Application supplement
Exhibit CLP-ADDITIONS-4 Supplemental 2
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
PDF · 2.1 MB · 77 pagesText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.pdfRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Excel · 613 KBText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsxRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 43 of 78
ETTCF17 | ETT Customer Focused | Operations | CUSTOMER FOCUS TRIMMING | 30-ETTCF17 ETTCF18 | ETT Customer Focused | Operations | CUSTOMER FOCUS TRIMMING | 31-ETTCF18 ETTCF19 | ETT Customer Focused - 2019 | Operations | CUSTOMER FOCUS TRIMMING | 32-ETTCF19 ETTCF20 | ETT Customer Focused - 2020 | Operations | CUSTOMER FOCUS TRIMMING | 33-ETTCF20 ETTCF21 | ETT Customer Focused - 2021 | Operations | CUSTOMER FOCUS TRIMMING | 34-ETTCF21 GXTD19 | Capital Tools & Equip Maint D S/S | Operations | Capital Tool Purchases/Other | 35-GXTD19 GXTD20 | 2020 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 36-GXTD20 GXTD21 | 2021 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 37-GXTD21 2017 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 38-102118 2017 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 39-103353 2017 SUBSTATION METERING | Operations | Substation Reliability | 40-201435 2017 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 41-495802 CD00412 (CDNXANNL) | 2017 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 42-CD00412 (CDNXANNL) CDMHANNL | 2017 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 43-CDMHANNL CSTMER (CDCDANNL) | 2017 Customer | Operations | New Customer | 44-CSTMER (CDCDANNL) DB_CABLE (101395) | 2017 DB Cable | Operations | URD/DB Cable Reliability | 45-DB_CABLE (101395) DSEQ | 2017 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 46-DSEQ EFO_TLS (GXCOCT) | 2017 EFO Tools | Operations | Capital Tool Purchases/Other | 47-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2017 Emergent Line | Operations | Emergent Equipment Failures | 48-EMRGNTLN (CDEMANNL) INSCLMCST (CTINS24) | 2017 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 49-INSCLMCST (CTINS24) IT1DWANA | 2017 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 50-IT1DWANA LIGHTNG (D7DA24) | 2017 Lighting | Operations | Lighting | 51-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2017 Line Relocations | Operations | Line Relocations/Act of Public Authority | 52-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2017 Line Reliability | Operations | Distribution Line Reliability | 53-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2017 Voltage Corrections | Operations | Peak Load/Capacity | 54-VLT_CORR (CDDKANNL) DT7C | 2017 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 55-DT7C LVEHPUR | 2017 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 56-LVEHPUR 2018 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 57-102118 2018 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 58-103353 2018 SUBSTATION METERING | Operations | Substation Reliability | 59-201435 2018 CL&P - FEEDER METERING PROJECT | Operations | Substation Reliability | 60-401051 468601 (CD48KVAN24) | 2018 4.8KV GROUNDING FOR CODE COMPLIANCE | Operations | Regulatory Commitments-Other | 61-468601 (CD48KVAN24) 2018 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 62-495802 CD00258 | 2018 LINE RECLOSER CONTROL PROG | Operations | RECLOSER CONTROL PROGRAM | 63-CD00258 CD00412 (CDNXANNL) | 2018 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 64-CD00412 (CDNXANNL) CSTMER (CDCDANNL) | 2018 Customer | Operations | New Customer | 65-CSTMER (CDCDANNL) DB_CABLE (101395) | 2018 DB Cable | Operations | URD/DB Cable Reliability | 66-DB_CABLE (101395) DSCN | 2018 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 67-DSCN DSEQ | 2018 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 68-DSEQ EFO_TLS (GXCOCT) | 2018 EFO Tools | Operations | Capital Tool Purchases/Other | 69-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2018 Emergent Line | Operations | Emergent Equipment Failures | 70-EMRGNTLN (CDEMANNL)Part 44 of 78
