Application supplement

Exhibit CLP-ADDITIONS-4 Supplemental 2

Files3

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 61 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 61 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00533:Salisbury 21J Replace Xfmr CS00544:N Canaan 5L Replace Xfmr CS00606:Glenbrook 1K Replace Transformer CS00665:73MX Mobile Xfmr Refurbishment FRSSXFMR:SS Transformer Reliability Forecast SS DSCADA LTC Controls CS00677:Haddam 11C DSCADA LTC FRSSDSCA:Forecast SS DSCADA LTC Netwk Auto G SUBSTATION RELIABILITY-L4 DSCN26:2026 CT D SS Planned Annual SWITCHGEAR Projected 2026 Capital Spend Project Long Description The project objective is to replace the 13MVA 69kV-13.2kV transformer 21J-1X with a new Eversource standard 40MVA 115/69kV-13.2kV transformer equipped with a modern LTC. The Salisbury 21J-1X is an Eversource standard size transformer which reduces the number of spare transformers required to be available for the Connecticut distribution system.This project will also replace outdated electromechanical protection systems on the 21J-1X transformer and 13.2kV A1 bus to update these systems to the latest Eversource standards.This relaying is 50 years old, is at the end of its service life and total of eight electromechanical relays will be replaced as part of this 31,337 project. This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset 94,364 conditions. This project is for the asset condition replacement of the existing 62-year old 115kV:13.2kV, 46.7MVA transformer 1K-2X at Glenbrook substation in Stamford, CT. The transformer is near its 4,859,002 end of life. 1,272,942 This project is to refurbish the 73MX mobile transformer unit. The unit is out of service. (419,600) Substation Transformer Reliability Forecast Project 550,000 This project will replace the Load Tap Changer (LTC) control scheme on the 11C-2X and 11C-3X 1,742 transformers at the Haddam 11C substation located in Haddam, CT. 548,258 Forecast project for DSCADA - LTC Network Auto Grid 2,000,001 This annual is to improve customer reliability for capital work not identified specifically during the 2,000,001 budget cycle but is a result of monitoring the system throughout the year. 9,300,000
  2. Page 62 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 62 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00189:Triangle 11A - Rpl Bus w/ Swgr CS00491:Chippen Hill 15U Replace SWGR CS00503:E. Meriden 21P Replace SWGR FRSSSWGR:FORECAST PROJECT FOR SS SWITCHGEAR System Resiliency/Expanded Reliability ENHANCED TREE REMOVAL CTREL26:Reliability Tree Removal REL Prgrm ETR2026:Enhanced Tree Removal ETR Program ENHANCED TREE TRIMMING Projected 2026 Capital Spend Project Long Description This project will rebuild the 13.8kV distribution end of the Triangle 11A substation in Danbury, CT by installing new enclosed, double bus, metal clad switchgear. The rehabilitation of the substation is required to replace aging substation equipment, address bus clearance needs, and update protection and control relays and System Control and Data Acquisition (DSCADA) interfaces for metering, 5,703,046 control, and monitoring. The project will replace the existing metal clad switchgear at the Chippen Hill substation located in Bristol, CT. The switchgear is being replaced to due to the history of operational and maintenance 1,627,104 issues caused by a sunken foundation which made the switchgear come out of alignment. This project is for the replacement of the 13.8kV switchgear with associated circuit breakers, protection relays, conduits, cabling, and foundations at East Meriden 21P substation. The foundation has begun to sink unevenly causing the switchgear to come out of alignment. This has 1,704,750 caused difficulties when racking circuit breakers in and out of the cubicles. 265,099 FORECAST PROJECT FOR SUBSTATION SWITCHGEAR RELAY 79,000,010 26,000,000 The project focuses on removal of trees in poor performing isolated device zones to improve system 12,000,000 reliability and resiliency. The ETR project strategically removes trees to proactively improve system reliability and mitigate long term costs for the distribution cycle trimming programs. Tree removals, in conjunction with 14,000,000 cycle pruning, drive improved reliability performance. 2,000,000
  3. Page 63 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 63 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category ETTCF26:ETT Customer Focused 2026 POLE INTEGRITY PROGRAM CD02444:2025 Pole Integrity CD02449:2025 Frontier Pole Shifts CD02545:2026 Pole Integrity Projected 2026 Capital Spend Project Long Description The Customer Focus Enhanced Tree Trimming project addresses system reliability by providing greater clearances and removing risk limbs and trees that are outside of the normal maintenance trim 2,000,000 zone in areas of emergent reliability concerns. 18,500,000 This initiative replaces or reinforces wood poles found during the annual pole inspections that cannot remain in service due to loss of strength from decay or insect infestation. This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm 3,079,200 damages. The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource equipment onto Frontier Defective Pole Replacements. As Frontier replaces defective poles, Eversource will receive an 300,000 automatic design request through Notify to create a WR for the equipment transfer. This project captures the cost necessary to replace wooden poles that were found during the 2025 annual pole inspections. These poles cannot remain in service due to loss of strength from decay or insect infestation.This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe 12,499,999 weather and or storm damages. P
  4. Page 64 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 64 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02546:2026 Frontier Pole Shifts RIGHT OF WAY LINES CD01246:Fry Brook 13B21/13B27 ROW Pole Repl Projected 2026 Capital Spend Project Long Description The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource facilities onto Frontier Defective Poles that will be replaced in the year 2026.As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the 2,620,800 equipment transfer. 12,000,000 The Fry Brook 13B21/13B27 ROW is an approximately 3-mile express feed from the substation to the towns of Plainfield and Killingly. 13B21 serves 3,607 customers and 13B27 serves 1,963 customers. For a double circuit fault from the substation to Plainfield Road 100% of customers are automatically restored. This is accomplished via ties with 13B10, 15C8 and 30Y10. While travelling along I-395 several crossarms were observed to be cocked and/or racked and upon a physical walk through, much more damage was recorded. A majority of the poles are 66+ years old and most crossarms were replaced in 1973. All crossarms are installed with bow braces. The project will perform 100% pole and conductor replacement from the substation to the Moosup 19Y Substation north of Route 14.The aim of this project is to install a new double circuit pole line adjacent to the existing pole line where easement restrictions allow, with all new 50-foot class 1 64,664 poles, 556 ACSR TW and 2/2/2 construction.
