Application supplement

Exhibit CLP-Additions-6 Folder 1 - 6 of 7

Files500

Search terms highlighted
Eversource rate increase is on 3 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting

Text of 3-CD01667 Supplement_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 1,380 characters

Text of 3-CD01652 Supplement_redacted.pdf

Extracted from the file · 11 pages, 7 without text · 3,271 characters

Words on different pages
Words on different pages
Words on different pages

Text of 3-CD01568 Supplement_redacted.pdf

Extracted from the file · 2 pages, 1 without text · 1,848 characters

Text of 3-CD01563 Supplement_redacted.pdf

Extracted from the file · 3 pages, 1 without text · 563 characters

Text of 3-CD01561 Supplement_redacted.pdf

Extracted from the file · 9 pages, 5 without text · 3,930 characters

Text of 3-CD01549 Supplement_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 2,236 characters

Text of 3-CD01544 Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,980 characters

Text of 3-CD01537 Supplement_redacted.pdf

Extracted from the file · 21 pages, 17 without text · 3,241 characters

Text of 3-CD01524 Supplement_redacted.pdf

Extracted from the file · 10 pages, 8 without text · 2,879 characters

Text of 3-CD01512 Supplement_redacted.pdf

Extracted from the file · 2 pages · 2,357 characters

Text of 3-CD01508 Supplement_redacted.pdf

Extracted from the file · 2 pages, 1 without text · 2,187 characters

Text of 3-CD01436 Supplement_Redacted.pdf

Extracted from the file · 11 pages, 6 without text · 7,142 characters

Text of 3-CD01386 Supplement_Redacted.pdf

Extracted from the file · 10 pages, 5 without text · 3,958 characters

Text of 3-CD01382 Supplemental_Redacted.pdf

Extracted from the file · 5 pages, 4 without text · 157 characters

Text of 3-CD01380 Supplemental_Redacted.pdf

Extracted from the file · 8 pages, 5 without text · 4,791 characters

Text of 3-CD01685 Supplement_redacted.pdf

Extracted from the file · 11 pages, 5 without text · 8,624 characters

Text of 3-CS00156 Supplemental_redacted_CEII.pdf

Extracted from the file · 19 pages, 13 without text · 4,191 characters

Text of 3-CS00141 Supplemental_redacted.pdf

Extracted from the file · 7 pages, 6 without text · 1,149 characters

Text of 3-CS00117 Supplemental_redacted.pdf

Extracted from the file · 6 pages, 5 without text · 561 characters

Text of 3-CS00115 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 5 without text · 5,997 characters

