  1. Page 15 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 13 of 24 1 years; it does not tell PURA whether the Company proposes to spend what the system 2 needs, nor does it offer an analysis of the long-term costs of deferred maintenance. 3 3 A ten-year average assumes that the past decade’s spending is a fair sample of the 4 system’s ongoing requirements, when it is not for an electric distribution system 5 operating in the current industry environment. This is a dynamic that PURA did not 6 examine in putting forward this measure. For a system that has the bulk of its assets 7 installed in concentrated periods and reaching the end of useful life together, a 8 historical view does not take into account current realities. Most distribution assets last 9 far longer than ten years, so a ten-year window sees only a fraction of any asset’s life 10 — and if the window falls in the middle of that life, it records little replacement 11 spending and sets a baseline that cannot anticipate the replacement wave that follows. 12 Consider a sub-transmission line whose poles were set in the same construction 13 program. For decades, the line requires little capital. Then the poles reach the end of 14 their service lives together, and the line is rebuilt once, in a few years, at a cost that no 15 average of the preceding decade would predict. The ten-year test would call that 16 rebuild unaffordable, but the system would call it overdue. The Company’s system has 17 that profile across major asset classes — poles, direct-buried cable, substation 18 transformers — with large shares at or beyond design life (Ex. CLP-ELP-1, pp. 42, 48– 19 49; Ex. CLP-TSP-1, p. 35; Ex. CLP-TSP-3, slide 58). A system in that condition has 3 The Company’s response to Interrogatory OCC-565 explains why the GDP deflator and the BLS PPI, which LEI used for a different purpose in its productivity study, are not the appropriate escalators for this test.
  2. Page 16 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 14 of 24 1 a different budget than the same system did a decade ago, even before construction 2 costs are considered, and no escalator applied to past spending recovers that fact. 3 The RE08 Decision describes the historical test as “a rebuttable presumption” (Ex. 4 CLP-IAP-7, p. 1). In this case, application of the RE08 “unaffordable” test is rebutted 5 by the quantification the RE08 Decision requires at page 47. Additionally, RE08 6 expressly provides that a utility “may also propose a different affordability definition” 7 (RE08 Decision, p. 46; Application of the United Illuminating Company to Amend its 8 Rate Schedule, Docket No. 24-10-04, at 42 (Oct. 28, 2025) (“UI 2025 Decision”)). The 9 Budget, Burden and Balance framework in Exhibit CLP-IAP-1 is that definition. The 10 Balance review provides a framework for weighing the challenges of overspending 11 against the long-term negative affordability and reliability consequences of 12 underspending. 13 Q. Is the historical test a cap on capital? 14 A. No. It is a check that triggers scrutiny, not a rule that sets the budget. The structure of 15 the RE08 Decision makes this clear. A plan above the escalated baseline is not rejected; 16 it must be justified by quantified benefits (RE08 Decision, p. 47). The mirror case 17 shows the same thing. If the Company had proposed a plan below its escalated history, 18 the RE08 Framework would not have required it to spend more. A benchmark that 19 binds in neither direction is a reference point for review, not a determination of need. 20 And once PURA sets rates in this proceeding, the approved plan — not a ten-year 21 average — governs what the Company builds and what customers pay. Mr. Balakumar
  3. Page 17 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 15 of 24 1 treats the baseline as the ceiling and the quantification as an afterthought (Balakumar 2 Direct, pp. 3, 34, 38), which inverts the RE08 Decision. Instead, the baseline is the 3 trigger for the analysis, and the analysis is what PURA weighs based on evidence 4 presented in this case. 5 Q. Which escalation index is appropriate for the RE08 test? 6 A. If the RE08 affordability test is used, it should be used only as a reference point, and 7 the Handy-Whitman index of public utility construction costs should be used as the 8 applicable inflation index. PURA itself has said that: “the HW Index better reflects 9 costs of utilities doing business, while the GDP Deflator reflects costs from the 10 consumer’s perspective” (UI 2025 Decision, at 43). The affordability test seeks to 11 understand whether the utility’s reliability spending has grown faster than the cost of 12 doing the work, and Handy-Whitman measures that cost — by FERC plant account, 13 for northeast utilities. The GDP deflator measures the price of the economy’s output 14 as a whole. Although the GDP deflator is an appropriate index for what customers can 15 bear in bills (the Burden review, addressing low-income discount rates), it is the wrong 16 measure of what the work costs to maintain reliability (the Budget). PURA recorded 17 how far the two have diverged. As of 2024, Handy-Whitman had risen 35 percent since 18 2022 against 5 percent for the deflator (UI 2025 Decision, at 43). Under Handy- 19 Whitman, the Company’s reliability plan averages 93 percent of its escalated ten-year 20 history (Ex. CLP-IAP-7, Tables 3–4).
