Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-Additions-6 Folder 3

Files344

Search terms highlighted
Eversource rate increase is on 19 pages across 19 files of the text below, highlighted. Go to the first matchClear highlighting

Text of 2-103353 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-103353 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-102118 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-102118 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-102118 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-19733 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-18742 PAF_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 4,386 characters

Text of 2-2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-18CGVE11 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 3 pages · 3,164 characters

Text of 2- CD00412 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Words on different pages
Words on different pages
Words on different pages

Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 18 pages, 9 without text · 16,578 characters

Text of 1-VLT_CORR (CDDKANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 22 pages, 6 without text · 36,839 characters

Text of 1-LVEHPUR CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,242 characters

Text of 1-LVEHPUR CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 7 pages, 2 without text · 6,091 characters

Text of 1-LVEHPUR CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 8,295 characters

Text of 1-LVEHPUR CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 9,731 characters

Text of 1-LN_RLBLTY CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 204 pages, 45 without text · 359,550 characters

Text of 1-LN_RLBLTY CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 199 pages, 36 without text · 342,307 characters

Text of 1-LN_RLBLTY CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 244 pages, 37 without text · 504,097 characters

Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 113 pages, 24 without text · 204,528 characters

Text of 1-LN_RLBLTY (CDDRANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 92 pages, 30 without text · 145,347 characters

Text of 1-LN_RELO CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 86 pages, 17 without text · 150,597 characters

Text of 1-LN_RELO CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 94 pages, 17 without text · 174,937 characters

Text of 1-LN_RELO CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 102 pages, 21 without text · 189,243 characters

Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 82 pages, 25 without text · 98,054 characters

Text of 1-LN_RELO (CDDHANNL) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 91 pages, 39 without text · 91,868 characters

Text of 1-LIGHTNG CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 670 pages, 32 without text · 1,396,582 characters

Text of 1-LIGHTNG CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 595 pages, 67 without text · 1,124,319 characters

Text of 1-LIGHTNG CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 417 pages, 103 without text · 603,838 characters

Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 293 pages, 48 without text · 458,489 characters

Text of 1-LIGHTNG (D7DA24) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 461 pages, 83 without text · 704,276 characters

Text of 1-IT1DWANA CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 8 pages, 4 without text · 4,914 characters

Text of 1-IT1DWANA CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 10 pages, 4 without text · 7,148 characters

Text of 1-IT1DWANA CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 12 pages, 4 without text · 13,903 characters

Text of 1-INSCLMCST CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 505 pages, 94 without text · 636,387 characters

Text of 1-INSCLMCST CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 575 pages, 33 without text · 1,053,525 characters

Text of 1-INSCLMCST CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 553 pages, 110 without text · 806,786 characters

Text of 1-INSCLMCST CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 491 pages, 64 without text · 884,679 characters

Text of 1-INSCLMCST (CTINS24) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 499 pages · 908,456 characters

Text of 1-GXTD21 CS & Closing Report_Redacted.pdf

Extracted from the file · 21 pages, 5 without text · 26,915 characters

Text of 1-GXTD20 CS & Closing Report_Redacted.pdf

Extracted from the file · 18 pages, 6 without text · 20,865 characters

Text of 1-GXTD19 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,908 characters

Text of 1-GXENG CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,362 characters

Text of 1-GXCOTRBL CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 4,108 characters

Text of 1-GXCOTRBL CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 1,540 characters

Text of 1-GXCOTRBL CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 4,286 characters

Text of 1-GECNCLP CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,165 characters

Text of 1-ETTCF21 CS & Closing Report_Redacted.pdf

Extracted from the file · 31 pages, 6 without text · 38,094 characters

Text of 1-ETTCF20 CS & Closing Report_Redacted.pdf

Extracted from the file · 24 pages, 4 without text · 29,216 characters

Text of 1-ETTCF19 CS & Closing Report_Redacted.pdf

Extracted from the file · 28 pages, 10 without text · 25,052 characters

Text of 1-ETTCF18 CS & Closing Report_Redacted.pdf

Extracted from the file · 21 pages, 5 without text · 24,956 characters

Text of 1-ETTCF17 CS & Closing Report_Redacted.pdf

Extracted from the file · 17 pages, 7 without text · 16,534 characters

Text of 1-ETT2017 CS & Closing Report_Redacted.pdf

Extracted from the file · 102 pages, 10 without text · 92,080 characters

Text of 1-ETT2016 CS & Closing Report_Redacted.pdf

Extracted from the file · 65 pages, 16 without text · 89,859 characters

Text of 1-ETR2021 CS & Closing Report_Redacted.pdf

Extracted from the file · 217 pages, 49 without text · 168,057 characters

Text of 1-ETR2020 CS & Closing Report_Redacted.pdf

Extracted from the file · 217 pages, 46 without text · 171,105 characters

Text of 1-ETR2019 CS & Closing Report_Redacted.pdf

Extracted from the file · 197 pages, 38 without text · 168,113 characters

Text of 1-ETR2018 CS & Closing Report_Redacted.pdf

Extracted from the file · 193 pages, 38 without text · 154,165 characters

Text of 1-EMRGNTLN CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 953 pages, 84 without text · 1,795,343 characters

Text of 1-EMRGNTLN CS & Closing Report 2019_Part2_Redacted.pdf

Extracted from the file · 616 pages, 78 without text · 995,151 characters

Text of 1-EMRGNTLN CS & Closing Report 2019_Part1_Redacted.pdf

Extracted from the file · 750 pages, 103 without text · 1,403,033 characters

Text of 1-EMRGNTLN CS & Closing Report 2018_Part2_Redacted.pdf

Extracted from the file · 528 pages, 195 without text · 635,082 characters

Text of 1-EMRGNTLN CS & Closing Report 2018_Part1_Redacted.pdf

Extracted from the file · 750 pages, 170 without text · 1,187,926 characters

Text of 1-EMRGNTLN CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 1,178 pages, 263 without text · 1,930,158 characters

Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 455 pages, 129 without text · 593,721 characters

Text of 1-EMRGNTLN (CDEMANNL) CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 139 without text · 1,267,663 characters

Text of 1-EFO_TLS CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 15 pages, 6 without text · 16,794 characters

Text of 1-EFO_TLS CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 12 pages, 5 without text · 16,453 characters

Text of 1-DT7C CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,066 characters

Text of 1-DT7C CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 1,078 characters

Text of 1-DT7C CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 10 pages, 2 without text · 63,534 characters

Text of 1-DSEQ21 CS & Closing Report_Redacted.pdf

Extracted from the file · 46 pages, 17 without text · 44,468 characters

Text of 1-DSEQ20 CS & Closing Report_Redacted.pdf

Extracted from the file · 8 pages, 3 without text · 7,513 characters

Text of 1-DSEQ CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 13 pages, 4 without text · 16,519 characters

