Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-ADDITIONS-4 Supplemental 2

Files3

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
2 parts match

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 33 of 78

    CD02325 | Energy Release MH covers – Eastern | Operations | Network Reliability | 322-CD02325 | 322-CD02325-SP01 | 322-CD02325-SP02 CD02329 | Energy Rel MH Covers Central 2025 | Operations | Network Reliability | 323-CD02329 | 323-CD02329-SP01 | 323-CD02329-SP02 CD02330 | Driftway Ln Reconductoring & Tree | Operations | Distribution Line Reliability | 324-CD02330 CD02334 | Great Pond, Windsor NS | Operations | New Customer | The Project was impacted by journal entry activity in December 2025 and subsequent journal entry reversals/corrections in 2026. The life to date spend through May 2026 is $1,269,138. A supplemental request is not required per the Project Authorization policy. | 325-CD02334 | 325-CD02334-SP01 CD02339 | CT Transit-26 Elm Ct-New Service | Operations | New Customer | 326-CD02339 | 326-CD02339-SP01 | 326-CD02339-SP02 CD02340 | 2024 Trip Saver Program | Operations | SMART SWITCHES PROGRAM | 327-CD02340 | 327-CD02340-SP01 CD02343 | Christian St. 31C Normal Overload | Operations | Peak Load/Capacity | 328-CD02343 CD02344 | LILLINNONAH LAKE RD N. RECONDUCTORI | Operations | Distribution Line Reliability | 329-CD02344 CD02350 | Christian Street 31C2 Replacement | Operations | Peak Load/Capacity | 330-CD02350 | 330-CD02350-SP01 CD02351 | Repl Net Xfmr Vault 394 Wtby | Operations | Network Reliability | 331-CD02351 | 331-CD02351-SP01 CD02353 | 37 Hunters Lane Southington DG | Operations | New Customer | 332-CD02353 | 332-CD02353-SP01 CD02357 | Plumtree Heights UG Loop | Operations | URD/DB Cable Reliability | 333-CD02357 | 333-CD02357-SP01 CD02358 | Enterprise Dr Rocky Hill DB Replace | Operations | URD/DB Cable Reliability | 334-CD02358 CD02359 | Southwest Hartford 47N9 PILC Repl. | Operations | Network Reliability | 335-CD02359 CD02368 | Glover Ave Reconfigure Switchgear | Operations | New Customer | 336-CD02368 | 336-CD02368-SP01 CD02376 | 2025 ROW Priority 3 Poles - Central | Operations | RIGHT OF WAY LINES | 337-CD02376 | 337-CD02376-SP01 | 337-CD02376-SP02 CD02377 | 2024 ROW Priority 3 Poles - Eastern | Operations | RIGHT OF WAY LINES | 338-CD02377 | 338-CD02377-SP01 | 338-CD02377-SP02 CD02383 | 7A79 – Newfield Street – New Servic | Operations | New Customer | 339-CD02383 | 339-CD02383-SP01 CD02385 | 2025 Eastern Smart Switch (CI) – 3 | Operations | SMART SWITCHES PROGRAM | 340-CD02385 | 340-CD02385-SP01 CD02392 | Blue Hills Ave 301D Switchgear Repl | Operations | Network Reliability | 341-CD02392 CD02394 | 2N16 Contingency Overload | Operations | Peak Load/Capacity | 342-CD02394 | 342-CD02394-SP01 CD02401 | 11F13 Reliability Improvements | Operations | Regulatory Commitments-Other | 343-CD02401 CD02402 | 21P3 CDOT 79-245 Rt 91 Widening | Operations | Line Relocations/Act of Public Authority | 344-CD02402 CD02404 | CDOT 0135-0349 Stamford | Operations | Line Relocations/Act of Public Authority | 345-CD02404 | 345-CD02404-SP01 * | CD02409 | 11N84 Spruce St Overloaded Step | Operations | Peak Load/Capacity | 346-CD02409 CD02415 | Church St Naugatuck Streetscape | Operations | Network Reliability | 347-CD02415 CD02426 | Amazon, Helmsford Way Windsor NS | Operations | New Customer | 348-CD02426 | 348-CD02426-SP01 | 348-CD02426-SP02 CD02444 | 2025 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 349-CD02444 | 349-CD02444-SP01 | 349-CD02444-SP02 CD02446 | Reconductor Jones Hill Rd East Ha | Operations | Distribution Line Reliability | 350-CD02446 | 350-CD02446-SP01 CD02449 | 2025 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 351-CD02449 | 351-CD02449-SP01 | 351-CD02449-SP02 CD02453 | Replace Center St Bridge, Meriden | Operations | Line Relocations/Act of Public Authority | 352-CD02453 | 352-CD02453-SP01 | 352-CD02453-SP02 CD02458 | New Service Amazon Plainfield | Operations | New Customer | 353-CD02458 | 353-CD02458-SP01 | 353-CD02458-SP02 CD02459 | Bokum 15L12, 15L68, 15L69 23kv geta | Operations | Peak Load/Capacity | 354-CD02459 | 354-CD02459-SP01 | 354-CD02459-SP02
  2. Part 34 of 78