GXCOTRBL | 2018 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 71-GXCOTRBL INSCLMCST (CTINS24) | 2018 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 72-INSCLMCST (CTINS24) IT1DWANA | 2018 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 73-IT1DWANA LIGHTNG (D7DA24) | 2018 Lighting | Operations | Lighting | 74-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2018 Line Relocations | Operations | Line Relocations/Act of Public Authority | 75-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2018 Line Reliability | Operations | Distribution Line Reliability | 76-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2018 Voltage Corrections | Operations | Peak Load/Capacity | 77-VLT_CORR (CDDKANNL) DT7C | 2018 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 78-DT7C LVEHPUR | 2018 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 79-LVEHPUR 2019 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 80-102118 2019 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 81-103353 2019 SUBSTATION METERING | Operations | Substation Reliability | 82-201435 2019 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 83-495802 CD00412 (CDNXANNL) | 2019 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 84-CD00412 (CDNXANNL) CDMHANNL | 2019 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 85-CDMHANNL CSTMER (CDCDANNL) | 2019 Customer | Operations | New Customer | The New Customer category in total was on budget for the year as overages in Customer Annuals were offset by lower spending for specific Customer projects. | 86-CSTMER (CDCDANNL) DB_CABLE (101395) | 2019 DB Cable | Operations | URD/DB Cable Reliability | 87-DB_CABLE (101395) DSCN | 2019 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 88-DSCN DSEQ | 2019 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 89-DSEQ EMRGNTLN (CDEMANNL) | 2019 Emergent Line | Operations | Emergent Equipment Failures | 90-EMRGNTLN (CDEMANNL) GXCOTRBL | 2019 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 91-GXCOTRBL INSCLMCST (CTINS24) | 2019 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 92-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2019 Lighting | Operations | Lighting | 93-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2019 Line Relocations | Operations | Line Relocations/Act of Public Authority | 94-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2019 Line Reliability | Operations | Distribution Line Reliability | 95-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2019 Voltage Corrections | Operations | Peak Load/Capacity | 96-VLT_CORR (CDDKANNL) DT7C | 2019 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 97-DT7C LVEHPUR | 2019 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 98-LVEHPUR 2020 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 99-102118 2020 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 100-103353 2020 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 101-495802 CD00412 (CDNXANNL) | 2020 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 102-CD00412 (CDNXANNL) CDMHANNL | 2020 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 103-CDMHANNL CSTMER (CDCDANNL) | 2020 Customer | Operations | New Customer | 104-CSTMER (CDCDANNL) DB_CABLE (101395) | 2020 DB Cable | Operations | URD/DB Cable Reliability | 105-DB_CABLE (101395) DSEQ | 2020 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 106-DSEQ EMRGNTLN (CDEMANNL) | 2020 Emergent Line | Operations | Emergent Equipment Failures | 107-EMRGNTLN (CDEMANNL) GXCOTRBL | 2020 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 108-GXCOTRBLPart 45 of 78
INSCLMCST (CTINS24) | 2020 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 109-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2020 Lighting | Operations | Lighting | 110-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2020 Line Relocations | Operations | Line Relocations/Act of Public Authority | 111-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2020 Line Reliability | Operations | Distribution Line Reliability | 112-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2020 Voltage Corrections | Operations | Peak Load/Capacity | 113-VLT_CORR (CDDKANNL) DT7C | 2020 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 114-DT7C LVEHPUR | 2020 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 115-LVEHPUR 2021 2021 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 116-102118 2021 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 117-103353 2021 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 118-495802 CD00412 (CDNXANNL) | 2021 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 119-CD00412 (CDNXANNL) CDMHANNL | 2021 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 120-CDMHANNL CSTMER (CDCDANNL) | 2021 Customer | Operations | New Customer | 121-CSTMER (CDCDANNL) DB_CABLE (101395) | 2021 DB Cable | Operations | URD/DB Cable Reliability | 122-DB_CABLE (101395) DSCN | 2021 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 123-DSCN DSEQ | 2021 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 124-DSEQ EMRGNTLN (CDEMANNL) | 2021 Emergent Line | Operations | Emergent Equipment Failures | 125-EMRGNTLN (CDEMANNL) GECNCLP | 2021 CT TRANSPORTATION TOOLS | Operations | Capital Tool Purchases/Other | 126-GECNCLP GXENG | 2021 Capital Tools for Engineering Org | Operations | Capital Tool Purchases/Other | 127-GXENG INSCLMCST (CTINS24) | 2021 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 128-INSCLMCST (CTINS24) IT1DWANA | 2021 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 129-IT1DWANA LIGHTNG (D7DA24) | 2021 Lighting | Operations | Lighting | 130-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2021 Line Relocations | Operations | Line Relocations/Act of Public Authority | 131-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2021 Line Reliability | Operations | Distribution Line Reliability | 132-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2021 Voltage Corrections | Operations | Peak Load/Capacity | 133-VLT_CORR (CDDKANNL) DT7C | 2021 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 134-DT7C Line Notes: Pre 2022 Project Specific and Annual tabs differ from Post 2022 formats, with Operations and Shared Services presented in separate columns to reflect differing reporting methods (direct costs vs total). [Sheet: Annual Projects Post 2022] The Connecticut Light and Power Company d/b/a Eversource Energy Actual Capital Expenditures and In-Service Capital Additions through August 31, 2026 Exhibit 4 Project Matrix--Post-2022 Annual Projects (Whole Dollars) Refer to Exhibit Line No. | Project | Project Description | Organization Category | Project Type | Annual Total Costs through 12/31/2025 | Annual Total Costs through 6/30/2026 | Total Costs July & August 2026 (as of October 15, 2026) | Total LTD Costs (as of October 15, 2026) | Pre-Construction Estimated Total Costs | % of Actual Cost Over or Under (-) Compared to Estimate | In-Service Capital Additions (For July 14, 2026) | In-Service Capital Additions June 2026 YTD (For Septmber 15, 2026) | In-Service Capital Additions July & August 2026 (as of October 15, 2026) | Total In-Service Capital Additions | Project Notes / Variance Explanations | CLP-ADDITIONS-6 (July 14, 2026 Filing) | CLP-ADDITIONS-6-Supplemental (September 15, 2026 Filing) | CLP-ADDITIONS-6-Supplemental 2 (October 15, 2026 Filing)Part 46 of 78
1DWANA2022 | CT Telecom WAN Annual 2022 | Operations | Capital Tool Purchases/Other | 1-1DWANA2022 1DWANA23 | CT Telecom WAN Annual 2023 | Operations | Capital Tool Purchases/Other | 2-1DWANA23 1DWANA24 | Telecom CT 2024 WAN Annual | Operations | Capital Tool Purchases/Other | 3-1DWANA24 25CGVE11 | 2025 CG Vehicles CT MTR | Shared Services | Capitalized Vehicles | 4-25CGVE11 | 4-25CGVE11-SP01 | 4-25CGVE11-SP02 CTCSTRN23 | CT Apprentice Tools & Equipment | Operations | Capital Tool Purchases/Other | 5-CTCSTRN23 CTCSTRN24 | CT Apprentice Tools & Equipment | Operations | Capital Tool Purchases/Other | 6-CTCSTRN24 CTEDVH22 | CT Elec Distrib Vehicle Purchases | Operations | Capitalized Vehicles | 7-CTEDVH22 | 7-CTEDVH22-SP01 CTEDVH23 | CT Elec Distrib Vehicle Purchases | Operations | Capitalized Vehicles | 8-CTEDVH23 | 8-CTEDVH23-SP01 | 8-CTEDVH23-SP02 CTEDVH24 | CT Elec D Fleet Capital Vehicles | Operations | Capitalized Vehicles | 9-CTEDVH24 | 9-CTEDVH24-SP01 | 9-CTEDVH24-SP02 CTEDVH25 | CT Elec D Fleet Capital Vehicles | Operations | Capitalized Vehicles | 10-CTEDVH25 | 10-CTEDVH25-SP01 | 10-CTEDVH25-SP02 CTFT2022 | CT Field Training Tools & Equipment | Operations | Capital Tool Purchases/Other | 11-CTFT2022 CTMTR22 | CT Annual Meter Project for 2022 | Shared Services | Meters - Electric | 12-CTMTR22 CTMTR23 | CT Annual Meter Project for 2023 | Shared Services | Meters - Electric | 13-CTMTR23 CTMTR24 | CT Annual Meter Project for 2024 | Shared Services | Meters - Electric | 14-CTMTR24 | 14-CTMTR24-SP01 CTMTR25 | CT Annual Meter Project for 2025 | Shared Services | Meters - Electric | 15-CTMTR25 | 15-CTMTR25-SP01 CTREL23 | 2023 CL&P System Resiliency - Syste | Operations | ENHANCED TREE REMOVAL | 16-CTREL23 CTREL24 | Reliability Tree Removal (REL) Prog | Operations | ENHANCED TREE REMOVAL | 17-CTREL24 CTREL25 | Reliability Tree Removal (REL) Prog | Operations | ENHANCED TREE REMOVAL | 18-CTREL25 | 18-CTREL25-SP01 | 18-CTREL25-SP02 CTTOOL22 | CT Elec Fleet Capital Tool Purchase | Operations | Capital Tool Purchases/Other | 19-CTTOOL22 CTTOOL23 | CT Elec Fleet Capital Tool Purchase | Operations | Capital Tool Purchases/Other | 20-CTTOOL23 CTTOOL24 | CT Elec D Fleet Capital Tools | Operations | Capital Tool Purchases/Other | 21-CTTOOL24 CTTOOL25 | CT Fleet Capital Tool Purchases | Operations | Capital Tool Purchases/Other | 22-CTTOOL25 CTTRN22 | CT Elec Training Annual Cap Project | Operations | Capital Tool Purchases/Other | 23-CTTRN22 CTTRN23 | CT Electric Tools & Equipment 2023 | Operations | Capital Tool Purchases/Other | 24-CTTRN23 CTTRN24 | CT Electric Tools & Equipment 2024 | Operations | Capital Tool Purchases/Other | 25-CTTRN24 CTTRN25 | CT Electric Tools & Equipment 2025 | Operations | Capital