Application supplement
Exhibit CLP-ADDITIONS-4 Supplemental 2
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
PDF · 2.1 MB · 77 pagesText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.pdfRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Excel · 613 KBText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsxRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 63 of 78
CS00382:Southington 4C Add Transformer | This project adds a third 115-13.8kV transformer rated 62.5MVA to Southington 4C Substation to address potential load growth that could result in future overloading of the existing bulk transformers. CS00383:Hopewell 22R Replace Xfrmr | This project addresses the current and future distribution load growth at Hopewell 22R Substation located in Glastonbury, CT. It replaces the 2X and 3X transformers with the Eversource 62.5 MVA standard. CS00392:Beacon Falls 11N Replace Xfrmr | This project replaces the Beacon Falls substation 1X and 2X transformers with the Eversource 62.5 MVA standard. CS00603:West Side 7A SS Overload | This project addresses substation capacity deficiencies at the 115-13.2kV West Side Substation located in Middletown, CT. CS00636:Saybrook 22D Conversion | To convert both the 22D-1X and 22D-2X from 27-6.kV to 23kV at Saybrook, the taps inside the transformers will need to be changes. This will require draining the oil, changing taps, and refilling oil. The lightning arresters and potential transformers will also need to be removed and replaced. CS00676:UConn System Upgrade #900 | The objectives are to reliably and cose-effectively accommodate the near term and long term UConn peak load forecasts and address asset condition concerns. CS00683:Berlin 6A Incr Capacity | This project will increase the load carrying capacity (LCC) of Berlin 6A substation. It will replace the 52 year-old 46.7 MVA 6A-1X and the 50 year-old 46.7 MVA 6A-2X to increase the substation LCC by replacing them with two 115-13.8kV 62.5 MVA transformers and associated transformer foundations. CS00703:Westbrook 20S Conversion | This project is to support the conversion of Westbrook 20S substation, located in Westbrook, CT, from 27.6kV to 23kV. FROVRLSS:FORECAST PROJ FOR OVERLOAD SUBSTATI | FORECAST PROJECT FOR SUBSTATION OVERLOADS Regulatory Commitments-ED Regulatory Commitments-Other 4.8KV GROUNDING 468601:4.8KV GROUNDING FOR CODE COMPLIANCE | CORRECT GROUNDING ON 4.8KV DELTA EQUIPMENT IN THE STATE OF CONNECTICUT TO BRING TO PRESENT CODE, AS REQUIRED BY DPUC ORDER. TRMSN DISTR RELIABILTY PERFRM CD02192:12J5 - Reliability Improvements | As part of Eversource’s plan to address the worst performing circuits (WPC) in Connecticut, project CD02192 was created to focus on the high impact zones of the 12J5 circuit. CD02193:12J4 WPC - Reliability Improvement | CD02193 focuses on infrastructure replacement to improve the reliability of the 12J4 circuit.The 12J4 is a 13.8 kV circuit out of Mansfield 12J, serving 3143 customers in Ashford and Willington. The 12J4 was ranked #9 on the worst performing circuits list in CT. CD02193 addresses the five high impact zones on the 12J4 where Eversource has experienced outages within the past four years. CD02207:11C14 WPC Reliability Improvement | CD02207 focuses on infrastructure replacement and creating a loop to improve the reliability of the 11C14 circuit.The 11C14 is a 23 kV circuit out of Haddam 11C, serving 3052 customers in Chester, Haddam, Higganum, Killingworth, and Middletown. The 11C14 was ranked #1 on the worst performing circuits list in CT. CD02207 addresses high impact zones on the 11C14 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming.Part 64 of 78