    CD02463 | Hartford 2025 Overloaded Step Trans | Operations | Peak Load/Capacity | 355-CD02463 | 355-CD02463-SP01 * | CD02464 | Newtown-2025 Overloaded Step | Operations | Peak Load/Capacity | 356-CD02464 CD02467 | Hartford Superior Ct 314D SG Repl | Operations | Network Reliability | 357-CD02467 | 357-CD02467-SP01 CD02480 | 30R15-Reconductor 336 ringed SC wit | Operations | Distribution Line Reliability | 358-CD02480 | 358-CD02480-SP01 CD02494 | New service STA-EV Charging Griswol | Operations | New Customer | 359-CD02494 | 359-CD02494-SP01 | 359-CD02494-SP02 CD02497 | New Service Uline Plainfield | Operations | New Customer | 360-CD02497 | 360-CD02497-SP01 | 360-CD02497-SP02 CD02498 | Enterprise Dr DB Cable Repl Bristol | Operations | URD/DB Cable Reliability | 361-CD02498 CD02499 | Replace Westlake. Switchgear with P | Operations | Emergent Equipment Failures | 362-CD02499 CD02504 | Enfield 12C Conversion | Operations | Emergent Equipment Failures | 363-CD02504 | 363-CD02504-SP01 | 363-CD02504-SP02 * | CD02506 | 37F Substation Cable to New Switchg | Operations | Peak Load/Capacity | 364-CD02506 CD02521 | Vacufuses Program 2025 | Operations | SMART SWITCHES PROGRAM | 365-CD02521 | 365-CD02521-SP01 | 365-CD02521-SP02 CD02524 | 4A8 DB Getaway Cable Replacement | Operations | Emergent Equipment Failures | 366-CD02524 CD02530 | Glenbrook 1K18 Failed Equip - Maher | Operations | Distribution Line Reliability | 367-CD02530 | 367-CD02530-SP01 * | CD02537 | 2025 Eastern-Madison CI Rank 1-100 | Operations | SMART SWITCHES PROGRAM | 368-CD02537 | 368-CD02537-SP01 CD02544 | 14S32 and 14S37 ROW | Operations | RIGHT OF WAY LINES | 369-CD02544 | 369-CD02544-SP01 CD02548 | 639 Staits Tpke Watertown | Operations | Emergent Equipment Failures | 370-CD02548 CD02564 | 2024 Flood Damage | Operations | Emergent Equipment Failures | 371-CD02564 | 371-CD02564-SP01 CD02567 | Town of Union Rel Improvement | Operations | SMART SWITCHES PROGRAM | 372-CD02567 | 372-CD02567-SP01 | 372-CD02567-SP02 CD02571 | CDOT 53-196 Bridge Mods Griswold St | Operations | Line Relocations/Act of Public Authority | 373-CD02571 | 373-CD02571-SP01 CD02577 | Amazon EV Chargers, Victoria Dr | Operations | New Customer | 374-CD02577 | 374-CD02577-SP01 CD02579 | PRI DB Turnover Ledgewood Dr Brookf | Operations | URD/DB Cable Reliability | 375-CD02579 CD02588 | Replace two PMH-5 with PME-5 Automa | Operations | Emergent Equipment Failures | 376-CD02588 | 376-CD02588-SP01 CD02595 | Bright Meadow Blvd Enfield DB | Operations | URD/DB Cable Reliability | 377-CD02595 | 377-CD02595-SP01 CD02599 | 39F-2X LTC Replace - AETNA | Operations | Emergent Equipment Failures | 378-CD02599 CD02636 | Stamford AWC-1G09 Cable Lockout | Operations | Emergent Equipment Failures | 379-CD02636 CD02664 | : CDOT 53-189 Modifications to Rt17 | Operations | Line Relocations/Act of Public Authority | 380-CD02664 | 380-CD02664-SP01 | 380-CD02664-SP02 CD02678 | ARKA - SCADA Backup | Operations | SMART SWITCHES PROGRAM | 381-CD02678 | 381-CD02678-SP01 CD02681 | ARKA Reconductor | Operations | Distribution Line Reliability | 382-CD02681 | 382-CD02681-SP01 CD02685 | 4A10 New Zone Commercial Area | Operations | SMART SWITCHES PROGRAM | 383-CD02685 | 383-CD02685-SP01 * | CD02715 | Western TripSaver Optimization | Operations | SMART SWITCHES PROGRAM | 384-CD02715 | 384-CD02715-SP01 CD02716 | Central TripSaver Optimization | Operations | SMART SWITCHES PROGRAM | 385-CD02716 | 385-CD02716-SP01 CD02717 | Eastern TripSaver Optimization | Operations | SMART SWITCHES PROGRAM | 386-CD02717 | 386-CD02717-SP01 CD02730 | 55 Elm St Hartford Vault Repairs | Operations | Emergent Equipment Failures | 387-CD02730 | 387-CD02730-SP01 CD02736 | Stonington 21U Transformers Replace | Operations | Network Reliability | 388-CD02736 | 388-CD02736-SP01 CD02769 | 2025 Western BCA Trip Savers | Operations | SMART SWITCHES PROGRAM | 389-CD02769 | 389-CD02769-SP01
  3. Part 35 of 78

