Application supplement
Exhibit CLP-ADDITIONS-4 Supplemental 2
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing October 19 2026.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
PDF · 2.1 MB · 77 pagesText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.pdfRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.pdf
Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
Excel · 613 KBText searchable
Download Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsxRead the text of Exhibit CLP-ADDITIONS-4 Supplemental 2.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 69 of 78
CS00070:Naugatuck 19K - Remove Substation | This project is to perform control house demolition, concrete foundation and pad removal, soil excavation, environmental remediation, groundwater monitoring, civil removal work, and site restoration for the de-energized Naugutuck 19K substation located in Naugutuck, CT. CS00072:Guilford 29F - Remove Substation | This project is to complete site removals and environmental remediation for the de-energized Guilford 29F substation located in Guilford, CT. CS00105:Meadow 28J - Remove Substation | This project is to complete equipment and structure removals, environmental monitoring, remediation, and site restoration for the de-energized Meadow 28J substation located in Branford, CT. CS00119:Oakville 17Q - Remove Deenergized S | This project is to perform soil excavations, environmental remediation, concrete foundation and pad removal, shed removal, and site restoration for the de-energized Oakville 17Q substation located in Watertown, CT. CS00269:Race Hill 15D - Remove S/S | This project is to complete removals, environmental remediation, and site restoration for the de-energized Race Hill 15D substation located in Madison, CT. CS00412:Newtown 12N Station Modernization | This project is to replace nine 23kV oil circuit breakers (OCBs) at Newtown 12M substation located in Newtown, CT. The OCBs may cause harm to the environment if leakage occurs, or spills occur during maintenance. CS00450:Clayton CT 21W Remove 21W-1X XF | This project is to decommission and retire the de-energized Clayton Court 21W substation located in New Britain, CT. CS00451:Carver 19R-1X and Oil Removal | This project is to complete equipment removals and to complete environmental testing for the de-energized Carver 19R substation in New Britain, CT. CS00490:Farmington 23L Remove SS | This project is to complete the equipment removal and environmental assessments for the de-energized Farmington 23L substation located in New Britain, CT. CS00541:Card 11F Battery Monitor | Card 11F Battery Monitor CS00567:Berlin 6A Replace Switch | This project is to replace failing Motor Operated Disconnect (MOD) Switches and obsolete load tap changer (LTC) controls at the Berlin 6A substation, located in Berlin, CT. Replacement of these switches and LTC controls will improve system reliability and operator safety. CS00569:RBIP - Rplc Battery Install Program | This project is establishing a program that will replace aging substation batteries and chargers across the Eversource system. Proactively replacing older substation batteries will ensure the continued reliabile operation of Distribution substations. CS00605:Baldwin 13F SS Access Upgrade | This project upgrades physical access to the Baldwin 13F substation, located in Waterbury, CT. CS00608:Flax Hill 24A Battery Monitor | Flax Hill 24A Battery Monitor CS00610:Shaws Hill 24H Battery Monitor | Shaws Hill 24H Battery Monitor CS00612:Thomaston 2B Battery Monitor | Thomaston 2B Battery Monitor CS00613:West Side 7A Battery Monitor | West Side 7A Battery Monitor CS00625:S. Meadow 1A Equipment Removal | This project is for the removal of the de-energized 1A112-1X and1A101/111-1X transformers at South Meadow 1A Substation, located in Hartford, CT. CS00634:N Canaan 5L Rplc Recloser & Feeder | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00637:Ridgefield 22N Add Feeders | This project is expanding the existing 13.8kV switchgear and adding two new feeders to the Ridgefield 22N substation, located in Ridgefield, CT. The expanded switchgear and new feeders will relieve overloading on the existing feeders and are needed to supply the existing and future projected load.Part 70 of 78
