Application supplement
Exhibit CLP-ADDITIONS-4 Supplemental 2
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
PDF · 2.1 MB · 77 pagesText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.pdfRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Excel · 613 KBText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsxRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Page 31 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 31 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DN5W:NEW/EXISTING CUSTMRS DANIELSON FRDN:Forecast Project Complex Services CUSTOMER DRIVEN-L4 PT4D:TEMPORARY WORK - MADISON PT4M:TEMPORARY WORK - E HAMPTON (HELCO) PT4N:TEMPORARY WORK - NEW LONDON (HELCO) PT5D:TEMPORARY WORK - DANIELSON PT5W:TEMPORARY WORK - DANIELSON PW2M:PRIVATE WORK - CHESHIRE PW3H:PRIVATE WORK - HARTFORD PW4D:PRIVATE WORK - MADISON PW4M:PRIVATE WORK - MIDDLETOWN (HELCO) PW4N:PRIVATE WORK - NEW LONDON (HELCO) Projected 2026 Project Long Description Capital Spend 174,665 NEW/EXISTING CUSTOMERS ANNUAL DANIELSON (7,082) NEW/EXISTING CUSTOMERS ANNUAL 1,330,858 ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 98,126 DISTRIBUTION FACILITIES MADISON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 43,611 DISTRIBUTION FACILITIES EAST HAMPTON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 133,452 DISTRIBUTION FACILITIES NEW LONDON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 65,417 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 37,068 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 223,336 CHESHIRE ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES HARTFORD 223,336 ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 120,130 MADISON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 37,068 MIDDLETOWN ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES NEW 39,249 LONDONPage 32 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 32 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category PW5D:PRIVATE WORK - DANIELSON PW5T:PRIVATE WORK - TOLLAND SIMPLE SERVICE-DV ANNUAL DV2M:SERVICES CHESHIRE/N.B. DV3H:SERVICES HARTFORD DV4M:SERVICES MIDDLETOWN DV4N:SERVICES NEW LONDON DV5T:SERVICES TOLLAND DV5W:SERVICES DANIELSON SPECIFIC PROJECTS-NEW SRVCE Projected 2026 Capital Spend Project Long Description ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 136,359 DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 173,706 TOLLAND 2,290,390 582,686 SIMPLE SERVICES ANNUAL CHESHIRE/NEW BRITAIN 291,343 SIMPLE SERVICES ANNUAL HARTFORD 386,582 SIMPLE SERVICES ANNUAL MIDDLETOWN 409,079 SIMPLE SERVICES ANNUAL NEW LONDON 582,686 SIMPLE SERVICES ANNUAL TOLLAND 38,014 SIMPLE SERVICES ANNUAL DANIELSON 23,989,199Page 33 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 33 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00454:Hartford Hospital - Construct New S Projected 2026 Capital Spend Project Long Description The main campus at Hartford Hospital is supplied by a customer owned substation (Substation 1) located on Retreat Avenue near the intersection of Maple Avenue. The substation is located inside a two-story brick building. The top floor of the building contains Eversource equipment consisting of two 23 KV primary feeders (109, 151), two ceiling mounted disconnect switches, and two 23 KV 11 KV, 10/12.5 MVA auto transformers. The first floor of the building contains Hartford Hospital equipment consisting of double-ended 11 KV bus with a normally closed bus tie breaker (such that the 109 and 151 feeders operate in parallel). Other buildings throughout the main campus are supplied by the Hartford Hospital 11 KV distribution feeders. Two of these feeders are stepped down to 4.16 KV to supply a Co-generation facility on campus. Campus peak demand is estimated at 11 MVA and co-gen capability is estimated at 8 MVA.Hartford Hospital is proposing to construct a new Substation 1. Previously, the plan was to demolish the existing Hall Wilson Lab building located adjacent to the existing substation and construct a new substation on the vacated site. However, the Hartford City Government prevented the demolition of that building forcing a redesign of the upgrade in 2021. Hartford Hospital plans to replace the two existing 10/12.5 MVA auto transformers with two 15 MVA auto transformers to support future load growth on campus. The land in front of the utility building where the new transformers will be located will be the future site of both Hartford Hospital’s and Eversource’s switch gear and metering. This project proposes to install ISG switchgear and primary metering cabinets to supply the new substation, and to remove all Eversource owned equipment (feeder cables, switches, and transformers) associated with the 91,500 existing substation.Page 34 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 34 