    CD02770 | 2025 Central BCA Trip Savers | Operations | SMART SWITCHES PROGRAM | 390-CD02770 | 390-CD02770-SP01 CD02771 | 2025 Eastern BCA Trip Savers | Operations | SMART SWITCHES PROGRAM | 391-CD02771 | 391-CD02771-SP01 CPTLAUVL | CAPITAL ASPLUNDH UVL | Operations | Emergent Equipment Failures | 392-CPTLAUVL * | CS00328 | NW Hatford 2N Rplc Failed Brkr | Operations | Emergent Equipment Failures | 393-CS00328 CS00413 | Bloomfield 3B Replace OCB's | Operations | Environmental | 394-CS00413 CS00414 | E. Hartford 32G Replace OCB's | Operations | Environmental | 395-CS00414 | 395-CS00414-SP01 CS00417 | N. Bloomfield 2A Rplace OCB's | Operations | Environmental | 396-CS00417 | 396-CS00417-SP01 | 396-CS00417-SP02 CS00438 | Mianus 16Q Rplc PT Xfr Q72056 | Operations | Emergent Equipment Failures | 397-CS00438 CS00441 | Carmel Hill Rplc MOD Xfr DSQ62036 | Operations | Emergent Equipment Failures | 398-CS00441 CS00455 | Weston 21M Rplc Rclsr Xfer DSN92046 | Operations | Substation Reliability | 399-CS00455 CS00475 | Jefferson Hill 26 Rplc Swch XQ42013 | Operations | Emergent Equipment Failures | 400-CS00475 CS00493 | Tracy 14M OCB Replacement PH2 | Operations | Environmental | 401-CS00493 CS00495 | Cos Cob 11R DSCADA LTC | Operations | Substation Reliability | 402-CS00495 CS00499 | Todd 30L DSCADA LTC | Operations | Substation Reliability | 403-CS00499 CS00501 | Weston 21M DSCADA LTC | Operations | Substation Reliability | 404-CS00501 CS00508 | Forestville 12A Duc Bnk X-DSN92038 | Operations | Substation Reliability | 405-CS00508 CS00520 | Bunker Hill 12B DSCADA LTC | Operations | Substation Reliability | 406-CS00520 CS00521 | Card 11F DSCADA LTC | Operations | Substation Reliability | 407-CS00521 CS00522 | Flanders 11Y DSCADA LTC | Operations | Substation Reliability | 408-CS00522 CS00523 | Flax Hill 24A DSCADA LTC | Operations | Substation Reliability | 409-CS00523 CS00525 | Mystic 13K DSCADA LTC | Operations | Substation Reliability | 410-CS00525 CS00527 | Westside 7A DSCADA LTC | Operations | Substation Reliability | 411-CS00527 CS00529 | Sherwood 18P DSCADA LTC | Operations | Substation Reliability | 412-CS00529 CS00543 | SW Htf 47N Switches Xfr DSN82043 | Operations | Substation Reliability | 413-CS00543 * | CS00549 | Berlin 6A Rplc Bat & Chrgr DSQ03004 | Operations | Emergent Equipment Failures | 414-CS00549 CS00571 | Middle River 28M Add Feeders | Operations | Substation Reliability | 415-CS00571 | 415-CS00571-SP01 CS00577 | Rockville 14W Transformer Refurbish | Operations | Substation Reliability | 416-CS00577 CS00581 | Ridgefield 22N Rplc 3-Xfmr Relay | Operations | Substation Reliability | 417-CS00581 CS00584 | Forestville 12A Rplc MOD | Operations | Substation Reliability | 418-CS00584 CS00590 | S End 1G DSCADA Xfer DSN72004 | Operations | Substation Reliability | 419-CS00590 CS00600 | Mystic 13K Sound Mitigation | Operations | Substation Reliability | 420-CS00600 CS00601 | CT Security Camera Replacements | Operations | SUBSTATION SECURITY | 421-CS00601 CS00602 | E. Meriden 21P Failed Transformer | Operations | Emergent Equipment Failures | 422-CS00602 CS00615 | S. End 1G Replace Bus Duct | Operations | Emergent Equipment Failures | 423-CS00615 CS00619 | Farmington 1C Rbuild LTC Xfr Q92050 | Operations | Emergent Equipment Failures | 424-CS00619 CS00620 | Card 11F Rebuild LTC Xfr Q03014 | Operations | Emergent Equipment Failures | 425-CS00620 CS00623 | Branford 11J LTC Xfer Q80305904 | Operations | Emergent Equipment Failures | 426-CS00623 CS00626 | Xfmr Vacuum Processor Refurbish | Operations | Substation Reliability | 427-CS00626 CS00630 | Columbia 20Y Rplc Oil Recloser | Operations | Environmental | 428-CS00630 | 428-CS00630-SP01 CS00631 | E Htf 32G Rplc CB Xfer DSQ92028 | Operations | Emergent Equipment Failures | 429-CS00631 CS00632 | E Htf 32G Rplc CB Xfer DSQ92046 | Operations | Emergent Equipment Failures | 430-CS00632
  4. Part 36 of 78

    CS00634 | N Canaan 5L Rplc Recloser & Feeder | Operations | Substation Reliability | 431-CS00634 | 431-CS00634-SP01 CS00638 | Weston 21M Rplc Batry Xfer DSQ92029 | Operations | Emergent Equipment Failures | 432-CS00638 * | CS00643 | Newington 4A Rplc VAC Swch XQ92008 | Operations | Emergent Equipment Failures | 433-CS00643 CS00647 | 69MX Recloser & DSCADA XN92051 | Operations | Substation Reliability | 434-CS00647 CS00664 | Workmans Ground Xfr GXTD20 WOs | Operations | Capital Tool Purchases/Other | 435-CS00664 CS00675 | Falls Village 9A Replace XFMR | Operations | Peak Load/Capacity | 436-CS00675 | 436-CS00675-SP01 CS00707 | Berlin 6A Install HVAC&H2 Detection | Operations | Substation Reliability | 437-CS00707 CS00709 | Enfield 12C Failed Transformer | Operations | Emergent Equipment Failures | 438-CS00709 | 438-CS00709-SP01 | 438-CS00709-SP02 CS00715 | Waterside 22M Replace Breaker | Operations | Emergent Equipment Failures | 439-CS00715 CS00716 | Christian 31C Replace Breaker | Operations | Emergent Equipment Failures | 440-CS00716 CS00717 | Todd 30L Replace Breaker | Operations | Emergent Equipment Failures | 441-CS00717 CS00721 | Waterside 22M 3X Refurbish Bus Duct | Operations | Emergent Equipment Failures | 442-CS00721 CT24CAPEQUIP | 2024 Capital Equipment Dist Comm | Operations | Capital Tool Purchases/Other | 443-CT24CAPEQUIP CTCSCG23 | CT Apprentice Climbing Gear 2023 | Operations | Capital Tool Purchases/Other | 444-CTCSCG23 CTCSCG24 | CT Apprentice Climbing Gear 2024 | Operations | Capital Tool Purchases/Other | 445-CTCSCG24 CTDESENG | CT Designer Training Field Eng Trng | Operations | Capital Tool Purchases/Other | 446-CTDESENG CTDMX23 | CT DMX Replacements | Operations | Capital Tool Purchases/Other | 447-CTDMX23 | 447-CTDMX23-SP01 | 447-CTDMX23-SP02 CTDSOCIT | New Windsor SOC IT and AV Equipment | Operations | Facilities | 448-CTDSOCIT | 448-CTDSOCIT-SP01 | 448-CTDSOCIT-SP02 CTFAN23 | CT DSCADA Replacement-Reliaiblity | Operations | Reliability - Other | 449-CTFAN23 | 449-CTFAN23-SP01 | 449-CTFAN23-SP02 CTFTCG22 | 2022 Apprentice Climbing Gear | Operations | Capital Tool Purchases/Other | 450-CTFTCG22 CTSELICON | Norwalk and Newtown SEL ICONs | Operations | DSCADA - RADIO EXPANSION | 451-CTSELICON CTSWITCH24 | CT Electric Training Equipment | Operations | Capital Tool Purchases/Other | 452-CTSWITCH24 CTTENT23 | 2 Tents for Berlin Training Yard | Operations | Capital Tool Purchases/Other | 453-CTTENT23 CTTRNDOBLE | CT Doble Test Kits | Operations | Capital Tool Purchases/Other | 454-CTTRNDOBLE CTTRNSUB | Berlin Training Substation | Operations | Capital Tool Purchases/Other | 455-CTTRNSUB CTTRNSUB24 | Berlin Training Substation 2024 | Operations | Capital Tool Purchases/Other | 456-CTTRNSUB24 | 456-CTTRNSUB24-SP01 | 456-CTTRNSUB24-SP02 D73H19 | ROADWAY LIGHTING HARTFORD | Operations | Lighting | 457-D73H19 DA2M20 | NON-ROADWAY LIGHTING CHESHIRE | Operations | Lighting | 458-DA2M20 DH1B18 | LINE RELOCATIONS NEWTOWN | Operations | Line Relocations/Act of Public Authority | 459-DH1B18 DH1B19 | LINE RELOCATIONS NEWTOWN | Operations | Line Relocations/Act of Public Authority | 460-DH1B19 DH1B21 | LINE RELOCATIONS Newtown | Operations | Line Relocations/Act of Public Authority | 461-DH1B21 DH1S18 | LINE RELOCATIONS Stamford | Operations | Line Relocations/Act of Public Authority | 462-DH1S18 DH1S19 | LINE RELOCATIONS Stamford | Operations | Line Relocations/Act of Public Authority | 463-DH1S19 DH1S21 | Line Relocations - Stamford | Operations | Line Relocations/Act of Public Authority | 464-DH1S21 DH2L21 | Line Relocations - Torrington | Operations | Line Relocations/Act of Public Authority | 465-DH2L21 DH2M19 | Line Relocations Cheshire | Operations | Line Relocations/Act of Public Authority | 466-DH2M19 DH2M20 | Line Relocations Cheshire | Operations | Line Relocations/Act of Public Authority | 467-DH2M20
  5. Part 37 of 78