Tool Purchases/Other | 26-CTTRN25 | 26-CTTRN25-SP01 | 26-CTTRN25-SP02 CTTTRN22 | CT Technical Training Tools & Equip | Operations | Capital Tool Purchases/Other | 27-CTTTRN22 CTWEDV23 | CT Elec D Wrkfrce Exp Flt Cap Veh | Operations | Capitalized Vehicles | 28-CTWEDV23 DOT24 | 2024 CT-DOT Cooperative Tree Remova | Operations | ENHANCED TREE REMOVAL | 29-DOT24 DOT25 | 2025 CT-DOT Cooperative Tree Remova | Operations | ENHANCED TREE REMOVAL | 30-DOT25 DSCN22 | 2022 CT D SS Planned Annual | Operations | Substation Reliability | 31-DSCN22 | 31-DSCN22-SP01 | 31-DSCN22-SP02 DSCN23 | 2023 CT D SS Planned Annual | Operations | Substation Reliability | 32-DSCN23 | 32-DSCN23-SP01 | 32-DSCN23-SP02 DSCN24 | 2024 CT D SS Planned Annual | Operations | Substation Reliability | 33-DSCN24 | 33-DSCN24-SP01 | 33-DSCN24-SP02 DSCN25 | 2025 CT D SS Planned Annual | Operations | Substation Reliability | 34-DSCN25 | 34-DSCN25-SP01 | 34-DSCN25-SP02 DSEQ22 | 2022 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 35-DSEQ22 | 35-DSEQ22-SP01 | 35-DSEQ22-SP02 DSEQ23 | 2023 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 36-DSEQ23 | 36-DSEQ23-SP01 | 36-DSEQ23-SP02Part 47 of 78
DSEQ24 | 2024 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 37-DSEQ24 | 37-DSEQ24-SP01 | 37-DSEQ24-SP02 DSEQ25 | 2025 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 38-DSEQ25 | 38-DSEQ25-SP01 | 38-DSEQ25-SP02 ETR2022 | Enhanced Tree Removal Program | Operations | ENHANCED TREE REMOVAL | 39-ETR2022 ETR2023 | 2023 CL&P System Resiliency | Operations | ENHANCED TREE REMOVAL | 40-ETR2023 ETR2024 | Enhanced Tree Removal (ETR) Prm 24 | Operations | ENHANCED TREE REMOVAL | 41-ETR2024 ETR2025 | Enhanced Tree Removal (ETR) Prm 25 | Operations | ENHANCED TREE REMOVAL | 42-ETR2025 | 42-ETR2025-SP01 | 42-ETR2025-SP02 ETTCF22 | Customer Focused ETT | Operations | CUSTOMER FOCUS TRIMMING | 43-ETTCF22 ETTCF23 | CL&P Customer Focused Enhanced Tree | Operations | CUSTOMER FOCUS TRIMMING | 44-ETTCF23 | 44-ETTCF23-SP01 | 44-ETTCF23-SP02 ETTCF24 | ETT Customer Focused 2024 | Operations | CUSTOMER FOCUS TRIMMING | 45-ETTCF24 ETTCF25 | ETT Customer Focused 2025 | Operations | CUSTOMER FOCUS TRIMMING | 46-ETTCF25 | 46-ETTCF25-SP01 | 46-ETTCF25-SP02 GXTD22 | 2022 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 47-GXTD22 GXTD23 | 2023 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 48-GXTD23 GXTD24 | 2024 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 49-GXTD24 GXTD25 | 2025 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 50-GXTD25 | 50-GXTD25-SP01 ML2310 | ML CL&P-D Vehicles | Shared Services | Capitalized Vehicles | 51-ML2310 ML2410 | ML CL&P-D Vehicles | Shared Services | Capitalized Vehicles | 52-ML2410 ML2510 | ML CL&P-D Vehicles 2025 | Shared Services | Capitalized Vehicles | 53-ML2510 | 53-ML2510-SP01 VEGDOT22 | 2022 CL&P - DOT Partnership | Operations | ENHANCED TREE REMOVAL | 54-VEGDOT22 VEGDOT23 | 2023 CL&P System Resiliency - DOT P | Operations | ENHANCED TREE REMOVAL | 55-VEGDOT23 2022 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 56-102118 2022 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 57-103353 2022 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 58-495802 CD00412 (CDNXANNL) | 2022 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 59-CD00412 (CDNXANNL) CDMHANNL | 2022 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 60-CDMHANNL CSTMER (CDCDANNL) | 2022 Customer | Operations | New Customer | 61-CSTMER (CDCDANNL) DB_CABLE (101395) | 2022 DB Cable | Operations | URD/DB Cable Reliability | 62-DB_CABLE (101395) DSCN | 2022 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 63-DSCN DSEQ | 2022 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 64-DSEQ EFO_TLS (GXCOCT) | 2022 EFO Tools | Operations | Capital Tool Purchases/Other | 65-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2022 Emergent Line | Operations | Emergent Equipment Failures | 66-EMRGNTLN (CDEMANNL) GXCOTRBL | 2022 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 67-GXCOTRBL GXENG | 2022 Capital Tools for Engineering Org | Operations | Capital Tool Purchases/Other | 68-GXENG GXTD11 | 2022 TLS/EQP CLP MAINTENANCE | Operations | Capital Tool Purchases/Other | 69-GXTD11 INSCLMCST (CTINS24) | 2022 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 70-INSCLMCST (CTINS24) IT1DWANA | 2022 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 71-IT1DWANA LIGHTNG (D7DA24) | 2022 Lighting | Operations | Lighting | 72-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2022 Line Relocations | Operations | Line Relocations/Act of Public Authority | 73-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2022 Line Reliability | Operations | Distribution Line Reliability | 74-LN_RLBLTY (CDDRANNL) ROWLN | 2022 Right of Way Lines | Operations | RIGHT OF WAY LINES | 75-ROWLNPart 48 of 78