CS00651:Riverside 2R RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Riverside Drive 2R substation, located in East Hartford, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00652:Westport 27F RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Westport 27K substation, located in Westport, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00653:Beacon Falls 11N RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Beacon Falls 11N substation, located in Beacon Falls, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00654:Portland 21H RBI Rls | This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Portland 21H substation, located in Portland, CT. Proactively replacing the battery and charger system will ensure continued reliable operation of the substation and Distribution System. CS00673:Van Dyke 12 Rplc Upgrd Cap Bank | This project will replace the 1215 1K, 1215-2K, and 1215-3K 6MVAR open air capacitor banks at Van Dyke 12 substation located in Hartford, CT with two new 6MVAR metal-enclosed capacitor banks to improve asset condition and customer reliability. CS00681:Portland 21H ElectroMech Relay REL | This project will upgrade existing electromechanical relays currently in operation at the Portland 21H substation located in Portland, CT. All electromechanical and obsolete microprocessor relays will be replaced with microprocessor-based relays. CS00682:Portland 21H H14-1X H15-1X Removals | This project is for the removal of the 21H14-1X and 21H15-1X auto transformers at Portland 21H substation located in Portland, CT. CS00689:CT D-SS AED Install Program | This project will install Automated External Defibrillators (AED) in Distribution substation control houses located in Connecticut. An AED is used as a lifesaving device in the event of a heart attack or sudden cardiac arrest. CS00694:115 kV Relay & Ctrl Encl Install | This project includes modification of yard manhole, installation of two riser poles, installation of underground duct bank, and modification of the current switchgear to remove Transmission protection to be migrated to the new Relay and Control Enclosure. FRSSGNMZ:FORECAST PROJ FOR SS GEN MODERNIZAT | FORECAST PROJECT FOR SUBSTATION GENERAL MODERNIZATION S/S TRANSFORMER RELIABILITY CS00286:Franklin Dr Replace Xfrmr | This project is for the replacement of the 1B-4X and 1B-5X transformers, the relocation of the 1B-4X1-2 circuit switcher, and associated new cabling, steel structures, and foundations at the Franklin Drive 1B substation located in Torrington, CT. The two existing transformers were installed in 1953 and have exceeded a standard transformer's life expectancy.Part 71 of 78
CS00396:Stevenson 14A Upgrade Xfrmr & Swgr | This project is to replace aging equipment and convert the existing 27.6-8.32kV distribution system to a 23kV distribution sstem to provide long term reliable power to distribution loads being fed from the Stevenson 14A substation located in Monroe, CT. CS00404:Todd 30L Mobile Position | The project is for the installation of a mobile transformer position and associated feeder activation at the Todd 30L Substation in Wolcott, CT. CS00533:Salisbury 21J Replace Xfmr | The project objective is to replace the 13MVA 69kV-13.2kV transformer 21J-1X with a new Eversource standard 40MVA 115/69kV-13.2kV transformer equipped with a modern LTC. The Salisbury 21J-1X is an Eversource standard size transformer which reduces the number of spare transformers required to be available for the Connecticut distribution system.This project will also replace outdated electromechanical protection systems on the 21J-1X transformer and 13.2kV A1 bus to update these systems to the latest Eversource standards.This relaying is 50 years old, is at the end of its service life and total of eight electromechanical relays will be replaced as part of this project. CS00544:N Canaan 5L Replace Xfmr | This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset conditions. CS00606:Glenbrook 1K Replace Transformer | This project is for the asset condition replacement of the existing 62-year old 115kV:13.2kV, 46.7MVA transformer 1K-2X at Glenbrook substation in Stamford, CT. The transformer is near its end of life. CS00665:73MX Mobile Xfmr Refurbishment | This project is to refurbish the 73MX mobile transformer unit. The unit is out of service. FRSSXFMR:SS Transformer Reliability Forecast | Substation Transformer Reliability Forecast Project SS DSCADA LTC Controls CS00677:Haddam 11C DSCADA LTC | This project will replace the Load Tap Changer (LTC) control scheme on the 11C-2X and 11C-3X transformers at the Haddam 11C substation located in Haddam, CT. FRSSDSCA:Forecast SS DSCADA LTC Netwk Auto G | Forecast project for DSCADA - LTC Network Auto Grid SUBSTATION RELIABILITY-L4 DSCN26:2026 CT D SS Planned Annual | This annual is to improve customer reliability for capital work not identified specifically during the budget