Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-ADDITIONS-4 Supplemental 2

Files3

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
2 parts match

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 23 of 78

    UNIONSR | DSCADA System Resiliency - Union | Operations | DSCADA - RADIO EXPANSION | 906-UNIONSR VOCSYS1D | CL&P VOICE RADIO SYSTEM | Operations | Capital Tool Purchases/Other | 907-VOCSYS1D | 907-VOCSYS1D-SP01 | 907-VOCSYS1D-SP02 MS20CCP | Tropical Storm Isaias | Operations | Emergent Equipment Failures | 908-MS20CCP IT17426 | Infrastructure Lifecycle CL&P | Shared Services | Information Technology | 909-IT17426 GREENWICH NETWORK TRANSFORMER RELOC | Operations | Network Reliability | 910-101339 WILLIMANTIC NETWORK ELIMINATION | Operations | Regulatory Commitments-Other | 911-103225 WESTPORT - REPL TYPE "B" SEC & RE-C | Operations | Regulatory Commitments-Other | 912-103358 NORWALK NW-REOLC XFRMRS TO NEW VIT | Operations | Network Reliability | 913-103612 RAINBOW 10L - RETIRE SUBSTATION | Operations | Environmental | Charges included on this funding project belong to project CS00386 Rainbow 10L Remove SS. A journal entry will be recorded to move the charges. A supplemental request is not required per the Project Authorization policy. | 914-103622 755 MAIN ST., HARTFORD NET. PROT. C | Operations | Regulatory Commitments-Other | 915-103810 RED HORSE HILL RD SHARON DB CABLE R | Operations | URD/DB Cable Reliability | 916-103870 HARTFORD INS. GROUP - NEW SWITCHGEA | Operations | New Customer | 917-103895 INSTALL AUTO TRANSFER SWITCHES - 20 | Operations | Network Reliability | 918-103915 CTR 23Q8 REDUCE OUTAGE FREQUENCY | Operations | Regulatory Commitments-Other | 919-103946 EDGEWATER DEVELOPMENT-NEW SERVICE | Operations | New Customer | 920-106035 Cons CL&P- Bldg Struct & Gen Plant | Shared Services | Facilities | 921-15715 CL&P-D Fac Bldg Structures LOB | Shared Services | Facilities | 922-16703 CANAL 15Q - ADD BULK XFMR AND PCE | Operations | Peak Load/Capacity | 923-201273 JUDD BROOK 32R - INSTALL TRANSFORME | Operations | Peak Load/Capacity | 924-201338 2012-17 ARC FLASH RELAY REPLACEMENT | Operations | Regulatory Commitments-Other | 925-201371 NEWINGTON 4A - BUS REHAB | Operations | Substation Reliability | 926-201402 NEWINGTON 4A - RPL 2 MOD WITH CKT S | Operations | Substation Reliability | 927-201410 * | JUDD BROOK 32R - ADD FDR MTRG & DSC | Operations | Substation Reliability | 928-201424 GREENWICH 28F - NEW BULK SUBSTAION | Operations | Substation Reliability | 929-201444 CD00135 | EVERGREEN WALK NSVC EXPANSION S WIN | Operations | New Customer | 930-CD00135 CD00142 | ATLANTIC OVERPASS RELOC STMFRD | Operations | Line Relocations/Act of Public Authority | 931-CD00142 CD00156 | STAMFORD MARRIOTT ATLANTIC | Operations | New Customer | 932-CD00156 CD00164 | NEW SERVICE - 1875 POQUONOCK AVE. | Operations | New Customer | 933-CD00164 CD00267 | COPPER SQUARE BETHEL NSVC 3PH DB | Operations | New Customer | 934-CD00267 CD00322 | OLD SYBRK - MAXS PLACE - DB LOOP | Operations | New Customer | 935-CD00322 CD00333 | BROAD ST, NEW BRITAIN P.D. LIGHTING | Operations | New Customer | 936-CD00333 CD00343 | BECKLEY RD CONDO DEVELOPMENT BERLIN | Operations | New Customer | 937-CD00343 CD00347 | WETH - RECNDCTR ON HTFD AVE | Operations | Distribution Line Reliability | 938-CD00347 CLPMOAR | CLP Momentary Outage Rel Tool | Operations | Reliability - Other | 939-CLPMOAR CS00009 | REMOTE RACKING UNITS FOR SWG | Operations | Substation Reliability | 940-CS00009 CS00015 | SS CIRCUIT BREAKER AUTOMATION | Operations | SS CIRCUIT BREAKER AUTOMATION | 941-CS00015 CS00021 | SS LIGHTING UPGRADES | Operations | Substation Reliability | 942-CS00021 CS00022 | EAST NEW BRITAIN 7L AREA STUDY | Operations | Peak Load/Capacity | 943-CS00022 CS00029 | FLAX HILL - NORWALK HOSPITAL TRNSF | Operations | New Customer | 944-CS00029 CS00035 | W BROOKFIELD 14H - REPL 2 BREAKERS | Operations | Environmental | 945-CS00035 CS00101 | Baldwin 13F - Swgr Brk replacement | Operations | Substation Reliability | 946-CS00101 IT16416 | HW - 2016 IT Infrastructure Life Cy | Shared Services | Information Technology | 947-IT16416
  2. Part 24 of 78