Text of 1-DSEQ CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 17 pages, 5 without text · 25,281 characters

Text of 1-DSEQ CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 25 pages, 6 without text · 52,950 characters

Text of 1-DSEQ CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 23 pages, 9 without text · 28,799 characters

Text of 1-DSEQ CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 16 pages, 5 without text · 22,297 characters

Text of 1-DSCN21 CS & Closing Report_Redacted.pdf

Extracted from the file · 55 pages, 12 without text · 61,698 characters

Text of 1-DSCN20 CS & Closing Report_Redacted.pdf

Extracted from the file · 9 pages, 5 without text · 7,519 characters

Text of 1-DSCN CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 18 pages, 5 without text · 22,473 characters

Text of 1-DSCN CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 28 pages, 9 without text · 36,554 characters

Text of 1-DSCN CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 29 pages, 9 without text · 42,697 characters

Text of 1-DB_CABLE CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 203 pages, 66 without text · 307,639 characters

Text of 1-DB_CABLE CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 117 pages, 44 without text · 160,299 characters

Text of 1-DB_CABLE CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 98 pages, 28 without text · 190,517 characters

Text of 1-DB_CABLE (101395) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 201 pages, 45 without text · 276,403 characters

Text of 1-DB_CABLE (101395) CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 231 pages, 25 without text · 449,921 characters

Text of 1-CTTRN21 CS & Closing Report_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 13,105 characters

Text of 1-CTTRN20 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 4,429 characters

Words on different pages
  1. Page 1

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 2

    funding project CTTRN19 Cost Element Category Indirect/Overheads month number 201901 201901 Total 201902 201902 Total 201903 201903 Total 201904 201904 Total 201905 201905 Total 201906 201906 Total 201907 201907 Total 201908 201908 Total 201909 201909 Total 201910 201910 Total 201911 201911 Total 201912 accounting work order 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTETRN Description Values Sum of Quantity Sum of Amount 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $35.82 $35.82 $35.82 $4,122.86 $4,122.86 $4,122.86 $5,946.20 $5,946.20 $5,946.20 $23,677.49 $23,677.49 $302.55 $302.55 $23,980.04 $1,212.68 $1,212.68 $2,081.35 $2,081.35 $3,294.03 $7,198.32 $7,198.32 $1,036.25 $1,036.25 $8,234.57 $1,267.63 $1,267.63 $84.72 $84.72 $1,352.35 $3,600.54 $3,600.54 -$46.64 -$46.64 $3,553.90 $7,880.97 $7,880.97 $38.79 $38.79 $7,919.76 $914.12 $914.12 $90.36 $90.36 $1,004.48 $1,753.96 $1,753.96 $90.35 $90.35 $1,844.31 $94.25
  3. Page 3

    funding project CTTRN19 Cost Element Category Indirect/Overheads month number 201912 201912 Total 202001 202001 Total 202002 202002 Total 202003 202003 Total 202004 202004 Total 202010 202010 Total 202012 202012 Total 202102 202102 Total 202103 accounting work order 19CTETRN 19CTETRN Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total Description AFUDC 19CTETRN 19CTETRN Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 202103 Total Indirect/Overheads Total Material 201901 19CTTRN1 BAR,DIGGING, HEXAGON HANDLE, 1-1/8 IN DIA, 8 FT LG, STEEL CLAMP, CLOTHS PIN, HAND, NYLON, FOR CLAMPING RUBBER BLANKETS, HAND USE GLOVE,WORK, COLD WEATHER, XL, SIZE: 11, SHORT CUFF, RED COTTON LINED, LEATHER, TAN, BLUE CUFF RIB GLOVE,WORK, WINTER, L, NAPPED ACRYLIC LINED, LATEX RUBBER, ORANGE/GREY, BROWN MICROFINISH, 10-GA SEA STICK,GRIPALL, 1-1/4 IN DIA, 8 FT LG, W/ UNIVERAL FITTING BOTH THE ENDS WRENCHE,BOX END, RATCHET, INSULATED MID- SECTION, 9/16 X 3/4 IN 19CTTRN1 Total 201901 Total 201902 19CTTRN1 ADAPTER, KELLY BAR, HEAVY DUTY, 2-5/8 IN HEX, 8-1/8 IN LG ADAPTER, LOCKING, 2-5/8 IN, STEEL ADAPTER, POWER HEX SHANK, IMPACT, FOR HAND USE, USE 1/2 IN SQUARE DRIVE, TOOL ATTACHMENT,SHACKLE, 7/8 IN, 13000 LB WORK LOAD LIMIT, W/ SCREW PIN BAG, BUCKET, W/ 6 INSIDE POCKETS, TWO GROMMETS FOR HOOKS(ORDER SEPARATELY), HARD BODY WITH MOLDED BO BAR, ANCHOR SCREW, DRIVE END ASSEMBLY, KELLY BAR, 7 FT BIT,DRILL, IMPACT, SINGLE TWIST, 9/16 IN HEX DRIVE SHANK, 12 IN LG BIT,DRILL, POLE, IMPACT, 15/16 IN, 18 IN LG Values Sum of Quantity 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sum of Amount $6.56 $100.81 $550.89 $550.89 -$90.35 -$90.35 $561.35 $81.72 $81.72 $646.84 $646.84 $728.56 $655.76 $655.76 $655.76 $448.76 $448.76 $448.76 $5.07 $5.07 $5.07 $1,423.06 $1,423.06 $1,423.06 $1,253.87 $1,253.87 $1,253.87 $10.18 $10.18 $10.18 $206.93 $206.93 $206.93 $66,581.86 $156.11 $251.24 $33.45 $19.24 $286.46 $123.28 $869.78 $869.78 $659.50 $1,236.50 $245.85 $226.48 $326.94 $733.11 $151.20 $194.34
  4. Page 4

