Eversource rate increase is on 3 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting

Text of 3-CD01667 Supplement_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 1,380 characters

Text of 3-CD01652 Supplement_redacted.pdf

Extracted from the file · 11 pages, 7 without text · 3,271 characters

Words on different pages
Words on different pages
Words on different pages

Text of 3-CD01568 Supplement_redacted.pdf

Extracted from the file · 2 pages, 1 without text · 1,848 characters

Text of 3-CD01563 Supplement_redacted.pdf

Extracted from the file · 3 pages, 1 without text · 563 characters

Text of 3-CD01561 Supplement_redacted.pdf

Extracted from the file · 9 pages, 5 without text · 3,930 characters

Text of 3-CD01549 Supplement_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 2,236 characters

Text of 3-CD01544 Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,980 characters

Text of 3-CD01537 Supplement_redacted.pdf

Extracted from the file · 21 pages, 17 without text · 3,241 characters

Text of 3-CD01524 Supplement_redacted.pdf

Extracted from the file · 10 pages, 8 without text · 2,879 characters

Text of 3-CD01512 Supplement_redacted.pdf

Extracted from the file · 2 pages · 2,357 characters

Text of 3-CD01508 Supplement_redacted.pdf

Extracted from the file · 2 pages, 1 without text · 2,187 characters

Text of 3-CD01436 Supplement_Redacted.pdf

Extracted from the file · 11 pages, 6 without text · 7,142 characters

Text of 3-CD01386 Supplement_Redacted.pdf

Extracted from the file · 10 pages, 5 without text · 3,958 characters

Text of 3-CD01382 Supplemental_Redacted.pdf

Extracted from the file · 5 pages, 4 without text · 157 characters

Text of 3-CD01380 Supplemental_Redacted.pdf

Extracted from the file · 8 pages, 5 without text · 4,791 characters

Words on different pages
  1. Page 2 of 11

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 3 of 11

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  3. Page 4 of 11

    Supplement Authorization Form Operations Project Authorization Form Date Prepared: 04-28-2021 Project Title: TDRP 2020 – Company/ies: Eversource CT Project ID Number:CD01685 Organization: Distribution Electric Class(es) of Plant: Distribution Project Initiator: Project Category: Line Project Manager: Project Type: TDRP Project Sponsor: Project Purpose: Reliability Improvement Spec Estimated in service date: 12/31/2022 If Transmission Project: PTF? N/A Eng. /Constr. Resources Budgeted? Y Capital Investment Part of Original Operating Plan? Y Authorization Type: Preliminary O&M Expenses Part of the Original Operating Plan? Y Total Request: $320K Financial Requirements: Project Authorization ERM: ____________________________________________________________________ FP&A: ____________________________________________________________________ Executive Summary Eversource Transmission-Distribution Reliability Performance (TDRP) Projects address reliability issues associated with the Worst Performing Top 100 Circuits in Connecticut. In doing so, Eversource maintains compliance with PURA Docket 86-12-03. Eversource is required to report the status of the actions taken to improve performance for each circuit topping the “Worst 100” list. Updates are required each year consecutively for a total of four years following a circuit’s appearance on the list. In 2020, the Circuit was ranked 17th due to tree related outages. Several segments were identified to mitigate the tree issues. The preferred option is estimated to cost $320K saving $0.98/CM and consists of segments 1,2,10 and 11. • • • The proposal includes creation of additional sectionalizing by installing a new smart switch, -4100, downstream of -72S recloser to create smaller customer zones of 271/250. Installing a new smart switch, -4002 downstream of the -4001 recloser, which creates an 86/3 customer zone and reduces the exposure to 86 customers from outages occurring within a 3-mile right-of-way Replace 3-100K cutouts with a triple single recloser, -360R, to reduce outages due to trees and to coordinate with installed downstream trip savers. 4 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3
  4. Page 5 of 11

    Supplement Authorization Form • • Reconductor one phase of a single-phase delta zone on beyond Pole 1 to mitigate the vulnerability of the 3,000 feet zone due to heavy vegetation. The areas that did not warrant a rebuild at this time, will be monitored and given to Vegetation Management to identify and address any danger trees. Project Costs Summary Note: Dollar values are in thousands Prior Authorized 2022 2023 2024 Totals Capital Additions - Direct $0 $182 $0 $0 $182 Less Customer Contribution Removals net of Salvage ____% Total - Direct Spending $0 $0 $0 $0 $0 $0 $17 $0 $0 $17 $0 $199 $0 $0 $199 Capital Additions - Indirect $0 $108 $0 $0 $108 Subtotal Request $0 $308 $0 $0 $308 AFUDC $0 $2 $0 $0 $2 Total Capital Request $0 $310 $0 $0 $310 O&M $0 $10 $0 $0 $10 Total Request $0 $320 $0 $0 $320 Financial Evaluation Note: Dollar values are in thousands 5 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3
  5. Page 6 of 11