    IT21476 | 2021 Modern Desktop - CL&P - D | Shared Services | Information Technology | 948-IT21476 IT21484 | Shared Clean Energy Facility (SCEF) | Shared Services | Information Technology | 949-IT21484 IT21491 | CT Residential Solar Tariff | Shared Services | Information Technology | 950-IT21491 CD01367 | CT Lateral Reliability | Operations | Distribution Line Reliability | 951-CD01367 WILLIAMS ST. 9L - REPLACE SWITCHGEA | Operations | Substation Reliability | 952-201423 STRM113C | 2013 MAJOR STORM RESTORATION | Operations | Emergent Equipment Failures | 953-STRM113C STRM17CP | CAPITAL STORM PROJECT FOR 2017 | Operations | Emergent Equipment Failures | 954-STRM17CP IASNVR11 | IAS NVR Replacements - CT | Shared Services | Capital Tool Purchases/Other | This project was for the Security purchase of NVR cameras and actual costs were below $500K. A PAF is not required per the Project Authorization policy. | 955-IASNVR11 CD00661 | Black Rock 11H - Network Monitoring | Operations | Network Reliability | 956-CD00661-SP01 CD00828 | Williams 9L - Network Monitoring Sy | Operations | Network Reliability | 957-CD00828-SP01 CD00992 | New Road in Bristol, Relocate and S | Operations | New Customer | 958-CD00992-SP01 | 958-CD00992-SP02 CD01705 | GRE, Jeremy Hill Rd, Stonington | Operations | New Customer | 959-CD01705-SP01 | 959-CD01705-SP02 CD01716 | CPG Middle Rd, Ellington | Operations | New Customer | 960-CD01716-SP01 | 960-CD01716-SP02 CS00365 | Bokum 15L Transformer & Reconfig SS | Operations | Peak Load/Capacity | 961-CS00365-SP01 | 961-CS00365-SP02 CS00557 | Christian 31C Replace RTU | Operations | Substation Reliability | 962-CS00557-SP01 CD01682 | GRE, East Windsor, Mulnite11 | Operations | New Customer | 963-CD01682-SP01 | 963-CD01682-SP02 CD01844 | White Oak Dr Berlin DB Replacement | Operations | URD/DB Cable Reliability | 964-CD01844-SP01 | 964-CD01844-SP02 CD01812 | The Nevar Company, Oakdale | Operations | New Customer | 965-CD01812-SP02 CS00390 | Rockville 14W Manhole & Conduit | Operations | Substation Reliability | 966-CS00390-SP02 Line Notes: Pre 2022 Project Specific and Annual tabs differ from Post 2022 formats, with Operations and Shared Services presented in separate columns to reflect differing reporting methods (direct costs vs total). * | Projects with direct costs under $100K and/or have less than a $25K direct cost variance do not require a supplemental request. [Sheet: Project Specifics Post 2022] The Connecticut Light and Power Company d/b/a Eversource Energy Actual Capital Expenditures and In-Service Capital Additions through August 31, 2026 Project Matrix--Post-2022 Projects (Whole Dollars) Capital Expenditures | Refer to Exhibit Line No. | Project | Project Description | Organization Category | Project Type | LTD Total Costs through 12/31/2025 | LTD Total Costs through 6/30/2026 | Total Costs July & August 2026 (as of October 15, 2026) | Total LTD Costs (as of October 15, 2026) | Pre-Construction Estimated Costs | % of Actual Cost Over or Under (-) Compared to Estimate | In-Service Capital Additions (For July 14, 2026) | In-Service Capital Additions June 2026 YTD (as of Septmber 15, 2026) | In-Service Capital Additions July & August 2026 (as of October 15, 2026) | Total In-Service Capital Additions | Project Notes / Variance Explanations | CLP-ADDITIONS-6 (July 14, 2026 Filing) | CLP-ADDITIONS-6-Supplemental (September 15, 2026 Filing) | CLP-ADDITIONS-6-Supplemental 2 (October 15, 2026 Filing) 01CTRL48P | 4.8KV Grounding CENTRAL | Operations | Regulatory Commitments-Other | 1-01CTRL48P 02EAST48P | 2023 4.8KV Delta System Grounding | Operations | Regulatory Commitments-Other | 2-02EAST48P Direct Buried Cable Replacement | Operations | URD/DB Cable Reliability | 3-10139520 Direct Buried Cable Replacement | Operations | URD/DB Cable Reliability | 4-10139521 10161017P | REPAIR & REPL OF CL&P UG STRUCTURES | Operations | URD/DB Cable Reliability | 5-10161017P
  3. Part 25 of 78

    10161018P | REPAIR & REPL OF CL&P UG STRUCTURES | Operations | URD/DB Cable Reliability | 6-10161018P REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 7-10161019 10161020P | REPAIR & REPL OF CL&P UG STRUCTURES | Operations | URD/DB Cable Reliability | 8-10161020P REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 9-10161021 Replace Leaky Splices | Operations | Network Reliability | 10-103353819 1B030344P | Holly PL, Monroe - DB Cable Replace | Operations | URD/DB Cable Reliability | 11-1B030344P 1B032612P | Hifield Dr, Washington - DB Cable R | Operations | URD/DB Cable Reliability | 12-1B032612P 1B823185P | Ridgefield, Harvey Rd BRKN POLE | Operations | Emergent Equipment Failures | 13-1B823185P 1B923277P | Turkey Roost Rd, Monroe - DB Cable | Operations | URD/DB Cable Reliability | 14-1B923277P 1N030212P | Norden's Switchgear Replacement | Operations | URD/DB Cable Reliability | 15-1N030212P 1N721224P | Relocate OH Facilities on Rt 7 | Operations | URD/DB Cable Reliability | 16-1N721224P CL&P-D Fac 2022 LOB - Bldgs & GP | Shared Services | Facilities | 17-22703 Cheshire Renovation | Shared Services | Facilities | 18-22742 Waterbury-Freight Satellite Svc Ctr | Shared Services | Facilities | 19-22746 Warehouse Storage Renovation | Shared Services | Facilities | 20-22748 Roof Replacement | Shared Services | Facilities | 21-22753 Torrington Paving Replacement | Shared Services | Facilities | 22-22759 Windsor ERP Staging Site | Shared Services | Facilities | 23-22760 Fan coil unit replacement | Shared Services | Facilities | 24-22769 Replace SW Yard Paving | Shared Services | Facilities | 25-22773 CL&P-D 2022 LOB | Shared Services | Facilities | 26-22774 RSO office construction reovation | Shared Services | Facilities | 27-22778 Replace paving West Yard | Shared Services | Facilities | 28-22782 2022 CL&P-D LOB - Add'l Projects | Shared Services | Facilities | 29-22784 Stamford Loading Dock Ceiling | Shared Services | Facilities | 30-22786 2022 CL&P-D Additional LOB Projects | Shared Services | Facilities | 31-22793 Small Building Renovations | Shared Services | Facilities | 32-22794 22CGMR11 | 2022 CG Equipment CLP Equipment | Shared Services | Capital Tool Purchases/Other | 33-22CGMR11 CL&P-D Buildings 2023 LOB | Shared Services | Facilities | 34-23703 * | Replace air handling unit | Shared Services | Facilities | 35-237102 CL&P-D 2034 LOB Add'l Projects | Shared Services | Facilities | 36-237104 New London - EOC Renovation | Shared Services | Facilities | 37-237112 | 37-237112-SP01 | 37-237112-SP02 Madison AWC PavIng | Shared Services | Facilities | 38-237120 Install new Canopy | Shared Services | Facilities | 39-237121 Wat Fr - Front office renovation | Shared Services | Facilities | 40-23747 Water Infiltration Prevention | Shared Services | Facilities | 41-23757 Facade Water Infiltration Preventio | Shared Services | Facilities | 42-23758 Wtby Freight - Mech. Equip. Replc. | Shared Services | Facilities | 43-23775 Norwalk Windows & Facade Renovation | Shared Services | Facilities | 44-23778 | 44-23778-SP01 | 44-23778-SP02 Watebury-Freight - Restroom Reno | Shared Services | Facilities | 45-23783 Replace paving | Shared Services | Facilities | 46-23795 2024 CL&P-D LOB | Shared Services | Facilities | 47-24703 | 47-24703-SP01 New Britain- Loading Dock Replc. | Shared Services | Facilities | 48-247110 Replace truck lift | Shared Services | Facilities | 49-24755 Cheshire - Replace paving | Shared Services | Facilities | 50-24763 Stamford - VAV Replacement | Shared Services | Facilities | 51-24772 Locker Room-Shower Room Renovation | Shared Services | Facilities | 52-24775 Loading Dock Replacement | Shared Services | Facilities | 53-24781 Hartford BMS system replacement | Shared Services | Facilities | 54-24785 Replace generator | Shared Services | Facilities | 55-24788 Cheshire - Truck Canopy | Shared Services | Facilities | 56-24797
  4. Part 26 of 78

