  1. Page 3 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 4 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Work Classi ca on Ownership / Management Category: Substa on Type: REL7 AWC: Newtown Statewide: No Type Desc: GENERAL MODERNIZATION Owner: Work Type: Repair/Replace Failed Equipment Manager: Project Informa on Status: Prelim Design Approved Associated Projects: SPS #: Assignment ID: AIS Score: Patrol Find ID: Replacement of failed culvert Budget Summary - Preferred Op on 2015 ID 2 Title Culvert replacement Asset & Investment Management System Status Rev # Contingency Prelim 0 24 % Expenditure Amount $372,000 Net Estimate $372,000 2015 Total: $372,000 $372,000 Total Project: $372,000 $372,000 11/04/2014 Page 1 of 9
  3. Page 5 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  4. Page 6 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  5. Page 7 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company If we don't do this project, what will happen? This project and ooding issue is currently a hot topic with the city of Danbury. We (company) are working with the city engineering department to come up with a solu on that bene ts everyone. Northeast Professional Engineering (NPE) Consultants, LLC was retained by Connec cut Light & Power (CL&P) to assess current drainage condi ons at the Substa on, speci cally the Kohanza Brook which ows through the substa on property. Due to the watershed size (>200Acres), the U.S. Army Corps of Engineers (USACE) Hydrologic Engineering Center - Hydrologic Modeling System (HEC-HMS) so ware was used in lieu of the Ra onal Method to determine stormwater runo rates. In the past ve to ten years the Danbury area has experienced severe weather events with rainfall amounts equivalent to a 100year storm. A "100 year" storm event is de ned as having a one in one hundred or 1% chance of happening in any given year. It had been reported by the City of Danbury Engineering Department personnel that during certain storm/rain events, the CL&P culvert may not have su cient ow capacity, causing increased headwater and subsequent localized ooding of neighbor’s property. Environmental Soil Contamina on: No Change Water Pollu on: Decrease Natural Habitats: No Change Alterna ves considered based on Environmental Impact or Descrip on of Aspects Oil Spill Risks Considered? Safety Concerns With This Project? Explain: External Stakeholders Customer Impact / Involvement Cust. Impacted: Crit. Cust. Impacted: Adjoining Property Owner Consent Required: Other U lity Pole Custodian Area: State Highway Permit Required: Reloca on / New Service New Srvc. Contact: Customer Type: Request Number: Asset & Investment Management System Approx. Pole Count (NU): Approx. Pole Count (Other): Town Hearing Required: Easement Required: Requestor Type: State Highway Project #: Route #: 11/04/2014 Page 4 of 9
  6. Page 8 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Design Alternative CS00034-01 General Informa on Segment: 1 - Culvert Replacement Segment Type: ENVIRONMENTAL Work Type: Other Status: Revision Prelim Design Town: DANBURY Trimming Required: Budget Year: 2015 In Service Date: 12/31/2015 Descrip on: This segment was originaly setup to fund this project for preliminary tes ng and site visits. Since the eld visits, contractors cost have come in under $100K without loaders and a limited scope. Replacement of the undersized culvert with one that has the proper capacity for the water ow in that area. Also relocate any of CL&P's facili es to allow for the construc on of the new culvert. Itemized Work List ID Major Grid Minor Grid Description of Work to be Performed Asset & Investment Management System 11/04/2014 Page 5 of 9
  7. Page 9 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 10 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Design Alternative CS00034-01 Reliability Projec on Title: Outage Start Date: 01/01/2007 Asset & Investment Management System Outage End Date: 04/29/2014 11/04/2014 Years History: 7.33 Page 7 of 9
  9. Page 11 of 12

    Connecticut Light & Power Speci c Project Proposal - Project #: CS00034 Dnbry - - Repl Culvert A Northeast Utilities Company Segment CS00034-02 General Informa on Segment: 2 - Culvert replacement Segment Type: S/S - EQFSUBST Work Type: Other Status: Prelim Design Approved Town: DANBURY Trimming Required: Budget Year: 2015 In Service Date: 12/31/2015 Descrip on: Culvert Structure(s): replace the exis ng CMP culvert with three precast box culverts to increase the ow capacity. Several T&D duct banks are buried in the gravel driveway and will have to be temporarily supported to allow inser on of precast concrete box culverts. Contractor is to provide precast concrete structures and installa on of devices. The company (NU) will need to provide support on the temporary new entrance to the sta on, any tree and brush clearing and support on suppor ng the concrete encapsulated duct banks. Site Improvement: Re-grading por ons of the Kohanza Brook channel to increase the ow rate. Itemized Work List ID Major Grid Minor Grid Description of Work to be Performed Asset & Investment Management System 11/04/2014 Page 8 of 9
  10. Page 12 of 12

    No text on this page. It may be a picture of a page, such as a scan or a chart.
No matches
Words on different pages

Text of 4-IT17426 Approval_redacted.pdf

Extracted from the file · 1 page · 2,265 characters

Text of 4-CTARAIT APPROVAL 1_redacted.pdf

Extracted from the file · 1 page · 1,013 characters

Scanned pages of 5-CD01192 Approval_Redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Scanned pages of 5-IT17426 Approval_redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

As listed on the current system

Supplement for New App [Filed: 09/25/2026]

This filing on the current system (opens in a new tab)