    Supplement Authorization Form Direct Capital Costs Year 1 Year 2 Year 3+ Total Straight Time Labor $14 $0 $0 $14 Overtime Labor $2 $0 $0 $2 Outside Services $136 $0 $0 $136 Materials Other, including contingency amounts (describe) $47 $0 $0 $47 $1 $0 $0 $1 Total Direct Costs $199 $0 $0 $199 Indirect Capital Costs Indirects/Overheads (including benefits) Capitalized interest or AFUDC, if any Year 1 Year 2 Year 3+ Total $108 $0 $0 $108 $2 $0 $0 $2 Total Indirect Costs $111 $0 $0 $111 $0 $0 $0 $0 Total Capital Costs $310 Less Total Customer Contribution $0 Total Capital Project Costs $310 Total O&M Project Costs Total Project Cost $0 $10 $ 320 $0 $0 $0 $ $310 $310 $0 - $ $10 - $ 320 Technical Justification (See Reliability Table): • Segment 1 ( -72S): Install new Smart Switch, -4100 on to reduce a 521-customer zone into two (250/271 customers respectively) customer zones. This is estimated to cost $66K with a saving of $0.40/CM. This segment will improve reliability by reducing a large zone into 2 smaller zones reducing the impact of a fault on . • Segment 2 (Pole 388): Install three single phase reclosers, -360R, at Pole 338, , a 329-customer zone. This is estimated to cost $66K with a savings of $1.28/CM. This segment will improve reliability by preventing temporary faults from progressing to full customer outages. • Segment 10 (Pole 1797): (Refer to Segment 5 attached below for conversion): Reconductor 1 phase of bare wire with 1/0 tree wire on without converting (3,000ft). This is estimated to cost $121K with a savings of 1.37/CM. This segment will improve reliability by replacing bare wire, in a historically hot zone for tree related outages, with tree wire. The trees in this area are not tall or large, but this was predominately the cause of outages on the 20,000ft customer zone. The first 3,000ft of this zone appears to be where the tree caused outages are occurring. 6 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3
  6. Page 7 of 11

    Supplement Authorization Form • Segment 11 ( -4001): Replace the -125 switch with smart switch -4002. This work is estimated to cost $66K with a savings of $4.39/CM. This segment will improve reliability by preventing outages to 86 customers of an 89-customer zone. The zone is ~3miles long and mostly Right-Of-Way. The 86 customers are located at the end of the 3-mile ROW. Project Objectives To improve the reliability of the Circuit where numerous outages have been the main cause and have affected customers’ service significantly. Project Scope • Install new smart switch, -4100, on near Pole 7915. , a few sections • Replace three 100K cutouts at Pole 388, ( -360R). , with a triple single recloser • Reconductor 1 phase of bare wire with 1/0 tree wire on from Pole 1 to Pole 7172 (~3,000ft). Note: Replacement is for the bare phase located on top of the vertical Pole that serves as the tap for this line. • Replace -125 switch with smart switch, -4002. Major Material: • • • 3,000 ft of 1/0 175mil Tree Wire Two Three Phase Reclosers One Triple Single Recloser Background / Justification was last trimmed in 2019 and is scheduled to be trimmed in 2023 (see mapping of trimming history). See CD01385 reliability by device for details (attached) 7 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3
  7. Page 8 of 11

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 9 of 11

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 10 of 11

    Supplement Authorization Form Actual cost higher than estimated due to scope changes. 2022 Medium Customer Permission / Siting Council / Municipal approvals 2022 Low Design to minimize customer impact. Project Preplanning and customer/community outreach Internal construction resources not available to perform the work. 2022 High Plan internal resources to perform the work. Use competitive bidding to ensure lowest outside labor cost. Internal engineering resources not available to perform the work. 2022 Medium Plan internal resources to perform the work. Use competitive bidding to ensure lowest outside labor cost. Storm delays 2022 Low If storm activity delays work, we may be forced to use external resources. System abnormal configuration 2022 Low Schedule work to minimize system abnormal time. Most of this work will require system to be abnormal for any extended period of time. Included contingency costs in the funding request. Perform detailed Field Analysis and walk down in project development to avoid potential issues. References 10 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3
  10. Page 11 of 11

    Supplement Authorization Form CD01685 PAF Calculator.xlsm CD01685 Load Summary.pdf CD01685 Reliability by Device rev1.pdf CD01685 Need Statement.pdf Attachments (One-Line Diagrams, Images, etc.) VisioMap of Proposals.pdf VisioOutage Visio-Tree Trimming VisioPC&E oneline.pdf Map.pdf Map.pdf 11 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.5 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.3

Text of 3-CS00156 Supplemental_redacted_CEII.pdf

Extracted from the file · 19 pages, 13 without text · 4,191 characters

Text of 3-CS00141 Supplemental_redacted.pdf

Extracted from the file · 7 pages, 6 without text · 1,149 characters

Text of 3-CS00117 Supplemental_redacted.pdf

Extracted from the file · 6 pages, 5 without text · 561 characters

Text of 3-CS00115 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 5 without text · 5,997 characters

Text of 3-CS00099 Supplemental_redacted.pdf

Extracted from the file · 20 pages, 14 without text · 18,624 characters

Text of 3-CS00098 Supplement_redacted_CEII.pdf

Extracted from the file · 20 pages, 15 without text · 5,116 characters

Text of 3-CS00097 Supplemental_redacted.pdf

Extracted from the file · 6 pages, 4 without text · 1,678 characters

Text of 3-CS00086 Suplemental_redacted.pdf

Extracted from the file · 10 pages, 8 without text · 2,299 characters

Text of 3-CS00075 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 6 without text · 3,406 characters

Text of 3-CD01850 Supplement_redacted.pdf

Extracted from the file · 18 pages, 13 without text · 5,325 characters

Text of 3-CD01756 Supplemental_redacted.pdf

Extracted from the file · 32 pages, 27 without text · 3,721 characters

Text of 3-CD01743 Supplement PAF_redacted.pdf

Extracted from the file · 7 pages, 6 without text · 1,013 characters

Text of 3-CD01701 PAF Supplemental_redacted.pdf

Extracted from the file · 26 pages, 18 without text · 9,920 characters

Text of 3-CD01688 Supplemental_redacted.pdf

Extracted from the file · 15 pages, 10 without text · 1,502 characters

Text of 3-CS00360 Supplemental_redacted.pdf

Extracted from the file · 5 pages, 4 without text · 1,585 characters

Text of 3-CS00339 Supplement_redacted.pdf

Extracted from the file · 15 pages, 10 without text · 6,119 characters

Text of 3-CS00265 Supplemental_redacted.pdf

Extracted from the file · 18 pages, 15 without text · 2,783 characters

Text of 3-CS00261 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 8 without text · 1,091 characters

Text of 3-CS00257 Supplemental_Redacted.pdf

Extracted from the file · 15 pages, 10 without text · 4,678 characters

Text of 3-CS00244 Supplemental_Redacted.pdf

Extracted from the file · 10 pages, 8 without text · 1,256 characters

Text of 3-CS00238 Supplemental_Redacted.pdf

Extracted from the file · 19 pages, 13 without text · 5,708 characters

Text of 3-CS00235 Supplemental_Redacted.pdf

Extracted from the file · 15 pages, 6 without text · 9,896 characters

Text of 3-CS00203 Supplemental_redacted.pdf

Extracted from the file · 5 pages, 2 without text · 5,641 characters

Text of 3-CS00200 Supplemental_redacted.pdf

Extracted from the file · 16 pages, 4 without text · 7,024 characters

Text of 3-CS00186 Supplemental_redacted.pdf

Extracted from the file · 8 pages, 7 without text · 330 characters

Text of 3-CS00183 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 6 without text · 1,950 characters

Text of 3-CS00182 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 774 characters

Text of 3-CS00181 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 7 without text · 2,481 characters

Text of 3-CS00180 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 6 without text · 2,791 characters

Text of 3-CS00177 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 8 without text · 985 characters

Text of 3-CS00168 Supplemental_redacted.pdf

Extracted from the file · 22 pages, 17 without text · 4,162 characters

Text of 4-103739 Supplemental_Redacted.pdf

Extracted from the file · 12 pages, 7 without text · 2,148 characters

Text of 3-VOCSYS1D Supplement_redacted.pdf

Extracted from the file · 35 pages, 25 without text · 11,566 characters

Text of 3-PIPHS-01 PAF Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 2,150 characters

Text of 3-MS20CCP Approval_redacted.pdf

Extracted from the file · 3 pages · 7,440 characters

Text of 3-IT17426 Supplemental_redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,429 characters

Text of 3-EEC20_22 Supplemental PAF_redacted.pdf

Extracted from the file · 7 pages, 3 without text · 6,121 characters

Text of 3-CTARAIT Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 623 characters

Text of 3-CS00516 Supplemental_redacted.pdf

Extracted from the file · 44 pages, 36 without text · 16,152 characters

Text of 3-CS00463 Supplemental_redacted.pdf

Extracted from the file · 42 pages, 38 without text · 5,574 characters

Text of 4-CD01057 Supplemental_Redacted.pdf

Extracted from the file · 11 pages, 7 without text · 2,666 characters

Text of 4-CD01053 Supplemental 2.47M_Redacted.pdf

Extracted from the file · 25 pages, 20 without text · 2,023 characters

Text of 4-CD00801 Supplement_Redacted.pdf

Extracted from the file · 16 pages, 11 without text · 3,621 characters

Text of 4-CD00759 Supplemental_Redacted.pdf

Extracted from the file · 25 pages, 17 without text · 7,391 characters

Text of 4-CD00641 Supplemental_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 306 characters

Text of 4-CD00630 Supplemental_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 3,297 characters

Text of 4-CD00472 Supplemental_Redacted.pdf

Extracted from the file · 7 pages, 4 without text · 3,283 characters

Text of 4-CD00384 Supplemental_Redacted.pdf

Extracted from the file · 12 pages, 7 without text · 6,691 characters

As listed on the current system

Supplement for New App [Filed: 09/25/2026]