Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-Additions-6 Folder 2 - 4 of 4

Files463

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 3-CD02260 Supplemental_Redacted.pdf

Extracted from the file · 30 pages, 23 without text · 2,041 characters

Text of 3-CD02259 Supplemental_Redacted.pdf

Extracted from the file · 29 pages, 22 without text · 1,400 characters

Words on different pages
1 page match

Text of 3-CD02203 Supplemental_Redacted.pdf

Extracted from the file · 56 pages, 24 without text · 5,516 characters

Words on different pages

Text of 3-CD02182 Supplemental_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 425 characters

Text of 3-CD02176 Supplemental_Redacted.pdf

Extracted from the file · 22 pages, 17 without text · 1,797 characters

Text of 3-CD02172 Supplemental_Redacted.pdf

Extracted from the file · 46 pages, 30 without text · 7,598 characters

Text of 3-CD02150 Supplemental_Redacted.pdf

Extracted from the file · 37 pages, 21 without text · 5,599 characters

Text of 3-CD02123 Supplemental_Redacted.pdf

Extracted from the file · 19 pages, 14 without text · 4,145 characters

Text of 3-CD02122 Supplemental_Redacted.pdf

Extracted from the file · 29 pages, 18 without text · 2,901 characters

Text of 3-CD02121 Supplemental_Redacted.pdf

Extracted from the file · 20 pages, 14 without text · 3,176 characters

Text of 3-CD02078 Supplemental_Redacted.pdf

Extracted from the file · 25 pages, 12 without text · 3,884 characters

Text of 3-CD02058 Supplemental_Redacted.pdf

Extracted from the file · 44 pages, 25 without text · 6,744 characters

Words on different pages
  1. Page 41 of 50

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 42 of 50

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  3. Page 43 of 50

    Supplement Authorization Form Project Scope: Major Material: • • • • Two PME-9 switchgear units 1,925 feet of 1,000 kcmil Cu EPR cable 3,700 feet of 500 kcmil Cu EPR cable One 900-ampere GOAB Background: According to the Distribution System Engineering Manual (DSEM) the switchgear should be limited to 160 amperes. See DSEM excerpt below. On page DSEM 05.012, "Present capacity needs must be met, both for normal conditions and for contingency conditions to the degree the Company wishes to accommodate them. In general, for a singlecontingency condition, lengthy outages must be avoided, except for the group of customers directly tied to the outage, and this group of customers is generally limited to 500 customers or 160 amps of load." There are two locations for installing the switchgear: in the transmission ROW or a cul-de-sac easement. The cul-de-sac easement was acquired when the first stage of the development was installed. The 43 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0
  4. Page 44 of 50

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  5. Page 45 of 50

    Supplement Authorization Form Business Address Projected Amperes On page DSEM 05.012, "Present capacity needs must be met, both for normal conditions and for contingency conditions to the degree the Company wishes to accommodate them. In general, for a single-contingency condition, lengthy outages must be avoided, except for the group of customers directly tied to the outage, and this group of customers is generally limited to 500 customers or 160 amps of load." Alternatives Considered: Were alternative solutions considered/applicable? Include any cost/benefit analysis. Alternatives were considered (please describe below) Option Two -($1,140K.) 45 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0
  6. Page 46 of 50

    Supplement Authorization Form Major Material: • • • • Two PME-9 switchgear units. 1.925 feet of 1,000 kcmil Cu EPR cable. 3,700 feet of 500 kcmil Cu EPR cable. One 900-ampere GOAB. . Option Three -($639K.) • Major Material: ▪ ▪ ▪ Two PME-9 switchgear units. 2,680 feet of 1,000 kcmil Cu EPR cable. One 900-ampere GOAB. Option Four -($435K.) 46 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0
  7. Page 47 of 50

    Supplement Authorization Form Major Material: • • 2,680 feet of 1,000 kcmil Cu EPR cable. One 900-ampere GOAB. . In addition, the design limit for a load group would be exceeded. For this reason, this option was not selected. Project Option Comparison 47 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0
  8. Page 48 of 50