VLT_CORR (CDDKANNL) | 2022 Voltage Corrections | Operations | Peak Load/Capacity | 76-VLT_CORR (CDDKANNL) DT7C | 2022 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 77-DT7C 2023 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 78-102118 2023 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 79-495802 CD00412 (CDNXANNL) | 2023 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 80-CD00412 (CDNXANNL) CDMHANNL | 2023 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 81-CDMHANNL CSTMER (CDCDANNL) | 2023 Customer | Operations | New Customer | 82-CSTMER (CDCDANNL) DB_CABLE (101395) | 2023 DB Cable | Operations | URD/DB Cable Reliability | 83-DB_CABLE (101395) DSCN | 2023 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 84-DSCN DSEQ | 2023 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 85-DSEQ EFO_TLS (GXCOCT) | 2023 EFO Tools | Operations | Capital Tool Purchases/Other | 86-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2023 Emergent Line | Operations | Emergent Equipment Failures | 87-EMRGNTLN (CDEMANNL) GXCOTRBL | 2023 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 88-GXCOTRBL GXTD11 | 2023 TLS/EQP CLP MAINTENANCE | Operations | Capital Tool Purchases/Other | 89-GXTD11 INSCLMCST (CTINS24) | 2023 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 90-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2023 Lighting | Operations | Lighting | 91-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2023 Line Relocations | Operations | Line Relocations/Act of Public Authority | 92-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2023 Line Reliability | Operations | Distribution Line Reliability | 93-LN_RLBLTY (CDDRANNL) ROWLN | 2023 Right of Way Lines | Operations | RIGHT OF WAY LINES | 94-ROWLN VLT_CORR (CDDKANNL) | 2023 Voltage Corrections | Operations | Peak Load/Capacity | 95-VLT_CORR (CDDKANNL) DT7C | 2023 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 96-DT7C 2024 SUBSTATION METERING | Operations | Substation Reliability | Additions relate to pre-2017 activity put into service in 2024. No spending or budget was incurred during the current year. | 97-201435 468601 (CD48KVAN24) | 2024 4.8KV GROUNDING FOR CODE COMPLIANCE | Operations | Regulatory Commitments-Other | 98-468601 (CD48KVAN24) 2024 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 99-495802 CD00412 (CDNXANNL) | 2024 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 100-CD00412 (CDNXANNL) CDMHANNL | 2024 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 101-CDMHANNL CSTMER (CDCDANNL) | 2024 Customer | Operations | New Customer | 102-CSTMER (CDCDANNL) DB_CABLE (101395) | 2024 DB Cable | Operations | URD/DB Cable Reliability | 103-DB_CABLE (101395) DSCN | 2024 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | Spending in 2024 DSCN is covered by annual project DSCN24 above. | 104-DSCN DSEQ | 2024 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | Spending in 2024 DSEQ is covered by annual project DSEQ24 above. | 105-DSEQ EFO_TLS (GXCOCT) | 2024 EFO Tools | Operations | Capital Tool Purchases/Other | 106-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2024 Emergent Line | Operations | Emergent Equipment Failures | 107-EMRGNTLN (CDEMANNL) GXCOTRBL | 2024 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 108-GXCOTRBL INSCLMCST (CTINS24) | 2024 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 109-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2024 Lighting | Operations | Lighting | 110-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2024 Line Relocations | Operations | Line Relocations/Act of Public Authority | 111-LN_RELO (CDDHANNL)Part 49 of 78
LN_RLBLTY (CDDRANNL) | 2024 Line Reliability | Operations | Distribution Line Reliability | 112-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2024 Voltage Corrections | Operations | Peak Load/Capacity | 113-VLT_CORR (CDDKANNL) DT7C | 2024 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 114-DT7C 2025 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | Additions relate to pre-2017 activity put into service in 2025. No spending or budget was incurred during the current year. | 115-102118 2025 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 116-495802 CD00412 (CDNXANNL) | 2025 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 117-CD00412 (CDNXANNL) CDMHANNL | 2025 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 118-CDMHANNL CSTMER (CDCDANNL) | 2025 Customer | Operations | New Customer | 119-CSTMER (CDCDANNL) DB_CABLE (101395) | 2025 DB Cable | Operations | URD/DB Cable Reliability | 120-DB_CABLE (101395) DSCN | 2025 