Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-ADDITIONS-4 Supplemental 2

Files3

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 18 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 18 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Parent Project Structure 1-Electric Distribution Basic Business-ED Basic Business - Other BASIC BUSINESS - OTHER-L4 CTETFI25:Berlin Training Yard Improvements CTETFI26:Berlin Training Yard Improvements OTHER CAPITAL CTCSCG26:CT Apprentice Climbing Gear 2026 CTCSFI26:CT Craft School Facility Improve CTCSTRN26:CT Apprentice Tools & Equipment CTDRYER:CT Dielectric Lab Equipment CTMTRTRN:CT Electric Curriculum Development CTSWITCH26:CT Electric Training Equipment CTTRN26:CT Electric Tools & Equipment 2026 Projected 2026 Capital Spend $ Project Long Description 605,236,736 571,801,881 246,643,870 9,510,802 149,950 CT Electric Berlin training yard facility improvements for rooftop solar DG metering for bathroom 100,000 facility 49,950 CT Electric Berlin training yard facility improvements to storage building 3,360,852 Connecticut lineworker apprentice climbing gear / apprentice toolkits for 2026 246,000 40,000 Connecticut craft school / apprentice facility (area work center) improvements 65,000 Connecticut craft school apprentice tools and equipment Connecticut dielectric / rubber goods lab equipment purchases. There will be a dryer purchase for the lab and a security card reader will be installed. 30,000 This project is for the development of training materials for electric apprentice schools, specifically overhead, meter operations, and substations. An effective, standard, flexible training program is 1,800,502 needed to ensure superior customer service and the safety and reliability of the electric grid. 500,000 Connecticut Technical (Electric) Training switchgear / new equipment purchases for 2026 100,000 Connecticut Technical (Electric) Training tools and equipment purchases for 2026
  2. Page 19 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 19 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CTTRNSUB25:Berlin Training Substation 2025 CTTRNTD878:CT TD-878 New Equipment Training TELECOMMUNICATIONS 1DWANA26:Telecom WAN Annuals CLP 2026 CMEEC26:CMEEC connection to CONVEX CSPETH26:CSP Ethernet Project CTADSS01:Distr Fiber Berlin 6A to Main Campu CTADSS02:Dist Fiber Newtown AWC CTAVTECCON26:CT Avtec Console Upgrade CTBATT26:2026 CT Battery and Charger Repl CTDISTERC26:CT Dist Sta Pilot-ERC Projected 2026 Capital Spend Project Long Description This project is to continue to modernize / upgrade the training substation in the Berlin, Connecticut training yard to increase hands-on skills training opportunities for Station Operations field workers 425,000 and supervisors. 154,350 New equipment initial training development with Mosaic per TD-878 6,000,000 195,000 TELECOM -WAN ANNUALS - CLP - 2026 The CMEEC26 project purpose is to provide a second communication path from Connecticut Municipal Electric Energy Cooperative (CMEEC) substations to Connecticut Valley Electric 150,000 Exchange (CONVEX). Eversource radio sites supporting DMR 220 Voice Radio and Open Sky radio systems supporting the Distribution Automation network must be upgraded to modern ethernet technology to continue to 565,000 utlize the Connecticut State Police (CSP) as a provider of backhaul services. 200,000 CTADSS01: Distribution Fiber from Berlin 6A substation to Berlin main campus 200,000 CTADSS02: Distribution Fiber - Newtown Area Work Center to Plumtree/Shepaug/Newtown This initiative will modernize the platform to a current fully supported AVTEC integrated voice communications system. This upgraded AVTEC platform will provide a standardized, flexible, and 3,000,000 reliabile communications tool across radio, cellular, and landline. 375,000 2026 CT Battery and Battery Charger Replacements 30,000 CT Pilot for Distribution Stations - ERC
