Application supplement
Exhibit CLP-Additions-6 Folder 3
Files344
2-103353 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-103353 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-103353 2019 Capital Book CL & P Approved Plan.pdf
2-103353 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-103353 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-103353 2018 Capital Book CL & P Approved Plan.pdf
2-102118 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-102118 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-102118 2021 Capital Book CL & P Approved Plan.pdf
2-102118 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-102118 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-102118 2020 Capital Book CL & P Approved Plan.pdf
2-102118 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-102118 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-102118 2019 Capital Book CL & P Approved Plan.pdf
2-19733 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-19733 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-19733 2019 Capital Book CL & P Approved Plan.pdf
2-18742 PAF_Redacted.pdf
PDF · 745 KB · 6 pagesText searchable
Download 2-18742 PAF_Redacted.pdfRead the text of 2-18742 PAF_Redacted.pdf
2-2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-2018 Capital Book CL & P Approved Plan.pdf
2-18CGVE11 Approval_Redacted.pdf
PDF · 280 KB · 1 pageNo text in this file
2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 3 pagesText searchable
Download 2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdf
2- CD00412 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2- CD00412 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2- CD00412 2018 Capital Book CL & P Approved Plan.pdf
1-VLT_CORR CS & Closing Report 2019_Redacted.pdf
PDF · 1.3 MB · 25 pagesText searchable
Download 1-VLT_CORR CS & Closing Report 2019_Redacted.pdfRead the text of 1-VLT_CORR CS & Closing Report 2019_Redacted.pdf
1-VLT_CORR CS & Closing Report 2018_Redacted.pdf
PDF · 1.3 MB · 29 pagesText searchable
Download 1-VLT_CORR CS & Closing Report 2018_Redacted.pdfRead the text of 1-VLT_CORR CS & Closing Report 2018_Redacted.pdf
1-VLT_CORR CS & Closing Report 2017_Redacted.pdf
PDF · 1.4 MB · 21 pagesText searchable
Download 1-VLT_CORR CS & Closing Report 2017_Redacted.pdfRead the text of 1-VLT_CORR CS & Closing Report 2017_Redacted.pdf
1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdf
PDF · 1.5 MB · 18 pagesText searchable
Download 1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdfRead the text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdf
1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdf
PDF · 1.1 MB · 22 pagesText searchable
Download 1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdfRead the text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdf
1-LVEHPUR CS & Closing Report 2020_Redacted.pdf
PDF · 299 KB · 4 pagesText searchable
Download 1-LVEHPUR CS & Closing Report 2020_Redacted.pdfRead the text of 1-LVEHPUR CS & Closing Report 2020_Redacted.pdf
1-LVEHPUR CS & Closing Report 2019_Redacted.pdf
PDF · 345 KB · 7 pagesText searchable
Download 1-LVEHPUR CS & Closing Report 2019_Redacted.pdfRead the text of 1-LVEHPUR CS & Closing Report 2019_Redacted.pdf
1-LVEHPUR CS & Closing Report 2018_Redacted.pdf
PDF · 295 KB · 9 pagesText searchable
Download 1-LVEHPUR CS & Closing Report 2018_Redacted.pdfRead the text of 1-LVEHPUR CS & Closing Report 2018_Redacted.pdf
1-LVEHPUR CS & Closing Report 2017_Redacted.pdf
PDF · 484 KB · 9 pagesText searchable
Download 1-LVEHPUR CS & Closing Report 2017_Redacted.pdfRead the text of 1-LVEHPUR CS & Closing Report 2017_Redacted.pdf
1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdf
PDF · 8.0 MB · 204 pagesText searchable
Download 1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdfRead the text of 1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdf
1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdf
PDF · 6.6 MB · 199 pagesText searchable
Download 1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdfRead the text of 1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdf
1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdf
PDF · 6.7 MB · 244 pagesText searchable
Download 1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdfRead the text of 1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdf
1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdf
PDF · 4.0 MB · 113 pagesText searchable
Download 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdfRead the text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdf
1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdf
PDF · 4.9 MB · 92 pagesText searchable
Download 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdfRead the text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdf
1-LN_RELO CS & Closing Report 2019_Redacted.pdf
PDF · 2.8 MB · 86 pagesText searchable
Download 1-LN_RELO CS & Closing Report 2019_Redacted.pdfRead the text of 1-LN_RELO CS & Closing Report 2019_Redacted.pdf
1-LN_RELO CS & Closing Report 2018_Redacted.pdf
PDF · 3.2 MB · 94 pagesText searchable
Download 1-LN_RELO CS & Closing Report 2018_Redacted.pdfRead the text of 1-LN_RELO CS & Closing Report 2018_Redacted.pdf
1-LN_RELO CS & Closing Report 2017_Redacted.pdf
PDF · 3.6 MB · 102 pagesText searchable
Download 1-LN_RELO CS & Closing Report 2017_Redacted.pdfRead the text of 1-LN_RELO CS & Closing Report 2017_Redacted.pdf
1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdf
PDF · 4.3 MB · 82 pagesText searchable
Download 1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdfRead the text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdf
1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdf
PDF · 6.4 MB · 91 pagesText searchable
Download 1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdfRead the text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdf
1-LIGHTNG CS & Closing Report 2019_Redacted.pdf
PDF · 6.9 MB · 670 pagesText searchable
Download 1-LIGHTNG CS & Closing Report 2019_Redacted.pdfRead the text of 1-LIGHTNG CS & Closing Report 2019_Redacted.pdf
1-LIGHTNG CS & Closing Report 2018_Redacted.pdf
PDF · 12 MB · 595 pagesText searchable
Download 1-LIGHTNG CS & Closing Report 2018_Redacted.pdfRead the text of 1-LIGHTNG CS & Closing Report 2018_Redacted.pdf
1-LIGHTNG CS & Closing Report 2017_Redacted.pdf
PDF · 20 MB · 417 pagesText searchable
Download 1-LIGHTNG CS & Closing Report 2017_Redacted.pdfRead the text of 1-LIGHTNG CS & Closing Report 2017_Redacted.pdf
1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdf
PDF · 8.6 MB · 293 pagesText searchable
Download 1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdfRead the text of 1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdf
1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdf
PDF · 16 MB · 461 pagesText searchable
Download 1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdfRead the text of 1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdf
1-IT1DWANA CS & Closing Report 2021_Redacted.pdf
PDF · 576 KB · 8 pagesText searchable
Download 1-IT1DWANA CS & Closing Report 2021_Redacted.pdfRead the text of 1-IT1DWANA CS & Closing Report 2021_Redacted.pdf
1-IT1DWANA CS & Closing Report 2018_Redacted.pdf
PDF · 566 KB · 10 pagesText searchable
Download 1-IT1DWANA CS & Closing Report 2018_Redacted.pdfRead the text of 1-IT1DWANA CS & Closing Report 2018_Redacted.pdf
1-IT1DWANA CS & Closing Report 2017_Redacted.pdf
PDF · 653 KB · 12 pagesText searchable
Download 1-IT1DWANA CS & Closing Report 2017_Redacted.pdfRead the text of 1-IT1DWANA CS & Closing Report 2017_Redacted.pdf
1-INSCLMCST CS & Closing Report 2021_Redacted.pdf
PDF · 16 MB · 505 pagesText searchable
Download 1-INSCLMCST CS & Closing Report 2021_Redacted.pdfRead the text of 1-INSCLMCST CS & Closing Report 2021_Redacted.pdf
1-INSCLMCST CS & Closing Report 2019_Redacted.pdf
PDF · 6.9 MB · 575 pagesText searchable
Download 1-INSCLMCST CS & Closing Report 2019_Redacted.pdfRead the text of 1-INSCLMCST CS & Closing Report 2019_Redacted.pdf
1-INSCLMCST CS & Closing Report 2018_Redacted.pdf
PDF · 17 MB · 553 pagesText searchable
Download 1-INSCLMCST CS & Closing Report 2018_Redacted.pdfRead the text of 1-INSCLMCST CS & Closing Report 2018_Redacted.pdf
1-INSCLMCST CS & Closing Report 2017_Redacted.pdf
PDF · 11 MB · 491 pagesText searchable
Download 1-INSCLMCST CS & Closing Report 2017_Redacted.pdfRead the text of 1-INSCLMCST CS & Closing Report 2017_Redacted.pdf
1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdf
PDF · 6.3 MB · 499 pagesText searchable
Download 1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdfRead the text of 1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdf
1-GXTD21 CS & Closing Report_Redacted.pdf
PDF · 849 KB · 21 pagesText searchable
Download 1-GXTD21 CS & Closing Report_Redacted.pdfRead the text of 1-GXTD21 CS & Closing Report_Redacted.pdf
1-GXTD20 CS & Closing Report_Redacted.pdf
PDF · 929 KB · 18 pagesText searchable
Download 1-GXTD20 CS & Closing Report_Redacted.pdfRead the text of 1-GXTD20 CS & Closing Report_Redacted.pdf
1-GXTD19 CS & Closing Report_Redacted.pdf
PDF · 340 KB · 4 pagesText searchable
Download 1-GXTD19 CS & Closing Report_Redacted.pdfRead the text of 1-GXTD19 CS & Closing Report_Redacted.pdf
1-GXENG CS & Closing Report 2021_Redacted.pdf
PDF · 251 KB · 3 pagesText searchable
Download 1-GXENG CS & Closing Report 2021_Redacted.pdfRead the text of 1-GXENG CS & Closing Report 2021_Redacted.pdf
1-GXCOTRBL CS & Closing Report 2020_Redacted.pdf
PDF · 331 KB · 4 pagesText searchable
Download 1-GXCOTRBL CS & Closing Report 2020_Redacted.pdfRead the text of 1-GXCOTRBL CS & Closing Report 2020_Redacted.pdf
1-GXCOTRBL CS & Closing Report 2019_Redacted.pdf
PDF · 417 KB · 4 pagesText searchable
Download 1-GXCOTRBL CS & Closing Report 2019_Redacted.pdfRead the text of 1-GXCOTRBL CS & Closing Report 2019_Redacted.pdf
1-GXCOTRBL CS & Closing Report 2018_Redacted.pdf
PDF · 371 KB · 4 pagesText searchable
Download 1-GXCOTRBL CS & Closing Report 2018_Redacted.pdfRead the text of 1-GXCOTRBL CS & Closing Report 2018_Redacted.pdf
1-GECNCLP CS & Closing Report 2021_Redacted.pdf
PDF · 286 KB · 3 pagesText searchable
Download 1-GECNCLP CS & Closing Report 2021_Redacted.pdfRead the text of 1-GECNCLP CS & Closing Report 2021_Redacted.pdf
1-ETTCF21 CS & Closing Report_Redacted.pdf
PDF · 955 KB · 31 pagesText searchable
Download 1-ETTCF21 CS & Closing Report_Redacted.pdfRead the text of 1-ETTCF21 CS & Closing Report_Redacted.pdf
1-ETTCF20 CS & Closing Report_Redacted.pdf
PDF · 636 KB · 24 pagesText searchable
Download 1-ETTCF20 CS & Closing Report_Redacted.pdfRead the text of 1-ETTCF20 CS & Closing Report_Redacted.pdf
1-ETTCF19 CS & Closing Report_Redacted.pdf
PDF · 1.4 MB · 28 pagesText searchable
Download 1-ETTCF19 CS & Closing Report_Redacted.pdfRead the text of 1-ETTCF19 CS & Closing Report_Redacted.pdf
1-ETTCF18 CS & Closing Report_Redacted.pdf
PDF · 728 KB · 21 pagesText searchable
Download 1-ETTCF18 CS & Closing Report_Redacted.pdfRead the text of 1-ETTCF18 CS & Closing Report_Redacted.pdf
1-ETTCF17 CS & Closing Report_Redacted.pdf
PDF · 996 KB · 17 pagesText searchable
Download 1-ETTCF17 CS & Closing Report_Redacted.pdfRead the text of 1-ETTCF17 CS & Closing Report_Redacted.pdf
1-ETT2017 CS & Closing Report_Redacted.pdf
PDF · 1.6 MB · 102 pagesText searchable
Download 1-ETT2017 CS & Closing Report_Redacted.pdfRead the text of 1-ETT2017 CS & Closing Report_Redacted.pdf
1-ETT2016 CS & Closing Report_Redacted.pdf
PDF · 2.3 MB · 65 pagesText searchable
Download 1-ETT2016 CS & Closing Report_Redacted.pdfRead the text of 1-ETT2016 CS & Closing Report_Redacted.pdf
1-ETR2021 CS & Closing Report_Redacted.pdf
PDF · 6.5 MB · 217 pagesText searchable
Download 1-ETR2021 CS & Closing Report_Redacted.pdfRead the text of 1-ETR2021 CS & Closing Report_Redacted.pdf
1-ETR2020 CS & Closing Report_Redacted.pdf
PDF · 6.2 MB · 217 pagesText searchable
Download 1-ETR2020 CS & Closing Report_Redacted.pdfRead the text of 1-ETR2020 CS & Closing Report_Redacted.pdf
1-ETR2019 CS & Closing Report_Redacted.pdf
PDF · 5.1 MB · 197 pagesText searchable
Download 1-ETR2019 CS & Closing Report_Redacted.pdfRead the text of 1-ETR2019 CS & Closing Report_Redacted.pdf
1-ETR2018 CS & Closing Report_Redacted.pdf
PDF · 5.1 MB · 193 pagesText searchable
Download 1-ETR2018 CS & Closing Report_Redacted.pdfRead the text of 1-ETR2018 CS & Closing Report_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2021_Redacted.pdf
PDF · 17 MB · 953 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2021_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2021_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdf
PDF · 11 MB · 616 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdf
PDF · 21 MB · 750 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdf
PDF · 24 MB · 528 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2018_Part1_Redacted.pdf
PDF · 35 MB · 750 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2018_Part1_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2018_Part1_Redacted.pdf
1-EMRGNTLN CS & Closing Report 2017_Redacted.pdf
PDF · 43 MB · 1,178 pagesText searchable
Download 1-EMRGNTLN CS & Closing Report 2017_Redacted.pdfRead the text of 1-EMRGNTLN CS & Closing Report 2017_Redacted.pdf
1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdf
PDF · 16 MB · 455 pagesText searchable
Download 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdfRead the text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdf
1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdf
PDF · 26 MB · 750 pagesText searchable
Download 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdfRead the text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdf
1-EFO_TLS CS & Closing Report 2018_Redacted.pdf
PDF · 984 KB · 15 pagesText searchable
Download 1-EFO_TLS CS & Closing Report 2018_Redacted.pdfRead the text of 1-EFO_TLS CS & Closing Report 2018_Redacted.pdf
1-EFO_TLS CS & Closing Report 2017_Redacted.pdf
PDF · 774 KB · 12 pagesText searchable
Download 1-EFO_TLS CS & Closing Report 2017_Redacted.pdfRead the text of 1-EFO_TLS CS & Closing Report 2017_Redacted.pdf
1-DT7C CS & Closing Report 2021_Redacted.pdf
PDF · 142 KB · 2 pagesNo text in this file
1-DT7C CS & Closing Report 2020_Redacted.pdf
PDF · 271 KB · 3 pagesText searchable
Download 1-DT7C CS & Closing Report 2020_Redacted.pdfRead the text of 1-DT7C CS & Closing Report 2020_Redacted.pdf
1-DT7C CS & Closing Report 2019_Redacted.pdf
PDF · 150 KB · 2 pagesNo text in this file
1-DT7C CS & Closing Report 2018_Redacted.pdf
PDF · 271 KB · 3 pagesText searchable
Download 1-DT7C CS & Closing Report 2018_Redacted.pdfRead the text of 1-DT7C CS & Closing Report 2018_Redacted.pdf
1-DT7C CS & Closing Report 2017_Redacted.pdf
PDF · 431 KB · 10 pagesText searchable
Download 1-DT7C CS & Closing Report 2017_Redacted.pdfRead the text of 1-DT7C CS & Closing Report 2017_Redacted.pdf
1-DSEQ21 CS & Closing Report_Redacted.pdf
PDF · 2.4 MB · 46 pagesText searchable
Download 1-DSEQ21 CS & Closing Report_Redacted.pdfRead the text of 1-DSEQ21 CS & Closing Report_Redacted.pdf
1-DSEQ20 CS & Closing Report_Redacted.pdf
PDF · 395 KB · 8 pagesText searchable
Download 1-DSEQ20 CS & Closing Report_Redacted.pdfRead the text of 1-DSEQ20 CS & Closing Report_Redacted.pdf
1-DSEQ CS & Closing Report 2021_Redacted.pdf
PDF · 633 KB · 13 pagesText searchable
Download 1-DSEQ CS & Closing Report 2021_Redacted.pdfRead the text of 1-DSEQ CS & Closing Report 2021_Redacted.pdf
1-DSEQ CS & Closing Report 2020_Redacted.pdf
PDF · 834 KB · 17 pagesText searchable
Download 1-DSEQ CS & Closing Report 2020_Redacted.pdfRead the text of 1-DSEQ CS & Closing Report 2020_Redacted.pdf
1-DSEQ CS & Closing Report 2019_Redacted.pdf
PDF · 1024 KB · 25 pagesText searchable
Download 1-DSEQ CS & Closing Report 2019_Redacted.pdfRead the text of 1-DSEQ CS & Closing Report 2019_Redacted.pdf
1-DSEQ CS & Closing Report 2018_Redacted.pdf
PDF · 1.4 MB · 23 pagesText searchable
Download 1-DSEQ CS & Closing Report 2018_Redacted.pdfRead the text of 1-DSEQ CS & Closing Report 2018_Redacted.pdf
1-DSEQ CS & Closing Report 2017_Redacted.pdf
PDF · 975 KB · 16 pagesText searchable
Download 1-DSEQ CS & Closing Report 2017_Redacted.pdfRead the text of 1-DSEQ CS & Closing Report 2017_Redacted.pdf
1-DSCN21 CS & Closing Report_Redacted.pdf
PDF · 1.7 MB · 55 pagesText searchable
Download 1-DSCN21 CS & Closing Report_Redacted.pdfRead the text of 1-DSCN21 CS & Closing Report_Redacted.pdf
1-DSCN20 CS & Closing Report_Redacted.pdf
PDF · 745 KB · 9 pagesText searchable
Download 1-DSCN20 CS & Closing Report_Redacted.pdfRead the text of 1-DSCN20 CS & Closing Report_Redacted.pdf
1-DSCN CS & Closing Report 2021_Redacted.pdf
PDF · 904 KB · 18 pagesText searchable
Download 1-DSCN CS & Closing Report 2021_Redacted.pdfRead the text of 1-DSCN CS & Closing Report 2021_Redacted.pdf
1-DSCN CS & Closing Report 2019_Redacted.pdf
PDF · 1.5 MB · 28 pagesText searchable
Download 1-DSCN CS & Closing Report 2019_Redacted.pdfRead the text of 1-DSCN CS & Closing Report 2019_Redacted.pdf
1-DSCN CS & Closing Report 2018_Redacted.pdf
PDF · 1.4 MB · 29 pagesText searchable
Download 1-DSCN CS & Closing Report 2018_Redacted.pdfRead the text of 1-DSCN CS & Closing Report 2018_Redacted.pdf
1-DB_CABLE CS & Closing Report 2019_Redacted.pdf
PDF · 11 MB · 203 pagesText searchable
Download 1-DB_CABLE CS & Closing Report 2019_Redacted.pdfRead the text of 1-DB_CABLE CS & Closing Report 2019_Redacted.pdf
1-DB_CABLE CS & Closing Report 2018_Redacted.pdf
PDF · 7.7 MB · 117 pagesText searchable
Download 1-DB_CABLE CS & Closing Report 2018_Redacted.pdfRead the text of 1-DB_CABLE CS & Closing Report 2018_Redacted.pdf
1-DB_CABLE CS & Closing Report 2017_Redacted.pdf
PDF · 5.3 MB · 98 pagesText searchable
Download 1-DB_CABLE CS & Closing Report 2017_Redacted.pdfRead the text of 1-DB_CABLE CS & Closing Report 2017_Redacted.pdf
1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdf
PDF · 8.5 MB · 201 pagesText searchable
Download 1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdfRead the text of 1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdf
1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdf
PDF · 5.4 MB · 231 pagesText searchable
Download 1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdfRead the text of 1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdf
1-CTTRN21 CS & Closing Report_Redacted.pdf
PDF · 428 KB · 11 pagesText searchable
Download 1-CTTRN21 CS & Closing Report_Redacted.pdfRead the text of 1-CTTRN21 CS & Closing Report_Redacted.pdf
1-CTTRN20 CS & Closing Report_Redacted.pdf
PDF · 469 KB · 6 pagesText searchable
Download 1-CTTRN20 CS & Closing Report_Redacted.pdfRead the text of 1-CTTRN20 CS & Closing Report_Redacted.pdf
1-CTTRN19 CS & Closing Report_Redacted.pdf
PDF · 384 KB · 9 pagesText searchable
Download 1-CTTRN19 CS & Closing Report_Redacted.pdfRead the text of 1-CTTRN19 CS & Closing Report_Redacted.pdf
1-CTTRN18 CS & Closing Report_Redacted.pdf
PDF · 254 KB · 4 pagesText searchable
Download 1-CTTRN18 CS & Closing Report_Redacted.pdfRead the text of 1-CTTRN18 CS & Closing Report_Redacted.pdf
1-CTROW17 CS & Closing Report_Redacted.pdf
PDF · 508 KB · 15 pagesText searchable
Download 1-CTROW17 CS & Closing Report_Redacted.pdfRead the text of 1-CTROW17 CS & Closing Report_Redacted.pdf
1-CTRMTR17 CS & Closing Report_Redacted.pdf
PDF · 472 KB · 6 pagesText searchable
Download 1-CTRMTR17 CS & Closing Report_Redacted.pdfRead the text of 1-CTRMTR17 CS & Closing Report_Redacted.pdf
1-CTMTR21 CS & Closing Report 2021_Redacted.pdf
PDF · 551 KB · 5 pagesText searchable
Download 1-CTMTR21 CS & Closing Report 2021_Redacted.pdfRead the text of 1-CTMTR21 CS & Closing Report 2021_Redacted.pdf
1-CTMTR20 CS & Closing Report_Redacted.pdf
PDF · 1.4 MB · 18 pagesText searchable
Download 1-CTMTR20 CS & Closing Report_Redacted.pdfRead the text of 1-CTMTR20 CS & Closing Report_Redacted.pdf
1-CTMTR19 CS & Closing Report_Redacted.pdf
PDF · 707 KB · 6 pagesText searchable
Download 1-CTMTR19 CS & Closing Report_Redacted.pdfRead the text of 1-CTMTR19 CS & Closing Report_Redacted.pdf
1-CTMTR18 CS & Closing Report_Redacted.pdf
PDF · 1.3 MB · 17 pagesText searchable
Download 1-CTMTR18 CS & Closing Report_Redacted.pdfRead the text of 1-CTMTR18 CS & Closing Report_Redacted.pdf
1-CTMTR17 CS & Closing Report_Redacted.pdf
PDF · 982 KB · 12 pagesText searchable
Download 1-CTMTR17 CS & Closing Report_Redacted.pdfRead the text of 1-CTMTR17 CS & Closing Report_Redacted.pdf
1-CTFT2021 CS & Closing Report_Redacted.pdf
PDF · 567 KB · 9 pagesText searchable
Download 1-CTFT2021 CS & Closing Report_Redacted.pdfRead the text of 1-CTFT2021 CS & Closing Report_Redacted.pdf
1-CTFT2020 CS & Closing Report_Redacted.pdf
PDF · 499 KB · 11 pagesText searchable
Download 1-CTFT2020 CS & Closing Report_Redacted.pdfRead the text of 1-CTFT2020 CS & Closing Report_Redacted.pdf
1-CTEDVH21 CS & Closing Report_Redacted.pdf
PDF · 449 KB · 26 pagesText searchable
Download 1-CTEDVH21 CS & Closing Report_Redacted.pdfRead the text of 1-CTEDVH21 CS & Closing Report_Redacted.pdf
1-CTEDVH20 CS & Closing Report_Redacted.pdf
PDF · 347 KB · 24 pagesText searchable
Download 1-CTEDVH20 CS & Closing Report_Redacted.pdfRead the text of 1-CTEDVH20 CS & Closing Report_Redacted.pdf
1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdf
PDF · 33 MB · 656 pagesText searchable
Download 1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdf
1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdf
PDF · 19 MB · 750 pagesText searchable
Download 1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdf
1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdf
PDF · 18 MB · 745 pagesText searchable
Download 1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdf
1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdf
PDF · 3.9 MB · 750 pagesText searchable
Download 1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdf
1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdf
PDF · 12 MB · 701 pagesText searchable
Download 1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdf
1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdf
PDF · 3.2 MB · 750 pagesText searchable
Download 1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdf
1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdf
PDF · 23 MB · 573 pagesText searchable
Download 1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdf
1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdf
PDF · 12 MB · 750 pagesText searchable
Download 1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdfRead the text of 1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdf
1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdf
PDF · 18 MB · 708 pagesText searchable
Download 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdfRead the text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdf
1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdf
PDF · 8.2 MB · 750 pagesText searchable
Download 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdfRead the text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdf
1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdf
PDF · 19 MB · 750 pagesText searchable
Download 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdfRead the text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdf
1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdf
PDF · 33 MB · 656 pagesText searchable
Download 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdfRead the text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdf
1-CDMHANNL CS & Closing Report 2021_Redacted.pdf
PDF · 339 KB · 5 pagesText searchable
Download 1-CDMHANNL CS & Closing Report 2021_Redacted.pdfRead the text of 1-CDMHANNL CS & Closing Report 2021_Redacted.pdf
1-CDMHANNL CS & Closing Report 2020_Redacted.pdf
PDF · 406 KB · 6 pagesText searchable
Download 1-CDMHANNL CS & Closing Report 2020_Redacted.pdfRead the text of 1-CDMHANNL CS & Closing Report 2020_Redacted.pdf
1-CDMHANNL CS & Closing Report 2019_Redacted.pdf
PDF · 300 KB · 6 pagesText searchable
Download 1-CDMHANNL CS & Closing Report 2019_Redacted.pdfRead the text of 1-CDMHANNL CS & Closing Report 2019_Redacted.pdf
1-CDMHANNL CS & Closing Report 2017_Redacted.pdf
PDF · 307 KB · 7 pagesText searchable
Download 1-CDMHANNL CS & Closing Report 2017_Redacted.pdfRead the text of 1-CDMHANNL CS & Closing Report 2017_Redacted.pdf
1-CD00412 CS & Closing Report 2020_Redacted.pdf
PDF · 326 KB · 6 pagesText searchable
Download 1-CD00412 CS & Closing Report 2020_Redacted.pdfRead the text of 1-CD00412 CS & Closing Report 2020_Redacted.pdf
1-CD00412 CS & Closing Report 2019_Redacted.pdf
PDF · 342 KB · 9 pagesText searchable
Download 1-CD00412 CS & Closing Report 2019_Redacted.pdfRead the text of 1-CD00412 CS & Closing Report 2019_Redacted.pdf
1-CD00412 CS & Closing Report 2018_Redacted.pdf
PDF · 682 KB · 10 pagesText searchable
Download 1-CD00412 CS & Closing Report 2018_Redacted.pdfRead the text of 1-CD00412 CS & Closing Report 2018_Redacted.pdf
1-CD00412 CS & Closing Report 2017_Redacted.pdf
PDF · 632 KB · 8 pagesText searchable
Download 1-CD00412 CS & Closing Report 2017_Redacted.pdfRead the text of 1-CD00412 CS & Closing Report 2017_Redacted.pdf
1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdf
PDF · 479 KB · 6 pagesText searchable
Download 1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdfRead the text of 1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdf
1-CD00258 CS & Closing Report 2018.pdf
PDF · 231 KB · 3 pagesText searchable
Download 1-CD00258 CS & Closing Report 2018.pdfRead the text of 1-CD00258 CS & Closing Report 2018.pdf
