Prefiled testimony
Witness: NED W. ALLIS
Files2
Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
PDF · 152 KB · 3 pagesText searchable
Download Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdfRead the text of Docket No. 26-05-10 CLP Rebuttals Filing Letter (11.18.26).pdf
Exhibit CLP-DEPRECIATION-REBUTTAL-1.pdf
PDF · 884 KB · 35 pagesText searchable
Download Exhibit CLP-DEPRECIATION-REBUTTAL-1.pdfRead the text of Exhibit CLP-DEPRECIATION-REBUTTAL-1.pdf
Search terms highlighted
Eversource rate increase is on 4 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 24 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 22 of 33 1 Company information regarding the actual forces of retirement for this account further 2 supports my recommendation. Reliability and capacity are important drivers of 3 overhead conductor retirements, and the Company has an ongoing program to replace 4 older copper conductor. As conductors reach advanced ages, physical survival is not 5 the only factor affecting whether they remain in service and it is common for utilities 6 to have programmatic replacement of older assets which tend to limit the maximum 7 life of assets in an account. There are several reasons to replace older conductor, 8 including condition, reliability, capacity or other system needs. These considerations 9 further support a retirement pattern that approaches zero surviving at a reasonable 10 maximum life rather than continuing to extrapolate survival beyond the maximum life 11 indicated by the historical analysis. 12 13 Q. Why do you disagree with Mr. Garrett’s proposed 82-year average service life for Account 366.00? 14 A. In my experience, an 82-year average service life is outside the typical industry range 15 for electric utility underground conduit. The Company’s proposed 75-year average 16 service life already recognizes that conduit is long-lived property. Mr. Garrett’s 17 recommendation extends that estimate by another seven years while retaining the same 18 R1.5 dispersion. Figure 6 compares the two curves. 19 approximately one third of the account will be in service more than 100 years and 20 around 15 percent will be in service more than 120 years. These are very long lives, 21 and there is not historical data demonstrating that a large share of assets will be in 22 service for that long. My recommendation is already for a fairly long service life. Mr. Mr. Garrett projects thatPage 25 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 23 of 33 1 2 Garrett has not provided justification for an even longer life. Figure 6: Account 366.00 - Underground Conduit 3 E. Account 370.48 Meters 4 5 Q. What does Mr. Garrett propose for Account 370.48, Meters? 6 A. Mr. Garrett proposes to retain the Company’s Iowa survivor curves and net salvage 7 estimates but remove the shorter-term probable retirement date used in the Company’s 8 depreciation calculation. He instead calculates remaining lives using a mass-property 9 approach. Mr. Garrett acknowledges that the Company currently plans to replace itsPage 26 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 24 of 33 1 existing meters with AMI meters in the short-term 6 but argues that the Company’s use 2 of a probable retirement date accelerates depreciation recovery beyond what is 3 supported by a normal mass-property analysis. He further recommends waiting for the 4 AMI program to progress and actual retirement experience to develop, at which point 5 PURA could recognize shorter remaining lives in a future depreciation study or rate 6 proceeding. 7 Q. Do you agree with Mr. Garrett’s proposed treatment? 8 A. No. His recommendation is fundamentally inconsistent with the prospective nature of 9 depreciation. The purpose of estimating service lives and remaining lives is to forecast 10 when the property currently in service is expected to retire. We should not wait until 11 an expected retirement has occurred before incorporating it into the depreciation 12 estimate. Such a delay could result in the customers of tomorrow paying for the 13 equipment used by the customers of today. If Mr. Garrett believes a mass property 14 approach is most appropriate for the account, he would need to incorporate the planned 15 retirement of meters into his recommended survivor curve and average service life. He 16 did not do so. 17 18 Q. Why should the planned AMI conversion be reflected in the depreciation calculation? 19 A. Depreciation should reflect the period over which the property is expected to provide 20 service. A planned technology replacement can shorten that period even where the 6 See Garrett at 78:15-16.Page 27 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 25 of 33 1 existing equipment remains physically capable of operating. Obsolescence and 2 management decisions concerning replacement are forces of retirement, just as 3 deterioration and failure are forces of retirement. Mr. Garrett’s proposal would result 4 in future customers paying the unrecovered costs of legacy meters in addition to the 5 cost of new meters. This would be inequitable. 6 7 Q. Do you agree that PURA should wait until the AMI program progresses before recognizing its effect on depreciation? 8 A. No. Mr. Garrett acknowledges that the Company currently plans to replace its existing 9 meters in the short-term, which means he proposes to recover the costs of these assets 10 over a longer time than they will be in service. His recommendation to calculate 11 depreciation without that expected retirement date and to recognize any shortening of 12 remaining lives in a future depreciation study or rate proceeding if the retirement 13 experience develops would defer cost recovery to future customers who will have to 14 pay for retired meters and the new AMI meters. 