  3. Page 20 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 20 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CTDMX23:CT DMX Replacements CTDNXSOL26:CT DNX Solution Upgrade CTLABUPGD26:CT Lab Ciena Server Upgrade CTXTRAN26:2026 CT XTRAN Project Capitalized Vehicles CAPITALIZED VEHICLES-L4 26CGVE11:2026 CG Vehicles CT Mtr Reading CTEDVH26:CT Elec D Fleet Capital Vehicles Projected 2026 Capital Spend Project Long Description Eversource has a number of Nokia DMX Multiplexers (DMXs) that need to be replaced due to their old age, decreasing reliability and end of life status for future support. The DMXs provide communications between Eversource sites in Connecticut, western Massachusetts, New Hampshire and multiple interconnects to ISO-New England & National Grid. The object of this project will be to replace all the DMXs with new SEL-ICONs. These devices will be configured in a standardized 160,000 manner to allow for expansion and organization. The object of this project will be to replace Infinera Digital Network Cross-connects (DNXs) with new Schweitzer Engineering Laboratories Integrated Communications Optical Networks (SELICON) or Belden XTRAN units. These devices will be configured in a standard manner to allow for 375,000 expansion and organization. 50,000 CT Lab Ciena Navigation Server Upgrade The objective of this project is to avoid loss of communication to any devices/services impacted by copper circuits and to migrate to the fiber based ethernet solution. The installation of these new devices will also allow Eversource to remove end-of-life equipment once the existing services have 700,000 been cut over to these new devices. 39,977,427 39,977,427 363,825 Vehicles Purchases for CT Electric Vehicles for Meter Reading and Field Collections This project is for the purchase of vehicles for the CT Electric Distribution line of business. All vehicles will include all current safety options and technologies to protect employees and the public, ensuring compliance with safety standards. The overall Fleet Vehicle Capital Program (FVCP) is designed to provide safe, reliable, and cost-effective vehicle operation. The FVCP is designed to 36,388,251 ensure Eversource's vehicles are safe, reliable, and meet operational needs.
  4. Page 21 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 21 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category ML2610:ML CL&P-D Vehicles 2026 Capital Tool Purchases CAPITAL TOOL PURCHASES-L4 CTTOOL26:CT Fleet Capital Tool Purchase GXCO:TOOLS/EQUIP. CUSTOMER OPERATIONS GXCOCENT:TOOLS/EQUIPMNT CUSTOMER OPS CENTRAL GXCOEAST:TOOLS/EQUIPMENT CUSTOMER OPS EASTER GXCOSGIO:TOOLS/EQUIP CUSTOMER OPS SGI&O GXCOTRBL:TOOLS/EQUIPMENT TROUBLE SHOOTER ORG GXCOWEST:TOOLS/EQUIPMENT CUSTOMER OPS WESTER GXENG2026:CT ENGINEERING TOOLS + EQUIP Projected 2026 Capital Spend Project Long Description This project is for the purchase of vehicles for the CT Electric Distribution Material Logistics line of business. All vehicles will include all current safety options and technologies to protect employees and the public, ensuring compliance with safety standards. The overall Fleet Vehicle Capital Program (FVCP) is designed to provide safe, reliable, and cost-effective vehicle operation. The 3,225,351 FVCP is designed to ensure Eversource's vehicles are safe, reliable, and meet operational needs. 8,807,058 8,807,058 This project is for the purchase of capital tools used by fleet employees to perform their daily jobs 164,859 throughout the year. This project is for the purchase of capital tools used by employees to perform their daily jobs (58,553) throughout the year. This project is for the purchase of capital tools used by central division field operations employees 1,243,915 to perform their daily jobs throughout the year. This project is for the purchase of capital tools used by eastern division field operations employees 1,200,000 to perform their daily jobs throughout the year. This project is for the purchase of capital tools used by Stamford/Greenwich field operations employees to perform their daily jobs throughout the year. 414,638 This project is for the purchase of capital tools used by response specialists to perform their daily 1,750,000 jobs throughout the year. This project is for the purchase of capital tools used by western division field operations employees 900,000 to perform their daily jobs throughout the year. This project is for the purchase of capital tools used by engineering employees to perform their daily 192,200 jobs throughout the year.