CD02208:15L68 WPC Reliability Improvement | CD02208 focuses on infrastructure replacement and vegetation management, which includes trimming and removals.The 15L68 is a 23 kV circuit out of Bokum 15L in Old Saybrook which is split between the Madison and New London districts and supplies a total of 5,184 customers. The district jurisdictional boundary is the Connecticut River. The 15L68 serves 2,309 customers in the Madison district and supplies the towns of Old Saybrook, Essex, Deep River, Ivoryton, and Westbrook. In the New London district, the 15L68 serves 2,875 customers and supplies the towns of Lyme, Old Lyme, East Lyme, Hadlyme, and East Haddam. The 15L68 was ranked #5 on the worst performing circuits list in CT. CD02208 addresses three high impact zones on the 15L68 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02213:12Y9 WPC Reliability Improvement | Project CD02213 focuses on infrastructure replacement to improve the reliability of the 12Y9 circuit.The 12Y9 is a 13.8 kV circuit out of the Rocky River 12Y S/S and serves 2,758 customers in Sherman and New Milford. The 12J5 was ranked #7 on the worst performing circuits list in CT. CD02213 addresses four high impact zones on the 12Y9 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02214:30R8 WPC Reliability Improvement | Project CD02214 focuses on infrastructure replacement to improve the reliability of the 30R8 circuit.The 30R8 is a 23 kV circuit out of the Green Hill 30R S/S and serves 3,791 customers in the Killingworth, Madison, and Clinton areas of Connecticut. The 30R8 was ranked #3 on the worst performing circuits list in CT. CD02214 addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. CD02215:35L9 WPC Reliability Improvement | Project CD02215 focuses on infrastructure replacement to improve the reliability of the 35L9 circuit.The 35L9 is a 13.8 kV circuit out of the Stepstone 35L S/S and serves 2,234 customers in Guilford, Connecticut. The 35L9 was ranked #9 on the worst performing circuits list in CT. CD02215 addresses two high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive vegetation trimming. FRTDRP:FORECAST PROJECT FOR TDRP PROJS | FORECAST PROJECTS FOR TDRP PROJECTS Reliability-ED Distribution Line Reliability RELIABILITY IMPROVE-DR ANNUAL DR1B:OH RELIAB IMPROVE NEWTOWN | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEWTOWN DR1N:OH RELIAB IMPROVE NORWALK | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NORWALK DR1S:OH RELIAB IMPROVE STAMFORD | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL STAMFORD DR2L:OH RELIAB IMPROVE TORR CLP | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TORRINGTON DR2M:OH RELIAB IMPROVE CHESHIRE/N.B | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL CHESHIRE DR2W:OH RELIAB IMPROVE WATERBURY | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL WATERBURY DR3H:OH RELIAB IMPROVE HARTFORD | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL HARTFORD DR4D:OH RELIAB IMPROVE MADISON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL MADISON DR4M:OH RELIAB IMPROVE E Hampton | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL EAST HAMPTON DR4N:OH RELIAB IMPROVE NEW LONDON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEW LONDON DR5D:OH RELIAB IMPROVE DANIELSON | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSONPart 65 of 78
DR5T:OH RELIAB IMPROVE TOLLAND | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TOLLAND DR5W:OH RELIAB IMPROVE Danielson | OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON FRDR:PROJECTION PROJECT DR ANNUAL | PROJECTION PROJECT DR ANNUAL RELIABILITY IMPROVE SPEC PROJ CD02116:Roxbury Rd Reconductoring | CD02116 addresses reliability concerns and aging infrastructure for the 21K2 & 21K3 backbone on Roxbury Rd in Southbury. These circuits both originate at Bates Rock 21K substation and operate at 13.8kV. This segment of double circuit pole line consists of predominately 1970 vintage infrastructure and is responsible for hosting a combined 2250 customers. There have been 3 outages along this segment of the 21K2 and 6 outages on this segment of the 21K3. Additionally, this segment of the 21K3 experienced a burn down due to ringed spacer cable and a lightning strike. The proposed work suggests reconductoring on the 21K2 and 21K3. This work involves reconductoring the 21K2 with 6,800’ of 556 spacer cable from P#S43 to P# S3 and reconductoring the 21K3 with 7,000’ of aerial cable from P#S42 to P# C3798. In addition, the side tap originating at P# S22 will be swapped from the 21K3 to 21K2 circuit creating a complete express for the 21K3 from the station to P#12176. The reconductoring of these segments will increase future reliability and load growth through the replacement of aging infrastructure, existing ringed spacer cable and the installation of upgraded overhead conductor. CD02405:12C4 Equip Conversion and Replace | This project adresses deficiencies on the Enfield 