Application supplement
Exhibit CLP-ADDITIONS-4 Supplemental 2
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
PDF · 2.1 MB · 77 pagesText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.pdfRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Excel · 613 KBText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsxRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Page 41 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 41 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02440:14R31 ROW Rebuild Projected 2026 Capital Spend Project Long Description CD02440 seeks to address reliability issues and aging infrastructure on the 14R31 ROW near Goshen, CT. The 14R31 circuit is responsible for feeding the 33M1, 33M2, 37J1, & 42J1 circuits, which when combined, serve over 3,100 customers. The identified portion of the 14R31 ROW is comprised of roughly 39,000’ of 3-ph 1/0 ACSR conductor. The identified segment includes 152 poles with an average age of 45 years. The 14R31 ROW has experienced 4 reliability related outages in the last 4 years and has seen multiple instances where the segment of 1/0 ACSR was burnt down 8,862,010 due to overload under contingency.Page 42 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 42 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend CD02459:Bokum 15L12, 15L68, 15L69 23kv geta 45,644 Project Long Description Bokum 15L substation is going through an expansion to increase capacity. The station voltage is now 27.6 kV, and this project will convert the voltage to 23 kV. The two existing transformers, 15L1X and 15L-2X, will be replaced with 62.5 MVA transformers, a third 62.5 MVA transformer (15L3X) will be added to the bus. All 3 transformers will be 115 kV to 23 kV. The new 15L-3X transformer is on site as well as the 23 kV switchgear, the plan is to energize the new 15L- 3X transformer and build a new duct bank for the 15L12 and 15L68 across Bokum Road and connect the 15L12, 15L68, and 15L69 circuits to their new breaker positions. 15L12 currently comes out of the station at 27.6 kV and gets stepped down to 23 kV through two sets of 3,000 kVA poletop autos on Essex Road. The 15L12 out of the station will be converted to 23 kV and the two sets of 3,000 kVA autos will be removed. The existing getaway cable is 3-1/C 750 kcmil Cu cable in three 3-inch ducts. This cable will be replaced with 1000 kcmil Cu cable. The 15L68 is stepped down from 27.6 kV to 23 kV through a 29 MVA auto inside the station and bifurcates east and north. The 15L68 going east over the Connecticut River to the New London District will remain the 15L68. The 15L68 going north to Deep River will become the 15L69. There is no work required outside the fence on the 15L68 circuit other than replacing the parallel 500 kcmil Cu getaway cable going east with 1000 kcmil Cu. The Bokum 15L substation is in the Madison Area Work Center in the Eastern Region.Page 43 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 43 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD02470:28M1 Contingent Overload CD02470 seeks to address a contingent overload within the 28M1-2 zone when supporting the 11A53-70S zone. The 28M1 is fed out of Middle River 28M sub in Danbury CT. The 28M1-2 zone is comprised entirely of 336 AAC T.W. beginning at P#1172 and extends until the 28M1-50Z on P#372. The 336 AAC T.W. serves as the primary limiting factor with a normal limit of 460A and an emergency rating of 520A. Under contingency with the 28M1 picking up the 11A53-70S zone, the 152,900 28M1-2 reaches 104% of its normal limit. CD02473:11A55 Contingency Overload This project was created to address a contingency overload created on the 11A55 breaker zone when recovering the 11A51-70S zone. The 11A55 is fed out of the Triangle 11A substation in Danbury, CT. The existing limiting factor is the 500 CU PILC, from MH 2 to riser pole 8491 on Federal Rd, Danbury, CT. This project will investigate solutions to either redistribute load or increase the 230,800 existing load limit for this zone. CD02513:Uncasville 1Q01 Getaway Overload Pr CD02618:15L69 Contingency Overload FROVRLDS:FORECAST OVERLOADS BUDGET PROJECT VOLTAGE CORRECTION-DK ANNUAL DK1B:MAINTAIN VOLTAGE NEWTOWN The purpose of this project is to prevent a contingency overload on the Uncasville 1Q01 feeder. The contingency overload is caused by a 3.7 MVA load swap between the Williams Street 9L09 feeder and the Uncasville 1Q01 feeder that was requested by Substation Engineering to relieve a capacity issue at Williams 9L substation. This overload will occur on the 1Q01 getaway cable and the 250,500 downstream OH conductors up to a bifurcation point while picking up the 1Q6 during contingency. This project proposes to solve a contingent overload between the Bokum 15L69 circuit and the Haddam 11C12 circuit. A load study showed that the Haddam 11C12 adds a load of 277A and 594,298 causes the Bokum 15L69 ROW to experience a 120% overload at normal and 100% at emergency. 