  5. Page 22 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 22 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category GXTD26:2026 CT D SS Capital Tool Annual Emergent Equipment Failures - Line EMERGENT EQUIPMENT FAILURES - LINE-L4 CD02504:Enfield 12C Conversion FAILED EQUIPMENT DB-DQ ANNUAL ARDB2M:DB PLANNED OBS ANNUAL CHES ARDB3H:DB PLANNED OBS ANNUAL HARTFORD ARDB4D:DB PLANNED OBS ANNUAL MADISON ARDB4M:DB PLANNED OBS. ANNUAL MIDDLETOWN ARDB4N:DB PLANNED OBS. ANNUAL NEW LONDON ARDB5D:DB PLANNED OBS ANNUAL DANIELSON ARDB5T:DB PLANNED OBS ANNUAL TOLLAND Projected 2026 Capital Spend Project Long Description This project is for the purchase of capital tools used by station operations employees to perform their 3,000,000 daily jobs throughout the year. 68,000,000 1,927,200 This project is resulting from the unexpected failure of the Enfield 12C-2X 115/27.6 kV transformer at Enfield 12C substation. Rather than replacing the failed transformer with another 115/27.6 kV transformer, the decision was made to proceed with converting the entire Enfield -Windsor Locks 27.6 kV system to 23 kV. This Distribution Line project is the first of two-distribution line projects to be established to convert the Enfield Windsor Locks 27.6 kV system to 23 kV. Substation Project CS00709 – Enfield 12C-2X Emergent Transformer Replacement has already been established for the conversion of the 27.6 kV substation equipment at Enfield 12C. This project will convert the Enfield 12C48 27.6 kV circuit to 23 kV and eliminate the Suffield 36M 27.6/23 kV substation. It will also reconfigure the 12C47 circuit at 27.6 kV until the Windsor Locks 14K transformer replacement project is established and completed. A new 14K8 circuit will be constructed under this project to 1,927,200 offload the 12C48 circuit and eliminate all contingency overloads in the area. 8,407,153 975,347 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL CHESHIRE 883,909 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL HARTFORD 455,744 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MADISON 1,621,348 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MIDDLETOWN 741,122 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL NEW LONDON 183,955 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL DANIELSON 1,168,350 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL TOLLAND
  6. Page 23 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 23 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category ARDB5W:DB PLANNED OBS ANNUAL DANIELSON DQDB2M:UG FAILED EQT CHES/NB ANNUAL DQDB3H:DB FAILED EQUIP HARTFORD ANNUAL DQDB4D:DB FAILED EQUIPMENT MADISON - ANNUA DQDB4M:DB FAILED EQUIPMENT MIDDLETOWN - AN DQDB4N:DB FAILD EQUIPMENT NEW LONDON - ANN DQDB5D:DB FAILED EQUIPMENT DANIELSON-ANNUA DQDB5W:DB FAILED EQUIPMENT DANIELSON-ANN FAILED EQUIPMENT OH-DQ ANNUAL AROH1B:OH PLANNED OBS ANNUAL NEWTOWN AROH1N:OH PLANNED OBS ANNUAL NORWALK AROH1S:OH PLANNED OBS ANNUAL STAMFORD AROH2M:OH PLANNED OBS ANNUAL CHES AROH2W:OH PLANNED OBS ANNUAL WTBY AROH3H:OH PLANNED OBS ANNUAL HARTFORD AROH4D:OH PLANNED OBS ANNUAL MADISON AROH4M:OH PLANNED OBS ANNUAL E HAMPTON AROH4N:OH PLANNED OBS ANNUAL NEW LONDON AROH5D:OH PLANNED OBS ANNUAL DANIELSON AROH5T:OH PLANNED OBS ANNUAL TOLLAND AROH5W:OH PLANNED OBS ANNUAL DANIELSON DQ2L:SYSTEM REPAIRS/OBSOL TORR CLP DQ2M:SYSTEM REPAIRS/OBSOL CHESHIRE/N.B. DQ3H:SYSTEM REPAIRS/OBSOL HARTFORD DQ4D:SYSTEM REPAIRS/OBSOL MADISON Projected 2026 Project Long Description Capital