Words on different pages
  1. Page 8 of 20

    Work Order Number: CS000991 TOTAL First 2017-06 $738,261.09 WBS 1.00 Brk Out 0 WBS 1 Last 2020-08 SUPPLEMENTAL ORIGINAL PAF First 2019-04 $60,814.68 First 2017-06 $677,446.41 Last 2020-08 Last 2019-03 WBS1 ROW / Easements / Land Acquisition $0.00 WBS2 WBS1 $0.00 WBS2 WBS1 $0.00 WBS2 ROW / Easements / Land Services Perso $0.00 $0.00 $0.00 1.03 6 ROW / Easements / Land Acquisition $0.00 $0.00 $0.00 0 0 1 Eversource Personnel $0.00 $0.00 2.02 3 Environmental Services Personnel $0.00 $0.00 $0.00 2.03 3 Mitigations $0.00 $0.00 $0.00 2.04 3 Fees $0.00 $0.00 $0.00 - 0 Environmental Approvals / Permits $0.00 $0.00 $0.00 3.00 0 1 Eversource Personnel $0.00 $0.00 $0.00 3 Outreach Services Personnel $0.00 $0.00 $0.00 - 0 $0.00 $0.00 $0.00 Siting Approvals / Permits 3 $0.00 $0.00 $0.00 Siting Mitigation $0.00 $0.00 $0.00 Payments $0.00 $0.00 $0.00 Siting Services Personnel 3 3 $0.00 $0.00 Eversource Personnel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - 0 5.00 0 5.01 1 Eversource Personnel $21 393.98 $749.24 $20 644.74 5.02 3 Engineering / Design $0.00 $0.00 $0.00 - 0 6.00 0 6.01 1 6.02 1 6.03 4 - 5 6 Engineering / Design ############# Materials (by Eversource) ############# Eversource Personnel $0.00 $0.00 $749.24 ############# $0.00 Procurement / Logistics Services Personn Equipment / Materials $0.00 $0.00 ############# ############# $0.00 $0.00 $0.00 $0.00 $0.00 $76 529.29 $0.00 $0.00 $8 415.79 $68 113.50 0 7 7.00 0 7.01 1 Eversource Personnel - General Construction ############# 7.02 1 7.03 1 7.04 1 7.05 1 7.06 3 7.07 3 Line Construction - Matting / Access Road 7.08 3 Line Construction - Civil / Drilling / Trenchi 7.09 3 7.10 $0.00 ############# $0.00 ############# $0.00 $150 503.77 $15 380.97 $135 122.80 Eversource Personnel - Overhead Line Wo $0.00 $0.00 $0.00 Eversource Personnel Underground Line W $0.00 $0.00 $0.00 Eversource Personnel - Substation Electric $0.00 $0.00 $0.00 Eversource Personnel - Civil Work $0.00 $0.00 $0.00 Contract Construction Reps $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Line Construction - Overhead Tower Cons $0.00 $0.00 3 Line Construction - Underground Cable Ins $0.00 $0.00 7.11 3 S/S Construction - Civil / Site Prep / Excava $0.00 $0.00 7.12 3 S/S Construction - Electrical 7.13 3 Misc. Construction - 0 8.00 0 8.01 1 Eversource Personnel 8.02 3 Testing / Commissioning Personnel - 0 8 Testing / Commissioning ############# $0.00 $0.00 $0.00 $0.00 $45 479.66 $0.00 $0.00 $0.00 0 1 Eversource Personnel $0.00 $0.00 3 Contract Personnel $0.00 $0.00 0 0 10.00 0 10.01 5 10.02 5 Contract Personnel 10.03 5 Material Salvage Investment Recovery Tra - 0 11.00 0 11.01 6 11.02 6 11.03 6 - 0 6 - 0 13.00 0 13.01 13.02 11 $0.00 $0.00 $0.00 ############# $2 200.00 Other $0.00 $0.00 $0.00 - Eversource Personnel ############# $45 479.66 - ############# $0.00 $9 506.80 9.00 Removals $0.00 $0.00 $10 075.65 9.02 10 Project Management Team $0.00 $0.00 $19 582.45 9.01 12.00 9 $0.00 $0.00 $0.00 $0.00 $0.00 $2 200.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$802.64 -$802.64 $0.00 $0.00 $0.00 $0.00 $0.00 Journal Entry Adjustments $0.00 $0.00 UVL $0.00 Property Tax $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 12 Risks $0.00 13 Overhead ############# $0.00 7 ZAS=Admin & Eng OH $3 735.10 $531.38 $3 203.72 7 ZEB ZEL ZES=> Alloc-E&S OH Subst Alloc -E $229 949.70 $11 467.39 $218 482.31 ############# $0.00 $0.00 ############# $0.00 7 ZGS =Gen Svc Co Benefit Loader $17 474.14 $773.25 $16 700.89 13.04 7 ZNP=Non Productive Time Loader $26 989.51 $2 036.26 $24 953.25 13.05 7 ZPB=Payroll Benefit Loader $83 517.19 $7 270.87 $76 246.32 13.06 7 ZVE=Vehicle Costs Clearing $31 848.25 $2 651.84 $29 196.41 13.07 7 ZMI=Misc Dist Exp Captia ized OH $15 527.18 $64.68 $15 462.50 $0.00 -$0.00 $5 489.54 $0.00 13.03 201804 201805 201807 201808 201809 $14 $21 $25 $30 $33 $41 $62 $84 $187 $374 $547 $830 $533 $16 $30 $46 $54 $64 $71 $89 $134 $181 $402 $804 $1 175 $1 782 $1 