  1. Page 1 of 12Match

    APS 1 - Project Authorization Policy Supplement Request Form Approved at May 15, 2019 EPAC Link to Meeting Minutes Date Prepared: 04/15/2019 Company/Companies: Eversource CT Organization: Asset Management Project Initiator: Project Manager: Project Sponsor: Current Authorized Amount: $730K Supplement Request: $497K Total Request: $1,227K Project Title: Replace Culvert Project ID Number: CS00034 Plant Class /(F.P. Type): Distribution Substations Project Type: Specific Capital Investment Part of Original Operating Plan? Y O&M Expenses Part of the Original Operating Plan? N Estimated in service date(s): 12/31/2018 PAC: No TCA: No Supplement Justification Background The culvert at the base of the entrance was undersized and required enlargement. After discussions with the nearby upstream neighbor who had experienced extensive flooding on their property and the City of Danbury, it was determined to have a study performed on the capacity of the existing culvert. The engineering study identified the culvert capacity required to resolve the flooding issue. This project included the replacement of the previously existing culvert with a larger capacity culvert to address the flooding. This project was a high priority for the City of Danbury. Eversource worked with the City Engineering Department to develop a solution to address the flooding condition. Northeast Professional Engineering (NPE) Consultants, LLC was retained by Eversource to assess drainage conditions at the and the associated Kohanza Brook, which flows through the substation property. Due to the watershed size (>200 acres), the U.S. Army Corps of Engineers (USACE) Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) software was used in lieu of the Rational Method to determine storm water runoff rates. This project started in 2014 with an estimated cost of $372K and was approved in PowerPlan on November 6, 2014. The scope of work involved the replacement of the existing steel culvert with a larger steel culvert. Field excavation revealed that an electrical duct system was present over the existing culvert. This field condition resulted in the need to design a cast in place culvert. As a result, the project would require additional funding to complete the work. Engineering requested an additional $358K to design a precast concrete culvert and install support structures to address field conditions. A supplement request form was approved by EPAC November 9, 2017. The total project budget was increased to $730K and approved in PowerPlan on January 20, 2017. During installation activities, there were numerous flooding events that delayed work and increased costs. Additionally, a second electrical duct bank was discovered underneath the existing culvert which, further complicating the design and installation of the pre-cast culvert. As a result, a supplemental request for an additional $497K is required to complete the project. Page 1 of 3 Issued 1/20/17 Rev. 4
  2. Page 2 of 12