12C4 circuit. Ringed spacer cable was found on N. River St., Whitworth St., and Alden Ave. The project replaces this cable prone to failure. To reduce several large customer zones on the 12C4 feeder, a 4.8kV portion of the circuit will be converted to 23kV to allow for recloser installation. CD02480:30R15-Reconductor 336 ringed SC wit | The 336 AL spacer cable is vintage and is ringed. This area has very poor reliability and has had eleven (11) interruptions over the last four years. Removing the 336 AL ringed spacer cable and installing 477 AL tree wire will improve the performance of this circuit. CD02723:Town Scorecard – Eastern Region | Project CD02723 was established to address the Town Scorecard Initiative which identifies the top 10 SADI and SAFI worst performing towns in Eversource, CT. CD02749:UCONN Health Protection Coord | Project CD02749 was established to address reliability concerns impacting operations at UConn Health in Farmington, CT. The affected infrastructure is served by the 1C01 overhead feeder, which supplies power to several critical facilities, including UConn Health Center, UConn Health Warehouse, UConn Fire Safety Complex, State of Connecticut Medical Examiner’s Office, Town of Farmington Sewer Pumping Station, and various hospital support buildings, such as parking areas and the UConn Health Childcare Center. FRSPRELI:FORECAST SPEC REL IMPROVEMENTS | FORECAST PROJECT FOR SPECIFIC RELIABILTY IMPROVEMENT PROJECTS S/S ELIMINATION-LINE WORKPart 66 of 78
CD00654:Eliminate 4.8 kV 12F-6X Islanded SS | Hanover 12F-6X Substation is located in Meriden, Connecticut, and consists of a single, 5/6.25 MVA transformer that supplies three, 4.8 kV circuits (12F2, 12F4 and 12F5) and 1,793 customers.The 12F-6X transformer and 4.8 kV switchgear was installed in 1957. If the 5/6.25 MVA transformer were to fail, then 1,793 customers would be out of power for +/- 24 hours until a mobile transformer was installed. There are no other 4.8 kV sources in the area that can be used to restore customers.Hanover 12F-6X Substation and much of its associated overhead distribution system is 60+ years old.1,793 customers on 12F-6X will be converted and transferred to new 13.8 kV circuit 12F50 and existing 13.8 kV circuit 12F52. 700 feet of 1000 MCM Cu and 4,900 feet of 556 AL TW will be installed to create the 12F50 backbone. Twenty, single phase, bare copper laterals with six or fewer transformers will be reconductored with 1/0 ASCR TW and converted to 13.8 kV.New recloser loop schemes will be created to split the number of customers per zone to approximately 500. Three new recloser loop schemes on the 12F50 which will be backed up by the 12F44, 12F52 and 12F55. The three loops will employ multiple reclosers creating six zones to limit the customer count. The six zones will have 142, 226, 241, 477, 479 and 550 customers. A new field tie with the 12F49, and an existing tie with the 12F51, will back up the 453 customers in the first zone of the 12F50.The new feeder, 12F50, will take some load from the 12F55 to mitigate a contingency overload condition that exists on the 12F55.A large, 958 customer zone on the 12F52 will be eliminated by creating a new recloser loop with the 12F50. The resulting zones will have 456 and 502 customers.The replacement of the 12F2, 1000 kcmil AL get-a-way cable (500 feet) with 1000 Cu mitigates a contingency overload on the 12F52. FRSSLNWK:S/S Elim-Line Work Forecast Project | FORECAST PROJECTS FOR OVERHEAD WORK TO ELIMINATE SUBSTATIONS. Network Reliability NETWORK XFMR + PROTECTOR REPL CD00412:CL&P Repl Net. Xfmrs Blanket | This project is for replacement of inoperable/condemned/failed network transformers and network transformer protectors. UG CABLE & EQUIPMNT REPLACEMNT CD02229:145 PILC Cable Replacement | Project CD02229 is being established to replace the remaining paper-insulated lead covered (PILC) cable on the South Meadow 145 circuit. This project is part of an overall strategy to address poor performing PILC cable in the underground distribution system. CD02393:NW Hartford 2N18 PILC Cbl Repl | Project CD02393 is being established to replace the 19,803’ of paper-insulated lead covered (PILC) cable on the Northwest Hartford 2N18 circuit. This project is part of an overall strategy to address poor performing