cycle but is a result of monitoring the system throughout the year. SWITCHGEAR CS00189:Triangle 11A - Rpl Bus w/ Swgr | This project will rebuild the 13.8kV distribution end of the Triangle 11A substation in Danbury, CT by installing new enclosed, double bus, metal clad switchgear. The rehabilitation of the substation is required to replace aging substation equipment, address bus clearance needs, and update protection and control relays and System Control and Data Acquisition (DSCADA) interfaces for metering, control, and monitoring. CS00491:Chippen Hill 15U Replace SWGR | The project will replace the existing metal clad switchgear at the Chippen Hill substation located in Bristol, CT. The switchgear is being replaced to due to the history of operational and maintenance issues caused by a sunken foundation which made the switchgear come out of alignment. CS00503:E. Meriden 21P Replace SWGR | This project is for the replacement of the 13.8kV switchgear with associated circuit breakers, protection relays, conduits, cabling, and foundations at East Meriden 21P substation. The foundation has begun to sink unevenly causing the switchgear to come out of alignment. This has caused difficulties when racking circuit breakers in and out of the cubicles. FRSSSWGR:FORECAST PROJECT FOR SS SWITCHGEAR | FORECAST PROJECT FOR SUBSTATION SWITCHGEAR RELAY System Resiliency/Expanded Reliability ENHANCED TREE REMOVAL CTREL26:Reliability Tree Removal REL Prgrm | The project focuses on removal of trees in poor performing isolated device zones to improve system reliability and resiliency.Part 72 of 78
ETR2026:Enhanced Tree Removal ETR Program | The ETR project strategically removes trees to proactively improve system reliability and mitigate long term costs for the distribution cycle trimming programs. Tree removals, in conjunction with cycle pruning, drive improved reliability performance. ENHANCED TREE TRIMMING ETTCF26:ETT Customer Focused 2026 | The Customer Focus Enhanced Tree Trimming project addresses system reliability by providing greater clearances and removing risk limbs and trees that are outside of the normal maintenance trim zone in areas of emergent reliability concerns. POLE INTEGRITY PROGRAM CD02444:2025 Pole Integrity | This initiative replaces or reinforces wood poles found during the annual pole inspections that cannot remain in service due to loss of strength from decay or insect infestation. This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. CD02449:2025 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource equipment onto Frontier Defective Pole Replacements. As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. CD02545:2026 Pole Integrity | This project captures the cost necessary to replace wooden poles that were found during the 2025 annual pole inspections. These poles cannot remain in service due to loss of strength from decay or insect infestation.This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm damages. P CD02546:2026 Frontier Pole Shifts | The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource facilities onto Frontier Defective Poles that will be replaced in the year 2026.As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the equipment transfer. RIGHT OF WAY LINES CD01246:Fry Brook 13B21/13B27 ROW Pole Repl | The Fry Brook 13B21/13B27 ROW is an approximately 3-mile express feed from the substation to the towns of Plainfield and Killingly. 13B21 serves 3,607 customers and 13B27 serves 1,963 customers. For a double circuit fault from the substation to Plainfield Road 100% of customers are automatically restored. This is accomplished via ties with 13B10, 15C8 and 30Y10. While travelling along I-395 several crossarms were observed to be cocked and/or racked and upon a physical walk through, much more damage was recorded. A majority of the poles are 66+ years old and most crossarms were replaced in 1973. All crossarms are installed with bow braces. The project will perform 100% pole and conductor replacement from the substation to the Moosup 19Y Substation north of Route 14.The aim of this project is to install a new double circuit pole line adjacent to the existing pole line where easement restrictions allow, with all new 50-foot class 1 poles, 556 ACSR TW and 2/2/2 construction.Part 73 of 78