    DH2M20A | LINE RELOCATIONS - Cheshire | Operations | Distribution Line Reliability | 468-DH2M20A | 468-DH2M20A-SP01 DH2W19 | Line Relocations Waterbury | Operations | Line Relocations/Act of Public Authority | 469-DH2W19 DH3H17 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 470-DH3H17 DH3H19 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 471-DH3H19 DH3H20 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 472-DH3H20 DH3H21 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 473-DH3H21 DH4D19 | LINE RELOCATIONS Madison | Operations | Line Relocations/Act of Public Authority | 474-DH4D19 DH4M18 | LINE RELOCATIONS East Hampton | Operations | Line Relocations/Act of Public Authority | 475-DH4M18 DH4M19 | LINE RELOCATIONS East Hampton | Operations | Distribution Line Reliability | 476-DH4M19 DH4M20 | LINE RELOCATIONS East Hampton | Operations | Line Relocations/Act of Public Authority | 477-DH4M20 DH5T17 | Line Relocations Tolland | Operations | Line Relocations/Act of Public Authority | 478-DH5T17 DH5T18 | Line Relocations Tolland | Operations | Line Relocations/Act of Public Authority | 479-DH5T18 DH5T20 | Line Relocations - Tolland | Operations | Line Relocations/Act of Public Authority | 480-DH5T20 DN1B21 | New/Existing Customers Newtown | Operations | Distribution Line Reliability | 481-DN1B21 DN1N17 | NEW/EXISTING CUSTMRS NORWALK | Operations | New Customer | 482-DN1N17 DN1N18 | NEW/EXISTING CUSTMRS NORWALK | Operations | New Customer | 483-DN1N18 DN1N21 | New/Existing Customers Norwalk | Operations | Distribution Line Reliability | 484-DN1N21 DN1S19 | NEW/EXISTING CUSTMRS STAMFORD | Operations | New Customer | 485-DN1S19 DN1S20 | NEW/EXISTING CUSTMRS STAMFORD | Operations | New Customer | 486-DN1S20 DN1S21 | New/Existing Customers - Stamford | Operations | New Customer | 487-DN1S21 DN2M18 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 488-DN2M18 DN2M19 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 489-DN2M19 DN2M20 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 490-DN2M20 DN2W20 | NEW/EXISTING CUSTOMERS - Waterbury | Operations | New Customer | 491-DN2W20 DN4N18 | NEW/EXISTING CUSTMRS New London | Operations | New Customer | 492-DN4N18 DN5D18 | NEW/EXISTING CUSTMRS Danielson | Operations | New Customer | 493-DN5D18 DN5T18 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 494-DN5T18 DN5T19 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 495-DN5T19 DN5T20 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 496-DN5T20 DN5T21 | New/Existing Customers Tolland | Operations | New Customer | 497-DN5T21 DQ1N21 | DB Planned OBS - Norwalk | Operations | Distribution Line Reliability | 498-DQ1N21 DQ1S21 | OH Planned OBS Stamford | Operations | Distribution Line Reliability | 499-DQ1S21 DQ2M20 | UG Planned OBS - Cheshire | Operations | Distribution Line Reliability | 500-DQ2M20 DQ5T21 | OH Planned OBS Tolland | Operations | Emergent Equipment Failures | 501-DQ5T21 DQDB2M19 | UG Failed Equipment Cheshire | Operations | Emergent Equipment Failures | 502-DQDB2M19 DQOH5T18 | OH Planned OBS Tolland | Operations | Emergent Equipment Failures | 503-DQOH5T18 DQUG1N18 | UG Planned OBS Norwalk | Operations | Emergent Equipment Failures | 504-DQUG1N18 DQUG3H19 | UG Failed Equipment Hartford | Operations | Emergent Equipment Failures | 505-DQUG3H19 DQUG3H20 | UG Failed Equipment Hartford | Operations | Emergent Equipment Failures | 506-DQUG3H20 DR1B18 | OH RELIAB IMPROVE Newtown | Operations | Distribution Line Reliability | 507-DR1B18 DR1B21 | OH Reliability Improve Newtown | Operations | Distribution Line Reliability | 508-DR1B21
  6. Part 38 of 78