PILC cable in the underground distribution system FRUGCBLR:FORECAST PROJECT FOR NETWORK CBL RE | FORECAST BUDGET PROJ FOR NETWORK CABLE REPLACEMENTS UG Network Automation CD01276:New Switchgear for SMH Waterbury | This project proposes installation of a set of 4-way solid dielectric switchgear on the line side of the existing feed to the existing switchgear at St Mary's Hospital 201B.The existing switchgear at St Mary's Hospital 201B is owned by the customer, but operated by Eversource, based on an agreement made years ago. This switchgear must be operated periodically, since both incoming feeders at St Mary's Hospital 201B are network feeders.Procedure NB-150 (in CT) discourages utility employees from operating customer-ownedhigh-voltage equipment. Because it does not own or maintain this equipment, the utility does not know its condition, nor can the utility be responsible for it. Installation of the new switchgear enables the utility to disconnect, test, and ground its system at switchgear it owns and maintains, without the need to access or operate non-utility-owned equipment.Part 67 of 78
CD01537:25 Laurel St Htfd - Automate Svc | The primary electric service at 25 Laurel Street in Hartford consists of two manual PMH-5 switches (309B) which serve seven pad-mounted transformers (3,850 KVA Connected) and 607 customers (586 residential / 21 commercial). The manual switches are fed by two underground feeders (47N9 - normal, 47N7 - alternate) out of Southwest Hartford 47N substation (23 KV).In the past five years, these customers have experienced three feeder outages averaging approximately 150 minutes/outage.This project proposes to automate the service to this location by replacing the manual switches with automatic switches.The expected benefits upon completion of this project include improved reliability and customer satisfaction. CD02059:Man to Auto Tuttle Rd Middletown | This project was established to address the manual switchgear at Tuttle Rd., Middletown. This project will replace one of the two existing PMH-9 switchgear units with a new DSCADA capable PME-9 switch, to be operated as a single unit auto-transfer switch. This proposal will automate 121 customers on Tuttle Rd., Middletown.The preferred feeder is the Westside 7A79 circuit and the alternate feeder is the Westside 7A71 circuit. The 7A71 has the capacity to accept the automatic transfer from the 7A79 without causing overload.This project is part of an overall program to eliminate manual switchgear in order to eliminate the need to manually transfer customers to their alternative source for loss of the preferred source. CD02092:Make 13H93 & 13H94 Non-Network | This project is being established to convert the Noera 13H93 and 13H94 feeders into non-network feeders. This will allow the 13H93 and 13H94 feeders to have multi-grounded primary connections, such as automatic switchgear or line-to-ground connected load, without the exposure of high voltage that can happen if a network feeder were to fault and a network protector failed to open.The Palace Theater 225P and UCONN 256D switchgear are both automatic switchgear that have the Noera 13H94 circuit as the alternate source. Under a separate project, the preferred source to these switchgear locations will become a non-network feeder via transfer to the Freight 11W44 circuit.The scope of this project includes transferring the two existing network transformers on the N185 network from the 13H94 & 13H93 to the Freight 11W43 and 11W76 respectively. This will require extending the 11W76 to manhole 147 on E Main St., a distance of 1,320’. The total load on the N185 network is less than 300kVA. The 11W43 and 11W76 has the capacity to accept the added load without causing overload. CD02107:Switch Gear Autom 21P1 Kirkland Pl | This project replaces a manual PMH 3 pair switch gear, located on Kirtland Place, Meriden, with an automatic PME 5 pair. PMH gear is live front while PME switch gear is dead front and is DSCADA capable offering both safety and operational flexibility.The switch gear is fed by the East Meriden 21P1 and the backup is the 21P4. 121 customers are fed from this switchgear. CD02543:Chelsea Piers Switchgear Isolation | This project addresses single point failures on feeders (Glenbrook 1K08 & 1K18) feeding NBC. A splice failed on the overhead system on Maher Rd causing an outage at the NBC facility during the Olympics. On post event investigation, it was deemed necessary to eliminate single point failures by isolating customer owned switchgear feeding Chelsea Piers with Vista Green 422’s to avoid future failures. UNDERGROUND STRUCTURE ISSUE 101610:REPAIR & REPL OF CL&P UG STRUCTURES | REPAIR & REPLACE MANHOLE AND VAULT (STRUCTURE) ROOFS AND DUCTLINE DUE TO OBSOLESCENCE &/OR WEAR & TEAR.Part 68 of 78