2,938,901 FORECAST BUDGET PROJECT FOR SPECIFIC PROJECT OVERLOADS 2,000,000 85,078 MAINTAIN VOLTAGE ANNUAL NEWTOWNPage 44 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 44 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DK1N:MAINTAIN VOLTAGE NORWALK DK1S:MAINTAIN VOLTAGE STAMFORD DK2L:MAINTAIM VOLTAGE TORR CLP DK2M:MAINTAIN VOLTAGE CHESHIRE/N.B. DK2W:MAINTAIN VOLTAGE WATERBURY DK3H:MAINTAIN VOLTAGE HARTFORD DK4D:MAINTAIN VOLTAGE MADISON DK4M:MAINTAIN VOLTAGE E Hampton DK4N:MAINTAIN VOLTAGE N LONDON DK5T:MAINTAIN VOLTAGE TOLLAND DK5W:MAINTAIN VOLTAGE DANIELSON FRDK:DKCT Projection Forecast Project Substation Capacity SUBSTATION OVERLOADS-SPEC PROJ CS00364:Falls Village 9A XFMR Reliability CS00365:Bokum 15L Transformer & Reconfig SS CS00382:Southington 4C Add Transformer Projected 2026 Project Long Description Capital Spend 27,178 MAINTAIN VOLTAGE ANNUAL NORWALK 277,746 MAINTAIN VOLTAGE ANNUAL STAMFORD 88,254 MAINTAIN VOLTAGE ANNUAL TORRINGTON 614,708 MAINTAIN VOLTAGE ANNUAL CHESHIRE 121,744 MAINTAIN VOLTAGE ANNUAL WATERBURY 175,631 MAINTAIN VOLTAGE ANNUAL HARTFORD 60,806 MAINTAIN VOLTAGE ANNUAL MADISON 121,685 MAINTAIN VOLTAGE ANNUAL EAST HAMPTON 207,704 MAINTAIN VOLTAGE ANNUAL N LONDON 87,815 MAINTAIN VOLTAGE ANNUAL TOLLAND 209,804 MAINTAIN VOLTAGE ANNUAL DANIELSON (78,154) DKCT Forecast project 36,393,999 36,393,999 The project eliminates the single contingency load loss (SCLL) conditions for Falls Village 9A, Salisbury 21J, and North Canaan 5L, located in Falls Village, Salisbury, and North Canaan, CT, 2,294,831 respectively. The project converts Bokum 15L substation from a 27.6kV to 23kV and adds a third transformer and 10,591,613 switchgear, including primary and secondary line protection. This project adds a third 115-13.8kV transformer rated 62.5MVA to Southington 4C Substation to address potential load growth that could result in future overloading of the existing bulk (231,059) transformers.Page 45 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 45 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00383:Hopewell 22R Replace Xfrmr CS00392:Beacon Falls 11N Replace Xfrmr CS00603:West Side 7A SS Overload CS00636:Saybrook 22D Conversion CS00676:UConn System Upgrade #900 CS00683:Berlin 6A Incr Capacity CS00703:Westbrook 20S Conversion FROVRLSS:FORECAST PROJ FOR OVERLOAD SUBSTATI Regulatory Commitments-ED Regulatory Commitments-Other 4.8KV GROUNDING Projected 2026 Capital Spend Project Long Description This project addresses the current and future distribution load growth at Hopewell 22R Substation located in Glastonbury, CT. It replaces the 2X and 3X transformers with the Eversource 62.5 MVA 5,152,198 standard. This project replaces the Beacon Falls substation 1X and 2X transformers with the Eversource 62.5 (206,940) MVA standard. This project addresses substation capacity deficiencies at the 115-13.2kV West Side Substation 387 located in Middletown, CT. To convert both the 22D-1X and 22D-2X from 27-6.kV to 23kV at Saybrook, the taps inside the transformers will need to be changes. This will require draining the oil, changing taps, and refilling 515,160 oil. The lightning arresters and potential transformers will also need to be removed and replaced. The objectives are to reliably and cose-effectively accommodate the near term and long term UConn 3,522,819 peak load forecasts and address asset condition concerns. This project will increase the load carrying capacity (LCC) of Berlin 6A substation. It will replace the 52 year-old 46.7 MVA 6A-1X and the 50 year-old 46.7 MVA 6A-2X to increase the substation LCC by replacing them with two 115-13.8kV 62.5 MVA transformers and associated transformer 13,003,731 foundations. This project is to support the conversion of Westbrook 20S substation, located in Westbrook, CT, 52,166 from 27.6kV to 23kV. 1,699,091 FORECAST PROJECT FOR SUBSTATION OVERLOADS 6,100,001 6,100,001 500,000Page 46 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 46 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category 468601:4.8KV GROUNDING FOR CODE COMPLIANCE TRMSN DISTR RELIABILTY PERFRM CD02192:12J5 - Reliability Improvements CD02193:12J4 WPC - Reliability Improvement CD02207:11C14 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CORRECT GROUNDING ON 4.8KV DELTA EQUIPMENT IN THE STATE OF 500,000 CONNECTICUT TO BRING TO PRESENT CODE, AS REQUIRED BY DPUC ORDER. 