144 13.08 7 ZSC=Service Company Allocations 13.09 7 ZST=Stores Loader - 0 14.00 8 - 0 15.00 7 - 0 16.00 5 -$0.00 $5 489.54 14 AFUDC ############# 15 Contingency $0.00 $0.00 16 Reimbursables $0.00 $0.00 $0.00 ############# ############## ############# ############## $8 843.97 Total ############# ############## $0.00 $0.00 ############# 201709 201710 201806 201810 201811 201812 $0 E13: Meals E14: Mileage $62 $1 126 J17: Rent Expense-External $440 $691 $126 $101 $594 $126 L12: Labor Straight Time Non-Exempt $962 $251 $565 $377 $523 $1 831 $265 $794 $265 $94 L22: Labor Overtime Non-Exempt 201902 201903 201904 201905 201906 201907 201908 201909 201910 201911 201912 202005 202006 202007 ($0) $0 $0 ($0) ($0) ($0) $0 $0 ($0) $0 ($0) $0 $0 $0 ($0) $6 034 $960 $2 710 $2 174 $4 775 $909 $230 ($0) $1 190 $788 $600 $0 $394 $649 $523 $1 188 $1 546 $595 $2 010 $2 986 $4 333 $4 418 $1 444 $131 $921 $2 978 $255 $13 199 $28 597 $24 228 $39 564 $10 286 $2 081 $120 $385 $186 $35 201 $30 $105 $2 789 $0 $12 $63 $3 013 $1 771 $8 769 $1 574 $1 231 M12: Materials- Stores $8 843.97 $0.00 MAX: Stores over 25K $28 $0 $13 579 $3 156 $421 $129 $287 $896 $89 $135 $12 125 $246 $0 $36 019 $2 894 $14 315 $10 045 ($803) $52 169 $0 $0 $151 ($3) $0 $1 853 $15 $3 $2 $13 $3 $35 $7 $17 $8 $12 $228 $1 096 $512 $37 $88 $255 $0 $35 $556 $499 $462 $43 580 $39 222 $20 239 ZEB: Alloc- E S OH Subst- Acct Use Only $5 484 $0 $1 114 $202 $85 $7 $78 057 $14 386 $47 $4 534 $206 $2 889 $8 091 $3 202 $492 $1 298 $3 634 $1 439 $351 $207 $322 $1 688 $1 274 $91 $114 $9 $14 $6 $5 $34 $7 $269 $51 $134 $63 $61 $161 $449 $178 $1 124 $2 421 $2 179 $6 505 $1 199 $567 $26 $35 $30 $128 $23 $19 $94 $20 $441 $91 $240 $113 $109 $287 $804 $318 $2 128 $3 837 $3 455 $10 325 $1 906 $490 $44 $58 $50 $6 214 $13 771 $12 298 $36 195 $5 943 $1 749 $76 $224 ($0) ($0) $0 $0 $96 $347 $150 $546 $27 $99 $22 $137 $80 $458 $29 $1 358 $257 $677 $97 $2 153 $412 $1 086 ZPB: Payroll Benefit Loader- Acct Use Only $0 ($0) $0 ($0) $0 $0 $0 ($0) $0 $0 ($0) $0 ($0) ($0) ZST: Stores Loader- Acct Use Only $8 $8 $4 $993 $1 562 $303 $244 $281 $4 $82 ZES: Engin and Super OH- Acct Use Only ZGS: Gen Ser Co Benefit Loader- Acct Use Only $2 $236 $106 $253 $113 ($0) ($0) $0 ($0) $5 065 ($60) $185 $56 $0 $2 001 $4 869 $0 $0 $4 869 $54 $1 $1 $3 735 $0 $191 452 $2 200 ($7) ZNP: Non Productive Time Loader- Acct Use Only ZVE: Vehicle Costs Clearing- Acct Use Only $138 397 $52 169 $10 $6 974 $25 509 $262 $35 ZMI: Misc Dist Exp Capitalized OH-Acct Use Only Grand Total $0 $8 416 S58: Facility Waste Haz-Non haz-PCB-Universal ZSC: Service Company Allocations- Acct Use Only $108 ($1 530) S50: Environmental Outside Services S68: Other Outside Services- Other ($0) $980 $1 567 ($803) MXX: Stores Loader Cap ZAS: Admin and Eng OH- Acct Use Only $0 $0 $182 $1 041 202008 Grand Total $2 810 $20 L42: Labor Premium and Special Non-Exempt M11: Materials- Purchased 201901 M15: Material Salvage 3.02 4.04 Outreach $0.00 3.01 4.03 201803 $8 $14 201708 A85: Miscellaneous Accounting Adjustments L11: Labor Straight Time Exempt 2.00 2.01 4.02 201802 $6 $11 CostTV 3 4 201801 $5 $10 ########### # 1.02 0 201712 $5 $6 ########## ## $0.00 1 201711 $3 $2 ########### # $0.00 4.00 201707 $1 A67: AFUDC Equity Indirects $0.00 4.01 month_numb er 201706 A66: AFUDC Debt ########### # Eversource Personnel 3 (Al ) Sum of amount ########## ## 1 2 (Al ) accounting work order ########### # 1.01 - funding project Directs $240 $26 $12 $8 702 $741 $195 $76 $8 $60 $880 $215 $111 $58 $231 $119 $1 794 $41 $46 $24 $6 940 $107 $0 ($0) $7 939 $0 $0 $0 ($0) $0 $38 498 ($0) $15 527 $17 474 $0 $23 $0 $26 990 $83 517 $0 ($0) $243 $4 $5 $5 $10 $19 $8 $17 $14 $19 $34 $2 833 $5 828 $5 101 $12 497 $2 062 $693 $27 $1 354 $310 $7 097 $1 410 $3 613 $1 668 $2 508 $7 481 $17 833 $7 335 $115 226 $107 405 $99 675 $238 985 $44 470 $17 838 $1 429 ($1 293) $5 490 $95 $5 $2 $2 495 $9 578 $865 $374 $34 759 $2 620 $50 $4 $1 $772 $3 187 $397 $0 $3 140 $4 922 $90 $110 $31 848 $0 $738 261
  2. Page 9 of 20