CD01821:Greenwich Ave Structural Upgrade | The Town of Greenwich is planning a streetscape project along Greenwich Avenue where they will reconstruct sidewalks and completely repave Greenwich Avenue from Putnam Avenue to Railroad Avenue. The Town has made it quite clear to all subsurface utility owners that all underground infrastructure must be installed or upgraded as necessary prior to their planned project. After careful review of Eversource’s existing infrastructure, it was determined that 2 manhole enlargements, 4 service box enlargements, and 5 lateral duct banks should be installed given the opportunity described above. The locations that were chosen for manhole enlargements are locations where there is insufficient room to properly splice and rack the three 27.6 kV feeders within the manhole, and to properly support the secondary mains and limited crab joints. The service box enlargements are required for potential service upgrades. The lateral duct bank extensions are required for two purposes. First, these ducts will accept additional or replacement secondary cable as required for network secondary voltage service. Second, each new duct bank will be extended to a side street where there is the potential to install a primary voltage loop cable that may eventually be used to convert the existing network to load loops from the existing open wire overhead distribution system. CD02332:Tresser Blvd Duct Bank | During a new service project, the contractors encountered blocked/ insufficient conduits between MH#700 and MH#731 on Tresser Blvd when trying to tap 1G02 feeder to the customer’s switchgear on Tresser Blvd. Repairs were attempted but to no avail. Furthermore, blocked ducts were encountered in the past in other sections of the duct bank on Tresser Blvd between Canal Street and Elm Street. A more accessible feeder (1G19) was used to complete the new service project. However, the fear is that should the need arise to install cable in this area in the future, it cannot be done because of issues with the duct bank.This project is being initiated to install a new 8-position duct bank along Tresser Blvd between Canal Street and Elm Street to facilitate future needs. CD02511:Manchester Bridge Conduit Replace | The project is for electrical conduit replacement on two Manchester bridges that are over the I-384 highway. The State notified the Civil Engineering team of steel conduit bank deficiencies. CD02580:Stamford Vault 292 Replacement | This project replaces vault #292 which is in the roadway at the very busy junction of North St. and Summer St. in Stamford, CT. An inspection revealed that vault #292 deteriorated extensively. CD02619:Cedar Heights Rd Shallow Duct Bank | This project has been created to address the shallow duct bank that occurred on Cedar Heights Rd in Stamford CT during work performed under CD00728. CD02691:Franklin Drive 1B Duct-bank Repair | This project address the replacement of deteriorated steel conduits that are location within an existing duct-bank with a horizontal 2 x 4 array on Main Street in Torrington, CT. This duct-bank spans the Naugatuck River and is located under the bridge. These conduits presently penetrates through a concrete support structure of the bridge which is adjacent to manholes MH# 9 and MH# 21 and has a span length of 110' with very limited room. The age of the duct-bank is over 65 years old and due to its exposure to a harsh environment, these conduits within the duct-bank have deteriorated to the point of either having large, elongated holes in their perimeter or they have deteriorated to the point of becoming separated into two pieces. Substation Reliability GENERAL MODERNIZATION CS00023:GOODWIN LANE 22 - REMOVE SUBSTATION | This project is to complete equipment removals, environmental monitoring, remediation, and site restoration for the de-energized Goodwin Lane 22 substation located in East Hartford, CT.Part 69 of 78