Spend 5,788 DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL DANIELSON 1,468,647 DIRECT-BURIED FAILED EQUIPMENT CHES/NB ANNUAL 591,538 DIRECT-BURIED FAILED EQUIPMENT HARTFORD AWC ANNUAL 155,238 DIRECT-BURIED FAILED EQUIPMENT MADISON - ANNUAL 100,335 DIRECT-BURIED FAILED EQUIPMENT MIDDLETOWN - ANNUAL 30,478 DIRECT-BURIED FAILED EQUIPMENT NEW LONDON - ANNUAL 15,889 DIRECT-BURIED FAILED EQUIPMENT DANIELSON-ANNUAL 9,465 DIRECT-BURIED FAILED EQUIPMENT DANIELSON-ANN 51,953,999 7,824,949 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NEWTOWN 4,886,114 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NORWALK 6,532,346 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL STAMFORD 2,005,940 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL CHESHIRE 3,392,441 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL WATERBURY 1,117,816 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL HARTFORD 1,931,008 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL MADISON 1,610,573 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL EAST HAMPTON 2,022,039 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL NEW LONDON 2,001,045 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON 3,414,773 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL TOLLAND 913 OVERHEAD PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON 4,994,806 SYSTEM REPAIRS/OBSOLETE EQUIPMENT TORRINGTON CLP 996,940 SYSTEM REPAIRS/OBSOLETE EQUIPMENT CHESHIRE/NEW BRITAIN 3,912,233 SYSTEM REPAIRS/OBSOLETE EQUIPMENT HARTFORD 681,531 SYSTEM REPAIRS/OBSOLETE EQUIPMENT MADISON
  7. Page 24 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 24 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DQ4M:SYSTEM REPAIRS/OBSOL E HAMPTON DQ4N:SYSTEM REPAIRS/OBSOL N LONDON DQ5D:SYSTEM REPAIRS/OBSOL DANIELSON DQ5T:SYSTEM REPAIRS/OBSOL TOLLAND DQ5W:SYSTEM REPAIRS/OBSOL DANIELSON DQOH2M:OH FAILED EQT CHESHIRE/NB ANNUAL DQOH3H:OH FAILED EQUIP HARTFORD AWC-ANNUAL DQOH4D:OH FAILD EQUIPMENT MADISON-ANNUAL DQOH4M:OH FAILD EQUIPMENT E HAMPTON-ANNUAL DQOH4N:OH FAILED EQUIPMENT NEW LONDON - AN DQOH5D:OH FAILED EQUIPMENT DANIELSON-ANNUA DQOH5T:OH FAILED EQUIPMENT TOLLAND ANNUAL FRDQOH:PROJECTION PROJECT - REPAIRS/OBS OH IFOH4D:OH INSPECTION FAILED EQUIPMENT MADI IFOH4M:OH INSPECTION FAILED EQUIPMENT E HA IFOH4N:OH INSPECTION FAILED EQUIPMENT NEW IFOH5D:OH INSPECTION FAILED EQUIPMENT DANI FAILED EQUIPMENT UG-DQ ANNUAL ARUG1B:UG PLANNED OBS ANNUAL NEWTOWN ARUG2M:UG PLANNED OBS ANNUAL CHES ARUG3H:UG PLANNED OBS ANNUAL HARTFORD ARUG4D:UG PLANNED OBS ANNUAL MADISON ARUG4M:UG PLANNED OBS. ANNUAL E Hampton ARUG4N:UG PLANNED OBS ANNUAL NEW LONDON ARUG5D:UG PLANNED OBS ANNUAL DANIELS Projected 2026 Project Long Description Capital Spend 992,009 SYSTEM REPAIRS/OBSOLETE EQUIPMENT EAST HAMPTON 508,120 SYSTEM REPAIRS/OBSOLETE EQUIPMENT NEW LONDON 685,319 SYSTEM REPAIRS/OBSOLETE EQUIPMENT DANIELSON 453,155 SYSTEM REPAIRS/OBSOLETE EQUIPMENT TOLLAND 43,025 SYSTEM REPAIRS/OBSOLETE EQUIPMENT DANIELSON 1,999,870 OVERHEAD FAILED EQUIPMENT CHESHIRE/NB ANNUAL 560,570 OVERHEAD EQUIPMENT FAILED HARTFORD AWC 321,834 OVERHEAD FAILED EQUIPMENT MADISON-ANNUAL 634,032 OVERHEAD FAILED EQUIPMENT EAST HAMPTON-ANNUAL 153,345 OVERHEAD FAILED EQUIPMENT NEW LONDON - ANNUAL 142,292 OVERHEAD FAILED EQUIPMENT DANIELSON-ANNUAL 681,774 OVERHEAD FAILED EQUIPMENT TOLLAND -ANNUAL (2,627,616) PROJECTION PROJECT - REPAIRS/OBSOLETE EQUIPENT OVERHEAD 4,338 OVERHEAD INSPECTION FAILED EQUIPMENT MADISON 8,515 OVERHEAD INSPECTION