  4. Page 18 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 16 of 24 1 2 Q. Mr. Balakumar applies the escalated baseline to the Company’s total distribution capital. Is that how the “affordability” test works? 3 A. No, in RE08, PURA did not apply the escalated baseline to the Company’s total 4 distribution capital. The RE08 test asks the utility to identify the reliability-related 5 portion of its capital plan, and Exhibit CLP-IAP-7, Table 1, does that component by 6 component. PURA confirmed in the UI 2025 Decision that new customer connections 7 and customer projects “are exempt from the affordability analysis in the 17-12-03RE08 8 Decision” because they are “not planned … to address system reliability or operational 9 needs but are done to meet specific customer needs” (UI 2025 Decision, at 42, citing 10 RE08 Decision, p. 46). Mr. Balakumar’s Table 1 includes New Customer Additions, 11 at 1.9 times their historical level, in a comparison he presents as the RE08 baseline test 12 (Balakumar Direct, Table 1). The comparison should be restated without the exempt 13 category before PURA gives it any weight. 14 15 Q. Mr. Balakumar also relies on the Company’s 2025 capital plan reduction and on a chart of SAIDI against spending. How should PURA read this information? 16 A. On the SAIDI comparison he writes: “I am not suggesting that reliability capital 17 produced no benefit, or that a single year’s result proves anything. Weather and other 18 factors affect annual reliability results” (Balakumar Direct, p. 21). The Company 19 agrees. His testimony does not state the level of investment he contends is justified, 20 and therefore he does not say what would satisfy the gap he is allegedly identifying, 21 which provides no basis for PURA to set a decision on capital allowance.
  5. Page 19 of 26Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 17 of 24 1 V. RESPONSES TO OCC WITNESSES MS. WILSON AND MR. TULLY 2 3 Q. What do Ms. Wilson and Mr. Tully recommend, and what would customers receive? 4 A. The primary recommendation of OCC witnesses Wilson and Tully is to deny the 5 PBMRP and approve a one-year rate plan (Wilson/Tully Direct, p. 49, ll. 11–13) — no 6 stay-out, and a new case within months of the decision. The Company’s own model 7 shows that cycle for customers, with increases of 2.4, 3.4 and 2.6 percent of the total 8 bill in sequential years, as compared to about 1.5 percent a year under the plan 9 (response to Interrogatory EOE-156, Table 1). Their fallback is a reopener to “combine 10 both O&M and capital under an externally indexed revenue cap formula, requiring a 11 new I-Factor, S-Factor, and X-Factor,” with supplemental capital recovery “on a case- 12 by-case basis” (pp. 49–50; p. 23, ll. 6–11) — a formula whose terms would be set later, 13 with capital funded by an escalator not yet determined, and anything above it recovered 14 under a process with no stated criteria, forum, timing or return rule. In every indexed 15 plan we know of, prudent capital enters rate base at the next reset. A ratemaking design 16 that defers capital investment is a delay and build-up for customers, not a savings. 17 18 Q. How does their recommendation compare to PURA’s proposed final decision in Docket No. 21-05-15RE01? 19 A. The Company opposed the proposed final decision and said so at length. On the face 20 of it, the CT-Bar is unworkable because it uses capital resources for the system with no 21 return and no cost of removal under a downward-only reconciliation (RE01 PFD, p. 22 33, citing Eversource Brief, pp. 20–26; the Company’s response to Interrogatory OCC- 23 423). We do not rely on it as a model. We cite it for one thing it recognized. OCC
  6. Page 20 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 18 of 24 1 argued that capital should have no funding mechanism at all (“we view regulatory lag 2 as an appropriate tool”) and asked for a case-by-case application process instead 3 (Wilson/Tully Direct, p. 22, n. 16, quoting OCC Letter in Lieu of Exceptions, pp. 6–7; 4 RE01 PFD, p. 32, citing OCC Brief, p. 2). However, the proposed final decision did 5 not adopt that position; whatever its other flaws may be, it recognized that a multi-year 6 plan needs a mechanism that funds capital during the term (RE01 PFD, p. 36). 