CS00070:Naugatuck 19K - Remove Substation | This project is to perform control house demolition, concrete foundation and pad removal, soil excavation, environmental remediation, groundwater monitoring, civil removal work, and site restoration for the de-energized Naugutuck 19K substation located in Naugutuck, CT. CS00072:Guilford 29F - Remove Substation | This project is to complete site removals and environmental remediation for the de-energized Guilford 29F substation located in Guilford, CT. CS00105:Meadow 28J - Remove Substation | This project is to complete equipment and structure removals, environmental monitoring, remediation, and site restoration for the de-energized Meadow 28J substation located in Branford, CT. CS00119:Oakville 17Q - Remove Deenergized S | This project is to perform soil excavations, environmental remediation, concrete foundation and pad removal, shed removal, and site restoration for the de-energized Oakville 17Q substation located in Watertown, CT. CS00269:Race Hill 15D - Remove S/S | This project is to complete removals, environmental remediation, and site restoration for the de-energized Race Hill 15D substation located in Madison, CT. CS00412:Newtown 12N Station Modernization | This project is to replace nine 23kV oil circuit breakers (OCBs) at Newtown 12M substation located in Newtown, CT. The OCBs may cause harm to the environment if leakage occurs, or spills occur during maintenance. CS00450:Clayton CT 21W Remove 21W-1X XF | This project is to decommission and retire the de-energized Clayton Court 21W substation located in New Britain, CT. CS00451:Carver 19R-1X and Oil Removal | This project is to complete equipment removals and to complete environmental testing for the de-energized Carver 19R substation in New Britain, CT. CS00490:Farmington 23L Remove SS | This project is to complete the equipment removal and environmental assessments for the de-energized Farmington 23L substation located in New Britain, CT. CS00541:Card 11F Battery Monitor | Card 11F Battery Monitor CS00567:Berlin 6A Replace Switch | This project is to replace failing Motor Operated Disconnect (MOD) Switches and obsolete load tap changer (LTC) controls at the Berlin 6A substation, located in Berlin, CT. Replacement of these switches and LTC controls will improve system reliability and operator safety. CS00569:RBIP - Rplc Battery Install Program | This project is establishing a program that will replace aging substation batteries and chargers across the Eversource system. Proactively replacing older substation batteries will ensure the continued reliabile operation of Distribution substations. CS00605:Baldwin 13F SS Access Upgrade | This project upgrades physical access to the Baldwin 13F substation, located in Waterbury, CT. CS00608:Flax Hill 24A Battery Monitor | Flax Hill 24A Battery Monitor CS00610:Shaws Hill 24H Battery Monitor | Shaws Hill 24H Battery Monitor CS00612:Thomaston 2B Battery Monitor | Thomaston 2B Battery Monitor CS00613:West Side 7A Battery Monitor | West Side 7A Battery Monitor CS00625:S. Meadow 1A Equipment Removal | This project is for the removal of the de-energized 1A112-1X and1A101/111-1X transformers at South Meadow 1A Substation, located in Hartford, CT. CS00634:N Canaan 5L Rplc Recloser & Feeder | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00637:Ridgefield 22N Add Feeders | This project is expanding the existing 13.8kV switchgear and adding two new feeders to the Ridgefield 22N substation, located in Ridgefield, CT. The expanded switchgear and new feeders will relieve overloading on the existing feeders and are needed to supply the existing and future projected load.Part 70 of 78