    Windsor Locks Whse Renovation | Shared Services | Facilities | 57-24798 | 57-24798-SP01 | 57-24798-SP02 Waterbury Warehouse Renovation | Shared Services | Facilities | 58-24799 2025 CL&P-D Facilities LOB | Shared Services | Facilities | 59-25703 | 59-25703-SP01 | 59-25703-SP02 Cheshire - Install BMS | Shared Services | Facilities | 60-25714 WF - Replace Generator | Shared Services | Facilities | 61-25744 Hartford - Replace building pump | Shared Services | Facilities | 62-25777 CL&P-D 2025 Add'l Projects LOB | Shared Services | Facilities | 63-25779 | 63-25779-SP01 | 63-25779-SP02 Falls Village - Install Pole Yard | Shared Services | Facilities | 64-25798 2L030956P | Orchard Hill Rd, Canton | Operations | URD/DB Cable Reliability | 65-2L030956P 2M032630P | Moonlight Cr, Naugatuck - DB Cable | Operations | URD/DB Cable Reliability | 66-2M032630P 2M621710P | Convert Belridge&Valley Rd Cheshire | Operations | New Customer | 67-2M621710P 2M920415P | Main St, Southington - DB Cable Rep | Operations | URD/DB Cable Reliability | 68-2M920415P 2M924244P | Offload 11W76 to the 11W46 | Operations | Distribution Line Reliability | 69-2M924244P 3H030927P | Pondview Dr, Cromwell - DB Cable Re | Operations | URD/DB Cable Reliability | 70-3H030927P 3H031966P | Apple Ln, Simsbury - DB Cable Repl | Operations | URD/DB Cable Reliability | 71-3H031966P 3H033345P | Batson Dr, Manchester - DB Cable Re | Operations | URD/DB Cable Reliability | 72-3H033345P 3H033666P | Orchard Rd, Windsor - DB Cable Repl | Operations | URD/DB Cable Reliability | 73-3H033666P 3H820023P | CDOT 33-001 Coles Rd Cromwell | Operations | Line Relocations/Act of Public Authority | 74-3H820023P 3H922097P | Shadowbrook Ln, Simsbury - DB Cable | Operations | URD/DB Cable Reliability | 75-3H922097P * | 4.8 KV Delta Grounding | Operations | Regulatory Commitments-Other | 76-46860116 4.8KV Delta Grounding | Operations | Regulatory Commitments-Other | 77-46860117 4.8 KV Delta Grounding | Operations | Regulatory Commitments-Other | 78-46860119 * | Third Party Make Ready Special Proj | Operations | Line Relocations/Act of Public Authority | 79-49580216 Third Party Make Ready Special Proj | Operations | Line Relocations/Act of Public Authority | 80-49580217 Third Party Make Ready Special Proj | Operations | Line Relocations/Act of Public Authority | 81-49580218 Third Party Make Ready Special Proj | Operations | Line Relocations/Act of Public Authority | 82-49580219 4N031414P | Lincoln Park Ext, Preston - DB Cabl | Operations | URD/DB Cable Reliability | 83-4N031414P 4N821953P | State St Rebuild Vlt 159 and MH #3 | Operations | Emergent Equipment Failures | 84-4N821953P 5D920586P | Thompson Ave, Putnam - DB Cable Rep | Operations | URD/DB Cable Reliability | 85-5D920586P 5T031827P | Commerce Way S. Windsor - DB Cable | Operations | URD/DB Cable Reliability | 86-5T031827P 5T820589P | DB Cable Replacement - ARDB5TA | Operations | URD/DB Cable Reliability | 87-5T820589P 5T921747P | Eastwood Dr, E Windsor - DB Cable R | Operations | URD/DB Cable Reliability | 88-5T921747P 80020159P | Main St New Britain 1/15/21 Outage | Operations | Emergent Equipment Failures | 89-80020159P 80038681P | Country Squire Rd, Cromwell | Operations | New Customer | 90-80038681P 80041309P | Cinnamon Dr, Newington - DB Cable R | Operations | URD/DB Cable Reliability | 91-80041309P * | 80043211P | Amaon-1215 Kennedy Rd, Windsor | Operations | New Customer | 92-80043211P 80051183P | New City Rd Stafford 3 or More | Operations | Line Relocations/Act of Public Authority | 93-80051183P 80070262A | 90 Kane St West Hartford Transforme | Operations | Capital Tool Purchases/Other | 94-80070262A 80070646P | Fairway Dr, Stamford - DB Cable Rep | Operations | URD/DB Cable Reliability | 95-80070646P 80092160P | 575 Jarvis St Cheshire Reconductor | Operations | URD/DB Cable Reliability | 96-80092160P 80102179P | 1175 Hebron Ave, Glastonbury - DB C | Operations | URD/DB Cable Reliability | 97-80102179P
  5. Part 27 of 78