5,600,000 As part of Eversource’s plan to address the worst performing circuits (WPC) in Connecticut, project 146,300 CD02192 was created to focus on the high impact zones of the 12J5 circuit. CD02193 focuses on infrastructure replacement to improve the reliability of the 12J4 circuit.The 12J4 is a 13.8 kV circuit out of Mansfield 12J, serving 3143 customers in Ashford and Willington. The 12J4 was ranked #9 on the worst performing circuits list in CT. CD02193 addresses the five 528,200 high impact zones on the 12J4 where Eversource has experienced outages within the past four years. CD02207 focuses on infrastructure replacement and creating a loop to improve the reliability of the 11C14 circuit.The 11C14 is a 23 kV circuit out of Haddam 11C, serving 3052 customers in Chester, Haddam, Higganum, Killingworth, and Middletown. The 11C14 was ranked #1 on the worst performing circuits list in CT. CD02207 addresses high impact zones on the 11C14 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive 562,002 vegetation trimming.Page 47 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 47 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02208:15L68 WPC Reliability Improvement CD02213:12Y9 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CD02208 focuses on infrastructure replacement and vegetation management, which includes trimming and removals.The 15L68 is a 23 kV circuit out of Bokum 15L in Old Saybrook which is split between the Madison and New London districts and supplies a total of 5,184 customers. The district jurisdictional boundary is the Connecticut River. The 15L68 serves 2,309 customers in the Madison district and supplies the towns of Old Saybrook, Essex, Deep River, Ivoryton, and Westbrook. In the New London district, the 15L68 serves 2,875 customers and supplies the towns of Lyme, Old Lyme, East Lyme, Hadlyme, and East Haddam. The 15L68 was ranked #5 on the worst performing circuits list in CT. CD02208 addresses three high impact zones on the 15L68 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as 1,723,901 extensive vegetation trimming. Project CD02213 focuses on infrastructure replacement to improve the reliability of the 12Y9 circuit.The 12Y9 is a 13.8 kV circuit out of the Rocky River 12Y S/S and serves 2,758 customers in Sherman and New Milford. The 12J5 was ranked #7 on the worst performing circuits list in CT. CD02213 addresses four high impact zones on the 12Y9 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes 848,300 to increase reliability and ampacity as well as extensive vegetation trimming.Page 48 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 48 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02214:30R8 WPC Reliability Improvement CD02215:35L9 WPC Reliability Improvement FRTDRP:FORECAST PROJECT FOR TDRP PROJS Reliability-ED Distribution Line Reliability RELIABILITY IMPROVE-DR ANNUAL DR1B:OH RELIAB IMPROVE NEWTOWN DR1N:OH RELIAB IMPROVE NORWALK DR1S:OH RELIAB IMPROVE STAMFORD DR2L:OH RELIAB IMPROVE TORR CLP DR2M:OH RELIAB IMPROVE CHESHIRE/N.B DR2W:OH RELIAB IMPROVE WATERBURY DR3H:OH RELIAB IMPROVE HARTFORD Projected 2026 Capital Spend Project Long Description Project CD02214 focuses on infrastructure replacement to improve the reliability of the 30R8 circuit.The 30R8 is a 23 kV circuit out of the Green Hill 30R S/S and serves 3,791 customers in the Killingworth, Madison, and Clinton areas of Connecticut. The 30R8 was ranked #3 on the worst performing circuits list in CT. CD02214 addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive 532,929 vegetation trimming. Project CD02215 focuses on infrastructure replacement to improve the reliability of the 35L9 circuit.The 35L9 is a 13.8 kV circuit out of the Stepstone 35L S/S and serves 2,234 customers in Guilford, Connecticut. The 35L9 was ranked #9 on the worst performing circuits list in CT. CD02215 addresses two high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor 324,095 sizes to increase reliability and ampacity as well as extensive vegetation trimming. 