CD01308:Saybrook 22D Triple Circuit ROW | This project addresses two right-of-way (ROW) issues in the Town of Old Saybrook. The first issue is a triple circuit pole line south of Saybrook 22D station extending 2,700 ft from Elm St to Ingham Hill Rd, Saybrook. This triple circuit pole line consists of the 15L46, 15L70, and 22D4 Circuits with 1,450 ft of pole line through a marsh. The Bokum 15L46 (27.6kV) supplies Cedar La 41L and Westbrook 20S. The Bokum 15L70 (27.6kV) backs-up the 15L46. Westbrook 20S is backed up by Green Hill 30R9 and Cedar La 41L is backed up by Bokum 15L5 and Saybrook 22D4. Having three circuits on one pole line that is difficult to access creates a risk extended abnormality should reliability issues occur. The second issue is a split pole top (vertical corner construction) on the Bokum 15L70 (27.6kV) circuit located in the Bokum-Old Saybrook ROW between I-95 and a marsh. This circuit supplies the Saybrook 22D-2X Substation Transformer. The existing conductor spans ~500 ft over I-95 and then goes for another 850 ft over a marsh. This project will replace this structure with three new steel structures (to Transmission Crossing Specs) due to the lengthy spans of 3ph 556 ACSR wire and the hazard it will create if the lines were downed across I-95. The project will resolve both issues by relocating the circuits along town roads. CD01720:ROW 006 Remediation | Eversource has completed drone patrols of all distribution ROWs and has categorized all findings into five priority levels. ROW 006 had 76 total findings, 3 priority 1 poles, 26 priority 2 poles, 42 priority 3 poles, 4 priority 4 poles, and 1 priority 5 pole. This project will maintain the ROW and rebuild in place with steel poles and 556 tree wire. CD02211:13K57, 32P3 ROW Removal | This project is for the removal of the 13K57 and 32P3 obsolete and de-energized ROWs in Stonington, CT. These ROWs are hazardous assets that have resulted in customer complaints and have warranted repairs to inoperative circuits. CD02376:2025 ROW Priority 3 Poles - Central | This project will address 103 priority 3 damages found during ROW drone inspections. All ROW poles will be replaced with Class 1 or larger steel poles. CD02377:2024 ROW Priority 3 Poles - Eastern | Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 55 Priority 3 findings. All ROW poles will be replaced with Class 1 or larger steel poles. CD02631:2026 ROW Priority 3 Poles | Approximately 500 linear miles of Distribution ROW were inspected by drones in Connecticut. The damage found was recorded and prioritized. This project will address 34 Priority 3 findings. All ROW poles will be replaced with Class 1 or larger steel poles. FRPROW:Projection Proj for ROW | Projection Project for Right of Way Lines SMART SWITCHES PROGRAM CD01278:12C4-71S Smart Switch Program | Project CD01278 will sectionalize a 2,397 customer zone located beyond the Enfield 12C4-71S into smaller automatic zones. With these changes, customers will experience increased reliability. CD01921:Willamantic 14S31 Smart Switch Proj | This project will install an automatic loop scheme between the 14S31 and 14S32 circuits. By automating the loop scheme, power can be restored to customer quickly.Part 74 of 78
CD02007:2B5 Smart Switch | Project CD02007 seeks to address large customer zones on the 2B5 circuit in Thomaston, CT. The 2B5 currently has two zones over 500 customers. The first zone is the 2B5-70S which hosts 511 customers. This zone has experienced three outages over the last four years. The second zone is the 2B5-60R which hosts 681 customers and has experienced two outages over the last four years. This project suggests the installation of two new sectionalizing devices to reduce large customer zones. One device, a radial recloser, will be installed on P# 830, Main St. Plymouth. This device will reduce the 2B5-70S zone from 511 to 145 customers and will simultaneously create a new 366 customer zone. The second device, a smart switch, will be installed in the 1B5-60R zone on P# 1181 along N Harwinton Ave, Plymouth. The installation of this device will reduce the 2B5-60R zone from 681 customers to 319 customers while also creating a new zone of 362 customers. With these changes, customers will experience increased reliability. CD02008:12J38 Smart Switch | This project is being established to address two large customer zones on the 12J38 circuit in Mansfield, CT. The 12J38-71S zone has 693 customers at risk and this project proposes adding a smart switch in the 12J38-71S zone, dividing it into a 365 and 328 customer zones. The 12J38-71S zone has experienced seven outages in the last four years. The 12J38-80M zone has 648 customers at risk which will be divided into zones of 286 and 362 customer zones. The zone reduction will be performed by adding a new recloser and reprogramming the existing 12J38-80M as a smart switch. The 