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | Spending in 2025 DSCN is covered by annual project DSCN25 above. | 121-DSCN DSEQ | 2025 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | Spending in 2025 DSEQ is covered by annual project DSEQ25 above. | 122-DSEQ EFO_TLS (GXCOCT) | 2025 EFO Tools | Operations | Capital Tool Purchases/Other | 123-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2025 Emergent Line | Operations | Emergent Equipment Failures | 124-EMRGNTLN (CDEMANNL) GXCOTRBL | 2025 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 125-GXCOTRBL INSCLMCST (CTINS24) | 2025 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 126-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2025 Lighting | Operations | Lighting | 127-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2025 Line Relocations | Operations | Line Relocations/Act of Public Authority | 128-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2025 Line Reliability | Operations | Distribution Line Reliability | 129-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2025 Voltage Corrections | Operations | Peak Load/Capacity | 130-VLT_CORR (CDDKANNL) DT7C | 2025 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 131-DT7C 2026 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 132-495802-SP01 | 132-495802-SP01 | 132-495802-SP02 CD00412 (CDNXANNL) | 2026 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 133-CD00412 (CDNXANNL)-SP01 | 133-CD00412 (CDNXANNL)-SP01 | 133-CD00412 (CDNXANNL)-SP02 CDMHANNL | 2026 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 134-CDMHANNL-SP01 | 134-CDMHANNL-SP01 | 134-CDMHANNL-SP02 CSTMER (CDCDANNL) | 2026 Customer | Operations | New Customer | 135-CSTMER (CDCDANNL)-SP01 | 135-CSTMER (CDCDANNL)-SP01 | 135-CSTMER (CDCDANNL)-SP02 DB_CABLE (101395) | 2026 DB Cable | Operations | URD/DB Cable Reliability | 136-DB_CABLE (101395)-SP01 | 136-DB_CABLE (101395)-SP01 | 136-DB_CABLE (101395)-SP02 DSCN | 2026 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 137-DSCN-SP01 | 137-DSCN-SP01 | 137-DSCN-SP02 DSEQ | 2026 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 138-DSEQ-SP01 | 138-DSEQ-SP01 | 138-DSEQ-SP02 EFO_TLS (GXCOCT) | 2026 EFO Tools | Operations | Capital Tool Purchases/Other | 139-EFO_TLS (GXCOCT)-SP01 | 139-EFO_TLS (GXCOCT)-SP01 | 139-EFO_TLS (GXCOCT)-SP02 EMRGNTLN (CDEMANNL) | 2026 Emergent Line | Operations | Emergent Equipment Failures | 140-EMRGNTLN (CDEMANNL)-SP01 | 140-EMRGNTLN (CDEMANNL)-SP01 | 140-EMRGNTLN (CDEMANNL)-SP02 GXCOTRBL | 2026 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 141-GXCOTRBL-SP01 | 141-GXCOTRBL-SP01 | 141-GXCOTRBL-SP02Part 50 of 78
INSCLMCST (CTINS24) | 2026 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 142-INSCLMCST (CTINS24)-SP01 | 142-INSCLMCST (CTINS24)-SP01 | 142-INSCLMCST (CTINS24)-SP02 LIGHTNG (D7DA24) | 2026 Lighting | Operations | Lighting | 143-LIGHTNG (D7DA24)-SP01 | 143-LIGHTNG (D7DA24)-SP01 | 143-LIGHTNG (D7DA24)-SP02 LN_RELO (CDDHANNL) | 2026 Line Relocations | Operations | Line Relocations/Act of Public Authority | 144-LN_RELO (CDDHANNL)-SP01 | 144-LN_RELO (CDDHANNL)-SP01 | 144-LN_RELO (CDDHANNL)-SP02 LN_RLBLTY (CDDRANNL) | 2026 Line Reliability | Operations | Distribution Line Reliability | 145-LN_RLBLTY (CDDRANNL)-SP01 | 145-LN_RLBLTY (CDDRANNL)-SP01 | 145-LN_RLBLTY (CDDRANNL)-SP02 VLT_CORR (CDDKANNL) | 2026 Voltage Corrections | Operations | Peak Load/Capacity | 146-VLT_CORR (CDDKANNL)-SP01 | 146-VLT_CORR (CDDKANNL)-SP01 | 146-VLT_CORR (CDDKANNL)-SP02 DT7C | 2026 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 147-DT7C-SP01 | 147-DT7C-SP01 | 147-DT7C-SP02 CTEDVH26 | CT Elec D Fleet Capital Vehicles | Operations | Capitalized Vehicles | 148-CTEDVH26-SP01 | 148-CTEDVH26-SP01 | 148-CTEDVH26-SP02 CTMTR26 | CT Annual Meter Project for 2026 | Shared Services | Meters - Electric | 149-CTMTR26-SP01 | 149-CTMTR26-SP01 | 149-CTMTR26-SP02 CTREL26 | Reliability Tree Removal REL Prgrm | Operations | ENHANCED TREE REMOVAL | 150-CTREL26-SP01 | 150-CTREL26-SP01 | 150-CTREL26-SP02 ETR2026 | Enhanced Tree Removal ETR Program | Operations | ENHANCED TREE REMOVAL | 151-ETR2026-SP01 | 151-ETR2026-SP01 | 151-ETR2026-SP02 ETTCF26 | ETT Customer Focused 2026 | Operations | CUSTOMER FOCUS TRIMMING | 152-ETTCF26-SP01 | 152-ETTCF26-SP01 | 152-ETTCF26-SP02 GXTD26 | 2026 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 153-GXTD26-SP01 | 153-GXTD26-SP01 | 153-GXTD26-SP02 CTSWITCH26 | CT Electric Training Equipment | Operations | Capital Tool Purchases/Other | 154-CTSWITCH26-SP02 CTTOOL26 | CT Fleet Capital Tool Purchase | Operations | Capital Tool Purchases/Other | 155-CTTOOL26-SP02 [Sheet: 2026 Plan Update] The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Projected 2026 Project