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00818:Relocate Meriden Record Journal Sw. Projected 2026 Capital Spend Project Long Description Meriden is redeveloping the Meriden Record Journal site to a mixed use of commercial/retail/residential. As part of the redevelopment, the customer has requested that the existing 315D PMH-5 automatic switchgear pair be relocated. As part of the relocation, Eversource will upgrade the switchgear to an ISG 4-way auto pair to provide service to the new development 486,900 and allow for additional underground loops to supply future development in the area. CD00992:New Road in Bristol, Relocate and S The project relocates the four circuits in the duct bank located on private property to the proposed new underground structures on the new road and in the underground structures on Riverside Avenue. We are requesting the City to install 12-conduit duct bank structure in the new road. With this number of conduits, Eversource can supply the new customer load and relocate two of the four circuits out of the private property duct bank. These same circuits would supply the proposed 353,072 switchgear, which will supply the new customers off the new road. CD01506:New Service – 210 Long Ridge Rd 111 A customer will be constructing a new development at 210 Long Ridge Rd in Stamford, CT. The project will consist of a 4-story assisted living facility with 200 individual residential units and a partial garage on the lower level. To serve this load, the customer has requested 4 separate 3000 Amp services at 120/208V. This project will provide electrical service to the new customer by using 418,000 a set of PME-9/12 switchgears fed from the Cedar Heights 4R17 and 4R14 circuits.Page 35 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 35 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01591:Corbin Drive - Darien - New Service CD01935:Hiawatha Village Westport CD02065:100 Clinton Ave - New Services CD02265:Brainerd Place New Service CD02339:CT Transit-26 Elm Ct-New Service Projected 2026 Capital Spend Project Long Description This project is upgrading the 13S5 feeder in Darien and providing service to a new development that is being constructed in the first zone of the feeder. The circuit upgrade is necessary because the added load will cause an overload on the feeder. The new service project consists of 10 3-story and 1 5-story mixed-use buildings and 3 basement level garages. There will be a combination of office, restaurant, and retail spaces on the ground floor and apartments on the 2nd and 3rd floors. One building will consist of 4 townhouses only. The new service will be developed in two phases. Phase 1 will include 3 buildings and Phase 2 will include 7 buildings. Service will be provided using riser 484,800 to pad scheme. Hiawatha Lane in Westport CT is a residential area that houses approximately 10 customers. However, beyond this road is a residential complex (Avalon) that has more than 265 residents, also the former Cervalis property. These properties are served by Eversource from the Compo 23K17 feeder and the Norwalk 9S26 feeder.The purpose of this project is to accommodate a new 150-unit 75,000 luxury housing complex that will eliminate the existing 10 houses currently on Hiawatha Lane. 100 Clinton Ave is a new residential development in Stamford, Ct. The new development consists of 2 buildings – Block A and Block B. There will have in total of 471 residential apartments, EV charging stations and parking facilities. The estimated new load is 1.8 MW. Eversource may need to 247,100 upgrade its facilities to serve the customer. Brainerd Place is a new commercial/ residential development in Portland, CT. It is located at the corner of Main Street and Marlborough Road in Portland. The new development will have 25 916,303 commercial areas and 362 residential apartments. The expected new load is 3.8 MW. Eversource is required to provide service to customers in its territory upon request. Based on a new load request of 6.5 MVA from CT Transit for EV bus charging stations, Eversource may need to 234,500 upgrade its facilities to serve the customer.Page 36 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 36 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02346:35 Bacon Rd, Enfield NS CD02383:7A79 – Newfield Street – New Servic CD02423:XL Center Service Upgrade Projected 2026 Capital Spend Project CD02346 – 35 Bacon Rd, Enfield New Service was established to cover the costs associated with supplying a new service to the customer. A new 820,000 ft warehouse is being constructed at 35 Bacon Rd, Enfield. The facility will be primary metered and placed in an existing radial primary feed. An additional riser will be constructed beyond the primary meter to create a looped supply. An estimated 4,700 ft of 4/0 Al