    funding project CTTRN19 Cost Element Category Material month number 201902 accounting work order 19CTTRN1 Description BIT,DRILL, POLE, IMPACT, HEX DRIVE SHANK, SINGLE TWIST, 11/16 IN X 7/16 IN SHANK, 12 IN LG BIT,DRILL, POLE, IMPACT, HEX DRIVE SHANK, SINGLE TWIST, 13/16 IN X 7/16 IN SHANK, 12 IN LG BIT,IMPACT, 13/16 IN X 15-1/2 IN TWIST, 18 IN OAL, W/ CARBIDE TIPS, TOOL BLOCK, W/ TACKLE, LINEMANS, W/ DETACH SWIVEL HOOKS, H267 BLOCK, 258 ANCHOR HOOK, H268 BLOCK, STEEL W CUTTER,BOLT, 5/16 IN HARD X 7/16 IN SOFT X 24 IN, HANDLE: FIBERGLASS, RUBBER GRIP CUTTER,BOLT, HEAVY DUTY, CENTER CUT, 1/4 IN HARD X 3/8 IN SOFT, 18-1/4 IN LG, STEEL, HANDLE: FIBERGL CUTTER,CABLE, HYDRAULIC, 15-1/8 IN LG CUTTER,CABLE, RATCHET, HARD, SHEAR CUT, 28 IN LG HANDLE, 20 KV IR, 7/16 IN EHS GUY STRAND CAPACITY CUTTER,CABLE, RATCHET, ONE-HAND, 10-1/4 IN OAL, CABLE: 400 MCM CU TO 600 MCM AL AND 336 MCM ACSR CUTTER,CABLE, RATCHET, SOFT, 27-1/2 IN LG HANDLE, CABLE: 1500 KCML CU TO 2500 KCME, INSULATED, 20 KV CUTTER,CABLE, SHEAR, SOFT, FIBERGLASS HANDLE, CABLE: 350 KCMLIL CU/AL GRAYBAR ELECTRIC COMPANY INC GRIP,CABLE, LINE WIRE, TENSION, Range 0.625 in to 1.362 in, 4000 LB PULLING CAPACITY GRIP,CABLE, TENSION, 0.7-1.25 IN DIA CABLE RANGE, W/ PARALLEL JAW, SPRING LOADED, SERRATED CONTACT S GRIP,CABLE, TENSION, DOUBLE V GROOVE, 5 IN JAW, 0.16-0.55 IN DIA CABLE RANGE, W/ PARALLEL JAW, FOR G HAMMER, LINEMANS DOUBLE-FACED, 3 TO 3/4 IN HEAD X 15 IN, 36 OZ, TEMPERED STEEL, W/ FIBERGLASS HANDL HOOK, BUCKET, 3/4 IN DIA, POLYMER HOOK, GUY PULLING, TUNING FORK, 13000 LB HOOK,CANT, 2 IN X 4 FT, HANDLE: FIBERGLASS, FIXED POINT, 8 LB INDICATOR,TORQUE, SHEAR PIN JUMPER,ELECTRICAL, INSULATED, CU, FOR METER SOCKET MAT,GROUNDING, NON-SKID,PERSONNEL, 58 X 58 IN, 4 IN GROUNDING GRID, MFR: KRI-TECH METER, CLAMP-ON, 3-3/4-DIGIT READOUT, 400-600 VDC, 400-1000 VAC, 400-1000 A, 4-40 KOHM, W/ TEST LEAD PLIER, ADJUSTABLE, TONGUE AND GROOVE, 2 IN JAW OPENING, 10 IN LG, HANDLE: PLASTIC-DIPPED, W/ 7 ADJUS PLIER,LINEMANS, SIDE CUTTING, 9 IN, W/ COVERED HANDLES POUCH, APRON, AERIAL, 7 LB, W/ MAGNETIC STRIP ROD,GROUND, 6 FT LG, W/ TEE HANDLE, SCREW RULE,FOLDING, 6 FT LG, 5/8 IN W, FIBERGLASS, 1/16 IN INCREMENTS SHEAR, CUTTING, LOPPING, 1-3/4 IN CUT, 30 IN W, TEFLON COATED BLADE SHOVEL, LONG HANDLE, ROLLED SHOULDER, SQUARE POINT, 48 IN, FIBERGLASS SHOVEL, LONG HANDLE, ROUND POINT, 48 IN, FIBERGLASS SHOVEL, SPADE, STRAIGHT, ROUND HEAD, 10 FT LG, FOR DIGGERS SLING, ADJUSTABLE, 48 IN LG, 27 IN W, 1/2 IN THK, VERTICAL 2200 LB, NYLON, POLYESTER SLING, POLE SETTING, DOUBLE THICK RETURN EYE, 4 FT LG, 2 IN W, BASKET 9500 LB, CHOKER 3500 LB, NYLON SLING, POLE SETTING, DOUBLE THICK RETURN EYE, 5 FT LG, 2 IN W, BASKET 10400 LB, CHOKER 4200 LB, NYLO SOCKET, DEEP, IMPACT, 1-1/8 IN, 1/2 IN DRIVE, 8 PT, TOOL SOCKET,DRIVE, IMPACT, 3/4 IN, 1/2 IN DRIVE, STEEL, 6 PT SOCKET,DRIVE, IMPACT, DEEP, 5/8 IN, 1/2 IN DRIVE, STEEL, 8 PT SOCKET,DRIVE, IMPACT, DEEP, 7/8 IN, 1/2 IN DRIVE, STEEL, 6 PT SPOON, 10 FT STICK, SWITCH, TELESCOPIC, UNIVERSAL HEAD, NO TWIST, TRIANGULAR, 68 IN LG RETRACTED X 35 FT LG EXTEN STICK, WIRE HOLDING HOT LINE ADJUSTABLE HEAD FBG, LINES, 1-1/4 IN, 6 FT LG, JUMPER WIRES AND HOLD CO TAMPER,HYDRAULIC, TAMPER,HYDRAULIC, TAMPER,HYDRAULIC, TAMPER,HYDRAULIC, TAMPER,HYDRAULIC, 71 IN, 71 TAPE,MEASURING, OPEN REEL, 100 FT LG, 1/2 IN W, FIBERGLASS, WHITE AND YELLOW, INCH & METRIC WB MASON CO INC WRENCH,ADJUSTABLE, 12 IN OAL, CHROME PLATED, W/ COVERED HANDLE WRENCH,ANCHOR, MULTI-HELIX ADAPTER, TUBE, 12 IN LG, FOR DRIVE DOUBLE HELIX SWAMP ANCHOR WRENCH,LINEMAN, REVERSIBLE, RATCHETING TRIPLE SQUARE, 3-IN-1 COMBINATION SOCKET, BOLT THRU, FOR LAG WRENCH,PIPE, ADJUSTABLE, 36 IN LG, AL, STRAIGHT WRENCHE,BOX END, RATCHET, INSULATED MID- SECTION, 9/16 X 3/4 IN Values Sum of Quantity Sum of Amount $175.32 $162.18 $215.92 $1,521.24 $391.07 $223.72 $2,241.96 $905.66 $626.06 $838.24 $648.00 -$228.31 $2,223.52 $1,608.64 $1,622.56 $82.29 $532.56 $455.31 $550.99 $13,453.80 $42.30 $1,168.86 $989.00 $171.36 $345.36 $386.22 $477.50 $143.60 $272.48 $96.52 $103.60 $509.47 $63.99 $79.28 $44.19 $125.42 $52.02 $91.69 $36.52 $205.34 $777.14 $568.88 $4,165.82 $127.84 $573.97 $159.92 $604.28 $1,357.44 $343.54 $369.84
  5. Page 5