    DR1N20 | OH RELIAB IMPROVE NORWALK | Operations | Distribution Line Reliability | 509-DR1N20 DR1S18 | OH RELIAB IMPROVE STAMFORD | Operations | Distribution Line Reliability | 510-DR1S18 DR1S21 | OH Reliability Improve Stamford | Operations | Distribution Line Reliability | 511-DR1S21 DR2L20 | OH RELIAB IMPROVE Torrington | Operations | Distribution Line Reliability | 512-DR2L20 DR2L21 | OH Reliability Improve Torrington | Operations | Distribution Line Reliability | 513-DR2L21 DR2M17 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 514-DR2M17 DR2M19 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 515-DR2M19 DR2M20 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 516-DR2M20 DR2M20A | OH RELIABILITY IMPROVE Cheshire | Operations | Distribution Line Reliability | 517-DR2M20A DR2W17 | OH Reliability Improve Waterbury | Operations | Distribution Line Reliability | 518-DR2W17 DR3H16 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 519-DR3H16 DR3H18 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 520-DR3H18 DR3H19 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 521-DR3H19 DR3H21 | OH Reliab Improve Hartford | Operations | Distribution Line Reliability | 522-DR3H21 DR3S18 | OH Reliablitiy Improvement Simsbury | Operations | Distribution Line Reliability | 523-DR3S18 DR4D17 | OH RELIAB IMPROVE MADISON | Operations | Distribution Line Reliability | 524-DR4D17 DR4D19 | OH RELIAB IMPROVE MADISON | Operations | Distribution Line Reliability | 525-DR4D19 DR4D21 | OH Reliability Improve Madison | Operations | Distribution Line Reliability | 526-DR4D21 DR4M16 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 527-DR4M16 DR4M17 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 528-DR4M17 DR4M18 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 529-DR4M18 DR4M19 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 530-DR4M19 DR4N20 | OH RELIABILITY IMPROVE New London | Operations | Distribution Line Reliability | 531-DR4N20 DR5D18 | OH RELIAB IMPROVE Danielson | Operations | Distribution Line Reliability | 532-DR5D18 DR5T19 | OH Reliability Improvement Tolland | Operations | Distribution Line Reliability | 533-DR5T19 DR5T21 | OH Reliab Improve Tolland | Operations | Distribution Line Reliability | 534-DR5T21 EAST4801P | 2021 4.8KV Delta System Grounding | Operations | Regulatory Commitments-Other | 535-EAST4801P EEC23-28 | Eversource Energy Center 2023-2028 | Operations | UCONN RESILIENT ENERGY CENTER | 536-EEC23-28 | 536-EEC23-28-SP01 * | GREENWICHSR | DSCADA System Res Greenwich | Operations | DSCADA - RADIO EXPANSION | 537-GREENWICHSR | 537-GREENWICHSR-SP01 GRPRLP1619 | SOUTH WINDSOR POST TOP LED REPLACE | Operations | Lighting | 538-GRPRLP1619 * | GRPRLP1620 | SOUTHINGTON POST TOP LED REPLACE | Operations | Lighting | 539-GRPRLP1620 GRPRLP1621 | STONINGTON LED POST TOP REPLACE | Operations | Lighting | 540-GRPRLP1621 GXRS16P | 2016 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 541-GXRS16P GXRS17P | 2017 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 542-GXRS17P GXRS19P | 2019 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 543-GXRS19P GXRS2007P | 2020 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 544-GXRS2007P GXRS2104P | 2021 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 545-GXRS2104P GXRS2208P | 2022 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 546-GXRS2208P IFUG3H19 | UG Insp Failed Equipment Hartford | Operations | Emergent Equipment Failures | 547-IFUG3H19 INSOH5T19 | OH Insurance Claim Tolland | Operations | Emergent Equipment Failures | 548-INSOH5T19
  7. Part 39 of 78