7 The RMI recommendation is OCC’s position from that docket again, and the record in 8 this case shows what PURA saw then: a design that funds capital by lag does not fund 9 the system the Company is obligated to operate, and the RMI testimony offers no 10 analysis showing it would. They further claim that the F-Factor recovers a return 11 “before” a prudence review (p. 23, ll. 1–3), which is a claim Mr. Balakumar also makes 12 (Balakumar Direct, pp. 15, 91–92), although he describes a design the Company has 13 not proposed. 14 15 Q. The RMI witnesses say the F-Factor removes the discipline that regulatory lag provides and favors capital over operating solutions. How do you respond? 16 A. The return on capital is not an incentive layered onto the business; it is the business. 17 Every utility borrows to build, and the time value of that money is a cost of service 18 someone pays, whether the utility is government run, municipal, or investor owned. 19 PURA’s observation that cost-of-service ratemaking can support capital solutions is 20 correct and not new (Decision, Apr. 26, 2023, Docket No. 21-05-15 “Phase 1 21 Decision”, at p. 29). PURA’s Phase I Decision describes how regulated utilities are
  7. Page 21 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 19 of 24 1 financed, and what it means for design is that a regulator should take care not to reward 2 capital twice. The Company’s mechanism is built with that care -- the forecast is 3 reviewed in advance; recovery is capped at the lesser of forecast and actual; the 4 adjustment is downward-only; every dollar is prudence-reviewed (response to 5 Interrogatory OCC-423). The cap is “hard,” in that capital additions five percent above 6 forecast earns no additional revenue and reduces earned return by roughly 35 basis 7 points, because the Company carries the plant unrecovered until the next case (EOE- 8 156, pp. 8–10, Table 2). 9 investment, not its cost. It withholds recovery on plant in service, weakens cash flow, 10 and leads a company to delay or avoid the proactive work that can be deferred without 11 immediate failure. The work that cannot be deferred is done at the system’s timing, 12 which the Company has to work with and manage. The plan keeps lag above the cap, 13 where it belongs as the consequence of exceeding a commitment, not the means of 14 funding it. Regulatory lag, by contrast, disciplines the timing of 15 16 Q. Why does the plan treat operating expense and capital investment costs differently? 17 A. Because operating expense and capital investment are different costs moving at 18 different rates, and one index cannot describe both. Operating costs are for items 19 consumed within a year and move with inflation; making it suitable for an index with 20 an efficiency factor and a dividend. Capital costs are long-lived, lumpy and front- 21 loaded at this stage of renewal, suitable for an index that is separate from general 22 inflation. The Company’s response to Interrogatory OCC-423 states the divergence:
  8. Page 22 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 20 of 24 1 capital investment rising nearly 40 percent, from $549 million in 2025 to $758 million 2 in 2028 — more than 11 percent a year, while operating costs excluding storms and 3 vegetation management rose 3 to 4 percent a year, making capital 87 to 89 percent of 4 each year’s adjustment under the plan (the Company’s response to Interrogatory UPA- 5 022). 6 A single escalator at the consumer-side index underfunds capital by the gap PURA 7 measured; yet, set high enough for capital, over-escalates operating cost with no 8 efficiency test. Under PBR theory, a cap that includes capital additions requires a 9 negative X-Factor and that design leaves “no direct link between the actual cost of 10 capital plant additions and the revenue collection through customer rates” (OCC- 11 423(a)–(b)). 12 For this reason, the X-Factor in this case is the O&M partial factor productivity measure 13 from LEI’s industry study, chosen because the revenue adjustment mechanism “applies 14 only to OM&A costs” (Ex. CLP-ELP-1, pp. 88–90). It was never derived nor offered 15 as a productivity factor for capital and operating cost combined. LEI’s study produces 16 separate measures for each, and a combined cap would require a different X and, as the 17 Company explained, a negative one (Ex. CLP-ELP-1, p. 88, ll. 10–14; OCC-423(a)– 18 (b)). In addition, the composite ECI/GDP-PI index was built to track the O&M cost 19 structure the PFP measures (Ex. CLP-ELP-1, p. 89, ll. 5–12). Both terms of the formula 20 are operating-cost measures by construction; neither was designed for capital.