1-495802 CS & Closing Report 2021_Redacted.pdf
PDF · 15 MB · 331 pagesText searchable
Download 1-495802 CS & Closing Report 2021_Redacted.pdfRead the text of 1-495802 CS & Closing Report 2021_Redacted.pdf
1-495802 CS & Closing Report 2020_Redacted.pdf
PDF · 4.5 MB · 204 pagesText searchable
Download 1-495802 CS & Closing Report 2020_Redacted.pdfRead the text of 1-495802 CS & Closing Report 2020_Redacted.pdf
1-495802 CS & Closing Report 2019_Redacted.pdf
PDF · 4.8 MB · 163 pagesText searchable
Download 1-495802 CS & Closing Report 2019_Redacted.pdfRead the text of 1-495802 CS & Closing Report 2019_Redacted.pdf
1-495802 CS & Closing Report 2018_Redacted.pdf
PDF · 7.0 MB · 207 pagesText searchable
Download 1-495802 CS & Closing Report 2018_Redacted.pdfRead the text of 1-495802 CS & Closing Report 2018_Redacted.pdf
1-201435 CS & Closing Report 2019_Redacted.pdf
PDF · 464 KB · 4 pagesText searchable
Download 1-201435 CS & Closing Report 2019_Redacted.pdfRead the text of 1-201435 CS & Closing Report 2019_Redacted.pdf
1-201435 CS & Closing Report 2018_Redacted.pdf
PDF · 342 KB · 4 pagesText searchable
Download 1-201435 CS & Closing Report 2018_Redacted.pdfRead the text of 1-201435 CS & Closing Report 2018_Redacted.pdf
1-201435 CS & Closing Report 2017_Redacted.pdf
PDF · 488 KB · 4 pagesText searchable
Download 1-201435 CS & Closing Report 2017_Redacted.pdfRead the text of 1-201435 CS & Closing Report 2017_Redacted.pdf
1-103353 CS & Closing Report 2021_Redacted.pdf
PDF · 130 KB · 2 pagesNo text in this file
1-103353 CS & Closing Report 2020_Redacted.pdf
PDF · 387 KB · 5 pagesText searchable
Download 1-103353 CS & Closing Report 2020_Redacted.pdfRead the text of 1-103353 CS & Closing Report 2020_Redacted.pdf
1-103353 CS & Closing Report 2019_Redacted.pdf
PDF · 338 KB · 3 pagesText searchable
Download 1-103353 CS & Closing Report 2019_Redacted.pdfRead the text of 1-103353 CS & Closing Report 2019_Redacted.pdf
1-103353 CS & Closing Report 2018_Redacted.pdf
PDF · 428 KB · 4 pagesText searchable
Download 1-103353 CS & Closing Report 2018_Redacted.pdfRead the text of 1-103353 CS & Closing Report 2018_Redacted.pdf
1-102118 CS & Closing Report 2021_Redacted.pdf
PDF · 830 KB · 14 pagesText searchable
Download 1-102118 CS & Closing Report 2021_Redacted.pdfRead the text of 1-102118 CS & Closing Report 2021_Redacted.pdf
1-102118 CS & Closing Report 2020_Redacted.pdf
PDF · 383 KB · 11 pagesText searchable
Download 1-102118 CS & Closing Report 2020_Redacted.pdfRead the text of 1-102118 CS & Closing Report 2020_Redacted.pdf
1-102118 CS & Closing Report 2019_Redacted.pdf
PDF · 536 KB · 11 pagesText searchable
Download 1-102118 CS & Closing Report 2019_Redacted.pdfRead the text of 1-102118 CS & Closing Report 2019_Redacted.pdf
1-102118 CS & Closing Report 2017_Redacted.pdf
PDF · 496 KB · 9 pagesText searchable
Download 1-102118 CS & Closing Report 2017_Redacted.pdfRead the text of 1-102118 CS & Closing Report 2017_Redacted.pdf
1-19733 CS & Closing Report_Redacted.pdf
PDF · 395 KB · 4 pagesText searchable
Download 1-19733 CS & Closing Report_Redacted.pdfRead the text of 1-19733 CS & Closing Report_Redacted.pdf
1-18742 CS & Closing Report_Redacted.pdf
PDF · 319 KB · 4 pagesText searchable
Download 1-18742 CS & Closing Report_Redacted.pdfRead the text of 1-18742 CS & Closing Report_Redacted.pdf
1-18CGVE11 CS & Closing Report.pdf
PDF · 217 KB · 3 pagesText searchable
Download 1-18CGVE11 CS & Closing Report.pdfRead the text of 1-18CGVE11 CS & Closing Report.pdf
2-103353 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-103353 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-103353 2020 Capital Book CL & P Approved Plan.pdf
3-DSEQ21 Approval_Redacted.pdf
PDF · 311 KB · 1 pageNo text in this file
3-DSEQ20 Approval_Redacted.pdf
PDF · 295 KB · 1 pageNo text in this file
3-DSEQ 2018 Variance Letter Docket.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-DSEQ 2018 Variance Letter Docket.pdfRead the text of 3-DSEQ 2018 Variance Letter Docket.pdf
3-DSCN21 Approval_Redacted.pdf
PDF · 305 KB · 1 pageNo text in this file
3-DSCN20 Approval_Redacted.pdf
PDF · 296 KB · 1 pageNo text in this file
3-DB_CABLE 2019 Variance Letter.pdf
PDF · 266 KB · 4 pagesText searchable
Download 3-DB_CABLE 2019 Variance Letter.pdfRead the text of 3-DB_CABLE 2019 Variance Letter.pdf
3-DB_CABLE 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-DB_CABLE 2018 Variance Letter.pdfRead the text of 3-DB_CABLE 2018 Variance Letter.pdf
3-CTTRN21 Approval_Redacted.pdf
PDF · 287 KB · 1 pageNo text in this file
3-CTTRN20 Approval_Redacted.pdf
PDF · 273 KB · 1 pageNo text in this file
3-CTTRN19 Supplement_Redacted.pdf
PDF · 224 KB · 2 pagesText searchable
Download 3-CTTRN19 Supplement_Redacted.pdfRead the text of 3-CTTRN19 Supplement_Redacted.pdf
3-CTTRN18 Supplemental_Redacted.pdf
PDF · 306 KB · 2 pagesText searchable
Download 3-CTTRN18 Supplemental_Redacted.pdfRead the text of 3-CTTRN18 Supplemental_Redacted.pdf
3-CTROW17 Approval_Redacted.pdf
PDF · 289 KB · 1 pageNo text in this file
3-CTRMTR17 Approval_Redacted.pdf
PDF · 288 KB · 1 pageNo text in this file
3-CTMTR21 Approval_Redacted.pdf
PDF · 204 KB · 1 pageNo text in this file
3-CTMTR20 Approval_Redacted.pdf
PDF · 209 KB · 1 pageNo text in this file
3-CTMTR19 Supplemental_Redacted.pdf
PDF · 357 KB · 3 pagesText searchable
Download 3-CTMTR19 Supplemental_Redacted.pdfRead the text of 3-CTMTR19 Supplemental_Redacted.pdf
3-CTMTR18 Approval_Redacted.pdf
PDF · 207 KB · 1 pageNo text in this file
3-CTMTR17 Approval_Redacted.pdf
PDF · 198 KB · 1 pageNo text in this file
3-CTFT2021 Approval_Redacted.pdf
PDF · 287 KB · 1 pageNo text in this file
3-CTFT2020 Approval_Redacted.pdf
PDF · 294 KB · 1 pageNo text in this file
3-CTEDVH21 Approval_Redacted.pdf
PDF · 305 KB · 1 pageNo text in this file
3-CTEDVH20 Approval_Redacted.pdf
PDF · 305 KB · 1 pageNo text in this file
3-CSTMER 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-CSTMER 2020 Variance Letter.pdfRead the text of 3-CSTMER 2020 Variance Letter.pdf
3-CSTMER 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-CSTMER 2018 Variance Letter.pdfRead the text of 3-CSTMER 2018 Variance Letter.pdf
3-CSTMER (CDCDANNL) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-CSTMER (CDCDANNL) 2020 Variance Letter.pdfRead the text of 3-CSTMER (CDCDANNL) 2020 Variance Letter.pdf
3-495802 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-495802 2020 Variance Letter.pdfRead the text of 3-495802 2020 Variance Letter.pdf
3-201435 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-201435 2018 Variance Letter.pdfRead the text of 3-201435 2018 Variance Letter.pdf
3-102118 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 3-102118 2017 Capital Book CL & P Approved Plan.pdfRead the text of 3-102118 2017 Capital Book CL & P Approved Plan.pdf
3-19733 Approval_Redacted.pdf
PDF · 296 KB · 1 pageNo text in this file
3-18742 Approval_Redacted.pdf
PDF · 291 KB · 1 pageNo text in this file
3- 103353 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 3- 103353 2017 Capital Book CL & P Approved Plan.pdfRead the text of 3- 103353 2017 Capital Book CL & P Approved Plan.pdf
2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdf
2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdf
2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdf
2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdf
2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdf
2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdf
2-LVEHPUR PAF 2019_Redacted.pdf
PDF · 566 KB · 4 pagesText searchable
Download 2-LVEHPUR PAF 2019_Redacted.pdfRead the text of 2-LVEHPUR PAF 2019_Redacted.pdf
2-LVEHPUR PAF 2018_Redacted.pdf
PDF · 409 KB · 4 pagesText searchable
Download 2-LVEHPUR PAF 2018_Redacted.pdfRead the text of 2-LVEHPUR PAF 2018_Redacted.pdf
2-LVEHPUR PAF 2017_Redacted.pdf
PDF · 330 KB · 4 pagesText searchable
Download 2-LVEHPUR PAF 2017_Redacted.pdfRead the text of 2-LVEHPUR PAF 2017_Redacted.pdf
2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdf
2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdf
2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdf
2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdf
2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdf
2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdf
2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdf
2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdf
2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdf
2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdf
2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdf
2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdf
2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdf
2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdf
2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdf
2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdf
2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdf
2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdf
2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdf
2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdf
2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdf
2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdf
2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdf
2-GXTD21 PAF_Redacted.pdf
PDF · 284 KB · 2 pagesNo text in this file
2-GXTD20 PAF_Redacted.pdf
PDF · 125 KB · 2 pagesText searchable
Download 2-GXTD20 PAF_Redacted.pdfRead the text of 2-GXTD20 PAF_Redacted.pdf
2-GXTD19 PAF_Redacted.pdf
PDF · 128 KB · 2 pagesText searchable
Download 2-GXTD19 PAF_Redacted.pdfRead the text of 2-GXTD19 PAF_Redacted.pdf
2-GXENG PAF_Redacted.pdf
PDF · 293 KB · 4 pagesText searchable
Download 2-GXENG PAF_Redacted.pdfRead the text of 2-GXENG PAF_Redacted.pdf
2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdf
2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdf
2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdf
2-GECNCLP PAF 2021_Redacted.pdf
PDF · 396 KB · 5 pagesText searchable
Download 2-GECNCLP PAF 2021_Redacted.pdfRead the text of 2-GECNCLP PAF 2021_Redacted.pdf
2-ETTCF21 PAF_Redacted.pdf
PDF · 323 KB · 4 pagesText searchable
Download 2-ETTCF21 PAF_Redacted.pdfRead the text of 2-ETTCF21 PAF_Redacted.pdf
2-ETTCF20 PAF_Redacted.pdf
PDF · 339 KB · 4 pagesText searchable
Download 2-ETTCF20 PAF_Redacted.pdfRead the text of 2-ETTCF20 PAF_Redacted.pdf
2-ETTCF19 PAF_Redacted.pdf
PDF · 473 KB · 4 pagesText searchable
Download 2-ETTCF19 PAF_Redacted.pdfRead the text of 2-ETTCF19 PAF_Redacted.pdf
2-ETTCF18 PAF_Redacted.pdf
PDF · 460 KB · 6 pagesText searchable
Download 2-ETTCF18 PAF_Redacted.pdfRead the text of 2-ETTCF18 PAF_Redacted.pdf
2-ETTCF17 PAF_Redacted.pdf
PDF · 562 KB · 9 pagesText searchable
Download 2-ETTCF17 PAF_Redacted.pdfRead the text of 2-ETTCF17 PAF_Redacted.pdf
2-ETT2017 PAF_Redacted.pdf
PDF · 562 KB · 9 pagesText searchable
Download 2-ETT2017 PAF_Redacted.pdfRead the text of 2-ETT2017 PAF_Redacted.pdf
2-ETT2016 PAF_Redacted.pdf
PDF · 336 KB · 4 pagesText searchable
Download 2-ETT2016 PAF_Redacted.pdfRead the text of 2-ETT2016 PAF_Redacted.pdf
2-ETR2021 PAF_Redacted.pdf
PDF · 324 KB · 5 pagesText searchable
Download 2-ETR2021 PAF_Redacted.pdfRead the text of 2-ETR2021 PAF_Redacted.pdf
2-ETR2020 PAF_Redacted.pdf
PDF · 345 KB · 5 pagesText searchable
Download 2-ETR2020 PAF_Redacted.pdfRead the text of 2-ETR2020 PAF_Redacted.pdf
2-ETR2019 PAF_Redacted.pdf
PDF · 330 KB · 5 pagesText searchable
Download 2-ETR2019 PAF_Redacted.pdfRead the text of 2-ETR2019 PAF_Redacted.pdf
2-ETR2018 PAF_Redacted.pdf
PDF · 460 KB · 6 pagesText searchable
Download 2-ETR2018 PAF_Redacted.pdfRead the text of 2-ETR2018 PAF_Redacted.pdf
2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdf
2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdf
2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdf
2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdf
2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdf
2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdf
2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdf
2-DT7C 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-DT7C 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-DT7C 2021 Capital Book CL & P Approved Plan.pdf
2-DT7C 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-DT7C 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-DT7C 2020 Capital Book CL & P Approved Plan.pdf
2-DT7C 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-DT7C 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-DT7C 2019 Capital Book CL & P Approved Plan.pdf
2-DT7C 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-DT7C 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-DT7C 2018 Capital Book CL & P Approved Plan.pdf
2-DT7C 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-DT7C 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-DT7C 2017 Capital Book CL & P Approved Plan.pdf