934,274 FORECAST PROJECTS FOR TDRP PROJECTS 190,264,011 24,000,000 10,000,000 1,366,897 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEWTOWN 619,404 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NORWALK 943,089 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL STAMFORD 1,300,962 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TORRINGTON 751,480 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL CHESHIRE 569,647 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL WATERBURY 751,480 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL HARTFORDPage 49 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 49 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DR4D:OH RELIAB IMPROVE MADISON DR4M:OH RELIAB IMPROVE E Hampton DR4N:OH RELIAB IMPROVE NEW LONDON DR5D:OH RELIAB IMPROVE DANIELSON DR5T:OH RELIAB IMPROVE TOLLAND DR5W:OH RELIAB IMPROVE Danielson FRDR:PROJECTION PROJECT DR ANNUAL RELIABILITY IMPROVE SPEC PROJ CD02116:Roxbury Rd Reconductoring Projected 2026 Project Long Description Capital Spend 410,233 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL MADISON 360,038 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL EAST HAMPTON 1,058,938 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEW LONDON 360,929 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON 707,275 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TOLLAND 808,644 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON (9,015) PROJECTION PROJECT DR ANNUAL 12,500,000 CD02116 addresses reliability concerns and aging infrastructure for the 21K2 & 21K3 backbone on Roxbury Rd in Southbury. These circuits both originate at Bates Rock 21K substation and operate at 13.8kV. This segment of double circuit pole line consists of predominately 1970 vintage infrastructure and is responsible for hosting a combined 2250 customers. There have been 3 outages along this segment of the 21K2 and 6 outages on this segment of the 21K3. Additionally, this segment of the 21K3 experienced a burn down due to ringed spacer cable and a lightning strike. The proposed work suggests reconductoring on the 21K2 and 21K3. This work involves reconductoring the 21K2 with 6,800’ of 556 spacer cable from P#S43 to P# S3 and reconductoring the 21K3 with 7,000’ of aerial cable from P#S42 to P# C3798. In addition, the side tap originating at P# S22 will be swapped from the 21K3 to 21K2 circuit creating a complete express for the 21K3 from the station to P#12176. The reconductoring of these segments will increase future reliability and load growth through the replacement of aging infrastructure, existing ringed spacer cable and the installation of 2,690,800 upgraded overhead conductor.Page 50 of 77
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 50 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02405:12C4 Equip Conversion and Replace CD02480:30R15-Reconductor 336 ringed SC wit CD02723:Town Scorecard – Eastern Region CD02749:UCONN Health Protection Coord FRSPRELI:FORECAST SPEC REL IMPROVEMENTS S/S ELIMINATION-LINE WORK Projected 2026 Capital Spend Project Long Description This project adresses deficiencies on the Enfield 12C4 circuit. Ringed spacer cable was found on N. River St., Whitworth St., and Alden Ave. The project replaces this cable prone to failure. To reduce several large customer zones on the 12C4 feeder, a 4.8kV portion of the circuit will be converted to 1,544,499 23kV to allow for recloser installation. The 336 AL spacer cable is vintage and is ringed. This area has very poor reliability and has had eleven (11) interruptions over the last four years. Removing the 336 AL ringed spacer cable and 57,750 installing 477 AL tree wire will improve the performance of this circuit. Project CD02723 was established to address the Town Scorecard Initiative which identifies the top 1,453,437 10 SADI and SAFI worst performing towns in Eversource, CT. Project CD02749 was established to address reliability concerns impacting operations at UConn Health in Farmington, CT. The affected infrastructure is served by the 1C01 overhead feeder, which supplies power to several critical facilities, including UConn Health Center, UConn Health Warehouse, UConn Fire Safety Complex, State of Connecticut Medical Examiner’s Office, Town of Farmington Sewer Pumping Station, and various hospital support buildings, such as parking areas 196,100 and the UConn Health Childcare Center. 6,557,414 FORECAST PROJECT FOR SPECIFIC RELIABILTY IMPROVEMENT PROJECTS 1,500,000
As listed on the current system
Supplement for New App [Filed: 10/19/2026]