    funding project CTTRN19 Cost Element Category Material month number 201902 201902 Total 201903 accounting work order 19CTTRN1 Total 19CTTRN1 Description BAG, 22 IN LG, 11 IN W, 11 IN DP, DOUBLE VINYL WEAVE, W/ HEAVY WEB HANDLES, FOR GROUND MAT STORAGE, BAR,DIGGING, HEXAGON HANDLE, 1-1/8 IN DIA, 8 FT LG, STEEL BAR,DIGGING, SPUD AND TAMPER, 9 FT LG, W/ STEEL HANDLE BAR,TAMPING, HEAVY SHOE, 9 FT LG, W/ WOOD HANDLE BIT,DRILL, POLE, IMPACT, SINGLE TWIST, 11/16 IN, 18 IN LG DIVAL SAFETY EQUIPMENT INC GRAYBAR ELECTRIC COMPANY INC GRIP,CABLE, TENSION, 4.5 IN JAW, 0.625-1.25 IN DIA CABLE RANGE, W/ PARALLEL JAW, SERRATED LOWER JAW, HARP SERVICES INC LIGHT, POLE TRANSPORTING, 6 V, AMBER, CONTINUOUS BURN, W/ CHAIN LOCKING DEVISE AND TWO FLAG HOLDERS, POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED POUCH, APRON, AERIAL, 23.9 X 4 IN, 6 LB, 10 OZ, W/ HARD BODY INOSIL PULLER,POLE, HYDRAULIC, 6 FT 1/2 IN , 1 TO 10 GPM, 2800 PSI, ALLOY CHAIN, W/ BASE PLATE, SWIVEL CHAI ROD, PULL ROPE CAP, 3000 FT, 6 IN W, 2000 LBS PULL RATING TIP,TORCH, SELF IGNITING, PROPANE, ADJUSTABLE, 16.92 OZ CANISTER VALLEN 19CTTRN1 Total 201903 Total 201904 19CTTRN1 3146 Klein Linemans Wrench 602-7DD Klein Screw Driver 80936MF Klein Hammer 9116 Klein Ruler BAR, ANCHOR SCREW, DRIVE END ASSEMBLY, KELLY BAR, 7 FT BW-223 Bug Wrench 9/16 & 3/4 CABLE, INSULATED, UG, 4/C, 500 KCMIL, 600 V, W/ 4/0 AWG NEUTRAL, EPR INSULATED, CU CONE,SAFETY, TRAFFIC, 3.5 LB EA, FLUORESCENT ORANGE, ORANGE BASE, SET OF 5 COLLAPSIBLE W/ CARRY CASE CONNECTOR,ELECTRICAL, CRAB, LIMITER, 500 MCM, 2 WAY STUD OUTLET, 8-WAY, W/ 21 IN PIGTAILS, COMPRESSI CUTTER,CABLE, RATCHET, SOFT, 27-1/2 IN LG HANDLE, CABLE: 1500 KCML CU TO 2500 KCME, INSULATED, 20 KV D507-10 Klein Adjustable Wrench FLAG, ORANGE, W/ MAGNETIC BASE, LOGO, POLE GRAYBAR ELECTRIC COMPANY INC HAMMER,CLAW, CURVED, 13-1/4 IN, 16 OZ, W/ FIBERGLASS HANDLE HD213-9NETH Klein Pliers HEAD,BROOM, STREET, ECONOLINE, 22 X 4 IN BRUSH FACE, W/ PALMYRA FILL, P/N: ESB-16-P HOOK, GUY PULLING, TUNING FORK, 13000 LB HYDRON INC Klien Pump Pliers LOADBUSTER TOOL, COMPLETE UNIT LOADBUSTER TOOL, OVERHEAD, 25/35 KV POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED POLE, 45 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED RAKE, LEVEL HEAD, 66 IN LG HANDLE, 16-5/8 IN W, CS, W/ WOOD HANDLE SHOVEL, ROUND POINT, 47 IN HANDLE, WOOD/STEEL SHOVEL, SQUARE POINT, 47 IN HANDLE SPLICE,ELECTRICAL, HEAT SHRINK, 500 TO 750, 3/C PLIC, STRAIGHT, 15 KV, INSULATED, HVS-3-1593 SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 500 TO 750 KCMIL, STRAIGHT, 15 KV, INSULATED, FOR 3/C P VALLEN WRENCH,ADJUSTABLE, HEAVY DUTY, CRESCENT, 10 IN OAL, DROP-FORGED, PLASTIC HANDLE, 1-1/8 IN MAX JAW CA Values Sum of Quantity Sum of Amount $46,478.04 $46,478.04 $118.49 $182.75 $275.85 $579.25 $167.76 $15.95 $14.13 $1,088.68 $57.34 $243.25 $8,760.00 $511.32 $8,280.00 $686.77 $138.18 $499.69 $21,619.41 $21,619.41 $3,376.80 $897.60 $2,203.20 $950.40 $726.07 $1,216.80 $22,923.59 $406.48 $8,393.50 $806.39 $1,572.00 $141.60 -$116.02 $29.49 $1,891.20 $22.78 $127.19 $1,100.68 $1,053.60 $7,050.56 $4,551.64 -$2,628.00 $5,580.00 $41.34 $193.17 $49.08 $10,909.12 $5,645.06 $12.64 $48.83
  6. Page 6