    Project Authorization Form Operations Project Authorization Form Approved at April 17, 2019 EPAC Link to Meeting Minutes Date Prepared: 03/24/2019 Project Title: OCB Replacement Company/ies: Eversource CT Project ID Number: CS00099 Organization: Asset Management Class(es) of Plant: Distribution Project Initiator: Project Category: Project Manager: Project Type: Specific Project Sponsor: Project Purpose: Replace Aging Oil Circuit Breaker Estimated in service date: 12/18 If Transmission Project: PTF? N/A Eng. /Constr. Resources Budgeted? Yes Capital Investment Part of Original Operating Plan? Y Authorization Type: Full Funding O&M Expenses Part of the Original Operating Plan? N - Breakers Total Request: $677,000 Financial Requirements: Project Authorization ERM: ____________________________________________________________________ FP&A: ____________________________________________________________________ Executive Summary This project is seeking full funding of $677,000 to replace Oil Circuit Breaker (OCB) at Eversource has an initiative that began in 2006 to replace all OCBs in distribution substations to minimize environmental and safety impacts from leaking and failed equipment. The initiative started by targeting OCBs with PCB bushings. In 2012, the initiative increased in scope to include all substation OCBs. There are two (2) customers that would be affected by a failure of this aging equipment. The previous authorized amount of $30,000 was approved in PowerPlan on October 24, 2016 for preliminary engineering. $677,446 has been spent to date and the project was in service December 2018. JA-AM-2001-A Rev 2 Page 1
  3. Page 10 of 20