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 49 of 50

    Supplement Authorization Form Actual cost higher than estimated due to scope changes. 2023 Medium Included contingency costs in the funding request. Perform detailed Field Analysis and walk down in project development to avoid potential issues. Customer Permission / Siting Council / Municipal approvals 2023 Medium Design to minimize customer impact. Project Preplanning and customer/community outreach. Internal construction resources not available to perform the work. 2023 Medium Plan internal resources to perform the work. Use competitive bidding to ensure lowest outside labor cost. Internal engineering resources not available to perform the work. 2023 Medium Plan internal resources to perform the work. Use competitive bidding to ensure lowest outside labor cost. Materials Shortage or long lead times 2023 Medium Pre-order long lead time material; minimize the use of non-standard and non-stocked material. Storm delays 2023 Medium If storm activity delays work, we may be forced to use external resources. System abnormal configuration 2023 Medium Schedule work to minimize system abnormal time. Install temporary bypasses/equipment if system will be abnormal for extended periods. Technological risks involving integration of new technology 2023 Medium Before use of new technology ensure support of standards and manufacturer. Schedule project to accommodate for extra time or ensure new technology is not on the critical path. Wetlands / Environmentally sensitive area 2023 Medium Use of mats and specialty equipment, only work during certain times of the year. 49 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0
  10. Page 50 of 50

    Supplement Authorization Form References NB-12 Calculations. Business Address Projected Load Amper Projected Annual evenue $57,074.04 Projected Revenue 6.7 years $382,396.07 $3,617.28 $24,235.78 $82,398.48 $44,888.64 $40,008.00 $227,986.44 $552,069.82 $300,753.89 $268,053.60 $1,527,509.15 50 Refer to Distribution Capital Project Approval Process JA-AM-2001-B, Rev.3 Refer to Distribution Capital Project Supplement Process JA-AM-2001-C, Rev.0

Text of 3-CD02040 Supplemental_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 812 characters

Text of 3-CD02031 Supplemental_Redacted.pdf

Extracted from the file · 38 pages, 17 without text · 2,728 characters

Text of 3-CD02030 Supplemental_Redacted.pdf

Extracted from the file · 30 pages, 16 without text · 4,025 characters

Text of 3-CD02017 Supplemental_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 204 characters