    funding project CTTRN19 Cost Element Category Material month number 201904 201904 Total 201905 accounting work order 19CTTRN1 Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 Description 14 X 10 SIGN, DANGEROUS / HAZARDOUS VOLTAGE.KEEP AWAY ADAPTER, POWER HEX SHANK, IMPACT, FOR HAND USE, USE 1/2 IN SQUARE DRIVE, TOOL BAG,TOOL, TOTE, CARRY-ALL, CANVAS, W/ VELCRO CLOSURES BATTERY,ALKALINE, 9 V BATTERY,ALKALINE, C-CELL, 1.5 V CAP,ELECTRICAL, INSULATING, DEADEND, LOADBREAK, 15 KV, 200 A COVER, ELBOW, 27 KV, INSULATED, TD 814 GLASSES,SAFETY, CLEAR LENS, BLACK FRAME, W/ANTI-FOG COAT GLOVE, SPLICER, NO DRIP NO MELT, XL, LEVELS: CUT A7, PUNCTURE 4, KEVLAR LINED GUIDE,CABLE, MINI CORNER, CABLE TENSION LOAD: 10000 LB, TD-814 HAMMER, LINEMANS DOUBLE-FACED, 3 TO 3/4 IN HEAD X 15 IN, 36 OZ, TEMPERED STEEL, W/ FIBERGLASS HANDL KNIFE,CABLE, SHEATH SPLITTING, HEAVY DUTY, 8-3/4 IN OAL, 4-1/2 IN LG BLADE, HANDLE: PLASTIC DIPPED, PLIER,LINEMANS, SIDE CUTTING, 9 IN, W/ COVERED HANDLES PLUG,STANDOFF, FEED-THRU, 15 KV, 2 POSITION, FOR LOAD BREAK ELBOW CONNECTOR PORTABLE SIGN, MINICADE 36 X 13 WITH 24 X 12 RED STROBE OR CONTINUOUS LIGHT SIGN,CAUTION, ROLL-UP, UTILITY WORK AHEAD, 48 X 48 IN, OSHA REFLECTIVE ORANGE, W/ O CROSSBRACE SLING,WIRE ROPE, 2 EYES, 6 X 37 CABLE, 1/2 IN DIA, 4 FT LG SPLICE,ELECTRICAL, TRANSITIONAL, 1/C, 4/0 TO 500 PILC TO 4/0 TO 350 SOLID/DIELECTRIC, 15 KV, INSULAT SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, #4 TO 4/0 STR, STRAIGHT, 15 KV, INSULATED, FOR 3/C PLIC STAND, SIGN, TRAFFIC, HOLDS UP TO 48 X 48 IN SIGNS TAPE, SEMI-CONDUCTING, 15 FT LG X 3/4 IN W, SHIELDING WB MASON CO INC COVER, LINE, HOSE, 30 KV, 1.5 IN ID, 6 FT LG, NATURAL RUBBER INSULATED, CLASS 3, W/ CONNECTOR END, O Kits for Line Trucks STUART C IRBY CO 19CTTRN2 Total 201905 Total 201906 19CTTRN1 19CTTRN1 Total 19CTTRN2 GRIP,CABLE, TENSION, DOUBLE V GROOVE, 5 IN JAW, 0.16-0.55 IN DIA CABLE RANGE, W/ PARALLEL JAW, FOR G MARKETING DISPLAYS INC PLIER,LINEMANS, SIDE CUTTING, 9 IN, W/ COVERED HANDLES POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED SIGN, DIRECTIONAL ARROW, OSHA, 48 IN LG, 24 IN W, FLEXIBLE, ROLL-UP, REFLECTIVE ORANGE, W/ CROSSBRAC SIGN,CAUTION, END UTILITY WORK, 24 X 48 IN, W DX2-W24H, W/ CROSSBRACE SIGN,CAUTION, ROLL-UP, ONE LANE ROAD AHEAD, 48 X 48 IN, OSHA REFLECTIVE ORANGE, W/ O CROSSBRACE TARPAULIN, DIRT BAG, 8 X 8 FT, FOR POLE SETTING UTICOM SYSTEMS INC GRAINGER SPILL CONTAINMENT KIT, INCIDENTAL, OIL, 4 EA/CTN, CONSISTS OF: (25) OIL PADS, (3) MINI-BOOMS 3 IN X 19CTTRN2 Total 201906 Total 201907 19CTTRN1 ADAPTER,CABLE, STRESS RELIEF, 15/25 KV, 500/350 KCMIL, 1.09-1.31 IN CABLE DIA, CONDUCTOR: CU/AL ATTACHMENT,SHACKLE, 7/8 IN, 13000 LB WORK LOAD LIMIT, W/ SCREW PIN BAG,TOOL, CARRY-ALL, TOTE, WATERPROOF, FLAME AND PUNCTURE RESISTANT, 24 X 7 X 15 IN, CANVAS, VINAL C BAG,TOOL, LIFTING, 12 X 15 IN, CANVAS, W/ PVC TOP RING, SWIVEL SNAP HOOK CONNECTOR,COMPRESSION, TERMINAL, 500 KCMIL KR, 15/25/30/35 KV, 600 A, CONDUCTOR: CU, FOR ELBOW Values Sum of Quantity Sum of Amount $79,176.79 $79,176.79 $241.90 $49.17 $68.86 $2.02 $3.65 $72.67 $417.29 $33.22 $29.91 $783.34 $80.58 $76.88 $26.09 $217.08 $347.40 $436.80 $1,240.25 $121.92 $1,382.56 $4,125.17 $6,152.96 $70.87 $63.83 $16,044.42 $13,283.15 $60,510.52 $2,499.08 $76,292.75 $92,337.17 $1,622.56 $197.25 $52.17 $4,380.00 $1,916.75 $1,619.20 $1,240.25 $979.18 $42.38 $12,049.74 $2,282.35 $1,080.00 $3,362.35 $15,412.09 $148.63 $168.16 $74.18 $42.36 $232.73
  7. Page 7