    80104359P | 4332 Town Brook, Middletown - DB Ca | Operations | URD/DB Cable Reliability | 98-80104359P 80106420P | 139 Hazard Ave Enfield 8/1/21 | Operations | Emergent Equipment Failures | 99-80106420P 80115237P | DB Primary Ext. for Gas Station | Operations | New Customer | 100-80115237P 80115790P | Carpenters Brook, Greenwich - DB Ca | Operations | URD/DB Cable Reliability | 101-80115790P 80122715P | 51 Hartford Turnpike, Vernon - DB C | Operations | URD/DB Cable Reliability | 102-80122715P 80134772P | Griffin Rd N, Windsor-DB Cable Repl | Operations | URD/DB Cable Reliability | 103-80134772P * | 80140261P | Charcoal Hill Cmn, Westport - DB Ca | Operations | URD/DB Cable Reliability | 104-80140261P 80141506P | Replace Switchgear at Shephard Park | Operations | Emergent Equipment Failures | 105-80141506P 80274459P | W. Newbury Bloomfield DB Replace | Operations | URD/DB Cable Reliability | 106-80274459P 80493998P | JMS-HTFD, 960 Main St - RELP 300E | Operations | Emergent Equipment Failures | 107-80493998P ARDB1B18 | DB Planned OBS Newtown | Operations | Emergent Equipment Failures | 108-ARDB1B18 ARDB1B20 | DB Planned OBS Newtown | Operations | Emergent Equipment Failures | 109-ARDB1B20 ARDB1N18 | DB Planned OBS Norwalk | Operations | Emergent Equipment Failures | 110-ARDB1N18 ARDB1S19 | DB Planned OBS Stamford | Operations | Emergent Equipment Failures | 111-ARDB1S19 ARDB2L19 | DB Planned OBS Torrington | Operations | Emergent Equipment Failures | 112-ARDB2L19 ARDB2M18 | DB Planned OBS Cheshire | Operations | Emergent Equipment Failures | 113-ARDB2M18 ARDB2M19 | DB Planned OBS Cheshire | Operations | Emergent Equipment Failures | 114-ARDB2M19 ARDB2M20 | DB Planned OBS Cheshire | Operations | Emergent Equipment Failures | 115-ARDB2M20 ARDB4N18 | DB Planned OBS New London | Operations | Distribution Line Reliability | 116-ARDB4N18 ARDB4N20 | DB Planned OBS New London | Operations | Distribution Line Reliability | 117-ARDB4N20 AROH1S17 | OH Planned OBS Stamford | Operations | Emergent Equipment Failures | 118-AROH1S17 AROH2L18 | OH PLANNED OBS ANNUAL TORR | Operations | Emergent Equipment Failures | 119-AROH2L18 AROH2M19 | OH Planned OBS Cheshire | Operations | Emergent Equipment Failures | 120-AROH2M19 AROH3H19 | OH Planned OBS Hartford | Operations | Emergent Equipment Failures | 121-AROH3H19 AROH4D19 | OH Planned OBS Madison | Operations | Distribution Line Reliability | 122-AROH4D19 AROH4M19 | OH Planned OBS East Hampton | Operations | Distribution Line Reliability | 123-AROH4M19 AROH4N19 | OH Planned OBS New London | Operations | Distribution Line Reliability | 124-AROH4N19 ARUG1B21 | UG Planned OBS Newtown | Operations | Distribution Line Reliability | 125-ARUG1B21 ARUG1N17 | UG PLANNED OBS ANNUAL-NORWALK | Operations | Emergent Equipment Failures | 126-ARUG1N17 ARUG1S18 | UG PLANNED OBS ANNUAL STAMFORD | Operations | Emergent Equipment Failures | 127-ARUG1S18 ARUG1S19 | UG Planned OBS Stamford | Operations | Emergent Equipment Failures | 128-ARUG1S19 ARUG1S20 | UG PLANNED OBS ANNUAL STAMFORD | Operations | Emergent Equipment Failures | 129-ARUG1S20 ARUG2M17 | UG Planned OBS Cheshire | Operations | Emergent Equipment Failures | 130-ARUG2M17 ARUG2M20 | UG Planned OBS Cheshire | Operations | Emergent Equipment Failures | 131-ARUG2M20 ARUG3H17 | UG Planned OBS Hartford | Operations | Emergent Equipment Failures | 132-ARUG3H17 ARUG3H18 | UG Planned OBS Hartford | Operations | Emergent Equipment Failures | 133-ARUG3H18 ARUG3H19 | UG Planned OBS Hartford | Operations | Emergent Equipment Failures | 134-ARUG3H19 ARUG3H20 | UG Planned OBS Hartford | Operations | Emergent Equipment Failures | 135-ARUG3H20 ARUG4N20 | UG Planned OBS New London | Operations | Distribution Line Reliability | 136-ARUG4N20 ARUG4N21 | UG Planned OBS New London | Operations | Distribution Line Reliability | 137-ARUG4N21 CD00303 | AMGRAPH FUEL CELL - DG INSTALLATION | Operations | New Customer | 138-CD00303
  6. Part 28 of 78