12J38-80M zone has experienced one outage in the last four years. With these changes, customers will experience increased reliability. CD02201:Large Customer Zones RWO Central | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02201 addresses 13 large customer zones in the Central Division with the installation of 24 viper reclosers. CD02318:2025 Large Customer Zones RWO West | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02318 addresses 8 large customer zones in the Western Division with the installation of 15 viper reclosers. CD02319:2025 Eastern Large Customer Zone >1 | The installation of multiple smart switches will reduce the customers affected in the event of future outages. Project CD02319 addresses 3 large customer zones in the Eastern Division with the installation of 4 viper reclosers. CD02340:2024 Trip Saver Program | Project CD02340 proposes to install Trip Savers at 1155 fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Tree, Animal, Lightning, Patrolled Nothing Found).A Trip Saver is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum interrupter recloser. The Trip Saver is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would otherwise trip to prevent a lateral fuse cutout from operating in response to a transient fault. CD02475:2025 Western Large Cusomer Zone 900 | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02475 addresses circuit zones that serves 900 - 999 customers.Part 75 of 78
CD02519:2025 Htfd Lg Customer Zones SS | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02519 addresses circuit zones that serves more than 500 customers. CD02520:2025 Norwalk AWC Smart Switch RWO | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project 2520 address zones that are ranked in the top 100 in terms of customer interruptions in the Norwalk AWC. CD02521:Vacufuses Program 2025 | Project CD02521 proposes to install Vacufuses on Distribution transformer locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found)._x000D__x000D_ _x000D__x000D_ A Vacufuse is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum_x000D__x000D_ interrupter recloser. The Vacufuse is designed to eliminate the sustained interruption that occurs when a transformer fuse cutout operates in response to a transient fault. This device will save outages and reduce trips by troubleshooters by reclosing after a transient fault occurs. CD02538:2025 Eastern-New London SS CI Rank | Smart Switch projects address circuit zones that serves more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that loses power during a single outage. Project CD02538 addresses circuit zones ranked in the top 100 due to customer outages over the past 4 years. CD02542:2025 Cent. Cheshire AWC SS (CI) - 1 | Smart Switch projects address circuit zones that serve more than 500 customers. Limiting circuit zones to less than 500 customers where possible limits the number of customers that will lose power during a single outage. Project CD02542 addresses circuit zones that serve more than 500 customers and is ranked in the top 100 based on customers interrupted over the past 4 years. CD02562:2025 Single Phase Recloser Project | Project CD02562 proposes to install Viper SP single phase reclosers at fused lateral locations in Connecticut to reduce the number of outages caused by transient type events (Limbs, Animal, Lightning, Patrolled Nothing Found).A Viper SP recloser is a pole mounted electronically controlled interrupter recloser with full SCADA control and visibility utilizing an SEL 351 control. The Viper SP recloser is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. It also can eliminate momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would otherwise trip to prevent a lateral fuse cutout from operating in response to a transient fault.In 2025 Viper SP recloser will be installed on fused single-phase laterals that have high fault current magnitudes which would exceed other single phase reclosing equipment ratings. CD02583:Barnes Aerospace 14K9 Windsor Locks | This project addresses a customer inquiry into the poor reliability performance of the Windsor Locks 14K9 circuit. The customer is Barnes Aerospace located on Old Kennedy Rd in Windsor, CT. This project will address the 14K9 backbone and the lateral that feeds the customer. The improvements will include adding a new 3-phase recloser and replacing one existing 3-phase recloser with a smart switch. In addition, all pole-top transformers along Old Kennedy Rd that are not already fused will be fused. CD02717:Eastern TripSaver Optimization | This project addresses trip saver locations where the minimum load requirement is not met year round. Minimum load is required in order for trip savers to operate properly in response to fault conditions.Part 76 of 78