    funding project CTTRN19 Cost Element Category Material month number 201907 accounting work order 19CTTRN1 19CTTRN1 Total 19CTTRN2 Description ELBOW,GROUNDING, 15 KV, 200 A, WATERPROOF, W/ 1/0 COPPER CABLE & GROUND CLAMP GRAYBAR ELECTRIC COMPANY INC JP MORGAN CHASE BANK LADDER, STEP, TYPE 1AA, 6 FT LG, FIBERGLASS/AL, 375 LB RATING SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 1/C, #4 TO 4/0 PILC TO #2 TO 4/0 SOLID DIELECTRIC, 15 K SPLICE,ELECTRICAL, URD REPAIR, #2STR/#1 SOLID, 15 KV, W/ PREMOLDED JOINT STICK, SWITCH, TELESCOPIC, PIN LOCK, ROUND, 63 3/8 IN LG RETRACTED X 35 FT LG EXTENDED, FIBERGLASS TERMINATOR,CABLE, #1-350, #2, #2-1/0, 0.840 - 1.38 IN CABLE DIA, 25/35 KV, W/O PIN TAP OR LUG, AL/CU TERMINATOR,CABLE, #2-4/0, 0.637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG, AL/CU, FOR INDOOR/OU WHEEL,MEASURE, 4 FT CIRCUMFERENCE, EQUIPMENT: ORANGE, REPLACES CAT 133414 ATLANTIC ENVIRONMENTAL CORP DIVAL SAFETY EQUIPMENT INC FIRST AID KIT, TRAUMA, LARGE GRAINGER 19CTTRN2 Total 201907 Total 201908 19CTTRN1 19CTTRN1 Total 19CTTRN2 50062 OX-Block w/ Clevis Top 5007R2 Buck Rigger Double Sheave Pully 5800-1 Hastings Transformer Gin w/ Fiberglass Mast, 5800-5 Hastings Transformer Gin w/ Ratchet Strap COOLER,WATER, PORTABLE, 5 GAL, PLASTIC DIVAL SAFETY EQUIPMENT INC GLASSES,SAFETY, GRAY LENS, GRAY/YELLOW FRAME, W/ ANTI-FOG COAT, 10/BOX, SOLAR PRO GRAYBAR ELECTRIC COMPANY INC HYDRON INC KNEEDPAD,PROTECTIVE, SPLICER, 22 IN LG X 12 IN W X 7/8 IN THK, RUBBER, BLACK LIVE END, CAP, INSULATING, HEAT SHRINK, 15 KV, 4-4/0 AWG, 3/C PILC P9J8V-+M-34 Prusik w/ Ring SHOVEL, SPADE, STRAIGHT, ROUND HEAD, 10 FT LG, FOR DIGGERS SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.68 IN, MAX JACKET DIA 1.26 IN, STRAIGHT, 15/25 SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 1.03 IN, MAX JACKET DIA 2.05 IN, STRAIGHT, 15/25 SPLICE,ELECTRICAL, TRANSITIONAL/HEAT SHRINK, 1/C, #4 TO 4/0 PILC TO #2 TO 4/0 SOLID DIELECTRIC, 15 K SPLICE,ELECTRICAL, URD REPAIR, #2STR/#1 SOLID, 15 KV, W/ PREMOLDED JOINT SPLICE,KIT, COLD SHRINK, ELBOW SEALING, CABLE OD RANGE: 0.8 - 1.5 IN SPOON, 10 FT SWIVEL,PULLING, 5/8 IN ROPE OPENING SIZE, 1-1/4 IN OD, ULTIMATE TENSILE LOAD: 4500 LB SWIVEL,PULLING, ROPE OPENING SIZE: 5/8 IN, 1-1/2 IN OD, RATING: 7500 LBS TAPE,INSULATION, SELF-FUSING, HIGH VOLTAGE, SPLICING, 30 FT LG X 3/4 IN W X 0.030 IN THK, EPR, 130 D TAPE,MEASURING, 100 FT LG, 1/2 IN W, NON-METALLIC, W/ ENCLOSED CASE, FRACTIONAL ENGLISH TERMINATOR,CABLE, #2-4/0, 0.637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG, AL/CU, FOR INDOOR/OU VALLEN WRENCH,RATCHET, ALLEN, PENTA GRAINGER GRAYBAR ELECTRIC COMPANY INC RECEIVER,ELECTRONIC, GPS, DEZL 580 LMT-S,TRUCK MODE, 5 IN SCREEN, LIFETIME FREE MAPS, W/BLUE TOOTH 19CTTRN2 Total 201908 Total 201909 19CTTRN1 BOB,PLUMB, 5-1/2 IN OAL, STEEL, W/ SLOTTED NECK, REMOVABLE POINT, NO 177 SERIES, 5 OZ Values Sum of Quantity Sum of Amount $521.41 $13.38 $1,616.56 $257.14 $515.67 $2,225.39 $481.04 $2,431.71 $940.41 $520.72 $10,189.49 $36.61 $40.60 $1,197.70 $10,021.12 $11,296.03 $21,485.52 $2,023.20 $1,593.80 $648.00 $504.00 $122.40 $8.77 $258.80 $31.31 $300.69 $258.96 $3,774.30 $285.20 $169.38 $3,792.42 $2,966.16 $1,547.02 $4,140.48 $465.63 $204.10 $697.56 $703.30 $261.14 $114.10 $3,560.82 $21.51 $191.94 $28,644.99 -$7,895.32 -$29.01 $3,259.96 -$4,664.37 $23,980.62 $749.58
  8. Page 8

    funding project CTTRN19 Cost Element Category Material month number 201909 accounting work order 19CTTRN1 19CTTRN1 Total 19CTTRN2 Description BOOT,PULLOVER, SUPER DIELECTRIC DEEP HEEL OVERSHOES, SIZE: 11, RUBBER, YELLOW, ANKLE HIGH, W/ ANTI-S BOOT,PULLOVER, SUPER DIELECTRIC DEEP HEEL OVERSHOES, SIZE: 12, RUBBER, YELLOW, ANKLE HIGH, W/ ANTI-S BOOT,PULLOVER, SUPER DIELECTRIC DEEP HEEL OVERSHOES, SIZE: 13, RUBBER, YELLOW, ANKLE HIGH, W/ ANTI-S SLING, 1/2 IN DIA, 20-40 IN LEG LG, VERTICAL 6600 LB SAFE WORKLOAD, POLYESTER, W/ 4 LEG, 12 STRAND SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.68 IN, MAX JACKET DIA 1.26 IN, STRAIGHT, 15/25 SPLICE,ELECTRICAL, URD REPAIR, #2STR/#1 SOLID, 15 KV, W/ PREMOLDED JOINT SWIVEL,WIRE PULLING, 1800 LB, 7/8 IN TERMINATOR,CABLE, #2-4/0, 0.637 - 1.12 IN CABLE DIA, 15 KV, W/O PIN TAP OR LUG, AL/CU, FOR INDOOR/OU TONG,POLE, MACHINED, 10000 LB, 16-3/4 IN OPENING, BRAND: NYLATRON VALLEN AMERICAN LADDERS & SCAFFOLDS ASSEMBLY GRIP, POLE V- RUNG, RUBBER PADED, W/LADDERS TO INCREASE STABILITY, FOR WERNER LADDERS 7800GRAINGER Values Sum of Quantity 0 19CTTRN2 Total 201909 Total 201910 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 201910 Total 201911 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 201911 Total 201912 201912 Total 202001 19CTETRN 19CTETRN Total 19CTTRN1 19CTTRN1 Total 19CTTRN2 19CTTRN2 Total 19CTETRN 19CTETRN Total 19CTTRN1 19CTTRN1 Total FIRST AID KIT, TRAUMA, SMALL, ORANGE, W/ SC: 0432013,0432014,0432015,0432016,0432017, 0432018,043201 FUSE,CURRENT LIMITING, SINGLE BARREL, 25 KV, 12 A CONTINOUS, 31 KA MAX IC, 150 KV BIL CUTOUTS SPLICE,ELECTRICAL, COLD SHRINK, MIN INSULATION DIA 0.68 IN, MAX JACKET DIA 1.26 IN, STRAIGHT, 15/25 SPLICE,ELECTRICAL, URD REPAIR, #2STR/#1 SOLID, 15 KV, W/ PREMOLDED JOINT GRAINGER 0 0 GRAYBAR ELECTRIC COMPANY INC GRIP,CABLE, TENSION, 0.12-0.50 IN DIA CABLE RANGE, W/ CURVED JAW, SERRATED CONTACT SURFACE, FOR GUY GRIP,CABLE, TENSION, HOT LINE, SPRING LOADED, 0.18-0.8 IN DIA CABLE RANGE, W/ PARALLEL JAW, SERRATED SOCKET,DRIVE, IMPACT, 7/8 IN, 1/2 IN DRIVE, 6 PT TURTLE & HUGHES INC GRAINGER 0 0 COMFORTS OF HOME SERVICES INC 0 0 0 0 0 0 0 0 0 GRAYBAR ELECTRIC COMPANY INC GRAINGER NESCO LLC POLE, 40 FT LG, CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED POLE, 55 FT LG , CLASS 2, SOUTHREN YELLOW PINE, PENTA TREATED RAKE, LEVEL HEAD, 66 IN LG HANDLE, 16-5/8 IN W, CS, W/ WOOD HANDLE SWIVEL,PULLING, 5/8 IN ROPE OPENING SIZE, 1-1/4 IN OD, ULTIMATE TENSILE LOAD: 4500 LB SWIVEL,WIRE PULLING, 1800 LB, 7/8 IN VALLEN 0 Sum of Amount $80.71 $86.15 $86.15 $578.32 $10,829.52 $6,457.92 $345.12 $979.73 $3,451.10 $145.80 $23,790.10 $6,415.80 $499.32 -$4,633.70 $2,281.42 $26,071.52 $2,133.00 $1,068.42 $1,361.11 $1,397.41 $5,959.94 $4,633.70 $4,633.70 $10,593.64 $88,613.40 $786.00 $514.80 $31.20 $1.04 $89,946.44 $4,633.70 $4,633.70 $94,580.14 $4,833.56 $4,833.56 -$883.52 -$883.52 -$4,633.70 -$4,633.70 -$683.66 $5,272.13 $5,272.13 $28.06 $2,715.64 $817.38 $40.92 $658.54 $0.00 $6.92 $4,267.46
  9. Page 9