    IT23426 | CT LI Discount Rate | Shared Services | Information Technology | 549-IT23426 | 549-IT23426-SP01 | 549-IT23426-SP02 IT23440 | CT Bill Redesign | Shared Services | Information Technology | 550-IT23440 IT23454 | CT Electric Vehicle | Shared Services | Information Technology | 551-IT23454 MCRO22NM | Microwave Upgrade New Milford | Operations | Capital Tool Purchases/Other | 552-MCRO22NM MCRO22NT | Microwave Upgrade Newtown | Operations | Capital Tool Purchases/Other | 553-MCRO22NT MCRO22SM | Microwave Upgrade South Mtn | Operations | Capital Tool Purchases/Other | 554-MCRO22SM MCRO22TM | Talcott Mtn Microwave Upgrade | Operations | Capital Tool Purchases/Other | 555-MCRO22TM ML2301 | 2023 CLP-D ML Line of Business | Shared Services | Facilities | 556-ML2301 ML2401 | 2024 Material Logistics LOB CL&P-D | Shared Services | Facilities | 557-ML2401 ML2501 | 2025 Material Logistics LOB CL&P-D | Shared Services | Facilities | 558-ML2501 | 558-ML2501-SP01 | 558-ML2501-SP02 MN21ECAPP | CT Storm Event – July 6, 2021 | Operations | Emergent Equipment Failures | 559-MN21ECAPP MN21KCAPP | CT Tropical Storm Ida – September 1 | Operations | Emergent Equipment Failures | 560-MN21KCAPP MS18CCAPP | CT Nor'easter Event - March 2, 2018 | Operations | Emergent Equipment Failures | 561-MS18CCAPP MS18DCAPP | CT Nor'easter EVent - March 8, 2018 | Operations | Emergent Equipment Failures | 562-MS18DCAPP MS18ECAPP | CT Snow & Wind Event-March 13, 2018 | Operations | Emergent Equipment Failures | 563-MS18ECAPP MS18GCAPP | CT Wind/Rain Storm Event - 5/15/18 | Operations | Emergent Equipment Failures | 564-MS18GCAPP MS18HCAPP | CT Heatwave Event - Jun. 29, 2018 | Operations | Emergent Equipment Failures | 565-MS18HCAPP MS19ACAPP | Rain & Wind Event - Jan. 20, 2019 | Operations | Emergent Equipment Failures | 566-MS19ACAPP MS19CCAPP | CT Wind Event - February 25, 2019 | Operations | Emergent Equipment Failures | 567-MS19CCAPP MS19DCAPP | CT Storm Event March 4, 2019 | Operations | Emergent Equipment Failures | 568-MS19DCAPP MS19GCAPP | CT Wind/Rain Event - Oct. 17, 2019 | Operations | Emergent Equipment Failures | 569-MS19GCAPP MS19HCAPP | CT Wind/Rain Event - oct. 31, 2019 | Operations | Emergent Equipment Failures | 570-MS19HCAPP MS21CCAPP | CT Wind Event – March 2, 2021 | Operations | Emergent Equipment Failures | 571-MS21CCAPP MS21FCAPP | CT Storm Event – July 6, 2021 | Operations | Emergent Equipment Failures | 572-MS21FCAPP MS21HCAPP | CT Storm Elsa – July 9, 2021 | Operations | Emergent Equipment Failures | 573-MS21HCAPP MS21KCAPP | CT Storm Henri – August 21, 2021 | Operations | Emergent Equipment Failures | 574-MS21KCAPP MS21LCAPP | CT Nor’easter – October 25, 2021 | Operations | Emergent Equipment Failures | 575-MS21LCAPP MS21MCAPP | CT Rain/Wind Event - November 12, 2 | Operations | Emergent Equipment Failures | 576-MS21MCAPP MS23BCAPP | CT Wind/Snow Event - Jan. 25, 2023 | Operations | Emergent Equipment Failures | 577-MS23BCAPP SLCAP011P | Street Light Capital Reclassing | Operations | Lighting | 578-SLCAP011P * | SMTNSR | DSCADA System Res South Mountain | Operations | DSCADA - RADIO EXPANSION | 579-SMTNSR STRM22CP | CL&P MAJOR STORMS 2022 | Operations | Emergent Equipment Failures | 580-STRM22CP XTRANCT01 | XTRAN Pilot Project | Operations | Capital Tool Purchases/Other | 581-XTRANCT01 STRM23CP | CT MAJOR STORMS 2023 | Operations | Emergent Equipment Failures | 582-STRM23CP STRM24CP | CT MAJOR STORMS 2024 | Operations | Emergent Equipment Failures | 583-STRM24CP CS00727 | South Meadow 1A DSCADA LTC | Operations | Substation Reliability | 584-CS00727 CS00728 | Canton 5R DSCADA LTC | Operations | Substation Reliability | 585-CS00728 CS00733 | Southington 4C DSCADA LTC | Operations | Substation Reliability | 586-CS00733 CS00730 | Rocky Hill DSCADA LTC | Operations | Substation Reliability | 587-CS00730 CS00431 | Green Hill 30R DSCADA LTC | Operations | Substation Reliability | 588-CS00431
  8. Part 40 of 78