FAILED EQUIPMENT EAST HAMPTON 31,826 OVERHEAD INSPECTION FAILED EQUIPMENT NEW LONDO 36,124 OVERHEAD INSPECTION FAILED EQUIPMENTDANIELSON 5,711,648 30,142 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEWTOWN 788,059 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL CHESHIRE 1,951,372 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL HARTFORD 158,689 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL MADISON 217,246 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL EAST HAMPTON 265,304 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEW LONDON 9,496 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON
  8. Page 25 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 25 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DQUG2M:UG FAILED EQT CHES/NB ANNUAL DQUG3H:UG FAILED EQUIPMENT HARTFORD ANNUAL DQUG4N:UG FAILED EQUIPMENT NEW LONDON - AN DQUG5D:UG FAILED EQUIPMENT DANIELSON -ANNU Emergent Equipment Failures - Substation EMERGENT EQUIPMENT FAILURES - SUBSTATION-L4 CS00709:Enfield 12C Failed Transformer DSEQ26:2026 CT D SS Emergent Annual FREQPFSS:FORECAST PROJ FOR SS FAILED TRANSFO Environmental ENVIRONMENTAL - SUBSTATION CS00245:S Meadow 1A - Replace OCB's CS00422:NW Hartford Bus Rehab Rel. Ph2 FRENVISS:FORECAST PROJ FOR ENVIRON SS PCB TRANSFORMER REPLACEMENT PRGRM Projected 2026 Project Long Description Capital Spend 966,636 UNDERGROUND FAILED EQUIPMENT CHESHIRE/NB ANNUAL 1,305,587 UNDERGROUND FAILED EQUIPMENT HARTFORD ANNUAL 17,037 UNDERGROUND FAILED EQUIPMENT NEW LONDON - ANNUAL 2,080 UNDERGROUND FAILED EQUIPMENT DANIELSON -ANNUAL 15,505,106 15,505,106 This project is for the emergent replacement of the 12C-2X transformer and associated equipment at 5,106 Enfield 12C Substation in Enfield, CT This annual is for the replacement or removal of broken or failed equipment not identified specifically during the budget cycle but are identified through monitoring the system throughout the 2,500,000 year. Work materializes due to inspections, system events, etc. 13,000,000 PROJECT FOR SUBSTATION FAILED EQUIPMENT 5,165,000 4,965,000 4,735,175 South Meadow 1A - Replace 38 Oil Circuit Breakers with vacuum breakers. This project is the second phase of bus rehabilitation at the Northwest Hartford 2N distribution 13 substation located in Hartford, CT to replace aging reactors and switches. 229,812 FORECAST PROJECT FOR SUBSTATION ENVIRONMENTAL PROJECTS 200,000
  9. Page 26 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 26 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category 102118:PCB TRANSFORMER REPL PROGRAM Insurance Claim/Keep Cost INSURANCE CLAIM/KEEP COST-L4 FRINS9A:PROJECTION PROJECT FOR 9A INSURANCE INSDB2M:DB INSURANCE CLAIM CHESHIRE/N.B. AN INSDB3H:DB INSURANCE CLAIM HARTFORD ANNUAL INSDB4D:DB INSURANCE CLAIM MADISON ANNUAL INSDB4M:DB INSURANCE CLAIM E HAMPTON ANNUA INSDB4N:DB INSURANCE CLAIM NEW LONDON ANNUA INSDB5D:DB INSURANCE CLAIM DANIELSON ANNUAL INSDB5W:DB INSURANCE CLAIM DANIELSON ANNU INSOH1B:OH INSURANCE CLAIM NEWTOWN-ANNUAL INSOH1N:OH INSURANCE CLAIM NORWALK-ANNUAL INSOH1S:OH INSURANCE CLAIM STAMFORD-ANNUAL INSOH2L:INS CLAIM TORR-ANNUAL INSOH2M:INS CLAIM CHES/NB-ANNUAL Projected 2026 Capital Spend Project Long Description This program funds the replacement of transformers that have a high content of polychlorinated biphenyls (PCBs). PCBs are harmful to humans and the environment. If a transformer with PCBs leaks, or spills for any reason (car accident, etc) then the PCBs can enter the environment and cause damage. PCBs were used in transformers as an insulating means but have been phased out due to their health and environmental risks. This project pertains to high volume work orders not to exceed $500K and covers the entire state of CT. Capital work orders initiated against this annual project must include total costs less than or equal to $500K. Any work order exceeding $500K will require a 200,000 separate Project Authorization Form (PAF) and Delegation of Authority (DOA) approval. 