    Project Authorization Form Project Costs Summary Note: Dollar values are in thousands Prior Years Spend $5 $0 $0 $5 $7 $12 $0 $12 $0 $12 2018 $265 $0 $0 $265 $374 $639 $9 $648 $0 $648 2019 ($2) $0 $10 $9 $9 $18 $0 $18 $0 $18 Totals $268 $0 $10 $278 $390 $668 $9 $677 $0 $677 Prior Years $5 $0 $0 $0 2018 $141 $39 $0 $70 2019 $4 $0 $5 ($2) Total $149 $39 $5 $68 $0 $15 $2 $17 $5 $265 $9 $278 Indirects/Overheads (including benefits) Capitalized interest or AFUDC, if any Total Indirect Costs Prior Years $7 $0 $7 2018 $374 $9 $381 2019 $9 $0 $9 $390 $9 $399 Total Capital Costs Less Total Customer Contribution Total Capital Project Costs Total O&M Project Costs $12 $0 $12 $0 $646 $0 $646 $0 $18 $0 $18 $0 $677 $0 $677 $0 Capital Additions - Direct Less Customer Contribution Removals net of Salvage ____% Total - Direct Spending Capital Additions - Indirect Subtotal Request AFUDC Total Capital Request O&M Total Request Prior Authorized $14 $0 $0 $14 $15 $29 $1 $30 $0 $30 Financial Evaluation Note: Dollar values are in thousands Direct Capital Costs Straight Time Labor Overtime Labor Outside Services Materials Other, including contingency amounts (describe) Total Direct Costs Indirect Capital Costs Note: Explain unique payment provisions, if applicable The other line item of $17K is for expenses, including mileage. JA-AM-2001-A Rev 2 Page 2 Total
  4. Page 11 of 20

    Project Authorization Form Future Financial Impacts: Provide below the estimated future costs that will result from the project: Note: Dollar values are in thousands: Future Costs Capital O&M Other Year 20__ $ TOTAL $ - Year 20__ $ $ - Year20__ $ $ - Year 20__+ $ $ - Total Future Project Costs $ $ - Describe the estimated future Capital, O&M and/or Other costs noted above: N/A What functional area(s) will these future costs be funded in? N/A A representative from the respective functional area is required to be included as a project approver. If this is other than a Reliability Project, please complete the section below; Provide below the estimated financial benefits that will result from the project: Note: Dollar values are in thousands: Year 20__ Future Benefits Capital $ O&M Other TOTAL $ - Year 20__ $ $ - Year20__ $ $ - Year 20__+ $ $ - Total Future Project Benefits $ $ - Describe the estimated future Capital, O&M and/or Other benefits noted above: N/A What functional area(s) will these benefits be reflected in? N/A A representative from the respective functional area is required to be included as a project approver. Asset Retirement Obligation (ARO) and/ or Environmental Cleanup Costs (Environmental Liabilities): Is there an ARO associated with this project? There are No ARO’s associated with this project If yes, please provide details: Are there other environmental cleanup costs associated with this project? No If yes, please provide details: JA-AM-2001-A Rev 2 Page 3
  5. Page 12 of 20

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  6. Page 13 of 20

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 14 of 20

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 15 of 20

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 16 of 20

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 17 of 20

    Project Authorization Form Figure 3 - Detail map showing JA-AM-2001-A Rev 2 Page 9

Text of 3-CS00098 Supplement_redacted_CEII.pdf

Extracted from the file · 20 pages, 15 without text · 5,116 characters

Text of 3-CS00097 Supplemental_redacted.pdf

Extracted from the file · 6 pages, 4 without text · 1,678 characters

Text of 3-CS00086 Suplemental_redacted.pdf

Extracted from the file · 10 pages, 8 without text · 2,299 characters

Text of 3-CS00075 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 6 without text · 3,406 characters

Text of 3-CD01850 Supplement_redacted.pdf

Extracted from the file · 18 pages, 13 without text · 5,325 characters

Text of 3-CD01756 Supplemental_redacted.pdf

Extracted from the file · 32 pages, 27 without text · 3,721 characters

Text of 3-CD01743 Supplement PAF_redacted.pdf

Extracted from the file · 7 pages, 6 without text · 1,013 characters

Text of 3-CD01701 PAF Supplemental_redacted.pdf

Extracted from the file · 26 pages, 18 without text · 9,920 characters

Text of 3-CD01688 Supplemental_redacted.pdf

Extracted from the file · 15 pages, 10 without text · 1,502 characters

Text of 3-CS00360 Supplemental_redacted.pdf

Extracted from the file · 5 pages, 4 without text · 1,585 characters

Text of 3-CS00339 Supplement_redacted.pdf

Extracted from the file · 15 pages, 10 without text · 6,119 characters

Text of 3-CS00265 Supplemental_redacted.pdf

Extracted from the file · 18 pages, 15 without text · 2,783 characters

Text of 3-CS00261 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 8 without text · 1,091 characters