    CS00729 | Mianus 16Q DSCADA LTC | Operations | Substation Reliability | 589-CS00729 CTENGCOM | Field Engineer Field Communication | Operations | Capital Tool Purchases/Other | 590-CTENGCOM | 590-CTENGCOM-SP02 CTETFI23 | CT Electric Training Facility Impro | Shared Services | Facilities | 591-CTETFI23 IT23442 | 2023 LC Modern Desktop - CL&P | Shared Services | Information Technology | 592-IT23442 IT24433 | 2024 LC Modern Desktop - CL&P Distr | Shared Services | Information Technology | 593-IT24433 IT22463 | 2022 LC Modern Desktop - CL&P | Shared Services | Information Technology | 594-IT22463 EV22400 | Multi-Family Dwelling (MUD) | Operations | Grid Modernization | 595-EV22400 GXSGIO24 | 2024 SGIO Capitalized Tools | Operations | Capital Tool Purchases/Other | 596-GXSGIO24-SP01 | 596-GXSGIO24-SP02 Newtown - AHU Replacements (2) | Shared Services | Facilities | 597-247122-SP01 | 597-247122-SP02 Elevator Replacement | Shared Services | Facilities | 598-25767-SP01 25CGMR11 | 2025 CG Equipment CLP Equipment | Shared Services | Capital Tool Purchases/Other | 599-25CGMR11-SP01 CL&P-D Buildings 2026 LOB | Shared Services | Facilities | 600-26703-SP01 | 600-26703-SP02 CD01884 | CDOT US Rt 1 Intersection Improv | Operations | Line Relocations/Act of Public Authority | 601-CD01884-SP01 CD02059 | Man to Auto Tuttle Rd Middletown | Operations | Network Reliability | 602-CD02059-SP01 | 602-CD02059-SP02 CD02105 | VCP, River St, Windsor | Operations | New Customer | 603-CD02105-SP01 CD02124 | VCP Realty, Woodstock | Operations | New Customer | 604-CD02124-SP01 | 604-CD02124-SP02 CD02213 | 12Y9 WPC Reliability Improvement | Operations | Regulatory Commitments-Other | 605-CD02213-SP01 | 605-CD02213-SP02 CD02220 | Town of Greenwich – Repl MH Covers | Operations | Network Reliability | 606-CD02220-SP01 | 606-CD02220-SP02 CD02239 | Verogy, Stafford Springs | Operations | New Customer | 607-CD02239-SP01 | 607-CD02239-SP02 CD02319 | 2025 Eastern Large Customer Zone >1 | Operations | SMART SWITCHES PROGRAM | 608-CD02319-SP01 | 608-CD02319-SP02 CD02381 | Convert 15L46 to 23kV & getaway wor | Operations | Peak Load/Capacity | 609-CD02381-SP01 | 609-CD02381-SP02 CD02462 | Tilcon NS on Black Rock 11H Sub | Operations | New Customer | 610-CD02462-SP01 | 610-CD02462-SP02 CD02513 | Uncasville 1Q01 Getaway Overload Pr | Operations | Peak Load/Capacity | 611-CD02513-SP01 | 611-CD02513-SP02 CD02545 | 2026 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 612-CD02545-SP01 | 612-CD02545-SP02 CD02546 | 2026 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 613-CD02546-SP01 | 613-CD02546-SP02 CD02723 | Town Scorecard – Eastern Region | Operations | Distribution Line Reliability | 614-CD02723-SP01 | 614-CD02723-SP02 CD02746 | Capital BLVD DB Cable Replacement | Operations | URD/DB Cable Reliability | 615-CD02746-SP01 | 615-CD02746-SP02 CD02766 | CDOT 304-22 Raise MH Water St Nauga | Operations | Line Relocations/Act of Public Authority | 616-CD02766-SP01 CD02779 | Replace Poles 3A09/3A02 ROW | Operations | Peak Load/Capacity | 617-CD02779-SP01 | 617-CD02779-SP02 CD02827 | CDOT 171-499 UG Dev Rte 187 E Granb | Operations | Line Relocations/Act of Public Authority | 618-CD02827-SP01 | 618-CD02827-SP02 CD02828 | Repl Network Vault 419-65 Garden St | Operations | Network Reliability | 619-CD02828-SP01 | 619-CD02828-SP02 CD02836 | Sachem Rd, Greenwich - Cable Fault | Operations | Emergent Equipment Failures | 620-CD02836-SP01 CD02840 | 12F43 Emergent Cable Failure | Operations | Emergent Equipment Failures | 621-CD02840-SP01 CS00593 | Rplc Mobile Xfrmr 71MX | Operations | Substation Reliability | 622-CS00593-SP01 CS00636 | Saybrook 22D Conversion | Operations | Peak Load/Capacity | 623-CS00636-SP01 | 623-CS00636-SP02 CS00703 | Westbrook 20S Conversion | Operations | Peak Load/Capacity | 624-CS00703-SP01 | 624-CS00703-SP02 CS00712 | Weston 21M Sound Mitigation | Operations | Substation Reliability | 625-CS00712-SP01 | 625-CS00712-SP02
  9. Part 41 of 78

    CS00720 | Rocky Hill 3R Replace ATS | Operations | Emergent Equipment Failures | 626-CS00720-SP01 CTBATT26 | 2026 CT Battery and Charger Repl | Operations | Capital Tool Purchases/Other | 627-CTBATT26-SP01 | 627-CTBATT26-SP02 IT25037 | 2025 Modern Desktop - CL&P Distri | Shared Services | Information Technology | 628-IT25037-SP01 IT25090 | ERP Contractor Storm Manager - CL&P | Shared Services | Information Technology | 629-IT25090-SP01 | 629-IT25090-SP02 ML2601 | 2026 Material Logistics LOB CL&P-D | Shared Services | Facilities | 630-ML2601-SP01 | 630-ML2601-SP02 MN25KCP | CL&P Major Storm MN25K011 | Operations | Emergent Equipment Failures | 631-MN25KCP-SP01 MS25ACP | CL&P Major Storm MS25A011 | Operations | Emergent Equipment Failures | 632-MS25ACP-SP01 Chiller/Boiler Replacements | Shared Services | Facilities | 633-25761-SP01 Storage Infrastructure | Shared Services | Facilities | 634-26804-SP01 CD01591 | Corbin Drive - Darien - New Service | Operations | New Customer | 635-CD01591-SP01 | 635-CD01591-SP02 CD02303 | Waterside 22M9 Overload | Operations | Peak Load/Capacity | 636-CD02303-SP01 | 636-CD02303-SP02 CD02470 | 28M1 Contingent Overload | Operations | Peak Load/Capacity | 637-CD02470-SP01 | 637-CD02470-SP02 CD02473 | 11A55 Contingency Overload | Operations | Peak Load/Capacity | 638-CD02473-SP01 | 638-CD02473-SP02 CD02618 | 15L69 Contingency Overload | Operations | Peak Load/Capacity | 639-CD02618-SP01 | 639-CD02618-SP02 CD02765 | Overloaded Network Xfmrs – N23-1X & | Operations | Peak Load/Capacity | 640-CD02765-SP01 | 640-CD02765-SP02 CD02788 | Replace Aluminum Bus Network Units | Operations | Network Reliability | 641-CD02788-SP01 | 641-CD02788-SP02 CD02894 | Replace 375C Failed Switchgear | Operations | Emergent Equipment Failures | 642-CD02894-SP01 | 642-CD02894-SP02 CD02901 | W Cornwall Road DB Cable Replacemen | Operations | URD/DB Cable Reliability | 643-CD02901-SP01 | 643-CD02901-SP02 Waterbury - Freight - Paving | Shared Services | Facilities | 644-26726-SP02 Test Department Renovation | Shared Services | Facilities | 645-26815-SP02 CD02007 | 2B5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 646-CD02007-SP02 CD02283 | VCP 2715 Mountain Rd Suffield | Operations | New Customer | 647-CD02283-SP02 CD02405 | 12C4 Equip Conversion and Replace | Operations | Distribution Line Reliability | 648-CD02405-SP02 CD02428 | CTEC No Main St, Suffield DG | Operations | New Customer | 649-CD02428-SP02 CD02440 | 14R31 ROW Rebuild | Operations | Peak Load/Capacity | 650-CD02440-SP02 CD02538 | 2025 Eastern-New London SS CI Rank | Operations | SMART SWITCHES PROGRAM | 651-CD02538-SP02 CS00689 | CT D-SS AED Install Program | Operations | Substation Reliability | 652-CS00689-SP02 Lower Parking Lot Paving | Shared Services | Facilities | 653-26814-SP02 CD02192 | 12J5 - Reliability Improvements | Operations | Regulatory Commitments-Other | 654-CD02192-SP02 CD02211 | 13K57, 32P3 ROW Removal | Operations | RIGHT OF WAY LINES | 655-CD02211-SP02 CD02793 | Foxwoods SWGR Replacement – 109/110 | Operations | Network Reliability | 656-CD02793-SP02 CD02834 | BCA TripSavers Central 2026 | Operations | SMART SWITCHES PROGRAM | 657-CD02834-SP02 CD02835 | BCA TripSavers Eastern 2026 | Operations | SMART SWITCHES PROGRAM | 658-CD02835-SP02 CD02970 | 1G08 Feeder Lockout | Operations | Emergent Equipment Failures | 659-CD02970-SP02 CD02102 | C&B Hebron Rd, Marlborough | Operations | New Customer | 660-CD02102-SP02 Line Notes: * | Projects under $500K do not require a Supplemental Authorization request. [Sheet: Annual Projects Pre 2022] The Connecticut Light and Power Company d/b/a Eversource Energy Actual Capital Expenditures and In-Service Capital Additions through August 31, 2026 Project Matrix--Pre-2022 Annual Projects (Whole Dollars) Capital Expenditures--Operations | Capital Expenditures--Shared Services | Refer to Exhibit Line No. | Project | Project Description | Organization Category | Project Type | Annual Direct Costs
  10. Part 42 of 78