  9. Page 23 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 21 of 24 1 VI. RESPONSES TO MS. GRIFFIN ON BEHALF OF CLF-AC 2 3 Q. What does Ms. Griffin recommend and how does it compare to the Company’s design? 4 A. Ms. Griffin recommends the RE01 proposed final decision’s tiering, the S-Factor set 5 in each rate case from a benchmarking study, larger for less efficient utilities and zero 6 for the most efficient (RE01 PFD, pp. 23, 26) (Griffin Direct, App. C, item 5(c), at 35) 7 (pp. 69–70). Under tiering, the S-Factor is set once from the utility’s position against 8 peers and held for the term; a utility in the most efficient tier receives an S-Factor of 9 zero (RE01 PFD, pp. 23, 26). Ms. Griffin’s recommendation on the dividend depends 10 on her larger one. She recommends a revenue cap formula “applied to the total revenue 11 requirement (capital and OM&A costs)” (Griffin Direct, App. C, item 1), and she faults 12 the Company’s proposal for removing “the total-cost discipline from the revenue cap” 13 (Griffin Direct, p. 21, ll. 16–18). Her S-Factor would apply to that combined base (App. 14 C, item 5(c)). The Company’s proposed consumer dividend applies to operating 15 expense only. 16 LEI’s 0.15 to 0.60 percent range was drawn from operating-cost mechanisms and is 17 specific to an operating-cost formula; a dividend applied to capital and operating cost 18 together would require a different range and a different benchmark (Ex. CLP-PBR-3, 19 Figure 16). On the design itself, the two share the first step and differ on the second. 20 Under tiering, the dividend is set once by the utility’s position against peers and left for 21 the term. 22 determined where the dividend starts” within LEI’s range, and “actual performance Under the Company’s design, “the Company’s relative cost position
  10. Page 24 of 26Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-IAP-REBUTTAL-1 November 18, 2026 Page 22 of 24 1 determines whether it increases” for example 0.10 percent up when Core Operating 2 Expense per customer beats the index-escalated benchmark, 0.05 down when it does 3 not, a 0.30 floor regardless, and a cap at I minus X (responses to Interrogatories OCC- 4 539(b), UPA-069 and UPA-072). Her criticism describes the step the designs share 5 and overlooks the one that is lacking from her design. Under tiering a utility that 6 reaches the top tier can see its factor fall to zero; under the Company’s design customers 7 receive 0.30 percent even then (the Company’s response to Interrogatory CLF-AC- 8 005). 9 Participant feedback regarding the S-Factor’ and left its structure to a rate case (RE01 10 PFD, p. 26); this is that rate case.” The proposed final decision adopted that design ‘[w]ithout substantive 11 12 Q. Ms. Griffin contends that the Company’s 0.30 percent starting level is too low. How should PURA weigh the starting level? 13 A. The mechanism operates at any level in LEI’s 0.15 to 0.60 percent range and PURA 14 may set the starting point. The Company proposed 0.30 percent, slightly below the 15 midpoint of LEI’s 0.15 to 0.60 percent range, based on the Company’s benchmarking 16 (responses to Interrogatories OCC-443 and OCC-559; Griffin Direct, p. 35). The 17 design of this mechanism, however, has the ability to increase beyond the starting level, 18 up to the maximum of the range (between 0.3 to 0.6). A higher fixed dividend pays 19 customers more whether any efficiency is achieved. The Company’s dividend starts at 20 0.30 and rises only in the years the Company earns it, so the customer benefit over the 21 term follows performance rather than a number set at the outset (response to 22 Interrogatory UPA-071, Attachment 1).