2-DSEQ21 PAF_Redacted.pdf
PDF · 465 KB · 4 pagesNo text in this file
2-DSEQ20 PAF_Redacted.pdf
PDF · 21 KB · 1 pageText searchable
Download 2-DSEQ20 PAF_Redacted.pdfRead the text of 2-DSEQ20 PAF_Redacted.pdf
2-DSEQ 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-DSEQ 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSEQ 2021 Capital Book CL & P Approved Plan.pdf
2-DSEQ 2020 Capital Book CL & P Approved Plan.pdf
PDF · 432 KB · 2 pagesText searchable
Download 2-DSEQ 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSEQ 2020 Capital Book CL & P Approved Plan.pdf
2-DSEQ 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-DSEQ 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSEQ 2019 Capital Book CL & P Approved Plan.pdf
2-DSEQ 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-DSEQ 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSEQ 2018 Capital Book CL & P Approved Plan.pdf
2-DSEQ 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-DSEQ 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSEQ 2017 Capital Book CL & P Approved Plan.pdf
2-DSCN21 PAF_Redacted.pdf
PDF · 146 KB · 1 pageText searchable
Download 2-DSCN21 PAF_Redacted.pdfRead the text of 2-DSCN21 PAF_Redacted.pdf
2-DSCN20 PAF_Redacted.pdf
PDF · 20 KB · 1 pageText searchable
Download 2-DSCN20 PAF_Redacted.pdfRead the text of 2-DSCN20 PAF_Redacted.pdf
2-DSCN 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-DSCN 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSCN 2021 Capital Book CL & P Approved Plan.pdf
2-DSCN 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-DSCN 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSCN 2019 Capital Book CL & P Approved Plan.pdf
2-DSCN 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-DSCN 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-DSCN 2018 Capital Book CL & P Approved Plan.pdf
2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdf
2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdf
2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdf
2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdfRead the text of 2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdf
2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdf
2-CTTRN21 PAF_Redacted.pdf
PDF · 356 KB · 3 pagesText searchable
Download 2-CTTRN21 PAF_Redacted.pdfRead the text of 2-CTTRN21 PAF_Redacted.pdf
2-CTTRN20 PAF_Redacted.pdf
PDF · 530 KB · 3 pagesText searchable
Download 2-CTTRN20 PAF_Redacted.pdfRead the text of 2-CTTRN20 PAF_Redacted.pdf
2-CTTRN19 PAF_Redacted.pdf
PDF · 350 KB · 3 pagesText searchable
Download 2-CTTRN19 PAF_Redacted.pdfRead the text of 2-CTTRN19 PAF_Redacted.pdf
2-CTTRN18 PAF_Redacted.pdf
PDF · 344 KB · 3 pagesText searchable
Download 2-CTTRN18 PAF_Redacted.pdfRead the text of 2-CTTRN18 PAF_Redacted.pdf
2-CTROW17 PAF_Redacted.pdf
PDF · 562 KB · 9 pagesText searchable
Download 2-CTROW17 PAF_Redacted.pdfRead the text of 2-CTROW17 PAF_Redacted.pdf
2-CTRMTR17 PAF_Redacted.pdf
PDF · 512 KB · 10 pagesText searchable
Download 2-CTRMTR17 PAF_Redacted.pdfRead the text of 2-CTRMTR17 PAF_Redacted.pdf
2-CTMTR21 PAF_Redacted.pdf
PDF · 349 KB · 3 pagesText searchable
Download 2-CTMTR21 PAF_Redacted.pdfRead the text of 2-CTMTR21 PAF_Redacted.pdf
2-CTMTR20 PAF_Redacted.pdf
PDF · 256 KB · 3 pagesText searchable
Download 2-CTMTR20 PAF_Redacted.pdfRead the text of 2-CTMTR20 PAF_Redacted.pdf
2-CTMTR19 PAF_Redacted.pdf
PDF · 353 KB · 3 pagesText searchable
Download 2-CTMTR19 PAF_Redacted.pdfRead the text of 2-CTMTR19 PAF_Redacted.pdf
2-CTMTR18 PAF_Redacted.pdf
PDF · 348 KB · 3 pagesText searchable
Download 2-CTMTR18 PAF_Redacted.pdfRead the text of 2-CTMTR18 PAF_Redacted.pdf
2-CTMTR17 PAF_Redacted.pdf
PDF · 347 KB · 3 pagesText searchable
Download 2-CTMTR17 PAF_Redacted.pdfRead the text of 2-CTMTR17 PAF_Redacted.pdf
2-CTFT2021 PAF_Redacted.pdf
PDF · 512 KB · 3 pagesText searchable
Download 2-CTFT2021 PAF_Redacted.pdfRead the text of 2-CTFT2021 PAF_Redacted.pdf
2-CTFT2020 PAF_Redacted.pdf
PDF · 371 KB · 3 pagesText searchable
Download 2-CTFT2020 PAF_Redacted.pdfRead the text of 2-CTFT2020 PAF_Redacted.pdf
2-CTEDVH21 PAF_Redacted.pdf
PDF · 396 KB · 5 pagesText searchable
Download 2-CTEDVH21 PAF_Redacted.pdfRead the text of 2-CTEDVH21 PAF_Redacted.pdf
2-CTEDVH20 PAF_Redacted.pdf
PDF · 406 KB · 5 pagesText searchable
Download 2-CTEDVH20 PAF_Redacted.pdfRead the text of 2-CTEDVH20 PAF_Redacted.pdf
2-CSTMER 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-CSTMER 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER 2020 Capital Book CL & P Approved Plan.pdf
2-CSTMER 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-CSTMER 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER 2019 Capital Book CL & P Approved Plan.pdf
2-CSTMER 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-CSTMER 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER 2018 Capital Book CL & P Approved Plan.pdf
2-CSTMER 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-CSTMER 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER 2017 Capital Book CL & P Approved Plan.pdf
2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdf
2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdf
2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdf
2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdf
2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdf
2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdf
2-CD00412 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-CD00412 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-CD00412 2020 Capital Book CL & P Approved Plan.pdf
2-CD00412 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-CD00412 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-CD00412 2019 Capital Book CL & P Approved Plan.pdf
2-CD00412 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-CD00412 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-CD00412 2017 Capital Book CL & P Approved Plan.pdf
2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdfRead the text of 2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdf
2a-CTTRN21 PAF Support.pdf
PDF · 19 KB · 1 pageNo text in this file
2-495802 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-495802 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-495802 2021 Capital Book CL & P Approved Plan.pdf
2-495802 2020 Capital Book CL & P Approved Plan.pdf
PDF · 167 KB · 2 pagesText searchable
Download 2-495802 2020 Capital Book CL & P Approved Plan.pdfRead the text of 2-495802 2020 Capital Book CL & P Approved Plan.pdf
2-495802 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-495802 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-495802 2019 Capital Book CL & P Approved Plan.pdf
2-495802 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-495802 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-495802 2018 Capital Book CL & P Approved Plan.pdf
2-201435 2019 Capital Book CL & P Approved Plan.pdf
PDF · 137 KB · 2 pagesText searchable
Download 2-201435 2019 Capital Book CL & P Approved Plan.pdfRead the text of 2-201435 2019 Capital Book CL & P Approved Plan.pdf
2-201435 2018 Capital Book CL & P Approved Plan.pdf
PDF · 133 KB · 2 pagesText searchable
Download 2-201435 2018 Capital Book CL & P Approved Plan.pdfRead the text of 2-201435 2018 Capital Book CL & P Approved Plan.pdf
2-201435 2017 Capital Book CL & P Approved Plan.pdf
PDF · 397 KB · 2 pagesText searchable
Download 2-201435 2017 Capital Book CL & P Approved Plan.pdfRead the text of 2-201435 2017 Capital Book CL & P Approved Plan.pdf
2-103353 2021 Capital Book CL & P Approved Plan.pdf
PDF · 222 KB · 2 pagesText searchable
Download 2-103353 2021 Capital Book CL & P Approved Plan.pdfRead the text of 2-103353 2021 Capital Book CL & P Approved Plan.pdf
3-DT7C 2020 Variance Letter_Redacted.pdf
PDF · 242 KB · 4 pagesText searchable
Download 3-DT7C 2020 Variance Letter_Redacted.pdfRead the text of 3-DT7C 2020 Variance Letter_Redacted.pdf
401051 2018 Capital Book CL & P Approved Plan.pdf
PDF · 335 KB · 2 pagesText searchable
Download 401051 2018 Capital Book CL & P Approved Plan.pdfRead the text of 401051 2018 Capital Book CL & P Approved Plan.pdf
5-GXTD20 Approval_Redacted.pdf
PDF · 291 KB · 1 pageNo text in this file
5-ETT2016 Approval_Redacted.pdf
PDF · 300 KB · 1 pageNo text in this file
5-CTTRN19 Approval_Redacted.pdf
PDF · 287 KB · 1 pageNo text in this file
5-CTTRN18 Approval_Redacted.pdf
PDF · 280 KB · 1 pageNo text in this file
5-CTMTR19 Approval_Redacted.pdf
PDF · 209 KB · 1 pageNo text in this file
4-LVEHPUR 2019 Variance Letter.pdf
PDF · 266 KB · 4 pagesText searchable
Download 4-LVEHPUR 2019 Variance Letter.pdfRead the text of 4-LVEHPUR 2019 Variance Letter.pdf
4-GXTD20 Approval_Redacted.pdf
PDF · 296 KB · 1 pageNo text in this file
4-ETT2016 Approval_Redacted.pdf
PDF · 295 KB · 1 pageNo text in this file
4-CTTRN19 Approval_Redacted.pdf
PDF · 275 KB · 1 pageNo text in this file
4-CTTRN18 Approval_Redacted.pdf
PDF · 274 KB · 1 pageNo text in this file
4-CTMTR19 Approval_Redacted.pdf
PDF · 204 KB · 1 pageNo text in this file
3-VLT_CORR 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-VLT_CORR 2018 Variance Letter.pdfRead the text of 3-VLT_CORR 2018 Variance Letter.pdf
3-T1DWANA 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-T1DWANA 2020 Variance Letter.pdfRead the text of 3-T1DWANA 2020 Variance Letter.pdf
3-LVEHPUR Approval 2019_Redacted.pdf
PDF · 303 KB · 1 pageNo text in this file
3-LVEHPUR Approval 2018_Redacted.pdf
PDF · 305 KB · 1 pageNo text in this file
3-LVEHPUR Approval 2017_Redacted.pdf
PDF · 340 KB · 1 pageNo text in this file
3-LN_RLBLTY 2019 Variance Letter.pdf
PDF · 266 KB · 4 pagesText searchable
Download 3-LN_RLBLTY 2019 Variance Letter.pdfRead the text of 3-LN_RLBLTY 2019 Variance Letter.pdf
3-LN_RLBLTY 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-LN_RLBLTY 2018 Variance Letter.pdfRead the text of 3-LN_RLBLTY 2018 Variance Letter.pdf
3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdfRead the text of 3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdf
3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdfRead the text of 3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdf
3-LIGHTNG (D7DA24) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-LIGHTNG (D7DA24) 2020 Variance Letter.pdfRead the text of 3-LIGHTNG (D7DA24) 2020 Variance Letter.pdf
3-INSCLMCST 2019 Variance Letter.pdf
PDF · 266 KB · 4 pagesText searchable
Download 3-INSCLMCST 2019 Variance Letter.pdfRead the text of 3-INSCLMCST 2019 Variance Letter.pdf
3-INSCLMCST 2018 Variance Letter.pdf
PDF · 216 KB · 3 pagesText searchable
Download 3-INSCLMCST 2018 Variance Letter.pdfRead the text of 3-INSCLMCST 2018 Variance Letter.pdf
3-INSCLMCST (CTINS24) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-INSCLMCST (CTINS24) 2020 Variance Letter.pdfRead the text of 3-INSCLMCST (CTINS24) 2020 Variance Letter.pdf
3-GXTD21 Approval_Redacted.pdf
PDF · 294 KB · 1 pageNo text in this file
3-GXTD20 Supplemental_Redacted.pdf
PDF · 841 KB · 7 pagesText searchable
Download 3-GXTD20 Supplemental_Redacted.pdfRead the text of 3-GXTD20 Supplemental_Redacted.pdf
3-GXTD19 Approval_Redacted.pdf
PDF · 294 KB · 1 pageNo text in this file
3-GXENG Approval_Redacted.pdf
PDF · 139 KB · 1 pageNo text in this file
3-GECNCLP Approval 2021_Redacted.pdf
PDF · 211 KB · 1 pageNo text in this file
3-ETTCF21 Approval_Redacted.pdf
PDF · 296 KB · 1 pageNo text in this file
3-ETTCF20 Approval_Redacted.pdf
PDF · 295 KB · 1 pageNo text in this file
3-ETTCF19 Approval_Redacted.pdf
PDF · 296 KB · 1 pageNo text in this file
3-ETTCF18 Approval_Redacted.pdf
PDF · 287 KB · 1 pageNo text in this file
3-ETTCF17 Approval_Redacted.pdf
PDF · 287 KB · 1 pageNo text in this file
3-ETT2017 Approval_Redacted.pdf
PDF · 300 KB · 1 pageNo text in this file
3-ETT2016 Supplemental_Redacted.pdf
PDF · 333 KB · 3 pagesText searchable
Download 3-ETT2016 Supplemental_Redacted.pdfRead the text of 3-ETT2016 Supplemental_Redacted.pdf
3-ETR2021 Approval_Redacted.pdf
PDF · 205 KB · 1 pageNo text in this file
3-ETR2020 Approval_Redacted.pdf
PDF · 309 KB · 1 pageNo text in this file
3-ETR2019 Approval_Redacted.pdf
PDF · 310 KB · 1 pageNo text in this file
3-ETR2018 Approval_Redacted.pdf
PDF · 294 KB · 1 pageNo text in this file
3-EMRGNTLN 2019 Variance Letter.pdf
PDF · 266 KB · 4 pagesText searchable
Download 3-EMRGNTLN 2019 Variance Letter.pdfRead the text of 3-EMRGNTLN 2019 Variance Letter.pdf
3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdf
PDF · 243 KB · 4 pagesText searchable
Download 3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdfRead the text of 3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdf
468601 2018 Capital Book CL & P Approved Plan.pdf
PDF · 335 KB · 2 pagesText searchable
Download 468601 2018 Capital Book CL & P Approved Plan.pdfRead the text of 468601 2018 Capital Book CL & P Approved Plan.pdf
Text of 2-103353 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-103353 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-102118 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-102118 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-102118 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-19733 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-18742 PAF_Redacted.pdf
Extracted from the file · 6 pages, 4 without text · 4,386 characters
Text of 2-2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 3 pages · 3,164 characters
Text of 2- CD00412 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 18 pages, 9 without text · 16,578 characters
Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 22 pages, 6 without text · 36,839 characters
Text of 1-LVEHPUR CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 2,242 characters
Text of 1-LVEHPUR CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 7 pages, 2 without text · 6,091 characters
Text of 1-LVEHPUR CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 8,295 characters
Text of 1-LVEHPUR CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 9 pages, 3 without text · 9,731 characters
Text of 1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 204 pages, 45 without text · 359,550 characters
Text of 1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 199 pages, 36 without text · 342,307 characters
Text of 1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 244 pages, 37 without text · 504,097 characters
Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 113 pages, 24 without text · 204,528 characters
Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 92 pages, 30 without text · 145,347 characters
Text of 1-LN_RELO CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 86 pages, 17 without text · 150,597 characters
Text of 1-LN_RELO CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 94 pages, 17 without text · 174,937 characters
Text of 1-LN_RELO CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 102 pages, 21 without text · 189,243 characters
Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 82 pages, 25 without text · 98,054 characters
Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 91 pages, 39 without text · 91,868 characters
Text of 1-LIGHTNG CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 670 pages, 32 without text · 1,396,582 characters
Text of 1-LIGHTNG CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 595 pages, 67 without text · 1,124,319 characters
Text of 1-LIGHTNG CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 417 pages, 103 without text · 603,838 characters
Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 293 pages, 48 without text · 458,489 characters
Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 461 pages, 83 without text · 704,276 characters
Text of 1-IT1DWANA CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 8 pages, 4 without text · 4,914 characters
Text of 1-IT1DWANA CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 10 pages, 4 without text · 7,148 characters
Text of 1-IT1DWANA CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 12 pages, 4 without text · 13,903 characters
Text of 1-INSCLMCST CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 505 pages, 94 without text · 636,387 characters
Text of 1-INSCLMCST CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 575 pages, 33 without text · 1,053,525 characters
Text of 1-INSCLMCST CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 553 pages, 110 without text · 806,786 characters
Page 165 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1N621543 Total 1N621620 1N621620 Total 1N621778 1N621778 Total 1N621809 1N621809 Total 1N621847 1N621847 Total 1N621929 1N621929 Total 1N621930 1N621930 Total 1N621978 1N621978 Total 1N720075 1N720075 Total 1N720078 1N720078 Total 1N720128 1N720128 Total 1N720170 1N720170 Total 1N720171 1N720171 Total 1N720221 1N720221 Total 1N720245 1N720245 Total 1N720251 1N720251 Total 1N720422 Description 0 POLE, SYP, 40 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600V, #2 AAC CONDUCTOR, #2 6201 ALLOY NEUTRAL, SHRIMP/XLP, 300' COIL, NSTAR CAT ID 8815 POLE, STREETLIGHT, FIBERGLASS-ROUND, 18 FT LG, BLACK, F/ POST TOP LUM LUMINAIRE, METAL HALIDE, POST TOP TRADITIONAL, 120 V WITH GROUNDED NEUTRAL, 175 W, AUTO-REGULATOR BALLAST POLE, SYP, 40 FT, CL 2, CCA COVER, HANDHOLE, FIBERGLASS, 42 IN DIA, EXTENSION, VAULT OR HANDHOLE, 36 IN ID/42 IN OD, 4 IN H, EACH SEGMENT IS 1/2 CIRCLE, CONCRETE PRECAST BRACKET, LUMINAIRE, STREET LIGHT, FOR AL OR FIBERGLASS POLE, ALUMINUM, 2INX8FT, TRUSSED POLE, STREETLIGHT, AL, 30 FT LENGTH, SINGLE BRACKET FITTING, W/ 1/2" X 13 TAPPED HOLE FOR GROUND, ANCHOR BASE, RATED FOR 90 MPH WIND PER SPC LUMINAIRE, HPS, HORIZONTAL, CUTOFF, 120 V, 400 W, REGULATED BALLAST, FLAT GLASS LENS POLE, SYP, 40 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD BRACKET, CUTOUT OR TERM CBL & ARRESTER 3 PHASE, FIBERGLASS W/ ALUM OR DUCTILE IRON END FITTINGS, W/ CAPTIVE BOLTS, 12 INCH W, 48 INCH L CONNECTOR, ELBOW, LOADBREAK, AL, #1 STR AWG, 175 MIL, 0.705 - 0.765 IN, 15 KV, 200 AMP BRACKET, LUMINAIRE, STREET LIGHT, WOOD POLE MOUNTING, GALV STEEL WITH GROUND LUG, 1-1/4INX8FT, SINGLE GUY, ANSI C136.13 CLASS D RATING BRACKET, CABLE, TERMINATOR MOUNTING, ALUM, 0.75 THRU 3.00 IN D CABLE CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 40, BELLED ONE END CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 80, BELLED ONE END LUMINAIRE, HPS, HORIZONTAL, CUTOFF, 120 V, 100 W, 9500 LUM, NPF REACTOR, TY2 TERMINATOR, CABLE, INDOOR/OUTDOOR, #2-4/0 AL/CPR, .637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG CROSSARM, DOUGLAS FIR, WOOD, 10 FT, 3-1/2 X 4-1/2 IN, 8 PIN, PHASED OUT , TO BE USED FOR POLE BRACING ONLY. USE S/C 459372 POLE, SYP, 40 FT, CL 2, CCA LUMINAIRE, HPS, HORIZONTAL, CUTOFF, 120 V, 70 W, 6300 L, NPF REACTOR, TY2 POLE, SYP, 40 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET POLE, SYP, 45 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 1, CCA POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, SYP, 35 FT, CL 2, CCA BRACKET, LUMINAIRE, STREET LIGHT, WOOD POLE MOUNTING, GALV STEEL WITH GROUND LUG, 1-1/4INX8FT, SINGLE GUY, ANSI C136.13 CLASS D RATING LUMINAIRE, HPS ROADWAY, HORIZONTAL, CUTOFF, 120 V, 250 W, 27500 LUM, AUTOREGULATED, TY3 CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET LUMINAIRE, HPS ROADWAY, HORIZONTAL, CUTOFF, 120 V, 250 W, 27500 LUM, AUTOREGULATED, TY3 BRACKET, LUMINAIRE, STREET LIGHT, FOR AL OR FIBERGLASS POLE, ALUMINUM, 2INX8FT, TRUSSED POLE, STREETLIGHT, AL, 30 FT LENGTH, SINGLE BRACKET FITTING, W/ 1/2" X 13 TAPPED HOLE FOR GROUND, ANCHOR BASE, RATED FOR 90 MPH WIND PER SPC BASE, MOUNTING, STREET LIGHT, STANDARD, PRECAST CONCRETE, SPEC B159 1N720422 Total 1N720427 0 0 CROSSARM, DOUGLAS FIR, WOOD, 10 FT, 3-1/2 X 4-1/2 IN, 8 PIN, PHASED OUT , TO BE USED FOR POLE BRACING ONLY. USE S/C 459372 1N720427 Total Values Sum of Quantity Sum of Amount $0.27 $383.89 $50.43 $434.32 -$211.54 $23.85 -$187.69 $137.28 $138.07 $275.35 $383.89 $383.89 $173.48 $113.42 $286.90 $262.52 $910.83 $157.57 $1,330.92 $382.81 $382.81 $151.32 $133.32 $135.13 $48.53 $67.34 $37.26 $19.39 $15.35 $57.42 $80.31 $36.23 $781.60 $374.18 $83.80 $457.98 $381.90 $381.90 $70.65 $483.17 $553.82 $70.89 $539.13 $610.02 $473.37 $473.37 $305.09 $93.73 $119.01 $517.83 $96.27 $96.27 $116.41 $269.63 $775.10 $0.00 $1,161.14 -$15.36 $101.69 $86.33Page 166 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1N720459 1N720459 Total 1N720479 1N720479 Total 1N720618 1N720618 Total 1N720620 Description CROSSARM, FIBERGLASS, 5FT - 7 IN TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 25 EA/ PALLET POLE, SYP, 40 FT, CL 2, CCA Values Sum of Quantity POLE, SYP, 40 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 2, CCA ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD TERMINATOR, CABLE, INDOOR/OUTDOOR, #2-4/0 AL/CPR, .637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG CABLE, INSULATED, UG, EPR, 15KV, AL, 4/0, 4CT JKT, P/O THEN SWITCH TO S/C 463919 CONNECTOR, COMPRESSION, TERMINAL, PIN, AL, 4/O, 4.5 IN LG, 1.13 IN OD SPLICE, INSULATED, STRAIGHT, COLD SHRINK, MAX., MIN. INSULATION D OF 0.75", 15 OR 25 KV, SEE D202 (D PANEL) FOR DESCRIPTION OF CABLE SIZE R 1N720620 Total 1N720629 0 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET 1N720629 Total 1N720632 1N720632 Total 1N720669 1N720669 Total 1N720692 1N720692 Total 1N720703 POLE, SYP, 40 FT, CL 2, CCA POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, SYP, 40 FT, CL 2, CCA 0 POLE, SYP, 35 FT, CL 2, CCA POLE, UTILITY, 35 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED 1N720703 Total 1N720739 1N720739 Total 1N720770 1N720770 Total 1N720822 1N720822 Total 1N720833 1N720833 Total 1N720847 1N720847 Total 1N720868 1N720868 Total 1N720910 1N720910 Total 1N720935 1N720935 Total 1N720944 1N720944 Total 1N720994 0 POLE, SYP, 40 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 40 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, FIBERGLASS, 10 FT LG, 3 5/8 IN X 4 5/8 IN, W/ALLEY ARM BRACE, FULL PALLET QUANTITY OF 20 EACH - DEPLETE WOOD SC 174445 POLE, SYP, 40 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN BRACKET, LUMINAIRE, STREET LIGHT, WOOD POLE MOUNTING, GALV STEEL WITH GROUND LUG, 1-1/4INX8FT, SINGLE GUY, ANSI C136.13 CLASS D RATING LUMINAIRE, HPS, HORIZONTAL, CUTOFF, 120 V, 70 W, 6300 L, NPF REACTOR, TY2 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS CROSSARM, FIBERGLASS, 5FT - 7 IN TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 25 EA/ PALLET POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS, PHASE OUT - USE 24" (180800) IN NH POLE, SYP, 40 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN POLE, SYP, 35 FT, CL 2, CCA POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB SPACER,CABLE, 46 KV, W/ CONDUCTOR CLAMPS, POLYETHYLENE, MFR: HENDRIX Sum of Amount $77.98 $377.32 $455.30 $377.32 $377.32 $71.13 $495.17 $566.30 $66.29 $111.82 $4,135.65 $22.37 $412.49 $4,748.62 -$24.89 $283.50 $490.69 $110.09 $859.39 $381.33 $381.33 -$362.79 -$71.56 -$434.35 $375.42 $375.42 $0.00 $304.31 -$297.41 $6.90 $376.04 $376.04 $71.12 $380.44 $24.79 $476.35 $65.57 $65.57 $269.56 $269.56 $380.59 $24.79 $93.88 $86.98 $586.24 $70.62 $78.10 $148.72 -$362.79 $70.21 $25.28 $762.38 $24.74 $519.82 $306.60 $306.60 $362.79 $362.79 $25.42 $28.04Page 167 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1N720994 1N720994 Total 1N721071 1N721071 Total 1N721159 1N721159 Total 1N721164 1N721164 Total 1N721335 1N721335 Total 1N721339 1N721339 Total 1N721429 1N721429 Total 1N721431 1N721431 Total 1N721445 1N721445 Total 1N721446 1N721446 Total 1N721468 1N721468 Total 1N721487 1N721487 Total 1N721506 1N721506 Total 1N721542 1N721542 Total 1N721544 1N721544 Total 1N721591 Description POLE, 50 FT LG, CLASS 1, SOUTHREN YELLOW PINE, CCA TREATED BRACKET,LUMINAIRE, SINGLE GUY, 1-1/4 IN X 6 FT, STEEL, GALV, ANSI C136.13 CLASS D RATING, W/ GROUND LUMINAIRE, HPS, HORIZONTAL, 120 V, 70 W, 5800 LUMINOUS, NPF REACTOR, W/ CUTOFF, TYPE 2 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB POLE, 50 FT LG, CLASS 1, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET AND HARDWARE, CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, ARRESTER,SURGE, ELBOW, LOADBREAK, 13.2 KV AND 13.8 KV MGY SYSTEM VOLTAGE, 12 KV ARRESTER RATING, 10. CABLE, INSULATED, 4CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 60 IN DIA CABLE, BARE, ANNEALED, #2 AWG, 7 STR, SOFT DRAWN CU POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CONNECTOR,ELBOW, LOADBREAK, 15 KV, 200 A, #1 AWG STRANDED, 175 KCMIL, 0.705-0.765 IN CABLE DIA, AL CABLE, INSULATED, UG, 1/C, #1 AWG, 15 KV, EPR INSULATED, LLDPE JACKET, AL ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 4/0 TO 350 STR, STRAIGHT, 15 KV, INSULATED, FOR 3/C PLI SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.96 IN, MAX JACKET DIA 1.81 IN, STRAIGHT, 15/25/ CABLE, INSULATED, UG, 4CT, 4/0 AWG, 15 KV, EPR INSULATED, JACKETED, CU SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.75 IN, MAX JACKET DIA 1.34 IN, STRAIGHT, 15/25 1N721591 Total 1N721604 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED MOUNT,CLUSTER, TRANSFORMER, MEDIUM, 5/8 X 2-1/2 IN, 37.5-167 KVA, AL, W/ SIX - SQ.HD. BOLTS, HEX NUT CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 1N721604 Total 1N721651 POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED Values Sum of Quantity Sum of Amount $629.40 $70.83 $97.75 $851.44 $71.56 $71.56 $25.42 $630.57 $655.99 $198.81 $443.31 $25.42 $196.57 $191.76 $1,055.87 $19.09 $19.09 $196.71 $196.71 $65.90 $443.79 $24.90 $113.81 $648.40 $75.96 $75.96 $173.87 $544.44 $11.83 $730.14 $716.52 $25.78 $131.80 $874.10 $42.63 $317.99 $360.62 $25.97 $388.83 $414.80 $345.40 $345.40 $358.26 $66.27 $424.53 $345.40 $66.27 $411.67 $1,219.33 $720.31 $2,417.38 $429.09 $4,786.11 -$243.66 $197.71 $444.27 $174.99 $113.81 $687.12 $444.27Page 168 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1N721651 Total 1N721658 1N721658 Total 1N721668 1N721668 Total 1N721742 1N721742 Total 1N721760 1N721760 Total 1N721777 1N721777 Total 1N721809 1N721809 Total 1N721810 1N721810 Total 1N721841 1N721841 Total 1N721851 1N721851 Total 1S521396 1S521396 Total 1S620192 1S620192 Total 1S620998 Description Values Sum of Quantity POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, UTILITY, 35 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CROSSARM, 3 5/8 IN X 4 5/8 IN, 8 FT LG, FIBERGLASS, FOR ALLEY ARM CONSTRUCTION, 20 EA/FULL PALLET 0 POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 0 POLE, SYP, 45 FT, CL 2, CCA 0 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS, PHASE OUT - USE 24" (180800) IN NH BRACKET, CABLE, TERMINATOR MOUNTING, ALUM, 0.75 THRU 3.00 IN D CABLE CABLE, INSULATED, UG, EPR, 15KV, AL, #1, STR, 1/C JKT, P/O THEN SWITCH TO S/C 463861 TERMINATOR, CABLE, INDOOR/OUTDOOR, #2-4/0 AL/CPR, .637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG CROSSARM, FIBERGLASS, 10 FT LG, 3 5/8 IN X 4 5/8 IN, W/ALLEY ARM BRACE, FULL PALLET QUANTITY OF 20 EACH - DEPLETE WOOD SC 174445 CROSSARM, FIBERGLASS, 8 FT LG, 3 5/8 IN X 4 5/8 IN, W/ALLEY ARM BRACE, FULL PALLET QUANTITY OF 20 EACH 1S620998 Total 1S621154 1S621154 Total 1S621160 1S621160 Total 1S621166 1S621166 Total 1S621243 1S621243 Total 1S621386 1S621386 Total 1S621465 HANDHOLE, SPLICING, CONCRETE POLYMER, 36 IN W, 72 IN L, 36 IN D, "ELECTRIC" LOGO 0 0 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CROSSARM, DOUGLAS FIR, WOOD, 10 FT, 3-1/2 X 4-1/2 IN, 8 PIN, PHASED OUT , TO BE USED FOR POLE BRACING ONLY. USE S/C 459372 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD POLE, SYP, 45 FT, CL 2, CCA BRACKET, CABLE, TERMINATOR MOUNTING, ALUM, 0.75 THRU 3.00 IN D CABLE CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS POLE, SYP, 45 FT, CL 2, CCA Sum of Amount $444.27 $444.27 $444.27 $282.19 $282.19 $345.40 $67.04 $412.44 $169.40 $157.57 $160.86 $487.83 $345.40 $67.04 $888.54 $25.97 $1,326.95 $0.00 $444.27 $236.55 $680.82 $345.40 $345.40 $345.40 $345.40 $52.80 $52.80 $3.13 $3.13 $426.28 $426.28 -$57.46 $70.83 $61.46 $25.15 $17.38 $81.68 $37.23 $538.41 $237.40 $1,012.08 $2,595.81 $2,595.81 $3.45 $3.45 $69.76 $480.07 $109.01 $50.84 $709.68 $209.50 $186.41 $488.50 $51.82 $936.23 $70.56 $109.91 $24.93 $205.40 -$476.97Page 169 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1S621465 1S621465 Total 1S621484 1S621484 Total 1S621529 1S621529 Total 1S621578 1S621578 Total 1S720007 1S720007 Total 1S720016 1S720016 Total 1S720017 1S720017 Total 1S720023 1S720023 Total 1S720034 1S720034 Total 1S720094 1S720094 Total 1S720106 1S720106 Total 1S720165 1S720165 Total 1S720171 1S720171 Total 1S720188 1S720188 Total 1S720199 1S720199 Total 1S720200 1S720200 Total 1S720201 1S720201 Total 1S720206 Description POLE, SYP, 45 FT, CL 1, CCA Values Sum of Quantity 0 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD POLE, SYP, 45 FT, CL 2, CCA ARRESTER, SURGE, 13.2 KV AND 13.8 KV MGY SYSTEM VOLTAGE, 12 KV ARRESTER RATING, 10.2 KV MCOV, ELBOW, LOADBREAK CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 40, BELLED ONE END CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 80, BELLED ONE END CABLE, INSULATED, UG, 3PH, EPR, 15KV, AL, #1, STR, 4CT JKT, P/O THEN SWITCH TO S/C 463918 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600V, #2 AAC CONDUCTOR, #2 6201 ALLOY NEUTRAL, SHRIMP/XLP, 500' COIL, NSTAR CAT ID 8815 CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600 V, AAC, 1/0, 7-STR, TRIPLEX WITH 1/0 7-STR ALLOY NEUT., GAMMARUS / XLP, REEL, NSTAR #72 POLE, SYP, 45 FT, CL 2, CCA CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600V, #2 AAC CONDUCTOR, #2 6201 ALLOY NEUTRAL, SHRIMP/XLP, 500' COIL, NSTAR CAT ID 8815 CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET POLE, SYP, 45 FT, CL 2, CCA CONNECTOR, STUD, FOR SWITCHES & DISCONNECTS, COPPER BRONZE, TIN PLATED, 600 AMP, 2 HOLE NEMA PAD SWITCH, DISCONNECT, OUTDOOR, AIR, 25 KV, 600A, LOADBUSTER, VERTICAL, 40 KA MOMENTARY, 1 PH, 125 KVBIL POLE, SYP, 40 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET POLE, SYP, 40 FT, CL 2, CCA POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT LG, 3 5/8 IN X 4 5/8 IN, W/ALLEY ARM BRACE, FULL PALLET QUANTITY OF 20 EACH - DEPLETE WOOD SC 174445 0 POLE, SYP, 45 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS, PHASE OUT - USE 24" (180800) IN NH POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CLEVIS, EYE 90 DEGREE, COTTER KEY TO HAVE 1-3/8 IN OVERALL LENGTH, 5/8 IN PIN, 1/2 IN TONGUE CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600V, #2 AAC CONDUCTOR, #2 6201 ALLOY NEUTRAL, SHRIMP/XLP, 500' COIL, NSTAR CAT ID 8815 CONDUIT, ELECTRICAL, PVC, 3 IN, 10 FT LG, SCH 80, 2.900 ID CONDUIT, ELECTRICAL, PVC, 3 IN, 10 FT, SCHEDULE 40, BELLED ONE END CABLE, INSULATED, AERIAL, XLPE, 600, AAC, #6, 7 STR, DUPLEX, PARALLEL LAY, BARE #6 7 STR ALLOY NEUTRAL, VIZSLA/XLP CABLE, INSULATED, DB, XLP, 600V, AL, 1/0 AWG, STR, 4CT, #2 AWG NEUTRAL, NOTRE DAME, 60 IN DIA X 40 IN WIDTH REEL 0 CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET POLE, SYP, 45 FT, CL 1, CCA POLE, SYP, 35 FT, CL 2, CCA BRACE, ALLEY ARM W/11/16 IN MOUNTING HOLES, WOOD, 8 FT 6 IN, P/O THEN SWITCH TO S/C 460432 POLE, SYP, 45 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 14 IN 0 0 Sum of Amount $532.96 $55.99 $211.72 $186.91 $488.50 $180.62 $28.33 $22.65 $472.24 $1,590.97 $212.07 $212.07 $53.09 $53.09 $219.83 $219.83 $69.99 $100.22 $491.91 $662.12 $27.59 $27.59 $92.37 $488.48 $30.69 $449.68 $1,061.22 $381.62 $109.93 $491.55 $15.18 $485.20 $268.69 $769.07 $479.18 $24.89 $218.20 $722.27 $67.83 $48.02 $484.17 $105.52 $29.23 $734.77 $42.35 $14.55 $20.37 $77.27 $17.89 $2.45 $20.34 $218.02 $531.12 $749.14 $302.71 $302.71 $11.49 $11.49 $495.37 $42.29Page 170 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1S720206 1S720206 Total 1S720264 1S720264 Total 1S720284 1S720284 Total 1S720321 Description NUT, ANCHOR ROD, SQ, GALVANIZED, F/ 1 IN BOLT ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET POLE, SYP, 45 FT, CL 2, CCA POLE, SYP, 45 FT, CL 2, CCA ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN 1S720321 Total 1S720331 0 POLE, SYP, 35 FT, CL 2, CCA POLE, SYP, 45 FT, CL 2, CCA 1S720331 Total 1S720388 1S720463 Total 1S720464 1S720464 Total 1S720470 1S720470 Total 1S720474 1S720474 Total 1S720531 1S720531 Total 1S720532 1S720532 Total 1S720547 0 0 CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS, 54 EACH PER PALLET ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD BRACKET, CUTOUT OR TERM CBL & ARRESTER 3 PHASE, FIBERGLASS W/ ALUM OR DUCTILE IRON END FITTINGS, W/ CAPTIVE BOLTS, 12 INCH W, 48 INCH L POLE, SYP, 45 FT, CL 2, CCA BRACKET, CABLE, TERMINATOR MOUNTING, ALUM, 0.75 THRU 3.00 IN D CABLE CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET TERMINATOR, CABLE, INDOOR/OUTDOOR, #2-4/0 AL/CPR, .637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG 1S720388 Total 1S720463 Values Sum of Quantity CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS, PHASE OUT - USE 24" (180800) IN NH POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS BRACKET, CUTOUT & ARRESTER / FIBERGLASS 12 IN, FERR / ALUM FITTINGS W/ MOUNTING BOLTS, PHASE OUT - USE 24" (180800) IN NH POLE, SYP, 40 FT, CL 2, CCA BRACKET, LUMINAIRE, STREET LIGHT, WOOD POLE MOUNTING, GALV STL W/GRND LUG, 1-1/4 IN X 6 FT, SINGLE GUY, ANSI C136.13 CLASS D RATING LUMINAIRE, HPS, HORIZONTAL, CUTOFF, 120 V, 50 W, 4000 L, NPF REACTOR, TY2 CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 2, CCA POLE, SYP, 45 FT, CL 2, CCA BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD POLE, SYP, 45 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD CONDUIT, ELECTRICAL, PVC, 3 IN, 10 FT LG, SCH 80, 2.900 ID CONDUIT, ELECTRICAL, PVC, 3 IN, 10 FT, SCHEDULE 40, BELLED ONE END BRACKET, CUTOUT OR TERM CBL & ARRESTER 3 PHASE, FIBERGLASS W/ ALUM OR DUCTILE IRON END FITTINGS, W/ CAPTIVE BOLTS, 12 INCH W, 48 INCH L CONNECTOR, ELBOW, LOADBREAK, AL, #1 STR AWG, 175 MIL, 0.705 - 0.765 IN, 15 KV, 200 AMP BRACKET, CABLE, TERMINATOR MOUNTING, ALUM, 0.75 THRU 3.00 IN D CABLE ARRESTER, SURGE, 13.2 KV AND 13.8 KV MGY SYSTEM VOLTAGE, 12 KV ARRESTER RATING, 10.2 KV MCOV, ELBOW, LOADBREAK CABLE, INSULATED, UG, EPR, 15KV, AL, #1, 3-1/C, LLDPE JKT, P/O 177698 TERMINATOR, CABLE, INDOOR/OUTDOOR, #2-4/0 AL/CPR, .637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG BUSHING, ELECTRICAL, LOADBREAK CONNECTOR, 15 KV, 200A 0 Sum of Amount $3.16 $540.82 $62.26 $62.26 $96.31 $484.43 $580.74 $484.17 $24.86 $509.03 -$13.30 $298.35 $18.92 $303.97 $9.96 $157.57 $139.03 $69.90 $14.37 $38.70 $81.59 $83.14 $594.26 $71.08 $25.35 $486.22 $109.07 $691.72 $67.84 $23.90 $377.92 $67.44 $79.73 $616.83 $96.31 $70.29 $484.16 $650.76 $483.35 $483.35 $23.90 $457.40 $61.19 $97.62 $640.11 $212.46 $184.70 $489.99 $887.15 $212.21 $184.17 $14.62 $20.40 $93.20 $66.54 $52.14 $179.37 $582.65 $111.68 $62.40Page 171 of 491
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 172 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1S721592 Description CABLE, INSULATED, UG, 4CT, 500 KCMIL, 15 KV, EPR INSULATED, JACKETED, CU, P/O USE CAT ID # 463848 FO CABLE, INSULATED, UG, 4CT, 4/0 AWG, 15 KV, EPR INSULATED, JACKETED, AL ADAPTER,CABLE, STRESS RELIEF, 15/25 KV, 500/350 KCMIL, 1.09-1.31 IN CABLE DIA, CONDUCTOR: CU/AL CONNECTOR,COMPRESSION, TERMINAL, 500 KCMIL KR, 15/25/30/35 KV, 600 A, CONDUCTOR: CU, FOR ELBOW SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.96 IN, MAX JACKET DIA 1.81 IN, STRAIGHT, 15/25/ SPLICE,ELECTRICAL, HIGH VOLTAGE/TAPERED SLEEVE, 1000 TO 700 COMPACT ROUND KR, KS/STR, 6 IN LG, COMPR 1S721592 Total 1S721628 Values Sum of Quantity 0 0 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 1S721628 Total 1S721646 1S721646 Total 1S721723 1S721723 Total 1S721724 1S721724 Total 1S721740 1S721740 Total 1S721745 1S721745 Total 1S721748 1S721748 Total 1S721749 1S721749 Total 1S721754 1S721754 Total 1S721763 POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 CROSSARM, 3-1/2 X 4-1/2 IN, 10 FT LG , DOUGLAS FIR, WOOD, P/O SWITCH TO S/C 459372 POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED FOAM, FROTH-PAK, 1 CU FT YIELD, 2-COMPONENT POLYURETHANE, SELF-CONTAINED KIT, PORTABLE, DISPENSING S CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END CONDUIT,ELECTRICAL, 4 IN DIA, 10 FT LG, PVC, SCH 80, ONE BELLED END CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END LUMINAIRE, HPS, HORIZONTAL, 120 V, 70 W, 5800 LUMINOUS, NPF REACTOR, W/ CUTOFF, TYPE 2 TO CORRECT INVENTORY ISSUES AT ZERO DOLLARS 0 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 BRACKET, CUTOUT AND ARRESTER, 12 IN W, 48 IN LG, FIBERGLASS, W/ ALUMINIUM OR DUCTILE IRON END FITTI CABLE, INSULATED, UG, 3-1/C, #1 AWG, 15 KV, EPR INSULATED, LLDPE JACKET, AL, P/O 177698 CONNECTOR,ELBOW, LOADBREAK, 15 KV, 200 A, #1 AWG STRANDED, 175 KCMIL, 0.705-0.765 IN CABLE DIA, AL HANDHOLE, SPLICING, 72 IN LG, 36 IN W, 36 IN DP, CONCRETE POLYMER, W/ ELECTRIC LOGO CONDUIT,ELECTRICAL, 4 IN DIA, 10 FT LG, PVC, SCH 80, ONE BELLED END CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END COVER,HANDHOLE, 42 IN DIA, FIBERGLASS POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA COMPOUND,SWEEPING, OIL BASE, 50 LB CONTAINER 0 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA TO CORRECT INVENTORY ISSUES AT ZERO DOLLARS ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB SWITCH,DISCONNECT, 600 A, 40 KA MOM , 25 KV, 125 KV BIL , 1 PH, AIR, VERTICAL MOUNT, W/ LOADBUSTER H BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE FITTING,SIDEWALK GUY, CLAMP END, 2-1/2 IN, STEEL, GALV CONNECTOR,STUD, 2 HOLE NEMA PAD, 600 A, CU BRONZE, FOR SWITCHES AND DISCONNECTS, FINISH: TIN PLATED SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 1.36 IN, MAX JACKET DIA 2.44 IN, STRAIGHT, 15/25/ TERMINATOR,CABLE, 750 KCMIL, 1000 KCMIL, 1.08 - 1.80 IN CABLE DIA, W/O PIN TAP OR LUG, AL/CU, AL, FO ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI 0 Sum of Amount $3,634.08 $0.00 $61.85 $55.11 $705.80 $112.87 $4,569.71 -$0.01 $87.45 $89.11 $176.55 $481.62 $218.20 $103.46 $803.28 $349.11 $112.93 $74.40 $42.26 $14.43 $85.09 $15.57 $693.79 $179.90 $51.61 $184.16 $90.25 $376.37 $64.32 $2,778.23 $21.13 $28.87 $180.71 $3,955.55 $368.12 $368.12 $632.11 $0.00 $632.11 $23.18 $23.18 $30.90 $30.90 $143.70 $611.05 $27.74 $160.54 $17.30 $960.33 $24.41 $456.84 $52.64 $10.26 $33.93 $849.97 $241.85 $190.05 $206.15 $109.41 $98.55Page 173 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1S721763 1S721763 Total 1S721883 1S721883 Total 1S721884 1S721884 Total 1S721901 1S721901 Total 1S721907 1S721907 Total 