  5. Page 65 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 65 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01308:Saybrook 22D Triple Circuit ROW CD01720:ROW 006 Remediation CD02211:13K57, 32P3 ROW Removal CD02376:2025 ROW Priority 3 Poles - Central Projected 2026 Capital Spend Project Long Description This project addresses two right-of-way (ROW) issues in the Town of Old Saybrook. The first issue is a triple circuit pole line south of Saybrook 22D station extending 2,700 ft from Elm St to Ingham Hill Rd, Saybrook. This triple circuit pole line consists of the 15L46, 15L70, and 22D4 Circuits with 1,450 ft of pole line through a marsh. The Bokum 15L46 (27.6kV) supplies Cedar La 41L and Westbrook 20S. The Bokum 15L70 (27.6kV) backs-up the 15L46. Westbrook 20S is backed up by Green Hill 30R9 and Cedar La 41L is backed up by Bokum 15L5 and Saybrook 22D4. Having three circuits on one pole line that is difficult to access creates a risk extended abnormality should reliability issues occur. The second issue is a split pole top (vertical corner construction) on the Bokum 15L70 (27.6kV) circuit located in the Bokum-Old Saybrook ROW between I-95 and a marsh. This circuit supplies the Saybrook 22D-2X Substation Transformer. The existing conductor spans ~500 ft over I-95 and then goes for another 850 ft over a marsh. This project will replace this structure with three new steel structures (to Transmission Crossing Specs) due to the lengthy spans of 3ph 556 ACSR wire and the hazard it will create if the lines were downed across I-95. The 386,508 project will resolve both issues by relocating the circuits along town roads. Eversource has completed drone patrols of all distribution ROWs and has categorized all findings into five priority levels. ROW 006 had 76 total findings, 3 priority 1 poles, 26 priority 2 poles, 42 priority 3 poles, 4 priority 4 poles, and 1 priority 5 pole. This project will maintain the ROW and 3,273,900 rebuild in place with steel poles and 556 tree wire. This project is for the removal of the 13K57 and 32P3 obsolete and de-energized ROWs in Stonington, CT. These ROWs are hazardous assets that have resulted in customer complaints and 488,013 have warranted repairs to inoperative circuits. This project will address 103 priority 3 damages found during ROW drone inspections. All ROW 3,130,200 poles will be replaced with Class 1 or larger steel poles.
  6. Page 66 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 66 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02377:2024 ROW Priority 3 Poles - Eastern CD02631:2026 ROW Priority 3 Poles FRPROW:Projection Proj for ROW SMART SWITCHES PROGRAM CD01278:12C4-71S Smart Switch Program CD01921:Willamantic 14S31 Smart Switch Proj CD02007:2B5 Smart Switch Projected 2026 Capital Spend Project Long Description Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 55 Priority 3 findings. All 1,146,126 ROW poles will be replaced with Class 1 or larger steel poles. Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 34 Priority 3 findings. All 1,498,100 ROW poles will be replaced with Class 1 or larger steel poles. 2,012,490 Projection Project for Right of Way Lines 15,000,000 Project CD01278 will sectionalize a 2,397 customer zone located beyond the Enfield 12C4-71S into 1,006,700 smaller automatic zones. With these changes, customers will experience increased reliability. This project will install an automatic loop scheme between the 14S31 and 14S32 circuits. By 225,099 automating the loop scheme, power can be restored to customer quickly. Project CD02007 seeks to address large customer zones on the 2B5 circuit in Thomaston, CT. The 2B5 currently has two zones over 500 customers. The first zone is the 2B5-70S which hosts 511 customers. This zone has experienced three outages over the last four years. The second zone is the 2B5-60R which hosts 681 customers and has experienced two outages over the last four years. This project suggests the installation of two new sectionalizing devices to reduce large customer zones. One device, a radial recloser, will be installed on P# 830, Main St. Plymouth. This device will reduce the 2B5-70S zone from 511 to 145 customers and will simultaneously create a new 366 customer zone. The second device, a smart switch, will be installed in the 1B5-60R zone on P# 1181 along N Harwinton Ave, Plymouth. The installation of this device will reduce the 2B5-60R zone from 681 customers to 319 customers while also creating a new zone of 362 customers. With these 1,700,900 changes, customers will experience increased reliability.