Text of 3-CS00257 Supplemental_Redacted.pdf

Extracted from the file · 15 pages, 10 without text · 4,678 characters

Text of 3-CS00244 Supplemental_Redacted.pdf

Extracted from the file · 10 pages, 8 without text · 1,256 characters

Text of 3-CS00238 Supplemental_Redacted.pdf

Extracted from the file · 19 pages, 13 without text · 5,708 characters

Text of 3-CS00235 Supplemental_Redacted.pdf

Extracted from the file · 15 pages, 6 without text · 9,896 characters

Text of 3-CS00203 Supplemental_redacted.pdf

Extracted from the file · 5 pages, 2 without text · 5,641 characters

Text of 3-CS00200 Supplemental_redacted.pdf

Extracted from the file · 16 pages, 4 without text · 7,024 characters

Text of 3-CS00186 Supplemental_redacted.pdf

Extracted from the file · 8 pages, 7 without text · 330 characters

Text of 3-CS00183 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 6 without text · 1,950 characters

Text of 3-CS00182 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 7 without text · 774 characters

Text of 3-CS00181 Supplemental_redacted.pdf

Extracted from the file · 10 pages, 7 without text · 2,481 characters

Text of 3-CS00180 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 6 without text · 2,791 characters

Text of 3-CS00177 Supplemental_redacted.pdf

Extracted from the file · 9 pages, 8 without text · 985 characters

Text of 3-CS00168 Supplemental_redacted.pdf

Extracted from the file · 22 pages, 17 without text · 4,162 characters

Text of 4-103739 Supplemental_Redacted.pdf

Extracted from the file · 12 pages, 7 without text · 2,148 characters

Text of 3-VOCSYS1D Supplement_redacted.pdf

Extracted from the file · 35 pages, 25 without text · 11,566 characters

Text of 3-PIPHS-01 PAF Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 2,150 characters

Text of 3-MS20CCP Approval_redacted.pdf

Extracted from the file · 3 pages · 7,440 characters

Text of 3-IT17426 Supplemental_redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,429 characters

Text of 3-EEC20_22 Supplemental PAF_redacted.pdf

Extracted from the file · 7 pages, 3 without text · 6,121 characters

Text of 3-CTARAIT Supplement_redacted.pdf

Extracted from the file · 3 pages, 2 without text · 623 characters

Text of 3-CS00516 Supplemental_redacted.pdf

Extracted from the file · 44 pages, 36 without text · 16,152 characters

Text of 3-CS00463 Supplemental_redacted.pdf

Extracted from the file · 42 pages, 38 without text · 5,574 characters

Text of 4-CD01057 Supplemental_Redacted.pdf

Extracted from the file · 11 pages, 7 without text · 2,666 characters

Text of 4-CD01053 Supplemental 2.47M_Redacted.pdf

Extracted from the file · 25 pages, 20 without text · 2,023 characters

Text of 4-CD00801 Supplement_Redacted.pdf

Extracted from the file · 16 pages, 11 without text · 3,621 characters

Text of 4-CD00759 Supplemental_Redacted.pdf

Extracted from the file · 25 pages, 17 without text · 7,391 characters

Text of 4-CD00641 Supplemental_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 306 characters

Text of 4-CD00630 Supplemental_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 3,297 characters

Text of 4-CD00472 Supplemental_Redacted.pdf

Extracted from the file · 7 pages, 4 without text · 3,283 characters

Text of 4-CD00384 Supplemental_Redacted.pdf

Extracted from the file · 12 pages, 7 without text · 6,691 characters

As listed on the current system

Supplement for New App [Filed: 09/25/2026]

This filing on the current system (opens in a new tab)