Number/Description by Category | Capital Spend | Project Long Description Parent Project Structure 1-Electric Distribution Basic Business-ED Basic Business - Other BASIC BUSINESS - OTHER-L4 CTETFI25:Berlin Training Yard Improvements | CT Electric Berlin training yard facility improvements for rooftop solar DG metering for bathroom facility CTETFI26:Berlin Training Yard Improvements | CT Electric Berlin training yard facility improvements to storage building OTHER CAPITAL CTCSCG26:CT Apprentice Climbing Gear 2026 | Connecticut lineworker apprentice climbing gear / apprentice toolkits for 2026_x000D__x000D_ CTCSFI26:CT Craft School Facility Improve | Connecticut craft school / apprentice facility (area work center) improvements CTCSTRN26:CT Apprentice Tools & Equipment | Connecticut craft school apprentice tools and equipment CTDRYER:CT Dielectric Lab Equipment | Connecticut dielectric / rubber goods lab equipment purchases. There will be a dryer purchase for the lab and a security card reader will be installed. CTMTRTRN:CT Electric Curriculum Development | This project is for the development of training materials for electric apprentice schools, specifically overhead, meter operations, and substations. An effective, standard, flexible training program is needed to ensure superior customer service and the safety and reliability of the electric grid. CTSWITCH26:CT Electric Training Equipment | Connecticut Technical (Electric) Training switchgear / new equipment purchases for 2026 CTTRN26:CT Electric Tools & Equipment 2026 | Connecticut Technical (Electric) Training tools and equipment purchases for 2026Part 51 of 78
CTTRNSUB25:Berlin Training Substation 2025 | This project is to continue to modernize / upgrade the training substation in the Berlin, Connecticut training yard to increase hands-on skills training opportunities for Station Operations field workers and supervisors. CTTRNTD878:CT TD-878 New Equipment Training | New equipment initial training development with Mosaic per TD-878 TELECOMMUNICATIONS 1DWANA26:Telecom WAN Annuals CLP 2026 | TELECOM -WAN ANNUALS - CLP - 2026 CMEEC26:CMEEC connection to CONVEX | The CMEEC26 project purpose is to provide a second communication path from Connecticut Municipal Electric Energy Cooperative (CMEEC) substations to Connecticut Valley Electric Exchange (CONVEX). CSPETH26:CSP Ethernet Project | Eversource radio sites supporting DMR 220 Voice Radio and Open Sky radio systems supporting the Distribution Automation network must be upgraded to modern ethernet technology to continue to utlize the Connecticut State Police (CSP) as a provider of backhaul services. CTADSS01:Distr Fiber Berlin 6A to Main Campu | CTADSS01: Distribution Fiber from Berlin 6A substation to Berlin main campus CTADSS02:Dist Fiber Newtown AWC | CTADSS02: Distribution Fiber - Newtown Area Work Center to Plumtree/Shepaug/Newtown CTAVTECCON26:CT Avtec Console Upgrade | This initiative will modernize the platform to a current fully supported AVTEC integrated voice communications system. This upgraded AVTEC platform will provide a standardized, flexible, and reliabile communications tool across radio, cellular, and landline. CTBATT26:2026 CT Battery and Charger Repl | 2026 CT Battery and Battery Charger Replacements CTDISTERC26:CT Dist Sta Pilot-ERC | CT Pilot for Distribution Stations - ERC CTDMX23:CT DMX Replacements | Eversource has a number of Nokia DMX Multiplexers (DMXs) that need to be replaced due to their old age, decreasing reliability and end of life status for future support. The DMXs provide communications between Eversource sites in Connecticut, western Massachusetts, New Hampshire and multiple interconnects to ISO-New England & National Grid. The object of this project will be to replace all the DMXs with new SEL-ICONs. These devices will be configured in a standardized manner to allow for expansion and organization. CTDNXSOL26:CT DNX Solution Upgrade | The object of this project will be to replace Infinera Digital Network Cross-connects (DNXs) with new Schweitzer Engineering Laboratories Integrated Communications Optical Networks (SEL-ICON) or Belden XTRAN units. These devices will be configured in a standard manner to allow for expansion and organization. CTLABUPGD26:CT Lab Ciena Server Upgrade | CT Lab Ciena Navigation Server Upgrade CTXTRAN26:2026 CT XTRAN Project | The objective of this project is to avoid loss of communication to any devices/services impacted by copper circuits and to migrate to the fiber based ethernet solution. The installation of these new devices will also allow Eversource to remove end-of-life equipment once the existing services have been cut over to these new devices. Capitalized Vehicles CAPITALIZED VEHICLES-L4 26CGVE11:2026 CG Vehicles CT Mtr Reading | Vehicles Purchases for CT Electric Vehicles for Meter Reading and Field Collections CTEDVH26:CT Elec D Fleet Capital Vehicles | This project is for the purchase of vehicles for the CT Electric Distribution line of business. All vehicles will include all current safety options and technologies to protect employees and the public, ensuring compliance with safety standards. The overall Fleet Vehicle Capital Program (FVCP) is designed to provide safe, reliable, and cost-effective vehicle operation. The FVCP is designed to ensure Eversource's vehicles are safe, reliable, and meet operational needs.Part 52 of 78