  7. Page 67 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 67 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02008:12J38 Smart Switch CD02201:Large Customer Zones RWO Central CD02318:2025 Large Customer Zones RWO West CD02319:2025 Eastern Large Customer Zone >1 Projected 2026 Capital Spend Project Long Description This project is being established to address two large customer zones on the 12J38 circuit in Mansfield, CT. The 12J38-71S zone has 693 customers at risk and this project proposes adding a smart switch in the 12J38-71S zone, dividing it into a 365 and 328 customer zones. The 12J38-71S zone has experienced seven outages in the last four years. The 12J38-80M zone has 648 customers at risk which will be divided into zones of 286 and 362 customer zones. The zone reduction will be performed by adding a new recloser and reprogramming the existing 12J38-80M as a smart switch. The 12J38-80M zone has experienced one outage in the last four years. With these changes, 205,400 customers will experience increased reliability. The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02201 addresses 13 large customer zones in the Central Division with the 1,144,500 installation of 24 viper reclosers. The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02318 addresses 8 large customer zones in the Western Division with the 1,868,834 installation of 15 viper reclosers. The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02319 addresses 3 large customer zones in the Eastern Division with the 341,300 installation of 4 viper reclosers.
  8. Page 68 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 68 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02340:2024 Trip Saver Program CD02475:2025 Western Large Cusomer Zone 900 Projected 2026 Capital Spend Project Long Description Project CD02340 proposes to install Trip Savers at 1155 fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Tree, Animal, Lightning, Patrolled Nothing Found).A Trip Saver is a self-powered, electronically controlled, single-phase, cutoutmounted vacuum interrupter recloser. The Trip Saver is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would otherwise trip to prevent a lateral fuse cutout from operating in response to a 500,009 transient fault. Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power 1,588,100 during a single outage. Project CD02475 addresses circuit zones that serves 900 - 999 customers. CD02519:2025 Htfd Lg Customer Zones SS Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02519 addresses circuit zones that serves more than 500 244,000 customers. CD02520:2025 Norwalk AWC Smart Switch RWO Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project 2520 address zones that are ranked in the top 100 in terms of 128,500 customer interruptions in the Norwalk AWC.
  9. Page 69 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 69 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02521:Vacufuses Program 2025 Projected 2026 Capital Spend Project Long Description Project CD02521 proposes to install Vacufuses on Distribution transformer locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found). A Vacufuse is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum interrupter recloser. The Vacufuse is designed to eliminate the sustained interruption that occurs when a transformer fuse cutout operates in response to a transient fault. This device will save 200,120 outages and reduce trips by troubleshooters by reclosing after a transient fault occurs. CD02538:2025 Eastern-New London SS CI Rank CD02542:2025 Cent. Cheshire AWC SS (CI) - 1 Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02538 addresses circuit zones ranked in the top 100 due to 36,200 customer outages over the past 4 years. Smart Switch projects address circuit zones that serve more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that will lose power during a single outage. Project CD02542 addresses circuit zones that serve more than 500 customers 846,700 and is ranked in the top 100 based on customers interrupted over the past 4 years.
  10. Page 70 of 77

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 2 Page 70 of 77 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02562:2025 Single Phase Recloser Project CD02583:Barnes Aerospace 14K9 Windsor Locks CD02717:Eastern TripSaver Optimization FRSMRTSW:FRCST PROJ REL IMPRV SMART SWITCHES SR DOUBLE POLE REMOVALS Projected 2026 Capital Spend Project Long Description Project CD02562 proposes to install Viper SP single phase reclosers at fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found).A Viper SP recloser is a pole mounted electronically controlled interrupter recloser with full SCADA control and visibility utilizing an SEL 351 control. The Viper SP recloser is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would otherwise trip to prevent a lateral fuse cutout from operating in response to a transient fault.In 2025 Viper SP recloser will be installed on fused single-phase laterals that have high fault current magnitudes which would exceed 210,177 other single phase reclosing equipment ratings. This project addresses a customer inquiry into the poor reliability performance of the Windsor Locks 14K9 circuit. The customer is Barnes Aerospace located on Old Kennedy Rd in Windsor, CT. This project will address the 14K9 backbone and the lateral that feeds the customer. The improvements will include adding a new 3-phase recloser and replacing one existing 3-phase recloser with a smart switch. In addition, all pole-top transformers along Old Kennedy Rd that are not already fused will 136,000 be fused. This project addresses trip saver locations where the minimum load requirement is not met year round. Minimum load is required in order for trip savers to operate properly in response to fault 738,387 conditions. 3,879,074 Forecast Project Reliability Improvement Smart Switches 5,000,010