    No text on this page. It may be a picture of a page, such as a scan or a chart.

Text of 1-CTTRN18 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,610 characters

Text of 1-CTROW17 CS & Closing Report_Redacted.pdf

Extracted from the file · 15 pages, 3 without text · 12,533 characters

Text of 1-CTRMTR17 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 8,323 characters

Text of 1-CTMTR21 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 5,890 characters

Text of 1-CTMTR20 CS & Closing Report_Redacted.pdf

Extracted from the file · 18 pages, 8 without text · 21,352 characters

Text of 1-CTMTR19 CS & Closing Report_Redacted.pdf

Extracted from the file · 6 pages, 4 without text · 6,215 characters

Text of 1-CTMTR18 CS & Closing Report_Redacted.pdf

Extracted from the file · 17 pages, 8 without text · 20,687 characters

Text of 1-CTMTR17 CS & Closing Report_Redacted.pdf

Extracted from the file · 12 pages, 6 without text · 14,369 characters

Text of 1-CTFT2021 CS & Closing Report_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 9,209 characters

Text of 1-CTFT2020 CS & Closing Report_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 14,590 characters

Text of 1-CTEDVH21 CS & Closing Report_Redacted.pdf

Extracted from the file · 26 pages, 3 without text · 30,119 characters

Text of 1-CTEDVH20 CS & Closing Report_Redacted.pdf

Extracted from the file · 24 pages, 2 without text · 25,121 characters

Text of 1-CSTMER CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 656 pages, 184 without text · 1,241,840 characters

Text of 1-CSTMER CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 143 without text · 925,443 characters

Text of 1-CSTMER CS & Closing Report 2019_Part2_Redacted.pdf

Extracted from the file · 745 pages, 117 without text · 1,311,127 characters

Text of 1-CSTMER CS & Closing Report 2019_Part1_Redacted.pdf

Extracted from the file · 750 pages · 1,818,090 characters

Text of 1-CSTMER CS & Closing Report 2018_Part2_Redacted.pdf

Extracted from the file · 701 pages, 50 without text · 1,928,204 characters

Text of 1-CSTMER CS & Closing Report 2018_Part1_Redacted.pdf

Extracted from the file · 750 pages, 7 without text · 1,170,967 characters

Text of 1-CSTMER CS & Closing Report 2017_Part2_Redacted.pdf

Extracted from the file · 573 pages, 116 without text · 1,377,910 characters

Text of 1-CSTMER CS & Closing Report 2017__Part1_Redacted.pdf

Extracted from the file · 750 pages, 70 without text · 1,191,670 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part2_Redacted.pdf

Extracted from the file · 708 pages, 93 without text · 1,527,022 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2021_Part1_Redacted.pdf

Extracted from the file · 750 pages, 56 without text · 1,006,998 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part1_Redacted.pdf

Extracted from the file · 750 pages, 143 without text · 925,443 characters

Text of 1-CSTMER (CDCDANNL) CS & Closing Report 2020_Part2_Redacted.pdf

Extracted from the file · 656 pages, 184 without text · 1,241,840 characters

Text of 1-CDMHANNL CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 5 pages, 2 without text · 3,113 characters

Text of 1-CDMHANNL CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 4,692 characters

Text of 1-CDMHANNL CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 6 pages, 2 without text · 5,822 characters

Text of 1-CDMHANNL CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 7 pages, 2 without text · 8,527 characters

Text of 1-CD00412 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 6 pages, 2 without text · 10,704 characters

Text of 1-CD00412 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 16,197 characters

Text of 1-CD00412 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 10 pages, 4 without text · 13,515 characters

Text of 1-CD00412 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 8 pages, 4 without text · 11,076 characters

Text of 1-CD00412 (CDNXANNL) CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 6 pages, 3 without text · 6,643 characters

Text of 1-CD00258 CS & Closing Report 2018.pdf

Extracted from the file · 3 pages · 1,786 characters

Text of 1-495802 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 331 pages, 76 without text · 481,532 characters

Text of 1-495802 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 204 pages, 21 without text · 414,147 characters

Text of 1-495802 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 163 pages, 25 without text · 244,382 characters

Text of 1-495802 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 207 pages, 39 without text · 291,857 characters

Text of 1-201435 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,904 characters

Text of 1-201435 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 1,868 characters

Text of 1-201435 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,526 characters

Text of 1-103353 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 5 pages, 3 without text · 4,460 characters

Text of 1-103353 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 3,734 characters

Text of 1-103353 CS & Closing Report 2018_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 2,489 characters

Text of 1-102118 CS & Closing Report 2021_Redacted.pdf

Extracted from the file · 14 pages, 5 without text · 19,415 characters

Text of 1-102118 CS & Closing Report 2020_Redacted.pdf

Extracted from the file · 11 pages, 2 without text · 21,744 characters

Text of 1-102118 CS & Closing Report 2019_Redacted.pdf

Extracted from the file · 11 pages, 3 without text · 16,618 characters

Text of 1-102118 CS & Closing Report 2017_Redacted.pdf

Extracted from the file · 9 pages, 3 without text · 14,796 characters

Text of 1-19733 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 3 without text · 944 characters

Text of 1-18742 CS & Closing Report_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 2,245 characters

Text of 1-18CGVE11 CS & Closing Report.pdf

Extracted from the file · 3 pages · 1,756 characters

Text of 2-103353 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 3-DSEQ 2018 Variance Letter Docket.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-DB_CABLE 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-DB_CABLE 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-CTTRN19 Supplement_Redacted.pdf