cable to be installed by Eversource after the customer constructs the infrastructure. Work will consist of installing primary cable and a new loop supplying the new 452,900 primary meter connected to the 2 existing transformers. Newfield Street is a new residential development in Middletown, CT. It is located on Newfield Street, across from Congdon Street in Middletown. The new development will have 488 residential 224,349 apartments. The expected new load is 1.7 MW. Project CD02423 – XL Center Service Upgrade – is established to provide additional power to this 1,216,410 existing customer. The new load is projected at 3MVA. A developer is rehabbing five existing mixed use buildings on Colony St, Meriden. The buildings will have apartments on upper floors and retail at street level. The buildings are currently fed by the N194 network in Meriden. CD02437:Colony St, Meriden Mixed Use Dev 190,001 CD02462:Tilcon NS on Black Rock 11H Sub Project Long Description The buildings will be all electric for heating, cooling, water heating and cooking. Heating will be a combination of heat pumps and resistance elements. Tilcon at Loon Lake Road in Plainville is requesting a new 5 MVA service. They are requesting a 500,000 primary meter service with one connection point.Page 37 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 37 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02497:New Service Uline Plainfield CD02505:Tomasso Loon Lake Rd Plainville NS Projected 2026 Capital Spend Uline J6 is a new commercial warehouse building located on Plainfield Pike, Plainfield, CT. The current construction design has projected a new load of 2679kW, or 71 Amps, which will be added to circuits 13B10 and 13B21 out of Frybrook 13B substation. Without system upgrades, the existing 13B10 and 13B21 circuits in the area do not have the capacity to support this commercial 46,320 warehouse. Tomasso has purchased 95 areas off Look Lake Road in Plainville. Their plan is to install 30,000 approximately six buildings for a total estimated load of 21 MVA. CD02522:6A3 New Load Berlin Tpke 30,000 CD02528:74 Broad St– New Service Project Long Description A large mixed use development is being built on the Berlin Tpke on the 6A3. Developer provided loads are as follows: club house (110 kVA), hotel or bank (230 kVA), retail (125 kVA), and five apartment buildings (591 kVA each). The total load is 3,420 kVA. The first phase includes the club house (110kVA) and two apartment buildings (591kVA each). A new customer will be constructing a new 8-story residential/commercial building at 74 Broad St, Stamford, CT. The building will consist of 280 residential apartment units. Spaces for parking garage, amenities, restaurant will be located throughout the footprint of the building. The total area of the building is 435,269 sf.To serve the building load the customer is requesting a total of (4) 3,000A 120/208V residential services for the base building loads and commercial spaces. The customer’s load letter estimates their demand to be 3.3 MVA.Eversource is required to provide service to customers in its territory upon request and may need to upgrade/extend its facilities to 30,000 serve the customer.Page 38 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 38 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02572:Amazon Distribution Warehouse Wtbry CD02573:Refeed 490 Capital Ave, Hartford CD02614:1700 Asylum Ave Apts NS CD02648:1679 King St, Enfield NS CD02667:Nordic Spa Portland CT CD02682:11H77 Contingency Overload NS Projected 2026 Capital Spend Project Long Description This project is being established to cover the costs associated with providing service to the new proposed Amazon Distribution Warehouse which will be located in the city of Waterbury. The 13,468,300 preliminary anticipated load is estimated to be about 9.6 MW. Project CD02573 is established to provide a new Distribution service to the customer, Capital District Energy Commission (CDEC). Currently, CDEC is connected to the Transmission System, but Eversource Transmission project 144531 removes the supply to the customer with a completion 765,700 date of Q4 2026. This project will determine the distribution design for supplying this customer. Project CD02614 – 1700 Asylum Ave Apartments - is established to provide power to a new 723,001 customer. This customer has a projected load of 3.76MVA. This project is being established account for the costs associated with a new service. A 420,000 ft2 warehouse is being constructed at 1679 King St, Enfield with cold storage, automation, and robotics for an estimated 8.6 MVA load. The existing electrical facilities along King St do not have the capacity to serve this size load. Also, due to the size of the projected load, 2 circuits will be required 4,257,501 to supply the