    APS 1 - Project Authorization Policy Justification for Additional Resources The following activities account for the $497K supplemental request: The $730,000 approved for construction assumed the concrete precast culvert would be installed over the existing duct bank. The crew mobilized for construction and during construction, an additional duct bank was discovered beneath the culvert that was not shown on Eversource drawings. More design work determined that the precast concrete culvert required modification to allow installation. The changes to the precast culverts also required additional design changes to the footings resulting in additional costs. During installation activities, there were numerous flooding events that delayed work and increased costs. One event was caused by the City of Danbury releasing water from a reservoir that flooded the construction site. This event required crews to work around the clock through the weekend to maintain pumps to maintain substation access. There were several heavy rain events that caused flooding of the construction site due to an already full reservoir overflowing to flood the construction site. The above charges total $311,332. The additional direct spending was due to in-house labor to oversee the contractor work as well as expenses and vehicle charges. The overall overage on the budget dollars was $497K. The project is now completed and in-service as of December 31, 2018. TOTAL SUPPLEMENT REQUEST: $497K The table below provides an overview of the line item categories from the original project estimates and the updated project costs: Supplement Cost Breakdown Note: Dollar values are in thousands: Original New Variance Estimate Estimate/Actual Eng.& Design $17 $19 $2 In House Labor/expenses $4 $27 $23 Materials $82 $74 ($8) Construction/Env Contracts $461 $781 $320 Total Direct $564 $901 $337 Indirects $152 $226 $74 AFUDC $14 $100 $86 Total $730 $1,227 $497 Please see the original approved document attached. Original funding approval was prior to the PAF authorization process. Category Page 2 of 3 Issued 1/20/17 Rev. 4
  3. Page 3 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  4. Page 4 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Work Classi ca on Ownership / Management Category: Substa on Type: REL7 AWC: Newtown Statewide: No Type Desc: GENERAL MODERNIZATION Owner: Work Type: Repair/Replace Failed Equipment Manager: Project Informa on Status: Prelim Design Approved Associated Projects: SPS #: Assignment ID: AIS Score: Patrol Find ID: Replacement of failed culvert Budget Summary - Preferred Op on 2015 ID 2 Title Culvert replacement Asset & Investment Management System Status Rev # Contingency Prelim 0 24 % Expenditure Amount $372,000 Net Estimate $372,000 2015 Total: $372,000 $372,000 Total Project: $372,000 $372,000 11/04/2014 Page 1 of 9
  5. Page 5 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  6. Page 6 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 7 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company If we don't do this project, what will happen? This project and ooding issue is currently a hot topic with the city of Danbury. We (company) are working with the city engineering department to come up with a solu on that bene ts everyone. Northeast Professional Engineering (NPE) Consultants, LLC was retained by Connec cut Light & Power (CL&P) to assess current drainage condi ons at the Substa on, speci cally the Kohanza Brook which ows through the substa on property. Due to the watershed size (>200Acres), the U.S. Army Corps of Engineers (USACE) Hydrologic Engineering Center - Hydrologic Modeling System (HEC-HMS) so ware was used in lieu of the Ra onal Method to determine stormwater runo rates. In the past ve to ten years the Danbury area has experienced severe weather events with rainfall amounts equivalent to a 100year storm. A "100 year" storm event is de ned as having a one in one hundred or 1% chance of happening in any given year. It had been reported by the City of Danbury Engineering Department personnel that during certain storm/rain events, the CL&P culvert may not have su cient ow capacity, causing increased headwater and subsequent localized ooding of neighbor’s property. Environmental Soil Contamina on: No Change Water Pollu on: Decrease Natural Habitats: No Change Alterna ves considered based on Environmental Impact or Descrip on of Aspects Oil Spill Risks Considered? Safety Concerns With This Project? Explain: External Stakeholders Customer Impact / Involvement Cust. Impacted: Crit. Cust. Impacted: Adjoining Property Owner Consent Required: Other U lity Pole Custodian Area: State Highway Permit Required: Reloca on / New Service New Srvc. Contact: Customer Type: Request Number: Asset & Investment Management System Approx. Pole Count (NU): Approx. Pole Count (Other): Town Hearing Required: Easement Required: Requestor Type: State Highway Project #: Route #: 11/04/2014 Page 4 of 9
  8. Page 8 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Design Alternative CS00034-01 General Informa on Segment: 1 - Culvert Replacement Segment Type: ENVIRONMENTAL Work Type: Other Status: Revision Prelim Design Town: DANBURY Trimming Required: Budget Year: 2015 In Service Date: 12/31/2015 Descrip on: This segment was originaly setup to fund this project for preliminary tes ng and site visits. Since the eld visits, contractors cost have come in under $100K without loaders and a limited scope. Replacement of the undersized culvert with one that has the proper capacity for the water ow in that area. Also relocate any of CL&P's facili es to allow for the construc on of the new culvert. Itemized Work List ID Major Grid Minor Grid Description of Work to be Performed Asset & Investment Management System 11/04/2014 Page 5 of 9
  9. Page 9 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 10 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Design Alternative CS00034-01 Reliability Projec on Title: Outage Start Date: 01/01/2007 Asset & Investment Management System Outage End Date: 04/29/2014 11/04/2014 Years History: 7.33 Page 7 of 9
No matches
Words on different pages

Text of 4-IT17426 Approval_redacted.pdf

Extracted from the file · 1 page · 2,265 characters

Text of 4-CTARAIT APPROVAL 1_redacted.pdf

Extracted from the file · 1 page · 1,013 characters

Scanned pages of 5-CD01192 Approval_Redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Scanned pages of 5-IT17426 Approval_redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers