Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-Additions-6 Folder 3

Files344

Search terms highlighted
Eversource rate increase is on 19 pages across 19 files of the text below, highlighted. Go to the first matchClear highlighting

Text of 2-103353 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-103353 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-102118 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-102118 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-102118 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-19733 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-18742 PAF_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 4,386 characters

Text of 2-2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 3 pages · 3,164 characters

Text of 2- CD00412 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Words on different pages
Words on different pages
Words on different pages

Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 18 pages, 9 without text · 16,578 characters

Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 22 pages, 6 without text · 36,839 characters

Text of 1-LVEHPUR CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,242 characters

Text of 1-LVEHPUR CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 7 pages, 2 without text · 6,091 characters

Text of 1-LVEHPUR CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 8,295 characters

Text of 1-LVEHPUR CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 9,731 characters

Text of 1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 204 pages, 45 without text · 359,550 characters

Text of 1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 199 pages, 36 without text · 342,307 characters

Text of 1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 244 pages, 37 without text · 504,097 characters

Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 113 pages, 24 without text · 204,528 characters

Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 92 pages, 30 without text · 145,347 characters

Text of 1-LN_RELO CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 86 pages, 17 without text · 150,597 characters

Text of 1-LN_RELO CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 94 pages, 17 without text · 174,937 characters

Text of 1-LN_RELO CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 102 pages, 21 without text · 189,243 characters

Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 82 pages, 25 without text · 98,054 characters

Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 91 pages, 39 without text · 91,868 characters

Text of 1-LIGHTNG CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 670 pages, 32 without text · 1,396,582 characters

Text of 1-LIGHTNG CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 595 pages, 67 without text · 1,124,319 characters

Text of 1-LIGHTNG CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 417 pages, 103 without text · 603,838 characters

Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 293 pages, 48 without text · 458,489 characters

Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 461 pages, 83 without text · 704,276 characters

Text of 1-IT1DWANA CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 8 pages, 4 without text · 4,914 characters

Text of 1-IT1DWANA CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 10 pages, 4 without text · 7,148 characters

Text of 1-IT1DWANA CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 12 pages, 4 without text · 13,903 characters

Text of 1-INSCLMCST CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 505 pages, 94 without text · 636,387 characters

Text of 1-INSCLMCST CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 575 pages, 33 without text · 1,053,525 characters

Text of 1-INSCLMCST CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 553 pages, 110 without text · 806,786 characters

Text of 1-INSCLMCST CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 491 pages, 64 without text · 884,679 characters

Text of 1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 499 pages · 908,456 characters

Text of 1-GXTD21 CS & Closing Report_Redacted.pdf

Extracted from the file · 21 pages, 5 without text · 26,915 characters

Text of 1-GXTD20 CS & Closing Report_Redacted.pdf

Extracted from the file · 18 pages, 6 without text · 20,865 characters

Text of 1-GXTD19 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,908 characters

Text of 1-GXENG CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,362 characters

Text of 1-GXCOTRBL CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 4,108 characters

Text of 1-GXCOTRBL CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 1,540 characters

Text of 1-GXCOTRBL CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 4,286 characters

Text of 1-GECNCLP CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,165 characters

Text of 1-ETTCF21 CS & Closing Report_Redacted.pdf

Extracted from the file · 31 pages, 6 without text · 38,094 characters

Text of 1-ETTCF20 CS & Closing Report_Redacted.pdf

Extracted from the file · 24 pages, 4 without text · 29,216 characters

Text of 1-ETTCF19 CS & Closing Report_Redacted.pdf

Extracted from the file · 28 pages, 10 without text · 25,052 characters

Text of 1-ETTCF18 CS & Closing Report_Redacted.pdf

Extracted from the file · 21 pages, 5 without text · 24,956 characters

Text of 1-ETTCF17 CS & Closing Report_Redacted.pdf

Extracted from the file · 17 pages, 7 without text · 16,534 characters

Text of 1-ETT2017 CS & Closing Report_Redacted.pdf

Extracted from the file · 102 pages, 10 without text · 92,080 characters

Text of 1-ETT2016 CS & Closing Report_Redacted.pdf

Extracted from the file · 65 pages, 16 without text · 89,859 characters

Text of 1-ETR2021 CS & Closing Report_Redacted.pdf

Extracted from the file · 217 pages, 49 without text · 168,057 characters

Text of 1-ETR2020 CS & Closing Report_Redacted.pdf

Extracted from the file · 217 pages, 46 without text · 171,105 characters

Text of 1-ETR2019 CS & Closing Report_Redacted.pdf

Extracted from the file · 197 pages, 38 without text · 168,113 characters

Text of 1-ETR2018 CS & Closing Report_Redacted.pdf

Extracted from the file · 193 pages, 38 without text · 154,165 characters

Text of 1-EMRGNTLN CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 953 pages, 84 without text · 1,795,343 characters

Text of 1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdf

Extracted from the file · 616 pages, 78 without text · 995,151 characters

Text of 1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdf

Extracted from the file · 750 pages, 103 without text · 1,403,033 characters

Text of 1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdf

Extracted from the file · 528 pages, 195 without text · 635,082 characters

Words on different pages
  1. Page 616 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 2M824134 2M824134 Total 2M824194 Description CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER Values Sum of Quantity CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER MOUNT,CLUSTER, TRANSFORMER, MEDIUM, 5/8 X 2-1/2 IN, 37.5-167 KVA, AL, W/ SIX - SQ.HD. BOLTS, HEX NUT CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET AND HARDWARE, 2M824194 Total 2M824208 2M824208 Total 2M824243 2M824243 Total 2M824244 2M824244 Total 2M824260 2M824260 Total 2M824320 2M824320 Total 2M824324 2M824324 Total 2M824357 2M824357 Total 2M824365 2M824365 Total 2M824379 2M824379 Total 2M824398 2M824398 Total 2W320146 CABLE, INSULATED, AERIAL, AAC, 4/0 AWG, 600 V, W/ 4/0 AWG ALLOY NEUTRAL, XLPE INSULATED, MOQ 10,000 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, 4/0 AWG, 600 V, W/ 4/0 AWG 6201 ALLOY NEUTRAL, XLPE INSULATE CONDUIT,ELECTRICAL, 5 IN DIA, 10 FT LG, PVC, SCH 40, ONE BELLED END CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER SWITCH,DISCONNECT, 600 A, 65 KA MOM PEAK, 25 KV, 125 KV BIL , 1 PH, AIR, VERTICAL MOUNT, INSULATED, CONNECTOR,STUD, 2 HOLE NEMA PAD, 600 A, CU BRONZE, FOR SWITCHES AND DISCONNECTS, FINISH: TIN PLATED CONTROL,RECLOSER, CLOSING COIL, LOW VOLTAGE, ELECTRONICALLY, LOOP SCHEME, W/ SCADA READY, TYPE: FORM RECLOSER, VACUUM, SOLID DIELECTRIC, 13.8/13.2 KV, 800 A CONTINUOUS, 12.5 KA, 3 PH, W/SS JUNC BOX, LO TAPE,INSULATION, JACKETING, 30 FT LG X 1 IN W, SILICONE RUBBER, GRAY MUNSELL RECLOSER, VACUUM, SOLID DIELECTRIC, 13.8/13.2 KV, 800 A CONTINUOUS, 12.5 KA, 3 PH, W/SS JUNC BOX, LO POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 5 FT-7 IN LG, W/ CENTER MOUNT BRACKET AND HARDWAR CABLE, INSULATED, 3CT, 4/0 AWG, 600 V, W/ 2/0 AWG NEUTRAL, UNILAY COMPRESSED, XLPE INSULATED, AL, 42 CONDUIT,ELECTRICAL, 3 IN DIA, PVC, SCH 80, 2.9 IN ID, STRAIGHT CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END SWITCH,DISTRIBUTION, 600 A, 30 KA MOM , 25 KV, REGULATOR BY-PASS, MANUAL, 150 KV BIL , 1 PH, AIR, VE CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CABLE, INSULATED, UG, 3-1/C, 500 KCMIL, 15 KV, EPR INSULATED, LLDPE JACKET, CU SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 500 TO 750 KCMIL, STRAIGHT, 15 KV, INSULATED, FOR 3/C P CABLE, INSULATED, 3CT, 4/0 AWG, 600 V, W/ 2/0 AWG NEUTRAL, UNILAY COMPRESSED, XLPE INSULATED, AL, 42 0 POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED 2W320146 Total 2W420623 2W420623 Total 2W420753 2W420753 Total 2W421163 ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 2W421163 Total 2W421396 2W421396 Total 2W422109 2W422109 Total 2W520199 2W520199 Total 0 LUMINAIRE, HPS, POST TOP TRADITIONAL, FULL CUTOFF, 120V, 100W, 9500L, GLASS REFRACTOR, BLACK FINISH, NPF REACTOR, TYPE II HANDHOLE, LAWN, HIGH DENSITY POLYETHYLENE, 10 IN W, 14 IN L, 12 IN D, GREEN, COVER MARKED "ELECTRIC" POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB ARRESTER,SURGE, ELBOW, LOADBREAK, 13.2 KV AND 13.8 KV MGY SYSTEM VOLTAGE, 12 KV ARRESTER RATING, 10. Sum of Amount $306.64 $429.55 -$180.09 $231.28 $175.89 $192.78 $419.86 $502.58 $0.00 $68.46 $571.04 $154.18 $154.18 $392.11 $33.62 $9,295.34 $21,593.73 $12.32 $31,327.12 $21,593.73 $21,593.73 $371.26 $153.32 $77.18 $601.76 $87.56 $17.39 $22.73 $2,056.93 $2,184.61 $153.32 $415.17 $568.49 $76.66 $76.66 $2,478.68 $5,776.26 $8,254.94 $205.92 $205.92 -$6.57 -$976.84 -$983.41 $68.79 $68.79 $60.81 $60.81 $99.00 $66.35 $165.35 $327.15 $53.48 $380.63 $370.82 $47.96 $199.57 $25.67 $644.02 $60.11 $60.11
  2. Page 617 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 2W520296 2W520296 Total 2W520900 2W520900 Total 2W520973 2W520973 Total 2W521052 2W521052 Total 2W521096 2W521096 Total 2W521319 2W521319 Total 2W521437 Description Values Sum of Quantity 0 0 ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 12 KV, 10.2 MCOV, W/ 30 IN # 4 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED SWITCH,DISTRIBUTION, 600 A, 30 KA MOM , 25 KV, REGULATOR BY-PASS, MANUAL, 150 KV BIL , 1 PH, AIR, VE POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB 2W521437 Total 2W522023 0 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CABLE, INSULATED, UG, 1/C, 500 KCMIL, 600 V, EPR INSULATED, CU CABLE, INSULATED, AERIAL, AAC, TRIPLEX, 4/0 AWG, 600 V, W/ 4/0 AWG 6201 ALLOY NEUTRAL, XLPE INSULATE 2W522023 Total 2W620931 2W620931 Total 3H421809 3H421809 Total 3H520748 3H520748 Total 3H522336 LUMINAIRE, HPS, POST TOP TRADITIONAL, 120 V, 100 W, 9500 LUMINOUS, NPF REACTOR, W/ FULL CUTOFF, TYPE POLE, STREETLIGHT, 18 FT LG, ROUND, FIBERGLASS, BLACK FINISH, FOR POST TOP LUM POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU 0 ANCHOR, SINGLE HELIX, SOCKET DRIVE, 8000#, 10 IN 3H522336 Total 3H522590 3H522590 Total 3H620638 3H620638 Total 3H621023 3H621023 Total 3H621842 3H621842 Total 3H621892 3H621892 Total 3H621902 3H621902 Total 3H622625 3H622625 Total 3H721905 3H721905 Total 3H722413 3H722413 Total CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.40 IN ID, 0.95 IN OD, 48 IN LG, BLACK CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.70 IN ID, 1.75 IN OD, 48 IN LG, 250-500 POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 CUTOUT, FUSE, OPEN, LOADBUSTER, 200 A, 25 KV, 150 KV BIL, W/ LOADBUSTER HOOKS, SILICONE CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 5 FT-7 IN LG, W/ CENTER MOUNT BRACKET AND HARDWAR ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB FITTING,SIDEWALK GUY, CLAMP END, 2-1/2 IN, STEEL, GALV CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI SIDEWALK GUY, FITTING, 2-1/2 IN, STEEL, GALV HANDHOLE, ROUND, 8 IN ID, 19 IN H, BODY: PLASTIC, W/ PLASTIC COVER MARKED ELECTRIC AND PENTA BOLT POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER Sum of Amount $7,384.85 $7,384.85 $185.62 $185.62 $200.00 $182.15 $382.15 $90.48 $90.48 $345.88 $345.88 $1,962.59 $1,962.59 $362.86 $25.67 $388.53 $7.65 $105.38 $88.40 $277.09 $478.52 $292.42 $156.27 $448.69 $391.80 $391.80 $2,133.75 $2,133.75 $25.83 -$25.83 $0.00 $37.59 $37.59 $187.60 $14,251.83 $301.89 $14,741.32 $353.15 $107.65 $251.81 $712.61 $61.27 $61.27 $65.58 $65.58 $343.23 $76.62 $25.94 $9.86 $211.89 $9.85 $677.39 $47.17 $47.17 $348.02 $131.53 $94.23 $573.78 $209.90 $209.90
  3. Page 618 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 3H722584 Description Values Sum of Quantity 0 BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE TERMINATOR,CABLE, #1-350, #2, #2-1/0, 0.840 - 1.38 IN CABLE DIA, 25/35 KV, W/O PIN TAP OR LUG, AL/CU CONDUIT,ELECTRICAL, 3 IN DIA, PVC, SCH 80, 2.9 IN ID, STRAIGHT CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END ARRESTER,SURGE, ELBOW, LOADBREAK, 22.9 KV MGY SYSTEM VOLTAGE, 18 KV ARRESTER RATING, 15.3 KV MCOV CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA CONNECTOR,ELBOW, LOADBREAK, 25 KV, 200 A, #1 AWG STRANDED, 260 KCMIL, 0.83-1.1 IN CABLE DIA, AL CABLE, INSULATED, UG, 1/C, #1 AWG, STRANDED, 25 KV, EPR INSULATED, JACKETED, AL, P/O THES SWITCH TO CABLE, BARE, ANNEALED, #2 AWG, 7 STR, SOFT DRAWN CU 3H722584 Total 3H723030 0 BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE SPLICE,ELECTRICAL, TRANSITIONAL, HEAT SHRINK, 350 TO 750 KCMIL, STRAIGHT, 25 KV, INSULATED, FOR CONN CABLE, INSULATED, UG, COMPACT ROUND, 4CT, 500 KCMIL, 25 KV, EPR INSULATED, JACKETED, CU, 800 FT REEL TERMINATOR,CABLE, 500-750, 750, 500, 1.08 - 1.80 IN CABLE DIA, 25/30/35 KV, W/O PIN TAP OR LUG, AL/C 3H723030 Total 3H723093 3H723093 Total 3H723240 3H723240 Total 3H723387 3H723387 Total 3H820025 3H820025 Total 3H820028 3H820028 Total 3H820052 3H820052 Total 3H820053 3H820053 Total 3H820064 3H820064 Total 3H820065 3H820065 Total 3H820067 3H820067 Total 3H820074 3H820074 Total 3H820086 3H820086 Total 3H820087 INDICATOR,FAULT, UNDERGROUND, 450 A, 1 PH, 8 HR CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 CABLE, INSULATED, UG, 3-1/C, 350 KCMIL, 25 KV, EPR INSULATED, LLDPE JACKET, CU, P/O 177728 SPLICE,ELECTRICAL, TRANSITIONAL, HEAT SHRINK, 350 TO 750 KCMIL, STRAIGHT, 25 KV, INSULATED, FOR CONN LIVE END, CAP, INSULATING, HEAT SHRINK, 25 KV, 350-750 KCMIL, 3/C PILC BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 0 CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END JP MORGAN CHASE BANK CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, 3CT, 1/0 AWG, STRANDED, 600 V, W/ #2 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN FLANGE 3H820087 Total 3H820090 0 TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.40 IN ID, 0.95 IN OD, 48 IN LG, BLACK CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CONNECTOR,ELECTRICAL, CRAB, LIMITER, 4/0 AWG-500 MCM, 2 WAY STUD OUTLET, 8-WAY, COMPRESSION, CU 3H820090 Total 3H820092 3H820092 Total 3H820095 HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER Sum of Amount -$0.70 $24.80 $71.36 $17.52 $98.07 $17.98 $181.94 $81.01 $632.89 $35.48 $498.78 $22.02 $1,681.15 -$2.31 $52.34 $2,049.14 $6,713.82 $362.41 $9,175.40 $409.66 $409.66 $108.02 $108.02 $8,075.75 $4,268.59 $968.53 $13,312.87 $25.37 $66.34 $91.71 $66.12 $66.12 $53.54 $53.54 $52.32 $52.32 $348.91 $348.91 $31.39 $31.39 $104.64 $104.64 $39.24 $39.24 $4,804.27 $4,804.27 $22.20 $24.38 $74.15 $121.88 $209.29 $451.90 -$0.84 $30.77 $1,540.76 $959.72 $2,530.41 $79.86 $79.86 $65.89
  4. Page 619 of 750

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  5. Page 620 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 3H820246 3H820246 Total 3H820250 3H820250 Total 3H820262 3H820262 Total 3H820272 3H820272 Total 3H820274 3H820274 Total 3H820282 3H820282 Total 3H820283 3H820283 Total 3H820295 3H820295 Total 3H820296 3H820296 Total 3H820297 3H820297 Total 3H820298 3H820298 Total 3H820307 3H820307 Total 3H820311 3H820311 Total 3H820314 3H820314 Total 3H820315 3H820315 Total 3H820327 Description CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI Values Sum of Quantity CABLE, INSULATED, 3CT, 1/0 AWG, STRANDED, 600 V, W/ #2 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN FLANGE SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.96 IN, MAX JACKET DIA 1.81 IN, STRAIGHT, 15/25/ SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 500 TO 750 KCMIL, STRAIGHT, 15 KV, INSULATED, FOR 3/C P CABLE,INSULATED, UG, FLAT STRAP, TRIPLEX, 3/C, 500 KCMIL FS, 15 KV, 0.175 IN, EPR INSULATED, CU SEAL,CABLE, BREAKOUT, 1/0-750 MCM-15 KV, 1/0-500 MCM-25 KV, FOR SEALING JACKET ENDS OF 3/C CU CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER BRACKET, CUTOUT AND ARRESTER, 12 IN, FIBERGLASS, FERR / ALUM FITTINGS W/ MOUNTING BOLTS CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER LIVE END, CAP, INSULATING, HEAT SHRINK, 15 KV, 4-4/0 AWG, 3/C PILC CONNECTOR,ELBOW, LOADBREAK, 25 KV, 200 A, #1 AWG STRANDED, 260 KCMIL, 0.83-1.1 IN CABLE DIA, AL INDICATOR,FAULT, UNDERGROUND, 120 A, 1 PH, 8 HR CABLE, INSULATED, UG, 1/C, #1 AWG, STRANDED, 25 KV, W/ 2IN HDPE NEMA TC-7 SCH 80 CONDUIT, BLACK W/ 3 CABLE, INSULATED, UG, 1/C, #1 AWG, 25 KV, EPR INSULATED, LLDPE JACKET, AL, P/O 177700 CONNECTOR,ELBOW, LOADBREAK, 25 KV, 200 A, #1 AWG STRANDED, 260 KCMIL, 0.83-1.1 IN CABLE DIA, AL INDICATOR,FAULT, UNDERGROUND, 120 A, 1 PH, 8 HR H I STONE & SON TRUCKING INC CABLE, INSULATED, UG, 1/C, #1 AWG, STRANDED, 25 KV, W/ 2IN HDPE NEMA TC-7 SCH 80 CONDUIT, BLACK W/ 3 0 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.40 IN ID, 0.95 IN OD, 48 IN LG, BLACK CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CONNECTOR,ELECTRICAL, CRAB, 4/0 AWG, 4 WAY, COMPRESSION, INSULATED, CU 3H820327 Total 3H820331 3H820331 Total 3H820343 3H820343 Total 3H820345 CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END CONDUIT,ELECTRICAL, 2 IN DIA, 10 FT LG, PVC, SCH 40, ONE BELLED END CABLE, INSULATED, UG, 3CT, #4 AWG, 600 V, EPR INSULATED, CU CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI PAD, 48 IN LG, 42 IN W, 4 IN H, PRECAST CONCRETE, 547 LB, 167 KVA MAX 3H820345 Total 3H820347 0 PAD, 48 IN LG, 42 IN W, 4 IN H, PRECAST CONCRETE, 547 LB, 167 KVA MAX 3H820347 Total 3H820349 3H820349 Total 3H820367 CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, Sum of Amount $188.68 $188.68 $142.32 $142.32 $738.64 $1,324.70 $11,429.82 $81.78 $13,574.94 $44.22 $44.22 $52.03 $52.03 $79.86 $79.86 $66.07 $66.07 $25.37 $66.07 $91.44 $967.81 $967.81 $73.10 $274.28 $1,428.24 $1,775.62 $979.18 $146.20 $274.28 $523.18 $2,013.65 $3,936.49 $52.03 $52.03 $64.25 $64.25 $0.00 $0.00 $66.92 $66.92 -$886.90 $84.57 $2,370.83 $396.09 $1,964.59 $0.00 $11.01 $107.68 $118.69 $282.25 $282.25 -$13.49 $83.88 $70.39 $0.01 $58.21 $58.22 $3,006.20 $3,006.20 $36.42
  6. Page 621 of 750

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 622 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 3H820539 3H820539 Total 3H820546 Description CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU Values Sum of Quantity ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB ANCHOR, CROSS PLATE 3H820546 Total 3H820552 3H820552 Total 3H820556 3H820556 Total 3H820559 3H820559 Total 3H820562 TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.40 IN ID, 0.95 IN OD, 48 IN LG, BLACK CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CABLE, INSULATED, UG, 4/C, 500 KCMIL, 600 V, W/ 4/0 AWG NEUTRAL, EPR INSULATED, CU TUBING, HEAT SHRINK, HEAVY WALL, FLAME RETARDANT, 1000 V, 0.70 IN ID, 1.75 IN OD, 48 IN LG, 250-500 CONNECTOR,ELECTRICAL, CRAB, LIMITER, 4/0 AWG-500 MCM, 2 WAY STUD OUTLET, 8-WAY, COMPRESSION, CU CABLE, COVERED, 4/0 AWG, 37 STR, 62.5 MILS PE, SOFT DRAWN CU, FOR USE AS TAP WIRE & TRANSFORMER LEAD JOINT,ELECTRICAL, CRAB, 4/0 AWG, 4 WAY- 4 WAY, NEUTRAL JOINT,ELECTRICAL, CRAB, 500 KCMIL, 4 WAY- 4 WAY, NEUTRAL, TINNED BARE CU, USE UP CATID 9600 INVENTOR CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CABLE, INSULATED, AERIAL, AAC, TRIPLEX, 1/0 AWG, 7 STR, 600 V, W/ 1/0 AWG 7 STR ALLOY NEUTRAL, GAMMA 0 POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER FUSE,POWER, 200K OR 200E A, 20000 A INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, MOUNTED, T FUSE,POWER, SLOW BLOW, 200 A, E, 25 KV, 12500 RMS SYM, S&C, COOPER TYPE CMUSMU-20 FUSE,POWER, STANDARD SPEED, 200 A, E, 25 KV, 20 KA ASYM ANCHOR, CROSS PLATE 3H820562 Total 3H820583 3H820583 Total 3H820586 3H820586 Total 3H820587 0 0 0 CABLE, INSULATED, 3CT, 4/0 AWG, 600 V, W/ 2/0 AWG NEUTRAL, UNILAY COMPRESSED, XLPE INSULATED, AL, 42 CONDUIT,ELECTRICAL, 3 IN DIA, PVC, SCH 80, 2.9 IN ID, STRAIGHT CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, #1 TO 350 MCM, STRAIGHT, 25 KV, INSULATED, FOR 3/C PILC CABLE, INSULATED, UG, 3-1/C, 1/0 AWG, 25 KV, EPR INSULATED, LLDPE JACKET, CU, P/O 177727 3H820587 Total 3H820590 0 CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER 3H820590 Total 3H820601 3H820601 Total 3H820603 CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, 0 ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB POLE, UTILITY, 35 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED 3H820603 Total 3H820628 TERMINATOR,CABLE, #1-350, #2, #2-1/0, 0.840 - 1.38 IN CABLE DIA, 25/35 KV, W/O PIN TAP OR LUG, AL/CU SPLICE,ELECTRICAL, COLD SHRINK, 0.91 IN, MAX JACKET DIA 1.73 IN, STRAIGHT, 15/25 KV, INSULATED LIVE END, CAP, INSULATING, 25 KV, 1-250 KCMIL, 1/C PILC, RUBBER SWITCHGEAR,DISTRIBUTION, 12.5/20 KA SYM, 20/32 KA ASYM, 15/25 KV, 1-150CL OR 1-200E FUSE, 1-600 A SW 3H820628 Total 3H820635 0 ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER POLE, 45 FT LG, CLASS 1, SOUTHREN YELLOW PINE, CCA TREATED ANCHOR, SINGLE HELIX, SOCKET DRIVE, 10 IN, 8000 LB BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE TERMINATOR,CABLE, #1-350, #2, #2-1/0, 0.840 - 1.38 IN CABLE DIA, 25/35 KV, W/O PIN TAP OR LUG, AL/CU GRIP,CABLE, SUPPORT, CLOSED, SINGLE EYE, 2.5-2.99 IN DIA CABLE RANGE CABLE, INSULATED, UG, 3-1/C, #1 AWG, 25 KV, EPR INSULATED, LLDPE JACKET, AL, P/O 177693 CABLE, BARE, ACSR/AW, 1/0 AWG, 6/1 STR, RAVEN CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET AND HARDWARE, Sum of Amount $2,370.83 $2,370.83 -$50.98 $25.95 $25.03 $0.00 $56.28 $1,546.11 $1,362.52 $99.76 $2,340.37 $172.60 $87.01 $116.16 $5,780.81 $1,185.42 $1,185.42 $561.00 $561.00 $6.42 $346.06 $158.32 $3.73 $291.24 $0.00 $19.34 $825.11 $3,349.82 $3,349.82 $296.15 $17.82 $24.22 $338.19 $3,118.08 $4,109.46 $7,227.54 -$2.41 $129.92 $127.51 $44.25 $44.25 -$0.03 $24.99 $273.84 $298.80 $292.42 $586.47 $879.61 $11,818.93 $13,577.43 -$27.13 $428.43 $519.74 $25.94 $105.25 $585.39 $65.22 $794.20 $104.26 $196.83
  8. Page 623 of 750

    funding project EMRGNTLN Cost Element Category Material month number (blank) accounting work order 3H820635 3H820635 Total 3H820646 3H820646 Total 3H820649 3H820649 Total 3H820654 3H820654 Total 3H820655 3H820655 Total 3H820670 3H820670 Total 3H820674 3H820674 Total 3H820678 3H820678 Total 3H820686 3H820686 Total 3H820690 3H820690 Total 3H820699 Description BRACKET, CUTOUT AND ARRESTER, 12 IN W, 48 IN LG, FIBERGLASS, W/ ALUMINIUM OR DUCTILE IRON END FITTI CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END CONDUIT,ELECTRICAL, 4 IN DIA, 10 FT LG, PVC, SCH 80, ONE BELLED END, 570 FT BUNDLE HANDHOLE, ROUND, 8 IN ID, 19 IN H, BODY: PLASTIC, W/ PLASTIC COVER MARKED ELECTRIC AND PENTA BOLT POLE, STREETLIGHT, 18 FT LG, ROUND, FIBERGLASS, BLACK FINISH, FOR POST TOP LUM LUMINAIRE, HPS, POST TOP TRADITIONAL, 120 V, 70 W, 6300 LUMINOUS, NPF REACTOR, W/ FULL CUTOFF, BLACK ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER RECLOSER, OIL, 24.9 KV, COIL: 200 A TRIP, 280 A CONTINUOUS, 4 KA, 1 PH, HYDRAULIC, DELAYED CURVE B, CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER BRACKET,CABLE, TERMINATOR MOUNTED, AL, FOR 0.75 THRU 3.00 IN DIA CABLE TERMINATOR,CABLE, #1-350, #2, #2-1/0, 0.840 - 1.38 IN CABLE DIA, 25/35 KV, W/O PIN TAP OR LUG, AL/CU GRIP,CABLE, SUPPORT, CLOSED, SINGLE EYE, 2.5-2.99 IN DIA CABLE RANGE CABLE, INSULATED, UG, 3-1/C, #1 AWG, 25 KV, EPR INSULATED, LLDPE JACKET, AL, P/O 177693 CABLE, BARE, ACSR/AW, 1/0 AWG, 6/1 STR, RAVEN BRACKET, CUTOUT AND ARRESTER, 12 IN W, 48 IN LG, FIBERGLASS, W/ ALUMINIUM OR DUCTILE IRON END FITTI CONDUIT,ELECTRICAL, 4 IN, 10 FT LG, PVC, SCH 40, BELLED END CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CROSSARM, DISTRIBUTION, DEADEND, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 10 FT LG , W/ CENTER MOUNT BRACKET, FIBERGLASS, 4 CROSSARM, DISTRIBUTION, TANGENT, 3-5/8 X 4-5/8 IN, 8 FT LG, W/ CENTER MOUNT BRACKET AND HARDWARE, FI CABLE, INSULATED, UG, 4CT, 4/0 AWG, 600 V, EPR INSULATED, JACKETED, CU CONNECTOR,ELECTRICAL, CRAB, LIMITER, 4/0 AWG-500 MCM, 2 WAY STUD OUTLET, 8-WAY, COMPRESSION, CU SLEEVE,INSULATING, 2-1/8 IN ID LARGE END, RUBBER, FOR LIMITER CRABS 4/0 CABLE, INSULATED, 3CT, 4/0 AWG, 600 V, W/ 2/0 AWG NEUTRAL, UNILAY COMPRESSED, XLPE INSULATED, AL, 42 CONDUIT,ELECTRICAL, 3 IN DIA, PVC, SCH 80, 2.9 IN ID, STRAIGHT CONDUIT,ELECTRICAL, 3 IN, 10 FT LG, PVC, SCH 40, ONE BELLED END 3H820699 Total 3H820702 0 SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 1.09 IN, MAX JACKET DIA 2.05 IN, STRAIGHT, 15/25/ SPLICE,ELECTRICAL, TRANSITIONAL, HEAT SHRINK, 350 TO 750 KCMIL, STRAIGHT, 25 KV, INSULATED, FOR CONN 3H820702 Total 3H820713 3H820713 Total 3H820716 3H820716 Total 3H820727 3H820727 Total 3H820747 3H820747 Total 3H820753 3H820753 Total 3H820761 3H820761 Total Values Sum of Quantity CABLE, INSULATED, AERIAL, AAC, TRIPLEX, #2 AWG, 600 V, W/ #2 AWG 6201 ALLOY NEUTRAL, XLPE INSULATED, CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER CABLE, INSULATED, 3CT, 350 KCMIL, STRANDED, 600 V, W/ 4/0 AWG NEUTRAL, XLPE INSULATED, AL, 48 IN DIA HANDHOLE, LAWN, 30 IN LG, 17 IN W, 17 IN DP, HIGH DENSITY POLYETHYLENE, W/ COVER MARKED ELECTRIC, POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CABLE, INSULATED, 3CT, 4/0 AWG, 600 V, W/ 2/0 AWG NEUTRAL, UNILAY COMPRESSED, XLPE INSULATED, AL, 42 POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, CCA TREATED CUTOUT, FUSE, OPEN, 100 A, 12 KA INTERRUPTING CURRENT ASYMMETRICAL, 25 KV, 150 KV BIL, W/ LOADBUSTER ARRESTER,SURGE, DISTRIBUTION RISER POLE, METAL OXIDE VARISTOR (MOV), 18 KV, 15.3 KV MCOV, POLYMER Sum of Amount $175.29 $69.24 $55.40 $3,098.06 $47.15 $156.27 $291.79 $495.21 $71.40 $3,937.63 $4,009.03 $196.82 $211.55 $158.45 $877.12 $32.71 $1,328.89 $78.19 $87.50 $50.58 $3,021.81 $196.82 $412.30 $609.12 $348.02 $348.02 $88.50 $88.50 $79.10 $79.10 $107.57 $94.08 $201.65 $3,165.09 $2,730.44 $865.79 $6,761.32 $259.13 $17.82 $24.22 $301.17 -$2,277.56 $859.06 $2,134.30 $715.80 $59.78 $59.78 $132.26 $132.26 $211.08 $78.98 $290.06 $343.00 $343.00 $296.15 $296.15 $343.00 $65.56 $69.88 $478.44
  9. Page 624 of 750

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 625 of 750

    No text on this page. It may be a picture of a page, such as a scan or a chart.