15 16 Q. Do you agree that PURA should wait until the AMI program progresses before recognizing its effect on depreciation? 17 A. No. Mr. Garrett acknowledges that the Company currently plans to replace its existing 18 meters with AMI meters in the short-term. Nevertheless, he recommends calculating 19 depreciation without that expected retirement date and recognizing shorter remaining 20 lives in a future study or rate proceeding if the retirement experience develops. Mr. 21 Garrett’s approach is not appropriate because it ignores known information concerning 22 the expected retirement of the legacy meters. Historical retirement data cannot reflectPage 28 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 26 of 33 1 a replacement program that has not yet occurred, and waiting for that experience to 2 develop would extend remaining lives beyond the period the meters are expected to 3 provide service. This would leave costs unrecovered at retirement and shift those costs 4 to future customers who are also paying for the replacement AMI meters. 7 Moreover, 5 delaying recognition of the meter retirement date does not avoid the cost; it merely 6 compresses recovery into fewer years and creates a larger future increase in 7 depreciation expense. Recognizing the short-term probable retirement date now more 8 appropriately aligns cost recovery with the expected service period and provides a more 9 gradual recovery. If the AMI program timing changes, the remaining life calculation 10 can be updated accordingly. 11 12 Q. Have other regulators recognized the need to align legacy meter depreciation with planned AMI replacement? 13 A. Yes. There are examples of cost recovery for AMI programs. For example, the 14 Company’s affiliates used a similar probable retirement date and approach in 15 Massachusetts. 8 16 The Florida Public Service Commission addressed Florida Power & Light Company’s 17 meters that were being made obsolete by AMI by establishing capital recovery 18 schedules. Under that mechanism, “the investment and associated reserve of 19 installations facing near-term retirement are separated out as sub-accounts, and the As outlined in Exhibit CLP-AMI-1, the Company is also proposing to securitize stranded meter costs, as permitted by Public Act No. 25-173, Section 10. 8 Massachusetts Order D.P.U. 22-22 (pp.186) 7Page 29 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 27 of 33 1 unrecovered net amounts are amortized over the period of their remaining service to 2 the public.” The Commission explained the consequences of failing to align recovery 3 with an early retirement (p. 23 of Order No. PSC-10-0153-FOF-EI): 4 5 6 7 8 9 10 11 12 If assets retire earlier than the average life of the group without recovery being afforded, a negative reserve component is created. The negative reserve component translates into a positive rate base element. From the Company’s standpoint, it will continue to earn a return on this nonexistent plant over the life of the group. From the ratepayers’ standpoint, they will continue paying for plant no longer providing service until the situation is corrected. Negative reserve amounts are non-life related net investments that we have historically corrected as fast as practicable to remedy the existing intergenerational inequity. 13 The shorter-term probable retirement date aligns the remaining life of the legacy meters 14 with their planned replacement, allowing the remaining investment to be recovered 15 through depreciation while the meters are still providing service. This avoids an 16 unrecovered balance at retirement, prevents future customers from paying for assets no 17 longer in service, and eliminates the need for a separate recovery mechanism. 18 Other regulators have similarly recognized the need to recover the remaining 19 investment in meters replaced through AMI programs. The North Carolina 20 Commission provided for recovery of Duke Energy Progress’s 9 and Duke Energy 21 Carolinas’ 10 legacy meter investment, as did the Nevada 11, California 12 and South 22 Carolina 13 commissions likewise provided for recovery of meters retired through 9 10 11 12 13 Order in North Carolina Docket Nos. E-2, Sub 1131, 1142, 1103 and 1153 Order in North Carolina Docket Nos. E-7, Sub 1146, 819, 1152 and 1110 Nevada Order Dockets 10-02009, 10-03022 and 10-03023 California Decision 11-05-018 South Carolina Joint Proposed Order Docket No. 2020-125-EPage 30 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 28 of 33 1 advanced metering programs. 2 Mr. Garrett’s approach would do the opposite. Removing the probable retirement date 3 would extend the assumed lives of the legacy meters beyond their planned replacement, 4 leaving costs unrecovered at retirement and shifting those costs to future customers 5 who will also be paying for the new AMI meters. 6 IV. NET SALVAGE ESTIMATES 7 Q. Please summarize Mr. Garrett’s net salvage recommendations. 8 A. Mr. Garrett recommends changes to the Company’s proposed net salvage estimates for 9 several distribution and general plant accounts. For most of the disputed accounts, he 10 selects an estimate halfway between the currently approved estimate and the 11 Company’s proposal, which he supports as incorporating the concept of “gradualism.” 