    CD01209 | 14M8-2 Smart Switch Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 139-CD01209 | 139-CD01209-SP01 CD01225 | 24H6 Smart Switch & Eliminating 25R | Operations | Distribution Line Reliability | 140-CD01225 | 140-CD01225-SP01 | 140-CD01225-SP02 CD01261 | North Square 25G Elimination | Operations | Distribution Line Reliability | 141-CD01261 | 141-CD01261-SP01 | 141-CD01261-SP02 CD01364 | 777 Summer St New Service | Operations | New Customer | 142-CD01364 * | CD01431 | North Silver Brook Holdings, LLC | Operations | New Customer | 143-CD01431 | 143-CD01431-SP01 | 143-CD01431-SP02 CD01451 | Ridgefield 22N Contingency Overload | Operations | Peak Load/Capacity | 144-CD01451 | 144-CD01451-SP01 | 144-CD01451-SP02 CD01555 | 11R56 PILC Cable Replacement | Operations | Network Reliability | 145-CD01555 CD01570 | 2022 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 146-CD01570 | 146-CD01570-SP01 | 146-CD01570-SP02 CD01580 | Franklin Dr 1B08 Overload Project | Operations | Peak Load/Capacity | 147-CD01580 | 147-CD01580-SP01 CD01586 | SSRK31.21-1Q6-61R->656-RWO.3 | Operations | SMART SWITCHES PROGRAM | 148-CD01586 CD01611 | Dooley 30K16 Contingency Overload d | Operations | Peak Load/Capacity | 149-CD01611 CD01615 | 23Q8 TDRP | Operations | Regulatory Commitments-Other | 150-CD01615 | 150-CD01615-SP01 CD01648 | 32R2 2020 TDRP | Operations | Regulatory Commitments-Other | 151-CD01648 CD01660 | 22M10 Load Relief | Operations | Peak Load/Capacity | 152-CD01660 A | CD01712 | CDOT 18-135 Federal Rd Improvement | Operations | Line Relocations/Act of Public Authority | 153-CD01712 CD01718 | Sandy Hook 37F2 TDRP | Operations | Regulatory Commitments-Other | 154-CD01718 CD01762 | New Serv - Broad and Greyrock | Operations | New Customer | 155-CD01762 CD01765 | 11Y3 & 11Y7 De-energized ROW Remova | Operations | RIGHT OF WAY LINES | 156-CD01765 | 156-CD01765-SP01 | 156-CD01765-SP02 CD01773 | Relocate 12F46/47/48 in ROW | Operations | Peak Load/Capacity | 157-CD01773 | 157-CD01773-SP01 | 157-CD01773-SP02 CD01779 | 13S9 Overload Project | Operations | Peak Load/Capacity | 158-CD01779 | 158-CD01779-SP01 CD01785 | 13K2 Reconductor Lateral (1 of 2) | Operations | Distribution Line Reliability | 159-CD01785 CD01790 | State Hwy Proj Bee St @ Rte 691&91 | Operations | Line Relocations/Act of Public Authority | The Project was impacted by journal entry activity in December 2025 and subsequent journal entry reversals/corrections in 2026. The life to date spend through May 2026 is $861,333. A supplemental request is not required per the Project Authorization policy. | 160-CD01790 | 160-CD01790-SP01 CD01827 | Cromwell Chelsea Estates Create DB | Operations | URD/DB Cable Reliability | 161-CD01827 CD01828 | Canton 5R2 – Contingency Overload | Operations | Peak Load/Capacity | 162-CD01828 CD01830 | SSRK43.21-21H12-71S->1060-RWO.2 | Operations | SMART SWITCHES PROGRAM | 163-CD01830 CD01832 | ROW Rehab & Conversion – Mohawk Mtn | Operations | RIGHT OF WAY LINES | 164-CD01832 CD01834 | Nevar Co, Spencer St, Suffield | Operations | New Customer | 165-CD01834 | 165-CD01834-SP01 | 165-CD01834-SP02 CD01840 | 11S15/2B6 - Waterbury Water Plant B | Operations | New Customer | 166-CD01840 | 166-CD01840-SP01 CD01849 | SSRK38.20-9S25-80M-738-RWO.4 | Operations | SMART SWITCHES PROGRAM | 167-CD01849 CD01851 | 12A5 Smart Switches | Operations | SMART SWITCHES PROGRAM | 168-CD01851 CD01852 | ROW 030 Priority Structures | Operations | RIGHT OF WAY LINES | 169-CD01852 | 169-CD01852-SP01 | 169-CD01852-SP02 CD01853 | Stevenson 14A1 Line Relocation | Operations | Peak Load/Capacity | 170-CD01853 | 170-CD01853-SP01 * | CD01860 | Glenbrook Smart Switches Program | Operations | SMART SWITCHES PROGRAM | 171-CD01860 CD01861 | Nevar Co., 343 Lopus Rd Beacon Fall | Operations | New Customer | 172-CD01861 CD01866 | 2023 ROW Priority 3 Poles | Operations | RIGHT OF WAY LINES | 173-CD01866
  7. Part 29 of 78