CS00651:Riverside 2R RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Riverside Drive 2R substation, located in East Hartford, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00652:Westport 27F RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Westport 27K substation, located in Westport, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00653:Beacon Falls 11N RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Beacon Falls 11N substation, located in Beacon Falls, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00654:Portland 21H RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Portland 21H substation, located in Portland, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00673:Van Dyke 12 Rplc Upgrd Cap Bank | This project will replace the 1215 1K, 1215-2K, and 1215-3K 6MVAR open air capacitor banks at Van Dyke 12 substation located in Hartford, CT with two new 6MVAR metal-enclosed capacitor banks to improve asset condition and customer reliability. CS00681:Portland 21H ElectroMech Relay REL | This project will upgrade existing electromechanical relays currently in operation at the Portland 21H substation located in Portland, CT. All electromechanical and obsolete microprocessor relays will be replaced with microprocessor-based relays. CS00682:Portland 21H H14-1X H15-1X Removals | This project is for the removal of the 21H14-1X and 21H15-1X auto transformers at Portland 21H substation located in Portland, CT. CS00689:CT D-SS AED Install Program | This project will install Automated External Defibrillators (AED) in Distribution substation control houses located in Connecticut. An AED is used as a lifesaving device in the event of a heart attack or sudden cardiac arrest. CS00694:115 kV Relay & Ctrl Encl Install | This project includes modification of yard manhole, installation of two riser poles, installation of underground duct bank, and modification of the current switchgear to remove Transmission protection to be migrated to the new Relay and Control Enclosure. FRSSGNMZ:FORECAST PROJ FOR SS GEN MODERNIZAT | FORECAST PROJECT FOR SUBSTATION GENERAL MODERNIZATION S/S TRANSFORMER RELIABILITY CS00286:Franklin Dr Replace Xfrmr | This project is for the replacement of the 1B-4X and 1B-5X transformers, the relocation of the 1B-4X1-2 circuit switcher, and associated new cabling, steel structures, and foundations at the Franklin Drive 1B substation located in Torrington, CT. The two existing transformers were installed in 1953 and have exceeded a standard transformer's life expectancy.Part 71 of 78
CS00396:Stevenson 14A Upgrade Xfrmr & Swgr | This project is to replace aging equipment and convert the existing 27.6-8.32kV distribution system to a 23kV distribution sstem to provide long term reliable power to distribution loads being fed from the Stevenson 14A substation located in Monroe, CT. CS00404:Todd 30L Mobile Position | The project is for the installation of a mobile transformer position and associated feeder activation at the Todd 30L Substation in Wolcott, CT. CS00533:Salisbury 21J Replace Xfmr | The project objective is to replace the 13MVA 69kV-13.2kV transformer 21J-1X with a new Eversource standard 40MVA 115/69kV-13.2kV transformer equipped with a modern LTC. The Salisbury 21J-1X is an Eversource standard size transformer which reduces the number of spare transformers required to be available for the Connecticut distribution system.This project will also replace outdated electromechanical protection systems on the 21J-1X transformer and 13.2kV A1 bus to update these systems to the latest Eversource standards.This relaying is 50 years old, is at the end of its service life and total of eight electromechanical relays will be replaced as part of this project. CS00544:N Canaan 5L Replace Xfmr | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00606:Glenbrook 1K Replace Transformer | This project is for the asset condition replacement of the existing 62-year old 115kV:13.2kV, 46.7MVA transformer 1K-2X at Glenbrook substation in Stamford, CT. The transformer is near its end of life. CS00665:73MX Mobile Xfmr Refurbishment | This project is to refurbish the 73MX mobile transformer unit. The unit is out of service. FRSSXFMR:SS Transformer Reliability Forecast | Substation Transformer Reliability Forecast Project SS DSCADA LTC Controls CS00677:Haddam 11C DSCADA LTC | This project will replace the Load Tap Changer (LTC) control scheme on the 11C-2X and 11C-3X transformers at the Haddam 11C substation located in Haddam, CT. FRSSDSCA:Forecast SS DSCADA LTC Netwk Auto G | Forecast project for DSCADA - LTC Network Auto Grid SUBSTATION RELIABILITY-L4 DSCN26:2026 CT D SS Planned Annual | This annual is to improve customer reliability for capital work not identified specifically during the budget