12 For example, for Account 364.00, Poles, Towers and Fixtures, the current estimate is 13 negative 90 percent, the Company proposes negative 100 percent, and Mr. Garrett 14 recommends negative 95 percent. 15 However, he only applies “gradualism” when the result is to reduce depreciation 16 expense. He takes a different approach for Accounts 365.00 and 369.00, selecting 17 negative 19 percent and negative 57 percent, respectively, based on recent historical 18 experience. Table 2 compares the current estimates, the Company’s proposals, and Mr. 19 Garrett’s recommendations with the overall and most recent five-year historical net 20 salvage averages.Page 31 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 29 of 33 Table 2: Comparison of Net Salvage Estimates and Historical Experience 1 Account Current Company Garrett Estimate Proposed Proposed Overall Historical Average 2021–2025 Average 392.10 392.11 392.12 392.13 Description Station Equipment Poles, Towers and Fixtures Overhead Conductors and Devices Underground Conduit Underground Conductors and Devices Line Transformers Services Installations on Customers’ Premises Structures and Improvements Cars Light Trucks Medium Trucks Heavy Trucks 3 Q. What is the concept of gradualism? 4 A. The concept of gradualism refers to an approach of allowing changes to occur over time 362.00 364.00 365.00 366.00 367.00 368.00 369.00 371.00 390.10 2 (50) (55) (53) (75) (124) (90) (100) (95) (128) (134) (40) (30) (19) (32) (19) (15) (30) (23) (43) (85) (35) (40) (38) (47) (38) (12) (15) (14) (15) (26) (85) (100) (57) (119) (57) (25) (30) (28) (34) (36) (5) (15) (10) (27) (70) 20 20 20 20 15 15 15 15 18 18 18 18 15 15 15 15 12 12 12 12 5 rather than all at once. Gradualism can be a consideration when making estimates, as 6 there is uncertainty in historical data and making changes over successive depreciation 7 studies may allow for confirmation of trends as more data becomes available. To the 8 extent that gradualism mitigates large changes that are reversed in subsequent studies,Page 32 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 30 of 33 1 the use of gradualism can lead to reasonable estimates over time. If, instead, it is used 2 simply to limit change in one direction, as Mr. Garrett does, the results are often 3 unreasonable and result instead in artificially low depreciation. 4 5 Q. Do you agree with Mr. Garrett’s use of gradualism to modify the Company’s proposed estimates? 6 A. No. The Company’s proposals already incorporate judgment and, for certain accounts, 7 gradual movement toward the historical indications. For example, for Account 364.00 8 I recommend changing from the current estimate of negative 90 percent to negative 9 100 percent, while the data supports estimates of negative 125 percent or more. I have, 10 therefore, already incorporated gradualism. Mr. Garrett’s proposal to be even more 11 gradual has no credible basis. 12 Account 367.00 provides another example. Its overall historical average is negative 47 13 percent and its most recent five-year average is negative 38 percent, compared with the 14 current estimate of negative 35 percent. The Company proposes negative 40 percent 15 after considering both the historical results and information concerning removal costs. 16 Indeed, the depreciation study expressly explains that a more gradual change is 17 recommended in light of the somewhat less negative recent experience. Mr. Garrett’s 18 additional midpoint adjustment does not introduce a consideration that the Company’s 19 study overlooked. 20 21Page 33 of 35
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-DEPRECIATION-REBUTTAL-1 November 18, 2026 Page 31 of 33 1 Q. Why is it important not to apply excessive gradualism to net salvage estimates? 2 A. Moderating the net salvage estimate does not eliminate the future cost of retiring the 3 property. To the extent that a less negative estimate understates the net removal costs 4 ultimately incurred, those costs remain to be recovered. Collecting less while the 5 property provides service can leave a greater amount for recovery in later periods, again 6 resulting in the customers of tomorrow paying higher costs than they otherwise should 7 because they are paying for the benefits received by customers of today. 8 Q. Does Mr. Garrett apply his gradualism approach consistently? 9 A. No. Mr. Garrett’s application of gradualism is inconsistent. He invokes gradualism to 10 limit changes that would increase depreciation expense yet does not apply that same 11 principled approach to Accounts 365.00 and 369.00, where his recommendations 12 substantially reduce the magnitude of negative net salvage. Those recommendations 13 are also based solely on the most recent five years of data and disregard the more 14 negative longer-term overall historical averages for both accounts. 15 Q. How does his recommendation for Account 365.00 illustrate this difference? 16 A. The current net salvage estimate for Account 365.00 is negative 40 percent, and the 17 Company proposes negative 30 percent. Applying the midpoint approach Mr. Garrett 18 uses for other accounts would produce negative 35 percent. Instead, he recommends 19 negative 19 percent. His recommendation therefore moves 21 percentage points from 20 the current net salvage estimate. 21 “gradualism,” my proposal changed the current net salvage estimate by 15 percentage For each of the accounts Mr. Garrett applies
As listed on the current system
Prefiled testimony: 11/18/2026 - Sponsor: TBD / Witness: NED W. ALLIS [26-05-10]