Text of 1-EMRGNTLN CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 1,178 pages, 263 without text · 1,930,158 characters

Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 455 pages, 129 without text · 593,721 characters

Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 139 without text · 1,267,663 characters

Text of 1-EFO_TLS CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 15 pages, 6 without text · 16,794 characters

Text of 1-EFO_TLS CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 12 pages, 5 without text · 16,453 characters

Text of 1-DT7C CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,066 characters

Text of 1-DT7C CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,078 characters

Text of 1-DT7C CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 10 pages, 2 without text · 63,534 characters

Text of 1-DSEQ21 CS & Closing Report_Redacted.pdf

Extracted from the file · 46 pages, 17 without text · 44,468 characters

Text of 1-DSEQ20 CS & Closing Report_Redacted.pdf

Extracted from the file · 8 pages, 3 without text · 7,513 characters

Text of 1-DSEQ CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 13 pages, 4 without text · 16,519 characters

Text of 1-DSEQ CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 17 pages, 5 without text · 25,281 characters

Text of 1-DSEQ CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 25 pages, 6 without text · 52,950 characters

Text of 1-DSEQ CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 23 pages, 9 without text · 28,799 characters

Text of 1-DSEQ CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 16 pages, 5 without text · 22,297 characters

Text of 1-DSCN21 CS & Closing Report_Redacted.pdf

Extracted from the file · 55 pages, 12 without text · 61,698 characters

Text of 1-DSCN20 CS & Closing Report_Redacted.pdf

Extracted from the file · 9 pages, 5 without text · 7,519 characters

Text of 1-DSCN CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 18 pages, 5 without text · 22,473 characters

Text of 1-DSCN CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 28 pages, 9 without text · 36,554 characters

Text of 1-DSCN CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 29 pages, 9 without text · 42,697 characters

Text of 1-DB_CABLE CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 203 pages, 66 without text · 307,639 characters

Text of 1-DB_CABLE CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 117 pages, 44 without text · 160,299 characters

Text of 1-DB_CABLE CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 98 pages, 28 without text · 190,517 characters

Text of 1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 201 pages, 45 without text · 276,403 characters

Text of 1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 231 pages, 25 without text · 449,921 characters

Text of 1-CTTRN21 CS & Closing Report_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 13,105 characters

Text of 1-CTTRN20 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 4,429 characters

Text of 1-CTTRN19 CS & Closing Report_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 20,761 characters

Text of 1-CTTRN18 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,610 characters

Text of 1-CTROW17 CS & Closing Report_Redacted.pdf

Extracted from the file · 15 pages, 3 without text · 12,533 characters

Text of 1-CTRMTR17 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 8,323 characters

Text of 1-CTMTR21 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 5,890 characters

Text of 1-CTMTR20 CS & Closing Report_Redacted.pdf

Extracted from the file · 18 pages, 8 without text · 21,352 characters

Text of 1-CTMTR19 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 6,215 characters

Text of 1-CTMTR18 CS & Closing Report_Redacted.pdf

Extracted from the file · 17 pages, 8 without text · 20,687 characters

Text of 1-CTMTR17 CS & Closing Report_Redacted.pdf

Extracted from the file · 12 pages, 6 without text · 14,369 characters

Text of 1-CTFT2021 CS & Closing Report_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 9,209 characters

Text of 1-CTFT2020 CS & Closing Report_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 14,590 characters

Text of 1-CTEDVH21 CS & Closing Report_Redacted.pdf

Extracted from the file · 26 pages, 3 without text · 30,119 characters

Text of 1-CTEDVH20 CS & Closing Report_Redacted.pdf

Extracted from the file · 24 pages, 2 without text · 25,121 characters

Text of 1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 656 pages, 184 without text · 1,241,840 characters

Text of 1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 143 without text · 925,443 characters

Text of 1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdf

Extracted from the file · 745 pages, 117 without text · 1,311,127 characters

Text of 1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdf

Extracted from the file · 750 pages · 1,818,090 characters

Text of 1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdf

Extracted from the file · 701 pages, 50 without text · 1,928,204 characters

Text of 1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdf

Extracted from the file · 750 pages, 7 without text · 1,170,967 characters

Text of 1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdf

Extracted from the file · 573 pages, 116 without text · 1,377,910 characters

Text of 1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdf

Extracted from the file · 750 pages, 70 without text · 1,191,670 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdf

Extracted from the file · 708 pages, 93 without text · 1,527,022 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdf

Extracted from the file · 750 pages, 56 without text · 1,006,998 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 143 without text · 925,443 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 656 pages, 184 without text · 1,241,840 characters

Text of 1-CDMHANNL CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 5 pages, 2 without text · 3,113 characters

Text of 1-CDMHANNL CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 4,692 characters

Text of 1-CDMHANNL CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 6 pages, 2 without text · 5,822 characters

Text of 1-CDMHANNL CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 7 pages, 2 without text · 8,527 characters

Text of 1-CD00412 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 6 pages, 2 without text · 10,704 characters