Extracted from the file · 2 pages · 3,066 characters

Text of 3-CTTRN18 Supplemental_Redacted.pdf

Extracted from the file · 2 pages, 1 without text · 2,135 characters

Text of 3-CTMTR19 Supplemental_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,186 characters

Text of 3-CSTMER 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-CSTMER 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-CSTMER (CDCDANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-495802 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-201435 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-102118 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 3- 103353 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-VLT_CORR 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-VLT_CORR 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-VLT_CORR 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-VLT_CORR (CDDKANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-VLT_CORR (CDDKANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-T1DWANA 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LVEHPUR PAF 2019_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,122 characters

Text of 2-LVEHPUR PAF 2018_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 4,579 characters

Text of 2-LVEHPUR PAF 2017_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,072 characters

Text of 2-LVEHPUR 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LN_RLBLTY 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LN_RLBLTY 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LN_RLBLTY 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LN_RLBLTY (CDDRANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LN_RLBLTY (CDDRANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LN_RELO 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LN_RELO 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LN_RELO 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LN_RELO (CDDHANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LN_RELO (CDDHANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-LIGHTNG 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-LIGHTNG 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-LIGHTNG 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-LIGHTNG (D7DA24) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-LIGHTNG (D7DA24) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-IT1DWANA 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-IT1DWANA 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-INSCLMCST 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-INSCLMCST 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-INSCLMCST 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-INSCLMCST (CTINS24) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-INSCLMCST (CTINS24) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-GXTD20 PAF_Redacted.pdf

Extracted from the file · 2 pages · 1,991 characters

Text of 2-GXTD19 PAF_Redacted.pdf

Extracted from the file · 2 pages · 1,980 characters

Text of 2-GXENG PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 2,867 characters

Text of 2-GXCOTRBL 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-GXCOTRBL 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-GXCOTRBL 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-GECNCLP PAF 2021_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,548 characters

Text of 2-ETTCF21 PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,350 characters

Text of 2-ETTCF20 PAF_Redacted.pdf

Extracted from the file · 4 pages, 1 without text · 5,310 characters

Text of 2-ETTCF19 PAF_Redacted.pdf

Extracted from the file · 4 pages, 2 without text · 3,187 characters

Text of 2-ETTCF18 PAF_Redacted.pdf

Extracted from the file · 6 pages, 1 without text · 10,601 characters

Text of 2-ETTCF17 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-ETT2017 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-ETT2016 PAF_Redacted.pdf

Extracted from the file · 4 pages · 8,282 characters

Text of 2-ETR2021 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 6,729 characters

Text of 2-ETR2020 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,746 characters

Text of 2-ETR2019 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,746 characters

Text of 2-ETR2018 PAF_Redacted.pdf

Extracted from the file · 6 pages, 1 without text · 10,601 characters

Text of 2-EMRGNTLN 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-EMRGNTLN 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-EMRGNTLN 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-EMRGNTLN (CDEMANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-EMRGNTLN (CDEMANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-EFO_TLS 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-EFO_TLS 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DT7C 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DT7C 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-DT7C 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DT7C 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DT7C 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DSEQ20 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,381 characters

Text of 2-DSEQ 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DSEQ 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,281 characters

Text of 2-DSEQ 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DSEQ 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DSEQ 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DSCN21 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,197 characters

Text of 2-DSCN20 PAF_Redacted.pdf

Extracted from the file · 1 page · 2,143 characters

Text of 2-DSCN 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-DSCN 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DSCN 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DB_CABLE 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-DB_CABLE 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-DB_CABLE 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-DB_CABLE (101395) Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-DB_CABLE (101395) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CTTRN21 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,329 characters

Text of 2-CTTRN20 PAF_Redacted.pdf

Extracted from the file · 3 pages, 2 without text · 783 characters

Text of 2-CTTRN19 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,353 characters

Text of 2-CTTRN18 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,349 characters

Text of 2-CTROW17 PAF_Redacted.pdf

Extracted from the file · 9 pages, 2 without text · 11,710 characters

Text of 2-CTRMTR17 PAF_Redacted.pdf

Extracted from the file · 10 pages, 2 without text · 10,234 characters

Text of 2-CTMTR21 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,669 characters

Text of 2-CTMTR20 PAF_Redacted.pdf

Extracted from the file · 3 pages · 5,573 characters

Text of 2-CTMTR19 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,670 characters

Text of 2-CTMTR18 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,704 characters

Text of 2-CTMTR17 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 3,597 characters

Text of 2-CTFT2021 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,751 characters

Text of 2-CTFT2020 PAF_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,661 characters

Text of 2-CTEDVH21 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 7,548 characters

Text of 2-CTEDVH20 PAF_Redacted.pdf

Extracted from the file · 5 pages, 1 without text · 6,052 characters

Text of 2-CSTMER 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CSTMER 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CSTMER 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-CSTMER 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CSTMER (CDCDANNL) 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CSTMER (CDCDANNL) 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CDMHANNL 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-CDMHANNL 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CDMHANNL 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CDMHANNL 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CD00412 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-CD00412 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-CD00412 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-CD00412 (CDNXANNL) Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-495802 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 2-495802 2020 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,280 characters

Text of 2-495802 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-495802 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-201435 2019 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,054 characters

Text of 2-201435 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 2-201435 2017 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,042 characters

Text of 2-103353 2021 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 1,888 characters

Text of 3-DT7C 2020 Variance Letter_Redacted.pdf

Extracted from the file · 4 pages · 12,652 characters

Text of 401051 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

Text of 4-LVEHPUR 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-VLT_CORR 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-T1DWANA 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LN_RLBLTY 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-LN_RLBLTY 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-LN_RLBLTY (CDDRANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LN_RELO (CDDHANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-LIGHTNG (D7DA24) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-INSCLMCST 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-INSCLMCST 2018 Variance Letter.pdf

Extracted from the file · 3 pages · 7,767 characters

Text of 3-INSCLMCST (CTINS24) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 3-GXTD20 Supplemental_Redacted.pdf

Extracted from the file · 7 pages, 5 without text · 1,994 characters

Text of 3-ETT2016 Supplemental_Redacted.pdf

Extracted from the file · 3 pages, 1 without text · 2,208 characters

Text of 3-EMRGNTLN 2019 Variance Letter.pdf

Extracted from the file · 4 pages · 10,910 characters

Text of 3-EMRGNTLN (CDEMANNL) 2020 Variance Letter.pdf

Extracted from the file · 4 pages · 13,641 characters

Text of 468601 2018 Capital Book CL & P Approved Plan.pdf

Extracted from the file · 2 pages · 2,098 characters

As listed on the current system

Supplement for New App [Filed: 09/25/2026]

This filing on the current system (opens in a new tab)