ML2610:ML CL&P-D Vehicles 2026 | This project is for the purchase of vehicles for the CT Electric Distribution Material Logistics line of business. All vehicles will include all current safety options and technologies to protect employees and the public, ensuring compliance with safety standards. The overall Fleet Vehicle Capital Program (FVCP) is designed to provide safe, reliable, and cost-effective vehicle operation. The FVCP is designed to ensure Eversource's vehicles are safe, reliable, and meet operational needs. Capital Tool Purchases CAPITAL TOOL PURCHASES-L4 CTTOOL26:CT Fleet Capital Tool Purchase | This project is for the purchase of capital tools used by fleet employees to perform their daily jobs throughout the year. GXCO:TOOLS/EQUIP. CUSTOMER OPERATIONS | This project is for the purchase of capital tools used by employees to perform their daily jobs throughout the year. GXCOCENT:TOOLS/EQUIPMNT CUSTOMER OPS CENTRAL | This project is for the purchase of capital tools used by central division field operations employees to perform their daily jobs throughout the year. GXCOEAST:TOOLS/EQUIPMENT CUSTOMER OPS EASTER | This project is for the purchase of capital tools used by eastern division field operations employees to perform their daily jobs throughout the year. GXCOSGIO:TOOLS/EQUIP CUSTOMER OPS SGI&O | This project is for the purchase of capital tools used by Stamford/Greenwich field operations employees to perform their daily jobs throughout the year. GXCOTRBL:TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | This project is for the purchase of capital tools used by response specialists to perform their daily jobs throughout the year. GXCOWEST:TOOLS/EQUIPMENT CUSTOMER OPS WESTER | This project is for the purchase of capital tools used by western division field operations employees to perform their daily jobs throughout the year. GXENG2026:CT ENGINEERING TOOLS + EQUIP | This project is for the purchase of capital tools used by engineering employees to perform their daily jobs throughout the year. GXTD26:2026 CT D SS Capital Tool Annual | This project is for the purchase of capital tools used by station operations employees to perform their daily jobs throughout the year. Emergent Equipment Failures - Line EMERGENT EQUIPMENT FAILURES - LINE-L4 CD02504:Enfield 12C Conversion | This project is resulting from the unexpected failure of the Enfield 12C-2X 115/27.6 kV transformer at Enfield 12C substation. Rather than replacing the failed transformer with another 115/27.6 kV transformer, the decision was made to proceed with converting the entire Enfield -Windsor Locks 27.6 kV system to 23 kV. This Distribution Line project is the first of two-distribution line projects to be established to convert the Enfield Windsor Locks 27.6 kV system to 23 kV. Substation Project CS00709 – Enfield 12C-2X Emergent Transformer Replacement has already been established for the conversion of the 27.6 kV substation equipment at Enfield 12C. This project will convert the Enfield 12C48 27.6 kV circuit to 23 kV and eliminate the Suffield 36M 27.6/23 kV substation. It will also reconfigure the 12C47 circuit at 27.6 kV until the Windsor Locks 14K transformer replacement project is established and completed. A new 14K8 circuit will be constructed under this project to offload the 12C48 circuit and eliminate all contingency overloads in the area. FAILED EQUIPMENT DB-DQ ANNUAL ARDB2M:DB PLANNED OBS ANNUAL CHES | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL CHESHIRE ARDB3H:DB PLANNED OBS ANNUAL HARTFORD | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL HARTFORD ARDB4D:DB PLANNED OBS ANNUAL MADISON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MADISON ARDB4M:DB PLANNED OBS. ANNUAL MIDDLETOWN | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL MIDDLETOWN ARDB4N:DB PLANNED OBS. ANNUAL NEW LONDON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL NEW LONDON ARDB5D:DB PLANNED OBS ANNUAL DANIELSON | DIRECT-BURIED OBSOLETE EQUIPMENT ANNUAL DANIELSON
As listed on the current system
Supplement for New App [Filed: 10/19/2026]