Text of 1-CD00412 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 16,197 characters

Text of 1-CD00412 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 10 pages, 4 without text · 13,515 characters

Text of 1-CD00412 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 8 pages, 4 without text · 11,076 characters

Text of 1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 6,643 characters

Text of 1-CD00258 CS & Closing Report 2018.pdf

Extracted from the file · 3 pages · 1,786 characters

Text of 1-495802 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 331 pages, 76 without text · 481,532 characters

Text of 1-495802 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 204 pages, 21 without text · 414,147 characters

Text of 1-495802 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 163 pages, 25 without text · 244,382 characters

Text of 1-495802 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 207 pages, 39 without text · 291,857 characters

Text of 1-201435 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,904 characters

Text of 1-201435 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 1,868 characters

Text of 1-201435 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,526 characters

Text of 1-103353 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 4,460 characters

Text of 1-103353 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 3,734 characters

Text of 1-103353 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,489 characters

Text of 1-102118 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 14 pages, 5 without text · 19,415 characters

Text of 1-102118 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 11 pages, 2 without text · 21,744 characters

Text of 1-102118 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 16,618 characters

Text of 1-102118 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 14,796 characters

Text of 1-19733 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 944 characters

Text of 1-18742 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,245 characters

Text of 1-18CGVE11 CS & Closing Report.pdf

Extracted from the file · 3 pages · 1,756 characters

Text of 2-103353 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 3-DSEQ 2018 Variance Letter Docket.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-DB_CABLE 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-DB_CABLE 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-CTTRN19 Supplement_Redacted.pdf

Extracted from the file · 2 pages · 3,066 characters

Text of 3-CTTRN18 Supplemental_Redacted.pdf

Extracted from the file · 2 pages, 1 without text · 2,135 characters

Text of 3-CTMTR19 Supplemental_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,186 characters

Text of 3-CSTMER 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-CSTMER 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-CSTMER (CDCDANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-495802 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-201435 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-102118 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 3- 103353 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LVEHPUR PAF 2019_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,122 characters

Text of 2-LVEHPUR PAF 2018_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 4,579 characters

Text of 2-LVEHPUR PAF 2017_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,072 characters

Text of 2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-GXTD20 PAF_Redacted.pdf

Extracted from the file · 2 pages · 1,991 characters

Text of 2-GXTD19 PAF_Redacted.pdf

Extracted from the file · 2 pages · 1,980 characters

Text of 2-GXENG PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 2,867 characters

Text of 2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-GECNCLP PAF 2021_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,548 characters

Text of 2-ETTCF21 PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,350 characters

Text of 2-ETTCF20 PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,310 characters

Text of 2-ETTCF19 PAF_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,187 characters

Text of 2-ETTCF18 PAF_Redacted.pdf

Extracted from the file · 6 pages, 1 without text · 10,601 characters

Text of 2-ETTCF17 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-ETT2017 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-ETT2016 PAF_Redacted.pdf

Extracted from the file · 4 pages · 8,282 characters

Text of 2-ETR2021 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 6,729 characters

Text of 2-ETR2020 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,746 characters

Text of 2-ETR2019 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,746 characters

Text of 2-ETR2018 PAF_Redacted.pdf

Extracted from the file · 6 pages, 1 without text · 10,601 characters

Text of 2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DT7C 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DT7C 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-DT7C 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DT7C 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DT7C 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DSEQ20 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,381 characters

Text of 2-DSEQ 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DSEQ 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,281 characters

Text of 2-DSEQ 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DSEQ 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DSEQ 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DSCN21 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,197 characters

Text of 2-DSCN20 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,143 characters

Text of 2-DSCN 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DSCN 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DSCN 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CTTRN21 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,329 characters

Text of 2-CTTRN20 PAF_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 783 characters

Text of 2-CTTRN19 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,353 characters

Text of 2-CTTRN18 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,349 characters

Text of 2-CTROW17 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-CTRMTR17 PAF_Redacted.pdf

Extracted from the file · 10 pages, 2 without text · 10,234 characters

Text of 2-CTMTR21 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,669 characters

Text of 2-CTMTR20 PAF_Redacted.pdf

Extracted from the file · 3 pages · 5,573 characters

Text of 2-CTMTR19 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,670 characters

Text of 2-CTMTR18 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,704 characters

Text of 2-CTMTR17 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,597 characters

Text of 2-CTFT2021 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,751 characters

Text of 2-CTFT2020 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,661 characters

Text of 2-CTEDVH21 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,548 characters

Text of 2-CTEDVH20 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 6,052 characters

Text of 2-CSTMER 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CSTMER 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CSTMER 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-CSTMER 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CD00412 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CD00412 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CD00412 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-495802 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-495802 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-495802 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-495802 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-201435 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-201435 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-201435 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-103353 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 3-DT7C 2020 Variance Letter_Redacted.pdf

Extracted from the file · 4 pages · 12,652 characters

Text of 401051 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 4-LVEHPUR 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-VLT_CORR 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-T1DWANA 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LN_RLBLTY 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-LN_RLBLTY 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LIGHTNG (D7DA24) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-INSCLMCST 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-INSCLMCST 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-INSCLMCST (CTINS24) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-GXTD20 Supplemental_Redacted.pdf

Extracted from the file · 7 pages, 5 without text · 1,994 characters

Text of 3-ETT2016 Supplemental_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,208 characters

Text of 3-EMRGNTLN 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 468601 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

As listed on the current system

Supplement for New App [Filed: 09/25/2026]

This filing on the current system (opens in a new tab)