    CD01872 | Line Relocation Rubber Ave Naugatuc | Operations | Line Relocations/Act of Public Authority | 174-CD01872 | 174-CD01872-SP01 CD01875 | Southington 4C No Gate Relo Facilit | Operations | Line Relocations/Act of Public Authority | 175-CD01875 CD01878 | 17F Brook St Recovery Plan | Operations | Distribution Line Reliability | 176-CD01878 CD01882 | 5R1 Smart Switches | Operations | SMART SWITCHES PROGRAM | 177-CD01882 CD01885 | CANTON 5R2 OVERLOAD | Operations | Peak Load/Capacity | 178-CD01885 CD01887 | 2022 Trip Saver Program | Operations | SMART SWITCHES PROGRAM | 179-CD01887 CD01889 | Canton Smart Switch 5R4 Circuit | Operations | SMART SWITCHES PROGRAM | 180-CD01889 CD01893 | 23J1-72S Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 181-CD01893 * | CD01897 | CDOT Exit 14 Southbury Line Reloc | Operations | Line Relocations/Act of Public Authority | 182-CD01897 | 182-CD01897-SP01 CD01899 | 9L05 Reconductor Glenwood Ave | Operations | Distribution Line Reliability | 183-CD01899 CD01901 | 2022 CT DB Insp/FI Replacement | Operations | URD/DB Cable Reliability | 184-CD01901 CD01902 | Carmel Hill – Subst. Feeder Additio | Operations | Peak Load/Capacity | 185-CD01902 | 185-CD01902-SP01 CD01903 | 7L90 Smart Switches | Operations | SMART SWITCHES PROGRAM | 186-CD01903 | 186-CD01903-SP01 CD01904 | 5R7 Vineyard Rd Reconductoring | Operations | Distribution Line Reliability | 187-CD01904 CD01907 | Middletown_River Rd_Multiple Tree O | Operations | Distribution Line Reliability | 188-CD01907 CD01912 | Middlebury 18J1 Reliability Improve | Operations | Distribution Line Reliability | 189-CD01912 * | CD01913 | Black Rock Tpke - DB Replacement 12 | Operations | URD/DB Cable Reliability | 190-CD01913 CD01914 | Bungee Lake Reconductoring | Operations | Distribution Line Reliability | 191-CD01914 CD01915 | New Canaan Network Conversion | Operations | Regulatory Commitments-Other | 192-CD01915 | 192-CD01915-SP01 | 192-CD01915-SP02 CD01916 | Smart Switches Oakville 17Q SS | Operations | SMART SWITCHES PROGRAM | 193-CD01916 | 193-CD01916-SP02 CD01917 | River Rd Reconductor | Operations | Distribution Line Reliability | 194-CD01917 CD01920 | Rte 72/69 Bristol Intersection Impr | Operations | Line Relocations/Act of Public Authority | 195-CD01920 | 195-CD01920-SP01 CD01925 | Country Club Development Waterbury | Operations | Distribution Line Reliability | 196-CD01925 CD01926 | Amenia Union Rd Reconductoring | Operations | Distribution Line Reliability | 197-CD01926 CD01927 | 31C2 Rabbit Hill Rd Reliability | Operations | Distribution Line Reliability | 198-CD01927 CD01930 | 12J4 Parker Rd-Lateral Reliability | Operations | Distribution Line Reliability | 199-CD01930 CD01931 | CDOT #320-0016 Windsor Locks RR | Operations | Line Relocations/Act of Public Authority | 200-CD01931 CD01932 | Berkshire Rd Reliability Impr. | Operations | Distribution Line Reliability | 201-CD01932 CD01933 | 32G8-74S Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 202-CD01933 | 202-CD01933-SP01 CD01935 | Hiawatha Village Westport | Operations | New Customer | 203-CD01935 | 203-CD01935-SP01 | 203-CD01935-SP02 CD01938 | GRE Durham, Middlefield Rd | Operations | New Customer | 204-CD01938 | 204-CD01938-SP01 | 204-CD01938-SP02 CD01946 | 12J5-1600F LT Reconductoring | Operations | Regulatory Commitments-Other | 205-CD01946 | 205-CD01946-SP01 CD01947 | Fuse Pole 1808 Lateral Reconductor | Operations | Distribution Line Reliability | 206-CD01947 CD01949 | 12Y9 Squash Hollow Rd Reliability I | Operations | Distribution Line Reliability | 207-CD01949 CD01950 | 30R10 Durham Rd Lateral Reconductor | Operations | Distribution Line Reliability | 208-CD01950 CD01951 | Long Hill Rd Lateral Reliability | Operations | Distribution Line Reliability | 209-CD01951 | 209-CD01951-SP01 CD01953 | 5R5 Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 210-CD01953
  8. Part 30 of 78

    CD01955 | Lateral Reliability Prioritization | Operations | Distribution Line Reliability | 211-CD01955 CD01956 | Reconductor Little City Rd, Haddam | Operations | Regulatory Commitments-Other | 212-CD01956 | 212-CD01956-SP01 CD01958 | Lakeview 31A Contingency Overload | Operations | Peak Load/Capacity | 213-CD01958 | 213-CD01958-SP01 | 213-CD01958-SP02 CD01959 | SSRK31.22-22R2-71S-.1209-RWO3 | Operations | SMART SWITCHES PROGRAM | 214-CD01959 CD01960 | Silver St, Coventry/Lateral Recond | Operations | Distribution Line Reliability | 215-CD01960 CD01961 | GRE,Spencer Hill Rd Winchester | Operations | New Customer | 216-CD01961 | 216-CD01961-SP01 CD01964 | Great Wolf Resort at Foxwoods | Operations | New Customer | 217-CD01964 CD01968 | 11H77 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 218-CD01968 CD01970 | 15U3-71S Smart Switch | Operations | SMART SWITCHES PROGRAM | 219-CD01970 CD01971 | 11F9-74S Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 220-CD01971 * | CD01975 | SmartSwitch Carmel Hill 11S13 Circu | Operations | SMART SWITCHES PROGRAM | 221-CD01975 CD01976 | 11H74 Smart Switch | Operations | SMART SWITCHES PROGRAM | 222-CD01976 CD01977 | Stevenson Aerial Cable Replacement | Operations | Distribution Line Reliability | 223-CD01977 CD01981 | Deer Hill Rd Reliability Imprv | Operations | Distribution Line Reliability | 224-CD01981 CD01982 | 21P4 OVLD | Operations | Peak Load/Capacity | 225-CD01982 CD01983 | 13B7 Alternate Source From 13B25 | Operations | Distribution Line Reliability | 226-CD01983 CD01984 | 14W6 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 227-CD01984 CD01986 | T-Mobile Bloomfield New Service | Operations | New Customer | 228-CD01986 CD01988 | SSRK171.22-11F14-73S->1185-RWO.2 | Operations | SMART SWITCHES PROGRAM | 229-CD01988 CD01993 | 11N83 & 11N84 Additional ROW Work | Operations | RIGHT OF WAY LINES | 230-CD01993 CD01995 | Smartswitches 2B-4 Breaker Zone | Operations | SMART SWITCHES PROGRAM | 231-CD01995 CD01999 | Glenbrook 1K11 Smart Switches | Operations | SMART SWITCHES PROGRAM | 232-CD01999 | 232-CD01999-SP01 CD02003 | Canton 5R2/5R6 ROW Contingency Over | Operations | Peak Load/Capacity | 233-CD02003 | 233-CD02003-SP01 | 233-CD02003-SP02 CD02004 | Canton 5R6 – Contingency Overload | Operations | Peak Load/Capacity | 234-CD02004 | 234-CD02004-SP01 CD02012 | 2N08 PILC Cable Replacement | Operations | Network Reliability | 235-CD02012 CD02016 | New Service – 18 Dock St | Operations | New Customer | 236-CD02016 | 236-CD02016-SP01 CD02017 | Westfarms North Sw Failure Replace | Operations | Network Reliability | 237-CD02017 CD02018 | Reconductor School St Wilton CT | Operations | Distribution Line Reliability | 238-CD02018 | 238-CD02018-SP01 CD02024 | 21P2 Smart Switches | Operations | SMART SWITCHES PROGRAM | 239-CD02024 CD02028 | Pure Power, Chamberlain Hwy, Berlin | Operations | New Customer | 240-CD02028 | 240-CD02028-SP01 | 240-CD02028-SP02 CD02030 | 6A7 Overload | Operations | Peak Load/Capacity | 241-CD02030 CD02031 | CDOT Flanders Rd Relocation | Operations | Line Relocations/Act of Public Authority | 242-CD02031 | 242-CD02031-SP01 CD02032 | 22H18 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 243-CD02032 CD02034 | Great Pond, Windsor NS | Operations | New Customer | 244-CD02034 | 244-CD02034-SP01 CD02036 | 11A56 Ringed Spacer Cable Replaceme | Operations | Distribution Line Reliability | 245-CD02036 CD02039 | Smart Switch 1C21 | Operations | SMART SWITCHES PROGRAM | 246-CD02039 | 246-CD02039-SP01 CD02040 | 7L87 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 247-CD02040 | 247-CD02040-SP01 CD02045 | 48C7 Overload Project | Operations | Peak Load/Capacity | 248-CD02045 CD02046 | New Load 311C Tech Park Bristol | Operations | New Customer | 249-CD02046 | 249-CD02046-SP01 CD02047 | Falls Village 4L Regulators | Operations | Peak Load/Capacity | 250-CD02047
  9. Part 31 of 78

