3 Q. What do Ms. Wilson and Mr. Tully recommend, and what would customers receive? 4 A. The primary recommendation of OCC witnesses Wilson and Tully is to deny the 5 PBMRP and approve a one-year rate plan (Wilson/Tully Direct, p. 49, ll. 11–13) — no 6 stay-out, and a new case within months of the decision. The Company’s own model 7 shows that cycle for customers, with increases of 2.4, 3.4 and 2.6 percent of the total 8 bill in sequential years, as compared to about 1.5 percent a year under the plan 9 (response to Interrogatory EOE-156, Table 1). Their fallback is a reopener to “combine 10 both O&M and capital under an externally indexed revenue cap formula, requiring a 11 new I-Factor, S-Factor, and X-Factor,” with supplemental capital recovery “on a case- 12 by-case basis” (pp. 49–50; p. 23, ll. 6–11) — a formula whose terms would be set later, 13 with capital funded by an escalator not yet determined, and anything above it recovered 14 under a process with no stated criteria, forum, timing or return rule. In every indexed 15 plan we know of, prudent capital enters rate base at the next reset. A ratemaking design 16 that defers capital investment is a delay and build-up for customers, not a savings. 17 18 Q. How does their recommendation compare to PURA’s proposed final decision in Docket No. 21-05-15RE01? 19 A. The Company opposed the proposed final decision and said so at length. On the face 20 of it, the CT-Bar is unworkable because it uses capital resources for the system with no 21 return and no cost of removal under a downward-only reconciliation (RE01 PFD, p. 22 33, citing Eversource Brief, pp. 20–26; the Company’s response to Interrogatory OCC- 23 423). We do not rely on it as a model. We cite it for one thing it recognized. OCC
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: MATTHEW NELSON AND MICHAEL GOLDMAN [26-05-10]