FRSMRTSW:FRCST PROJ REL IMPRV SMART SWITCHES | Forecast Project Reliability Improvement Smart Switches SR DOUBLE POLE REMOVALS CD02547:2026 Double Pole Removals | This initiative captures the cost necessary to perform bare pole removals at double pole locations and is required to the meet the orders of PURA Docket No. 03-03-07. Double pole locations are commonly created when these instances occur: I. Structural and electrical upgrades. II. Pole Integrity projects. III. Other programs including the replacement of poles with third party attachments that cannot be removed or transferred to the new pole during replacement. Attachments are removed or transferred by third parties later following a notification through the Alden 1 database, managed by the single pole administrator. Once all pole attachments have been transferred to the new pole, the old pole is bare and ready to be removed. UCONN RESILIENT ENERGY CENTER EEC23-28:Eversource Energy Center 2023-2028 | The proposed project is needed to fund the continuation of the operations of the Eversource Energy Center at the University of Connecticut and the development and operation of the UConn Predictive Storm and Outage models for Eversource Connecticut service territory for the period June 1, 2023, through May 31st, 2028, by regularly updating and improving the model integrating utility specific infrastructure and outage data from the Outage Management System (OMS). This project is part of the 2023-2028 Eversource-UConn Master Agreement for the Eversource Energy Center._x000D__x000D_ _x000D__x000D_ URD/DB Cable Improvements DB CABLE REPLACE-SPECIFIC PROJ 101395:DIRECT BURIED CABLE REPLACEMENT PRO | This program funds the replacement of direct buried distribution cables in underground residential and commercial developments that are reaching the end of their useful lives or have failed. This improves reliability for customers served by these cables. CD02388:Bristol DB Cable Replacement 15U4 | This project is to address the poor reliabilty of direct buried cable in downtown Bristol. CD02438:33M1 Woodridge Lake Cable Replace | Project CD02438 addresses underground reliability issues within the Woodridge Lake community in Goshen, CT. The identified portion of the housing community is fed via the Goshen 33M1 circuit at 23.0kV off Milton Rd, Goshen. The two lateral taps located at P#1372 & P#1373 are comprised a mixture of direct buried #1 AL and 1972-vintage #1 AL Concentric UG conductor. Both taps have experienced a combined 8 outages due to underground equipment failures in 4 years. This poor underground reliability ended up resulting in a customer complaint from the Woodridge Lake Housing Association. New direct buried cable will be installed in conduit to reduce future deterioration and to ensure reliable service to the portion of the housing community. CD02750:2026 DB Fault Indicator Replacement | The purpose of this project is to fund the 2026 Direct Buried (DB) inspection program and replace approximately 2,390 fault indicators in the Eastern Region and perform inspections of the DB equipment. CD02751:2026 DB Fault Indicator Replacement | The purpose of this project is to fund the 2026 Direct Buried (DB) inspection program and replace approximately 3,628 fault indicators in the Central Region and perform inspections of the DB equipment. CD02752:2026 DB Fault Indicator Replacement | The purpose of this project is to fund the 2026 Direct Buried (DB) inspection program and replace approximately 3,778 fault indicators in the Western Region and perform inspections of the DB equipment. 5-Facilities Basic Business-FAC Acquisition and Sale LAND - AS 26715:2026 CL&P-D RE & ROW LOB | CL&P-D Real Estate & Right of Way 2026 Line of Business (LOB) Replacements EQUIPMENT - RPart 77 of 78