    CD02048 | 2022 Backbone Sweep Corrections | Operations | Distribution Line Reliability | 251-CD02048 CD02058 | Middletown Ind Park Rd Auto SWGR | Operations | Network Reliability | 252-CD02058 | 252-CD02058-SP01 | 252-CD02058-SP02 CD02063 | Back up for upper Pattagansett Road | Operations | Peak Load/Capacity | 253-CD02063 | 253-CD02063-SP01 CD02067 | SS 14N3 Circuit Norfolk Improvement | Operations | SMART SWITCHES PROGRAM | 254-CD02067 CD02070 | Replace Failed Getaway 30R10 | Operations | Network Reliability | 255-CD02070 CD02074 | 14W8 Rockville Hospital Reliability | Operations | Distribution Line Reliability | 256-CD02074 CD02078 | 12J5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 257-CD02078 CD02079 | Lighthouse Hill Windsor DB Cable Re | Operations | URD/DB Cable Reliability | 258-CD02079 CD02093 | 2023 Trip Saver Program | Operations | SMART SWITCHES PROGRAM | 259-CD02093 | 259-CD02093-SP01 CD02100 | Convert ABB Relay Testing Site Svc | Operations | Distribution Line Reliability | 260-CD02100 * | CD02101 | 11N86 Overload Project | Operations | Peak Load/Capacity | 261-CD02101 CD02103 | Stevenson 14A1 Conversion 8.32 to | Operations | Distribution Line Reliability | 262-CD02103 | 262-CD02103-SP01 | 262-CD02103-SP02 * | CD02104 | VCP, Johnson St, Middletown | Operations | New Customer | 263-CD02104 CD02109 | 2023 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 264-CD02109 | 264-CD02109-SP01 * | CD02118 | Verogy, Oakdale Rd, Montville | Operations | New Customer | 265-CD02118 CD02119 | VCP Realty,Winthrop Rd Deep River | Operations | New Customer | 266-CD02119 CD02121 | 11R50 PILC Cable Replacement | Operations | Network Reliability | 267-CD02121 CD02122 | Riverview Mobile Home Park Improve | Operations | URD/DB Cable Reliability | The Project was impacted by year-end December 2025 accrual activity and subsequent reversals/corrections in 2026. The life to date spend through May 2026 is $503,537. A supplemental request is not required per the Project Authorization policy. | 268-CD02122 | 268-CD02122-SP01 CD02123 | 1A151 PILC Cable Replacement | Operations | Network Reliability | 269-CD02123 CD02133 | Rentschler Field - New Service | Operations | New Customer | 270-CD02133 | 270-CD02133-SP01 CD02134 | ANO Brainard, Hartford | Operations | New Customer | 271-CD02134 | 271-CD02134-SP02 CD02135 | 2023 CT DB Insp/FI Replacement | Operations | URD/DB Cable Reliability | 272-CD02135 CD02136 | VCP Realty Warrenville Rd Mansfield | Operations | New Customer | 273-CD02136 | 273-CD02136-SP01 | 273-CD02136-SP02 CD02137 | Salmon Brook Granby NS DB | Operations | New Customer | 274-CD02137 | 274-CD02137-SP01 | 274-CD02137-SP02 CD02138 | 5R80 EXTENSION - Colebrook | Operations | New Customer | 275-CD02138 CD02146 | 2N05 Contingency Overload | Operations | Peak Load/Capacity | 276-CD02146 CD02150 | CDOT 95-97 Route 44 Norfolk | Operations | Line Relocations/Act of Public Authority | 277-CD02150 CD02153 | Stone Bridge Commons Cheshire NS | Operations | New Customer | 278-CD02153 * | CD02154 | Greenwich Smart Switches - 28F8 | Operations | SMART SWITCHES PROGRAM | 279-CD02154 | 279-CD02154-SP01 CD02162 | RECOMMENDATION FOR I-95 | Operations | Distribution Line Reliability | 280-CD02162 CD02164 | Norwalk 9S27 Normal Overload | Operations | Peak Load/Capacity | 281-CD02164 CD02169 | TRC Circuit Patrol Fixes | Operations | Distribution Line Reliability | 282-CD02169 | 282-CD02169-SP01 CD02172 | Farmington1C19 Contingency Overload | Operations | Peak Load/Capacity | 283-CD02172 | 283-CD02172-SP01 | 283-CD02172-SP02 CD02176 | W Main St Wtby Replace Duct Bank | Operations | Network Reliability | 284-CD02176 | 284-CD02176-SP01 CD02182 | NS 3333 Berlin Tpke, Newington | Operations | New Customer | 285-CD02182 | 285-CD02182-SP01 CD02190 | Middle River 28M3 Load Relief via 2 | Operations | Peak Load/Capacity | 286-CD02190 | 286-CD02190-SP01 | 286-CD02190-SP02
  10. Part 32 of 78