    (as of 12/31/2025) | Annual Direct Costs through 6/30/2026 | Direct Costs July & August 2026 (as of October 15, 2026) | Total LTD Direct Costs (as of October 15, 2026) | Pre-Construction Estimated Direct Costs | % of Actual Cost Over or Under (-) Compared to Estimate | Annual Total Costs (as of 12/31/2025) | Annual Total Costs through 6/30/2026 | Total Costs July & August 2026 (as of October 15, 2026) | Total LTD Total Costs (as of October 15, 2026) | Pre-Construction Estimated Total Costs | % of Actual Cost Over or Under (-) Compared to Estimate | In-Service Capital Additions | In-Service Capital Additions June 2026 YTD (as of Septmber 15, 2026) | In-Service Capital Additions July & August 2026 (as of October 15, 2026) | Total In-Service Capital Additions | Project Notes / Variance Explanations | CLP-ADDITIONS-6 (July 14, 2026 Filing) | CLP-ADDITIONS-6-Supplemental (September 15, 2026 Filing) | CLP-ADDITIONS-6-Supplemental 2 (October 15, 2026 Filing) CL&P-D Vehicles | Shared Services | Capitalized Vehicles | 1-18742 18CGVE11 | 2018 CG Vehicles for CT FMW | Shared Services | Capitalized Vehicles | 2-18CGVE11 CL&P Facilities Vehicles | Shared Services | Capitalized Vehicles | 3-19733 CTEDVH20 | CT Electric Distrb Vehicle Purchase | Operations | Capitalized Vehicles | 4-CTEDVH20 | 4-CTEDVH20-SP02 CTEDVH21 | CT Electric Distrib Vehicle Purchas | Operations | Capitalized Vehicles | 5-CTEDVH21 CTFT2020 | CT Field Training Tools & Equipment | Operations | Capital Tool Purchases/Other | 6-CTFT2020 CTFT2021 | CT Field Training Tools & Equipment | Operations | Capital Tool Purchases/Other | 7-CTFT2021 CTMTR17 | CT ANNUAL METER PROJECT FOR 2017 | Operations | Meters - Electric | 8-CTMTR17 CTMTR18 | CT Annual Meter Project for 2018 | Operations | Meters - Electric | 9-CTMTR18 CTMTR19 | CT Annual Meter Project for 2019 | Operations | Meters - Electric | 10-CTMTR19 CTMTR20 | CT Annual Meter Project for 2020 | Operations | Meters - Electric | 11-CTMTR20 CTMTR21 | CT Annual Meter Project for 2021 | Operations | Meters - Electric | 12-CTMTR21 CTRMTR17 | CTRemote Disconnect 2017-2018 | Operations | Meters - Electric | Total direct costs of $39,450,439 on the total project were $1,520,439 and 4% higher than approved direct costs of $37,900,000. A supplemental request is not required per the Project Authorization policy. There was a shift in spending from MA to CT, all within total project approvals. | 13-CTRMTR17 CTROW17 | ETT ROW CLEARING | Operations | ENHANCED TREE TRIMMING | 14-CTROW17 CTTRN18 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 15-CTTRN18 CTTRN19 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 16-CTTRN19 CTTRN20 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 17-CTTRN20 CTTRN21 | CT Elec Training Annual Cap Project | Operations | Capital Tool Purchases/Other | 18-CTTRN21 DSCN20 | 2020 CT D SS Planned Annual | Operations | Substation Reliability | 19-DSCN20 DSCN21 | 2021 CT D SS Planned Annual | Operations | Substation Reliability | 20-DSCN21 | 20-DSCN21-SP01 DSEQ20 | 2020 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 21-DSEQ20 DSEQ21 | 2021 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 22-DSEQ21 | 22-DSEQ21-SP01 ETR2017 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 23-ETR2017 ETR2018 | Enhanced Tree Removals - CL&P | Operations | ENHANCED TREE REMOVAL | 24-ETR2018 ETR2019 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 25-ETR2019 ETR2020 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 26-ETR2020 ETR2021 | Enhanced Tree Removals - CL&P | Operations | ENHANCED TREE REMOVAL | 27-ETR2021 ETT2016 | ENHANCED TREE TRIMMING - LATERAL | Operations | ENHANCED TREE TRIMMING | 28-ETT2016 ETT2017 | ENHANCED TREE TRIMMING - LATERAL | Operations | ENHANCED TREE TRIMMING | 29-ETT2017

As listed on the current system

Supplement for New App [Filed: 10/19/2026]

This filing on the current system (opens in a new tab)