ML2601:2026 Material Logistics LOB CL&P-D | This is for Material Logistics capital projects for the year 2026. Each year, capital dollars are allocated to the Material Logistics organization to replace, improve, or upgrade Warehouse equipment, shelving, and handling equipment. The projects covered by this authorization are generally related to safety issues and Warehouse functionality. Projects can also be related to Operational needs and requests or to maintain basic office working standards. Upgrade, Paving and Other BUILDING - UPO 23768:Building Interior Redesign | This project is for the New London area work center renovation. The building was constructed in 1930 and last renovated in 1993. The project will accommodate existing needs along with projected growth and comply with the latest company space guidelines. 23778:Norwalk Windows & Facade Renovation | This project is for the replacement of the exterior windows, doors, and facade at the Norwalk Service Center located on Tindall Ave. The AWC is a 52,000 sq ft facility that was built in the 1920’s for Electric Operations. The AWC services Norwalk and its surrounding communities and houses approximately 100 employees. Water has been infiltrating the brick facade resulting in structural deterioration of the building windows, doors, and brick siding. In addition to the structural damage this is also a safety concern due to the potential of falling brick and/or the development of mold due to the water infiltration. 24774:Restroom Renovation | This project is for the Torrington Restroom/Locker Room Renovation. Outdated plumbing, insufficient ventilation, fire-rated assemblies and fire alarm system will be addressed. These changes will provide energy and water efficiency improvements along with providing adequate space for all employees. 24780: Electrical Service Redesign | This is for the MadisonElectrical Service Redesign. It will replace the existing electrical service to the building which is obsolete. 25735:Replace Elec Switchgear | This project is to replace the switchgear at the Berlin Central Warehouse. The existing Switchgear in the Berlin Central Warehouse is at the end of its useful life and requires replacement. It has been identified as having multiple issues during the latest arc-flash study analysis. Due to the age and condition of the equipment, reliability and serviceability are compromised. The equipment is critical to power distribution in the Berlin Central Warehouse and failure of the switchgear would likely result in an extended electrical outage which would halt productivity, security, and life safety features within the building as well as power that is provided to the outdoor equipment stored on site. Replacement parts are no longer available and arc-flash safety requirements cannot be achieved based upon the age and installation of this unit. This project also includes proper guarding of the switchgear with the installation of a cage and other safety barriers. 25743:Replace generator | Berlin Central Warehouse NE Corner Generator Replacement 25761:Chiller/Boiler Replacements | This project is for the replacement of one 80-ton chiller, six gas fired boilers along with the installation of two circulating pumps at the 626 Glenbrook Road Stamford CT Electric Operations Facility. This facility is a key electric area work center located in lower Fairfield County and is occupied by 109 Eversource employees. The existing equipment is over 40 years old and has begun to show signs of failure. The replacement of these units will provide adequate heating and cooling throughout the facility for all employees. 25767:Elevator Replacement | Hartford Elevator has made several attempts to repair the New London elevator. The elevator requires a full modernization to become operational again providing a means for employees with disabilities to reach all floors of the Facility as required by the Americans with Disabilities Act (ADA).Part 78 of 78
26703:CL&P-D Buildings 2026 LOB | This project covers emergent facility capital work that is required across CL&P Distributions’s 14 facilities which are made up of approximately 786,000 square footage of building space. These projects will typically include building system failures that require immediate replacement (such as: HVAC systems and electrical transformers/gear, etc.). In addition, this funding will also be used to rectify code compliance/safety issues that arise throughout the CL&P Distribution facilities. 26724:Turbine Building Removal | This project is for the Danielson Turbine Building Removal. 26725:Window Replacement | This project is for the replacement of the exterior windows, doors, and facade at the Stamford Service Center located on 626 Glenbrook Road, Stamford, CT. The AWC is a 55,000 sq ft facility that was built in 1962 for Electric Operations. The AWC services Stamford and its surrounding communities and houses approximately 112 employees. This project consists of replacing the aging windows and exterior doors that are original to the building. This replacement is needed due to failure of the window and storefront framing, and glass seals and ga
As listed on the current system
Supplement for New App [Filed: 10/19/2026]