facility. Project CD02667 was established to address a Nordic Spa new service coming on the 21H15 circuit 5,855,661 in Portland CT. The purpose of the project is to address the circuit overload which occurs during contingency with the 7L90 circuit in New Britain. The 11H77 circuit feeds 2,574 customers out of the Blackrock substation in New Britain. During contingency with the 7L90 circuit, the 11H77 circuit picks up the 7L90-72S Zone through the 7L90-92T. This brings the normal rating of the 11H77 circuit to 121% 167,500 and emergency rating to 87%.Page 39 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 39 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02721:25 Holy Dr, Newington NS CD02747:1499 Silas Deane Hwy, Rocky Hill NS CD02755:Install New Service & Repl. Swgr FRNEWSVC:FORECAST PROJECT FOR NEW SERVICE Distributed Generation DISTRIBUTED GENERATION-L4 CD02167:Endurant, N.Colony Rd, Meriden Peak Load / Capacity-ED Distribution Line Capacity OVERLOADS-SPECIFIC PROJECTS Projected 2026 Capital Spend Project Long Description This project is for a 10 MVA new service. The site is currently supplied by the 4A1 circuit. The 10 MVA load will be supplied by switch gear, fed by the 4A1 and 4A11 from the Newington 4A 1,003,900 substation. Both circuits can now supply 5 MVA, but neither can back up the other in contingency. CD02747 is created to provide power to an Electric Vehicle (EV) charging station, at 1499 Silas Deane Hwy in Rocky Hill, CT on the 3R03 circuit. The 3R03 circuit does not have capacity to 123,000 support the requested 2,700 KVA load addition. Project CD02755 has been established to address new service to two rehabilitated office buildings in Norwalk. These offices 201 and 101 Merritt 7 will be converted to residential buildings consisting 30,000 of 150 units in each building for a total of 300 new residential customers. (8,432,519) FORECAST PROJECT FOR BUDGETING NEW SERVICE 1,010,802 1,010,802 This project was established for Endurant Meriden, which is in the Central Division, in the Cheshire AWC, in the town of Meriden.Endurant Meriden is proposing a 4.9 MW battery energy storage system (BESS) at 508A N Colony Road, Meriden CT which is currently fed from the Hanover St 12F44 feeder. This BESS will adhere to a charging schedule to prevent exceeding the thermal limits of any conductors on the Eversource distribution system. A distribution impact study determined that the proposed battery has no negative impact on voltage or thermal violations on the distribution 1,010,800 system if the battery adheres to the charge and discharge limits. 55,793,998 19,399,999 17,400,000Page 40 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 40 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01451:Ridgefield 22N Contingency Overload CD02381:Convert 15L46 to 23kV & getaway wor Projected 2026 Capital Spend Project Long Description This project has been established to address the contingency overloads on several circuits at the Ridgefield 22N S/S. This proposal involves the 22N2, 22N3, 22N4 & 22N5 circuits. Substation Project CS00637 was established to create two additional breaker positions at Ridgefield to help alleviate the current overloads at Ridgefield 22N.The 22N2 feeds 1679 customers in the Ridgefield area. The circuit has a peak load of 250A and a summer normal rating of 450A. The 22N2 exceeds it summer normal rating for a 22N A2 bus fault in which the 22N4 & 22N5 loses power and the 22N2 picks up some of their load. The 22N2-2 zone has 815 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3 feeds 1,992 customers in the Ridgefield/Wilton area. The circuit has a peak load of 422A and a summer normal rating of 490A. This puts the 22N3 at 86% of normal load. The 22N3 exceeds it summer normal rating for the contingent loss of the 22N4 or the 22N7. The 22N3-2 zone has 698 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3-91T loop scheme is currently disabled during summer peak periods to guard against overloading the circuit. The 22N4 feeds 1,900 customers in the Ridgefield area. The circuit is currently overloaded with a peak load of 378A and a summer normal rating of 423A. This puts the 22N4 at 89% of normal load and exceeds the 80% of UG summer normal criteria. Project CD01558 was created to resolve the UG issues for the 22N4 and 22N1. The portion of the project to replace 750 AL UG cable between MH#10 and riser pole# 550-23 was halted due to leaking transformers and deteriorated structure in Vault#9. Project CD01810 was created to replace the leaking transformers with a UTC, replace the deteriorated structure and replace the remaining 2,975,000 22N4 cable with 1000 CU. 1,349,946 Bokum 15L is being converted from 27.6kV to 23kv and adding more capacity.
As listed on the current system
Supplement for New App [Filed: 10/19/2026]