cycle but is a result of monitoring the system throughout the year. SWITCHGEAR CS00189:Triangle 11A - Rpl Bus w/ Swgr | This project will rebuild the 13.8kV distribution end of the Triangle 11A substation in Danbury, CT by installing new enclosed, double bus, metal clad switchgear. The rehabilitation of the substation is required to replace aging substation equipment, address bus clearance needs, and update protection and control relays and System Control and Data Acquisition (DSCADA) interfaces for metering, control, and monitoring. CS00491:Chippen Hill 15U Replace SWGR | The project will replace the existing metal clad switchgear at the Chippen Hill substation located in Bristol, CT. The switchgear is being replaced to due to the history of operational and maintenance issues caused by a sunken foundation which made the switchgear come out of alignment. CS00503:E. Meriden 21P Replace SWGR | This project is for the replacement of the 13.8kV switchgear with associated circuit breakers, protection relays, conduits, cabling, and foundations at East Meriden 21P substation. The foundation has begun to sink unevenly causing the switchgear to come out of alignment. This has caused difficulties when racking circuit breakers in and out of the cubicles. FRSSSWGR:FORECAST PROJECT FOR SS SWITCHGEAR | FORECAST PROJECT FOR SUBSTATION SWITCHGEAR RELAY System Resiliency/Expanded Reliability ENHANCED TREE REMOVAL CTREL26:Reliability Tree Removal REL Prgrm | The project focuses on removal of trees in poor performing isolated device zones to improve system reliability and resiliency.Part 72 of 78
ETR2026:Enhanced Tree Removal ETR Program | The ETR project strategically removes trees to proactively improve system reliability and mitigate long term costs for the distribution cycle trimming programs. Tree removals, in conjunction with cycle pruning, drive improved reliability performance. ENHANCED TREE TRIMMING ETTCF26:ETT Customer Focused 2026 | The Customer Focus Enhanced Tree Trimming project addresses system reliability by providing greater clearances and removing risk limbs and trees that are outside of the normal maintenance trim zone in areas of emergent reliability concerns. POLE INTEGRITY PROGRAM CD02444:2025 Pole Integrity | This initiative replaces or reinforces wood poles found during the annual pole inspections that cannot remain in service due to loss of strength from decay or insect infestation. This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. CD02449:2025 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource equipment onto Frontier Defective Pole Replacements. As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. CD02545:2026 Pole Integrity | This project captures the cost necessary to replace wooden poles that were found during the 2025 annual pole inspections. These poles cannot remain in service due to loss of strength from decay or insect infestation.This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. P CD02546:2026 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource facilities onto Frontier Defective Poles that will be replaced in the year 2026.As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. RIGHT OF WAY LINES CD01246:Fry Brook 13B21/13B27 ROW Pole Repl | The Fry Brook 13B21/13B27 ROW is an approximately 3-mile express feed from the substation to the towns of Plainfield and Killingly. 13B21 serves 3,607 customers and 13B27 serves 1,963 customers. For a double circuit fault from the substation to Plainfield Road 100% of customers are automatically restored. This is accomplished via ties with 13B10, 15C8 and 30Y10. While travelling along I-395 several crossarms were observed to be cocked and/or racked and upon a physical walk through, much more damage was recorded. A majority of the poles are 66+ years old and most crossarms were replaced in 1973. All crossarms are installed with bow braces. The project will perform 100% pole and conductor replacement from the substation to the Moosup 19Y Substation north of Route 14.The aim of this project is to install a new double circuit pole line adjacent to the existing pole line where easement restrictions allow, with all new 50-foot class 1 poles, 556 ACSR TW and 2/2/2 construction.
As listed on the current system
Supplement for New App [Filed: 10/19/2026]