1S721929 1S721929 Total 1S721976 1S721976 Total 1S721978 1S721978 Total 1S721986 1S721986 Total 1S722041 1S722041 Total 1S722043 1S722043 Total 1S722081 1S722081 Total 1S722152 1S722152 Total 1S722193 1S722193 Total 1S722223 1S722223 Total 1S722263 1S722263 Total 1S722292 1S722292 Total 1S722309 1S722309 Total 1S722368 1S722368 Total 1S722409 1S722409 Total Description FITTING,SIDEWALK GUY, POLE END, 2-1/2 IN, STEEL, GALV PIPE, 2-1/2 IN DIA, 10 FT LG, PLAIN ENDS, SCH 40, STEEL, GALV, FOR SIDEWALK GUYS Values Sum of Quantity POLE, UTILITY, 35 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CABLE, INSULATED, AERIAL, AAC, TRIPLEX, 1/0 AWG, 7 STR, 600 V, W/ 1/0 AWG 7 STR ALLOY NEUTRAL, GAMMA POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER BOX, HANDHOLE, 30 IN LG, 17 IN W, 18 IN DP, POLYMER CONCRETE, W/ HEAVY DUTY COVER AND ELECTRIC LOG CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CONDUIT,ELECTRICAL, 4 IN DIA, 10 FT LG, PVC, SCH 80, ONE BELLED END CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB LUMINAIRE, HPS, HORIZONTAL (ROADWAY), 120 V, 250 W, 30000 LUMINOUS, AUTO-REGULATOR, W/ CUTOFF, TYPE BRACKET,LUMINAIRE, SINGLE GUY, 1-1/4 IN X 10 FT, STEEL, GALV, ANSI C136.13 CLASS D RATING, W/ GROUND CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, COVERED, UG, 7/C, 4/0 AWG, 600 V, EPR INSULATED, CU POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED FITTING,SIDEWALK GUY, CLAMP END, 2-1/2 IN, STEEL, GALV FITTING,SIDEWALK GUY, POLE END, 2-1/2 IN, STEEL, GALV BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, 3 5/8 IN X 4 5/8 IN, 8 FT LG, FIBERGLASS, FOR ALLEY ARM CONSTRUCTION, 20 EA/FULL PALLET POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET AND HARDWARE, CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 BEND,CONDUIT, 3 IN , 24 IN RADIUS, PVC, SCH 40, ONE BELLED END, GRAY, 90 DEG 0 Sum of Amount $10.26 $88.94 $2,373.26 $300.45 $300.45 $59.97 $59.97 $60.80 $114.01 $174.81 $368.12 $23.77 $53.12 $445.01 $193.94 $193.94 $76.91 $300.63 $195.24 $21.13 $28.87 $749.36 $0.00 $1,372.14 $446.62 $24.39 $471.01 $114.41 $96.43 $210.84 $52.00 $52.00 $654.45 $654.45 $368.12 $368.12 $4,596.64 $4,596.64 $457.40 $9.46 $10.26 $477.12 $23.87 $66.65 $246.02 $336.54 $457.40 $457.40 $23.83 $65.06 $61.06 $149.95 $349.11 $88.35 $437.46 $193.89 $111.99 $305.88 $10.93 $10.93Page 174 of 491
funding project INSCLMCST Cost Element Category Material month number (blank) accounting work order 1S722428 1S722428 Total 1S722493 1S722493 Total 1S722610 1S722610 Total 2C220248 Description CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET AND HARDWARE, BRACKET, CUTOUT AND ARRESTER, 12 IN W, 48 IN LG, FIBERGLASS, W/ ALUMINIUM OR DUCTILE IRON END FITTI CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 125 KV BIL, W/ LOADBUSTER 2C220248 Total 2C520262 2C520262 Total 2C620156 2C620156 Total 2C620295 2C620295 Total 2C720004 2C720004 Total 2C720019 2C720019 Total 2C720110 2C720110 Total 2C720112 2C720112 Total 2C720181 2C720181 Total 2L221378 2L221378 Total 2L620104 2L620104 Total 2L620382 2L620382 Total 2L620540 2L620540 Total 2L620566 2L620566 Total 2L620991 2L620991 Total 2L621073 2L621073 Total 2L621205 0 0 0 ARRESTER, SURGE, LIGHTNING, DISTRIBUTION CLASS, 12 KV MOV, POLYMER, 10.2 MCOV, W/ANIMAL GUARD & 30 " #4 COV FLEXIBLE GRD LEAD POLE, SYP, 45 FT, CL 2, CCA CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS POLE, SYP, 45 FT, CL 2, CCA POLE, SYP, 40 FT, CL 2, CCA POLE, SYP, 45 FT, CL 2, CCA CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET POLE, SYP, 40 FT, CL 2, CCA BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET 0 0 CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET 0 0 CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CUTOUT, FUSED, OPEN, LOADBUSTER, SILICONE, 25 KV, 150 KV BIL, 100 A, 12 KA IC ASYM, W/LOADBUSTER HOOKS CABLE, INSULATED, AERIAL TRIPLEX, XLP, 600V, #2 AAC CONDUCTOR, #2 6201 ALLOY NEUTRAL, SHRIMP/XLP, 500' COIL, NSTAR CAT ID 8815 CROSSARM, FIBERGLASS, 8 FT TANGENT, 3-5/8 X 4-5/8 IN, CENTER MOUNT BRACKET, 49 EA/PALLET CROSSARM, FIBERGLASS, 10 FT TANGENT, 3-5/8 X 4-5/8 IN, WITH CENTER MOUNT BRACKET, 49 EA/PALLET CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 40, BELLED ONE END CONDUIT, ELECTRICAL, PVC, 4 IN DIA, 10 FT LG, SCH 80, BELLED ONE END CONTROL, RECLOSER, ELECTRONIC, FORM 6, LOOP SCHEME, LOW VOLTAGE CLOSING COIL, SCADA READY RECLOSER, VAC, SOL DIE, SS JBOX, LV COILS, W/MNT RACK, 35' CBL, 18KV LA'S, 3PH, 22.9KV CKTS, 27KV, 800A CONT, 12.5KA, DRSD, 2 EXT SENSORS, 2 CONNECTOR, STUD, FOR SWITCHES & DISCONNECTS, COPPER BRONZE, TIN PLATED, 600 AMP, 2 HOLE NEMA PAD SWITCH, DISCONNECT, OUTDOOR, AIR, 25 KV, 600A, LOADBUSTER, VERTICAL, 40 KA MOMENTARY, 1 PH, 125 KVBIL RECLOSER, VAC, SOL DIEL, SS JBOX, LV COILS, W/MNT RACK, 35' CBL, 18KV LA'S, 3PH, 22.86KV CKTS, 27KV, 800A CONT, 12.5KA, DRSD, 2 EXT SENSORS, 2L621205 Total Values Sum of Quantity 0 0 0 0 Sum of Amount $58.90 $58.90 $466.98 $466.98 $103.25 $103.25 -$68.20 $147.20 $37.05 $0.53 $142.87 $69.71 $22.02 -$304.62 $46.56 $5.27 $5.27 $184.57 $492.65 $677.22 $71.14 $71.14 $488.50 $488.50 $377.40 $377.40 $503.38 $503.38 $96.19 $378.94 $475.13 $25.09 $68.13 $95.88 $189.10 $96.31 $96.31 $1.09 $1.09 $96.31 $96.31 $0.90 $0.90 $219.57 $219.57 $71.03 $71.03 $0.05 $0.05 -$0.01 $96.15 $109.80 $28.30 $22.62 $8,571.79 $741.32 $33.08 $458.66 $17,946.57 $28,008.28
Text of 1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 499 pages · 908,456 characters
Text of 1-GXTD21 CS & Closing Report_Redacted.pdf
Extracted from the file · 21 pages, 5 without text · 26,915 characters
Text of 1-GXTD20 CS & Closing Report_Redacted.pdf
Extracted from the file · 18 pages, 6 without text · 20,865 characters
Text of 1-GXTD19 CS & Closing Report_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 2,908 characters
Text of 1-GXENG CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 1,362 characters
Text of 1-GXCOTRBL CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 4,108 characters
Text of 1-GXCOTRBL CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 4 pages, 3 without text · 1,540 characters
Text of 1-GXCOTRBL CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 4,286 characters
Text of 1-GECNCLP CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 1,165 characters
Text of 1-ETTCF21 CS & Closing Report_Redacted.pdf
Extracted from the file · 31 pages, 6 without text · 38,094 characters
Text of 1-ETTCF20 CS & Closing Report_Redacted.pdf
Extracted from the file · 24 pages, 4 without text · 29,216 characters
Text of 1-ETTCF19 CS & Closing Report_Redacted.pdf
Extracted from the file · 28 pages, 10 without text · 25,052 characters
Text of 1-ETTCF18 CS & Closing Report_Redacted.pdf
Extracted from the file · 21 pages, 5 without text · 24,956 characters
Text of 1-ETTCF17 CS & Closing Report_Redacted.pdf
Extracted from the file · 17 pages, 7 without text · 16,534 characters
Text of 1-ETT2017 CS & Closing Report_Redacted.pdf
Extracted from the file · 102 pages, 10 without text · 92,080 characters
Text of 1-ETT2016 CS & Closing Report_Redacted.pdf
Extracted from the file · 65 pages, 16 without text · 89,859 characters
Text of 1-ETR2021 CS & Closing Report_Redacted.pdf
Extracted from the file · 217 pages, 49 without text · 168,057 characters
Text of 1-ETR2020 CS & Closing Report_Redacted.pdf
Extracted from the file · 217 pages, 46 without text · 171,105 characters
Text of 1-ETR2019 CS & Closing Report_Redacted.pdf
Extracted from the file · 197 pages, 38 without text · 168,113 characters
Text of 1-ETR2018 CS & Closing Report_Redacted.pdf
Extracted from the file · 193 pages, 38 without text · 154,165 characters
Text of 1-EMRGNTLN CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 953 pages, 84 without text · 1,795,343 characters
Text of 1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdf
Extracted from the file · 616 pages, 78 without text · 995,151 characters
Text of 1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdf
Extracted from the file · 750 pages, 103 without text · 1,403,033 characters
Text of 1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdf
Extracted from the file · 528 pages, 195 without text · 635,082 characters
Text of 1-EMRGNTLN CS & Closing Report 2018_Part1_Redacted.pdf
Extracted from the file · 750 pages, 170 without text · 1,187,926 characters
Text of 1-EMRGNTLN CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 1,178 pages, 263 without text · 1,930,158 characters
Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdf
Extracted from the file · 455 pages, 129 without text · 593,721 characters
Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdf
Extracted from the file · 750 pages, 139 without text · 1,267,663 characters
Text of 1-EFO_TLS CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 15 pages, 6 without text · 16,794 characters
Text of 1-EFO_TLS CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 12 pages, 5 without text · 16,453 characters
Text of 1-DT7C CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 1,066 characters
Text of 1-DT7C CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 1,078 characters
Text of 1-DT7C CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 10 pages, 2 without text · 63,534 characters
Text of 1-DSEQ21 CS & Closing Report_Redacted.pdf
Extracted from the file · 46 pages, 17 without text · 44,468 characters
Text of 1-DSEQ20 CS & Closing Report_Redacted.pdf
Extracted from the file · 8 pages, 3 without text · 7,513 characters
Text of 1-DSEQ CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 13 pages, 4 without text · 16,519 characters
Text of 1-DSEQ CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 17 pages, 5 without text · 25,281 characters
Text of 1-DSEQ CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 25 pages, 6 without text · 52,950 characters
Text of 1-DSEQ CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 23 pages, 9 without text · 28,799 characters
Text of 1-DSEQ CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 16 pages, 5 without text · 22,297 characters
Text of 1-DSCN21 CS & Closing Report_Redacted.pdf
Extracted from the file · 55 pages, 12 without text · 61,698 characters
Text of 1-DSCN20 CS & Closing Report_Redacted.pdf
Extracted from the file · 9 pages, 5 without text · 7,519 characters
Text of 1-DSCN CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 18 pages, 5 without text · 22,473 characters
Text of 1-DSCN CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 28 pages, 9 without text · 36,554 characters
Text of 1-DSCN CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 29 pages, 9 without text · 42,697 characters
Text of 1-DB_CABLE CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 203 pages, 66 without text · 307,639 characters
Text of 1-DB_CABLE CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 117 pages, 44 without text · 160,299 characters
Text of 1-DB_CABLE CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 98 pages, 28 without text · 190,517 characters
Text of 1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 201 pages, 45 without text · 276,403 characters
Text of 1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 231 pages, 25 without text · 449,921 characters
Text of 1-CTTRN21 CS & Closing Report_Redacted.pdf
Extracted from the file · 11 pages, 3 without text · 13,105 characters
Text of 1-CTTRN20 CS & Closing Report_Redacted.pdf
Extracted from the file · 6 pages, 3 without text · 4,429 characters
Text of 1-CTTRN19 CS & Closing Report_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 20,761 characters
Text of 1-CTTRN18 CS & Closing Report_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 3,610 characters
Text of 1-CTROW17 CS & Closing Report_Redacted.pdf
Extracted from the file · 15 pages, 3 without text · 12,533 characters
Text of 1-CTRMTR17 CS & Closing Report_Redacted.pdf
Extracted from the file · 6 pages, 3 without text · 8,323 characters
Text of 1-CTMTR21 CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 5 pages, 3 without text · 5,890 characters
Text of 1-CTMTR20 CS & Closing Report_Redacted.pdf
Extracted from the file · 18 pages, 8 without text · 21,352 characters
Text of 1-CTMTR19 CS & Closing Report_Redacted.pdf
Extracted from the file · 6 pages, 4 without text · 6,215 characters
Text of 1-CTMTR18 CS & Closing Report_Redacted.pdf
Extracted from the file · 17 pages, 8 without text · 20,687 characters
Text of 1-CTMTR17 CS & Closing Report_Redacted.pdf
Extracted from the file · 12 pages, 6 without text · 14,369 characters
Text of 1-CTFT2021 CS & Closing Report_Redacted.pdf
Extracted from the file · 9 pages, 3 without text · 9,209 characters
Text of 1-CTFT2020 CS & Closing Report_Redacted.pdf
Extracted from the file · 11 pages, 3 without text · 14,590 characters
Text of 1-CTEDVH21 CS & Closing Report_Redacted.pdf