8,800,000 8,800,000 13,171 PROJECTION PROJECT FOR 9A INSURANCE CLAIMS 209,307 DIRECT BURIED INSURANCE CLAIM CHESHIRE/N.B. ANNUAL 209,307 DIRECT BURIED INSURANCE CLAIM HARTFORD ANNUAL 28,347 DIRECT BURIED INSURANCE CLAIM MADISON ANNUAL 21,827 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 76,038 DIRECT BURIEDINSURANCE CLAIM NEW LONDON ANNUAL 93,387 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 43,829 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 1,101,714 DIRECT BURIED INSURANCE CLAIM NEWTOWN ANNUAL 604,363 OVERHEAD INSURANCE CLAIM NORWALK-ANNUAL 659,167 OVERHEAD INSURANCE CLAIM STAMFORD-ANNUAL 802,664 OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL 840,393 OVERHEAD INSURANCE CLAIM CHESHIRE-ANNUAL
  10. Page 27 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 27 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category INSOH2W:INS CLAIMWTBY-ANNUAL INSOH3H:OH INSURANCE CLAIM HARTFORD ANNUAL INSOH4D:OH INSURANCE CLAIM MADISON - ANNUAL INSOH4M:OH INSURANCE CLAIM MIDDLETOWN - ANN INSOH4N:OH INSURANCE CLAIM NEW LONDON - ANN INSOH5D:OH INSURANCE CLAIM DANIELSON-ANNUAL INSOH5T:OH INSURANCE CLAIM TOLLAND ANNUAL INSOH5W:OH INSURANCE CLAIM DANIELSON-ANNU INSUG4D:UG INSURANCE CLAIM MADISON - ANNUAL INSUG4M:UG INSURANCE CLAIM E Hampton- ANN INSUG4N:UG INSURANCE CLAIM NEW LONDON - ANN INSUG5D:UG INSURANCE CLAIM DANIELSON-ANNUAL Lighting NON ROADWAY LIGHTING - DA ANNUAL DA3L:NON-ROADWAY LIGHTING CT ROADWAY LIGHTING - D7 ANNUAL D73L:ROADAY LIGHTING CT FRD7:PROJECTION PROJECT D7 ROADWAY LIGHT Line Relocations/Act of Public Authority LINE RELOCATIONS-DH ANNUAL DH1B:LINE RELOCATIONS NEWTOWN DH1N:LINE RELOCATIONS NORWALK DH1S:LINE RELOCATIONS STAMFORD DH2L:LINE RELOCATIONS TORR CLP DH2M:LINE RELOCATIONS CHESHIRE/N.B. Projected 2026 Project Long Description Capital Spend 732,092 OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL 840,393 OVERHEAD INSURANCE CLAIM HARTFORD-ANNUAL 390,285 OVERHEAD INSURANCE CLAIM MADISON - ANNUAL 368,935 OVERHEAD INSURANCE CLAIM MIDDLETOWN-ANNUAL 434,976 OVERHEAD INSURANCE CLAIM NEW LONDON-ANNUAL 327,522 OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL 988,697 OVERHEAD INSURANCE CLAIM TOLLAND-ANNUAL 2,180 OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL 2,159 UNDERGROUND INSURANCE CLAIM MADISON-ANNUAL 2,355 UNDERGROUND INSURANCE CLAIM EAST HAMPTON-ANNUAL 4,710 UNDERGROUND INSURANCE CLAIM NEW LONDON-ANNUAL 2,182 UNDERGROUND INSURANCE CLAIM DANIELSON-ANNUAL 3,000,000 1,253,713 1,253,713 NON-ROADWAY LIGHTING REPAIRS 1,746,287 1,752,505 REPAIR ROADWAY LIGHTING (6,218) PROJECTION PROJECT D7 ROADWAY LIGHTING 20,400,211 3,800,000 318,346 LINE RELOCATIONS ANNUAL NEWTOWN 335,270 LINE RELOCATIONS ANNUAL NORWALK 692,254 LINE RELOCATIONS ANNUAL STAMFORD 227,529 LINE RELOCATIONS ANNUAL TORRINGTON 382,292 LINE RELOCATIONS ANNUAL CHESHIRE/NEW BRITAIN
2 parts match

As listed on the current system

Supplement for New App [Filed: 10/19/2026]

This filing on the current system (opens in a new tab)