    CD02194 | 26E8 WPC Reliability Improvement | Operations | Regulatory Commitments-Other | 287-CD02194 | 287-CD02194-SP01 | 287-CD02194-SP02 CD02195 | 11F13 WPC Reliability Improvement | Operations | Regulatory Commitments-Other | 288-CD02195 | 288-CD02195-SP01 CD02197 | 2023 Trip Saver Program | Operations | SMART SWITCHES PROGRAM | 289-CD02197 | 289-CD02197-SP02 CD02200 | 2024 DB Insp & Fault Indctr Rplcmnt | Operations | URD/DB Cable Reliability | 290-CD02200 CD02201 | Large Customer Zones RWO Central | Operations | SMART SWITCHES PROGRAM | 291-CD02201 | 291-CD02201-SP01 | 291-CD02201-SP02 CD02202 | 2024 Large Customer Zones RWO – Eas | Operations | SMART SWITCHES PROGRAM | 292-CD02202 | 292-CD02202-SP01 CD02203 | 2024 Large Customer Zones RWO – Wes | Operations | SMART SWITCHES PROGRAM | 293-CD02203 | 293-CD02203-SP01 CD02222 | 2024 Pole Integrity/Defective Poles | Operations | POLE INTEGRITY PROGRAM | 294-CD02222 | 294-CD02222-SP01 CD02224 | 2024 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 295-CD02224 | 295-CD02224-SP02 CD02226 | 2N07 PILC Cable Replacement | Operations | Network Reliability | 296-CD02226 | 296-CD02226-SP01 | 296-CD02226-SP02 CD02232 | 47N1 PILC Cable Replacement | Operations | Network Reliability | 297-CD02232 CD02236 | SSRK22.21-30R13-51Z->700RWO.5 | Operations | SMART SWITCHES PROGRAM | 298-CD02236 CD02244 | VCP Glastonbury Solar One, Wickham | Operations | New Customer | 299-CD02244 | 299-CD02244-SP01 * | CD02247 | Verogy, Rt 32 North Franklin | Operations | New Customer | 300-CD02247 | 300-CD02247-SP01 | 300-CD02247-SP02 CD02253 | North Canaan 5L – Temporary Feeder | Operations | Network Reliability | 301-CD02253 | 301-CD02253-SP01 | 301-CD02253-SP02 CD02254 | Greenwich - MH Frame & Cover Replac | Operations | Network Reliability | 302-CD02254 CD02259 | 305N LOB Switchgear Replacement | Operations | Network Reliability | 303-CD02259 CD02260 | Salisbury 21J – Feeder Relocation | Operations | Network Reliability | 304-CD02260 | 304-CD02260-SP01 | 304-CD02260-SP02 CD02261 | NS 321 Ellis St, New Britain | Operations | New Customer | 305-CD02261 CD02270 | Eastern CEMI-Lateral Reconductoring | Operations | Distribution Line Reliability | 306-CD02270 CD02273 | Riverton 14N3 - Reconductor Danbury | Operations | Distribution Line Reliability | 307-CD02273 | 307-CD02273-SP01 CD02275 | Western Lateral Contributors to CEM | Operations | Distribution Line Reliability | 308-CD02275 CD02276 | Central Lateral Reconductor | Operations | Distribution Line Reliability | 309-CD02276 CD02278 | Relocate Norwalk 9S42 in ROW | Operations | Peak Load/Capacity | 310-CD02278 | 310-CD02278-SP01 | 310-CD02278-SP02 CD02279 | 1B12 PILC Cable Replacement | Operations | Network Reliability | 311-CD02279 CD02282 | ASML Switchgear Relocation Project | Operations | New Customer | 312-CD02282 | 312-CD02282-SP01 | 312-CD02282-SP02 CD02287 | Lower Summer St Roadway/Sidewalk Im | Operations | Line Relocations/Act of Public Authority | 313-CD02287 | 313-CD02287-SP01 | 313-CD02287-SP02 CD02291 | 37F2 Highland Dr UG Replacement | Operations | Network Reliability | 314-CD02291 CD02293 | Somers Rd Enfield DB Cable Replace | Operations | URD/DB Cable Reliability | 315-CD02293 CD02295 | Pine Ridge Rd, Greenwich – Conv. & | Operations | Distribution Line Reliability | 316-CD02295 | 316-CD02295-SP02 CD02296 | Eversource CT Hot Line Clamp Repl. | Operations | Distribution Line Reliability | 317-CD02296 CD02299 | 2025 Central Smart Switch (CI) | Operations | SMART SWITCHES PROGRAM | 318-CD02299 | 318-CD02299-SP01 * | CD02314 | 29A3 Fuse Pole 2093 Reconductoring | Operations | Distribution Line Reliability | 319-CD02314 | 319-CD02314-SP01 CD02322 | Capitol Blvd Rocky Hill DB Cable Re | Operations | URD/DB Cable Reliability | 320-CD02322 CD02324 | Energy Release MH Covers - Western | Operations | Network Reliability | 321-CD02324 | 321-CD02324-SP01 | 321-CD02324-SP02

As listed on the current system

Supplement for New App [Filed: 10/19/2026]

This filing on the current system (opens in a new tab)