Extracted from the file · 26 pages, 3 without text · 30,119 characters
Text of 1-CTEDVH20 CS & Closing Report_Redacted.pdf
Extracted from the file · 24 pages, 2 without text · 25,121 characters
Text of 1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdf
Extracted from the file · 656 pages, 184 without text · 1,241,840 characters
Text of 1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdf
Extracted from the file · 750 pages, 143 without text · 925,443 characters
Text of 1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdf
Extracted from the file · 745 pages, 117 without text · 1,311,127 characters
Text of 1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdf
Extracted from the file · 750 pages · 1,818,090 characters
Text of 1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdf
Extracted from the file · 701 pages, 50 without text · 1,928,204 characters
Text of 1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdf
Extracted from the file · 750 pages, 7 without text · 1,170,967 characters
Text of 1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdf
Extracted from the file · 573 pages, 116 without text · 1,377,910 characters
Text of 1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdf
Extracted from the file · 750 pages, 70 without text · 1,191,670 characters
Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdf
Extracted from the file · 708 pages, 93 without text · 1,527,022 characters
Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdf
Extracted from the file · 750 pages, 56 without text · 1,006,998 characters
Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdf
Extracted from the file · 750 pages, 143 without text · 925,443 characters
Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdf
Extracted from the file · 656 pages, 184 without text · 1,241,840 characters
Text of 1-CDMHANNL CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 5 pages, 2 without text · 3,113 characters
Text of 1-CDMHANNL CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 6 pages, 3 without text · 4,692 characters
Text of 1-CDMHANNL CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 6 pages, 2 without text · 5,822 characters
Text of 1-CDMHANNL CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 7 pages, 2 without text · 8,527 characters
Text of 1-CD00412 CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 6 pages, 2 without text · 10,704 characters
Text of 1-CD00412 CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 16,197 characters
Text of 1-CD00412 CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 10 pages, 4 without text · 13,515 characters
Text of 1-CD00412 CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 8 pages, 4 without text · 11,076 characters
Text of 1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 6 pages, 3 without text · 6,643 characters
Text of 1-CD00258 CS & Closing Report 2018.pdf
Extracted from the file · 3 pages · 1,786 characters
Text of 1-495802 CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 331 pages, 76 without text · 481,532 characters
Text of 1-495802 CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 204 pages, 21 without text · 414,147 characters
Text of 1-495802 CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 163 pages, 25 without text · 244,382 characters
Text of 1-495802 CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 207 pages, 39 without text · 291,857 characters
Text of 1-201435 CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 4 pages, 3 without text · 2,904 characters
Text of 1-201435 CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 1,868 characters
Text of 1-201435 CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 4 pages, 3 without text · 2,526 characters
Text of 1-103353 CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 5 pages, 3 without text · 4,460 characters
Text of 1-103353 CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 3,734 characters
Text of 1-103353 CS & Closing Report 2018_Redacted.pdf
Extracted from the file · 4 pages, 3 without text · 2,489 characters
Text of 1-102118 CS & Closing Report 2021_Redacted.pdf
Extracted from the file · 14 pages, 5 without text · 19,415 characters
Text of 1-102118 CS & Closing Report 2020_Redacted.pdf
Extracted from the file · 11 pages, 2 without text · 21,744 characters
Text of 1-102118 CS & Closing Report 2019_Redacted.pdf
Extracted from the file · 11 pages, 3 without text · 16,618 characters
Text of 1-102118 CS & Closing Report 2017_Redacted.pdf
Extracted from the file · 9 pages, 3 without text · 14,796 characters
Text of 1-19733 CS & Closing Report_Redacted.pdf
Extracted from the file · 4 pages, 3 without text · 944 characters
Text of 1-18742 CS & Closing Report_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 2,245 characters
Text of 1-18CGVE11 CS & Closing Report.pdf
Extracted from the file · 3 pages · 1,756 characters
Text of 2-103353 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 3-DSEQ 2018 Variance Letter Docket.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-DB_CABLE 2019 Variance Letter.pdf
Extracted from the file · 4 pages · 10,910 characters
Text of 3-DB_CABLE 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-CTTRN19 Supplement_Redacted.pdf
Extracted from the file · 2 pages · 3,066 characters
Text of 3-CTTRN18 Supplemental_Redacted.pdf
Extracted from the file · 2 pages, 1 without text · 2,135 characters
Text of 3-CTMTR19 Supplemental_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,186 characters
Text of 3-CSTMER 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-CSTMER 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-CSTMER (CDCDANNL) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-495802 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-201435 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-102118 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 3- 103353 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-LVEHPUR PAF 2019_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 3,122 characters
Text of 2-LVEHPUR PAF 2018_Redacted.pdf
Extracted from the file · 4 pages, 1 without text · 4,579 characters
Text of 2-LVEHPUR PAF 2017_Redacted.pdf
Extracted from the file · 4 pages, 1 without text · 5,072 characters
Text of 2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-GXTD20 PAF_Redacted.pdf
Extracted from the file · 2 pages · 1,991 characters
Text of 2-GXTD19 PAF_Redacted.pdf
Extracted from the file · 2 pages · 1,980 characters
Text of 2-GXENG PAF_Redacted.pdf
Extracted from the file · 4 pages, 1 without text · 2,867 characters
Text of 2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-GECNCLP PAF 2021_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 7,548 characters
Text of 2-ETTCF21 PAF_Redacted.pdf
Extracted from the file · 4 pages, 1 without text · 5,350 characters
Text of 2-ETTCF20 PAF_Redacted.pdf
Extracted from the file · 4 pages, 1 without text · 5,310 characters
Text of 2-ETTCF19 PAF_Redacted.pdf
Extracted from the file · 4 pages, 2 without text · 3,187 characters
Text of 2-ETTCF18 PAF_Redacted.pdf
Extracted from the file · 6 pages, 1 without text · 10,601 characters
Text of 2-ETTCF17 PAF_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 11,710 characters
Text of 2-ETT2017 PAF_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 11,710 characters
Text of 2-ETT2016 PAF_Redacted.pdf
Extracted from the file · 4 pages · 8,282 characters
Text of 2-ETR2021 PAF_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 6,729 characters
Text of 2-ETR2020 PAF_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 7,746 characters
Text of 2-ETR2019 PAF_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 7,746 characters
Text of 2-ETR2018 PAF_Redacted.pdf
Extracted from the file · 6 pages, 1 without text · 10,601 characters
Text of 2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-DT7C 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-DT7C 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-DT7C 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-DT7C 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-DT7C 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-DSEQ20 PAF_Redacted.pdf
Extracted from the file · 1 page · 2,381 characters
Text of 2-DSEQ 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-DSEQ 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,281 characters
Text of 2-DSEQ 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-DSEQ 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-DSEQ 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-DSCN21 PAF_Redacted.pdf
Extracted from the file · 1 page · 2,197 characters
Text of 2-DSCN20 PAF_Redacted.pdf
Extracted from the file · 1 page · 2,143 characters
Text of 2-DSCN 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-DSCN 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-DSCN 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-CTTRN21 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,329 characters
Text of 2-CTTRN20 PAF_Redacted.pdf
Extracted from the file · 3 pages, 2 without text · 783 characters
Text of 2-CTTRN19 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,353 characters
Text of 2-CTTRN18 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,349 characters
Text of 2-CTROW17 PAF_Redacted.pdf
Extracted from the file · 9 pages, 2 without text · 11,710 characters
Text of 2-CTRMTR17 PAF_Redacted.pdf
Extracted from the file · 10 pages, 2 without text · 10,234 characters
Text of 2-CTMTR21 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,669 characters
Text of 2-CTMTR20 PAF_Redacted.pdf
Extracted from the file · 3 pages · 5,573 characters
Text of 2-CTMTR19 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,670 characters
Text of 2-CTMTR18 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,704 characters
Text of 2-CTMTR17 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 3,597 characters
Text of 2-CTFT2021 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 2,751 characters
Text of 2-CTFT2020 PAF_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 2,661 characters
Text of 2-CTEDVH21 PAF_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 7,548 characters
Text of 2-CTEDVH20 PAF_Redacted.pdf
Extracted from the file · 5 pages, 1 without text · 6,052 characters
Text of 2-CSTMER 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-CSTMER 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-CSTMER 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-CSTMER 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-CD00412 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-CD00412 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-CD00412 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-495802 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 2-495802 2020 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,280 characters
Text of 2-495802 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-495802 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-201435 2019 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,054 characters
Text of 2-201435 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 2-201435 2017 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,042 characters
Text of 2-103353 2021 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 1,888 characters
Text of 3-DT7C 2020 Variance Letter_Redacted.pdf
Extracted from the file · 4 pages · 12,652 characters
Text of 401051 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
Text of 4-LVEHPUR 2019 Variance Letter.pdf
Extracted from the file · 4 pages · 10,910 characters
Text of 3-VLT_CORR 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-T1DWANA 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-LN_RLBLTY 2019 Variance Letter.pdf
Extracted from the file · 4 pages · 10,910 characters
Text of 3-LN_RLBLTY 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-LIGHTNG (D7DA24) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-INSCLMCST 2019 Variance Letter.pdf
Extracted from the file · 4 pages · 10,910 characters
Text of 3-INSCLMCST 2018 Variance Letter.pdf
Extracted from the file · 3 pages · 7,767 characters
Text of 3-INSCLMCST (CTINS24) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 3-GXTD20 Supplemental_Redacted.pdf
Extracted from the file · 7 pages, 5 without text · 1,994 characters
Text of 3-ETT2016 Supplemental_Redacted.pdf
Extracted from the file · 3 pages, 1 without text · 2,208 characters
Text of 3-EMRGNTLN 2019 Variance Letter.pdf
Extracted from the file · 4 pages · 10,910 characters
Text of 3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdf
Extracted from the file · 4 pages · 13,641 characters
Text of 468601 2018 Capital Book CL & P Approved Plan.pdf
Extracted from the file · 2 pages · 2,098 characters
As listed on the current system
Supplement for New App [Filed: 09/25/2026]