Text of 3-CD02016 Supplemental_Redacted.pdf

Extracted from the file · 29 pages, 15 without text · 2,190 characters

Text of 3-CD01999 Supplemental_Redacted.pdf

Extracted from the file · 25 pages, 13 without text · 1,921 characters

Text of 3-CD01986 Supplemental_Redacted.pdf

Extracted from the file · 24 pages, 17 without text · 2,920 characters

Text of 3-CS00417 Supplememental Redacted.pdf

Extracted from the file · 6 pages, 5 without text · 1,444 characters

Text of 3-CD02771 Supplemental Redacted.pdf

Extracted from the file · 25 pages · 24,622 characters

Text of 3-CD02770 Supplemental Redacted.pdf

Extracted from the file · 25 pages · 24,184 characters

Text of 3-CD02769 Supplemental Redacted.pdf

Extracted from the file · 25 pages · 24,626 characters

Text of 3-CD02736 Supplemental Redacted.pdf

Extracted from the file · 15 pages, 9 without text · 940 characters

Text of 3-CD02595 Supplemental_Redacted.pdf

Extracted from the file · 19 pages, 11 without text · 3,088 characters

Text of 3-CD02588 Supplemental_Redacted.pdf

Extracted from the file · 25 pages, 15 without text · 4,410 characters

Text of 3-CD02571 Supplemental Redacted.pdf

Extracted from the file · 21 pages, 14 without text · 3,519 characters

Text of 3-CD02567 Supplemental Redacted.pdf

Extracted from the file · 32 pages, 18 without text · 4,756 characters

Text of 3-CD02564 Supplemental Redacted.pdf

Extracted from the file · 28 pages, 15 without text · 5,843 characters

Text of 3-CD02498 Supplemental _Redacted.pdf

Extracted from the file · 17 pages, 12 without text · 1,979 characters

Text of 3-CD02453 Supplemental_Redacted.pdf

Extracted from the file · 22 pages, 15 without text · 1,984 characters

Text of 3-CD02449 Supplemental_Redacted.pdf

Extracted from the file · 10 pages, 6 without text · 3,316 characters

Text of 3-CD02444 Supplemental_Redacted.pdf

Extracted from the file · 12 pages, 7 without text · 3,600 characters

Text of 3-CD02426 Supplemental_Redacted.pdf

Extracted from the file · 31 pages, 21 without text · 6,385 characters

Text of 3-CD02415 Supplemental_Redacted.pdf

Extracted from the file · 21 pages, 9 without text · 2,247 characters

Text of 3-CD02385 Supplemental_Redacted.pdf

Extracted from the file · 24 pages, 18 without text · 1,107 characters

Text of 3-CD02368 Supplemental_Redacted.pdf

Extracted from the file · 33 pages, 25 without text · 3,319 characters

Text of 3-CD02359 Supplemental_Redacted.pdf

Extracted from the file · 23 pages, 18 without text · 2,190 characters

Text of 3-CD02351 Supplemental_Redacted.pdf

Extracted from the file · 19 pages, 18 without text · 434 characters

Text of 3-CD02325 Supplemental_Redacted.pdf

Extracted from the file · 18 pages, 16 without text · 2,787 characters

Text of 3-CD02296 Supplemental_Redacted.pdf

Extracted from the file · 13 pages, 10 without text · 1,416 characters

Text of 3-CS00571 Supplemental Redacted.pdf

Extracted from the file · 5 pages · 8,230 characters

Text of 3-XTRANCT01 Supplemental Redacted.pdf

Extracted from the file · 3 pages · 4,816 characters

Text of 3-MCRO22NM Supplemental Redacted.pdf

Extracted from the file · 3 pages · 3,064 characters

Text of 3H820023P PAF Form #1_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 3,486 characters

Text of 3-FTDESENG APPROVAL Redacted.pdf

Extracted from the file · 1 page · 1,158 characters

Text of 3-CTTRNSUB Supplemental Redacted.pdf

Extracted from the file · 4 pages · 6,457 characters

Scanned pages of 3-CS00590 Approval Redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of 4- CD01364 PAF Supplement 2_Redacted.pdf

Extracted from the file · 16 pages, 12 without text · 2,403 characters

Scanned pages of 5-CD01261 Approval 2_Redacted.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of 4-CTTRNSUB Approval Redacted.pdf

Extracted from the file · 1 page · 936 characters

Text of 4-CD02176 Supplemental_Redacted.pdf

Extracted from the file · 26 pages, 17 without text · 2,405 characters

Text of 4-CD01958 Supplemental_Redacted.pdf

Extracted from the file · 37 pages, 23 without text · 1,985 characters

Text of 4-CD01915 PAF Supplement 2_Redacted.pdf

Extracted from the file · 63 pages, 39 without text · 7,204 characters

Text of 4-CD01615 PAF Supplement 2_Redacted.pdf

Extracted from the file · 16 pages, 11 without text · 1,441 characters

Text of 4-CD01451 PAF Supplement 2_Redacted.pdf

Extracted from the file · 39 pages, 22 without text · 3,399 characters

Text of 4-CD01225 PAF Supplement 2_Redacted.pdf

Extracted from the file · 189 pages, 30 without text · 12,161 characters

Text of 22753 PAF Form #1_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 1,025 characters

Text of 5-CD02176 Supplemental_Redacted.pdf

Extracted from the file · 30 pages, 19 without text · 2,573 characters

Text of CPTLAUVL PAF Form #1 Redacted.pdf

Extracted from the file · 3 pages · 5,179 characters

As listed on the current system

Supplement for New App [Filed: 09/25/2026]

This filing on the current system (opens in a new tab)