Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
2 parts match

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 9 of 78

    CD00925 | Convert South Leonard Ave 5 kV Feed | Operations | Distribution Line Reliability | 330-CD00925 | 330-CD00925-SP01 | 330-CD00925-SP02 CD00926 | 13H96-13H99 Recloser Loop Scheme | Operations | SMART SWITCHES PROGRAM | 331-CD00926 CD00928 | Freight 11W DGI Sensors | Operations | Network Reliability | 332-CD00928 | 332-CD00928-SP01 CD00931 | Middletown-Rosecommon Dr_DB Cbl Rep | Operations | URD/DB Cable Reliability | 333-CD00931 CD00932 | CDOT - Norw Westport Ave Rd Widenin | Operations | Line Relocations/Act of Public Authority | 334-CD00932 CD00937 | 12N19 Overload Correction | Operations | Peak Load/Capacity | 335-CD00937 CD00941 | Relocate Bushy Plains Rd Pole line | Operations | Line Relocations/Act of Public Authority | 336-CD00941 CD00942 | CDOT 14-185 Int 95 Brdg over rt 1 | Operations | Line Relocations/Act of Public Authority | 337-CD00942 CD00943 | Black Rock 11H DGI Sensors | Operations | Network Reliability | 338-CD00943 CD00944 | Cos Cob 11R DGI Sensors | Operations | Network Reliability | 339-CD00944 | 339-CD00944-SP01 CD00945 | Farmington 1C DGI Sensors | Operations | Network Reliability | 340-CD00945 | 340-CD00945-SP01 CD00946 | 1K10/13S7 Contingency Overload | Operations | Network Reliability | 341-CD00946 CD00947 | Westside 7A DGI Sensors | Operations | Network Reliability | 342-CD00947 CD00948 | Williams 9L DGI Sensors | Operations | Network Reliability | 343-CD00948 CD00949 | New Customer on 3R12 overload (LNG) | Operations | New Customer | 344-CD00949 * | CD00951 | 725 Bedford Street - New Service | Operations | New Customer | 345-CD00951 CD00954 | Stamford Ice Skating Rink New Serv | Operations | New Customer | 346-CD00954 CD00955 | Westport Overload Project | Operations | Peak Load/Capacity | 347-CD00955 CD00958 | Championship Drive - DB Line Exten | Operations | New Customer | 348-CD00958 CD00959 | New Brtn 5kv Conversion - 21W Porti | Operations | Regulatory Commitments-Other | 349-CD00959 CD00960 | Hillcroft Apartments Create Loop | Operations | URD/DB Cable Reliability | 350-CD00960 CD00964 | 1G28 Contingency Overload | Operations | Peak Load/Capacity | 351-CD00964 CD00969 | Campville Row pole replacements | Operations | RIGHT OF WAY LINES | 352-CD00969 CD00970 | Back up Westbrook Sub 20S | Operations | ISLANDED SUBSTATION PROGRAM | 353-CD00970 CD00971 | 12J4-12J33 R.O.W. Rebuild | Operations | RIGHT OF WAY LINES | 354-CD00971 CD00976 | Eliminate Manual Switchgear I84 PF | Operations | Network Reliability | 355-CD00976 CD00978 | New Brtn Conv Farmington 23L Sub. | Operations | Regulatory Commitments-Other | 356-CD00978 CD00979 | Convert 19R2 | Operations | Regulatory Commitments-Other | 357-CD00979 CD00984 | 26 Russell St. New Brtn - New Svc | Operations | New Customer | 358-CD00984 CD00986 | Cable inject Trinity Ave, Glastonbu | Operations | URD/DB Cable Reliability | 359-CD00986 CD00987 | Pole Integrity - 2018 | Operations | POLE INTEGRITY PROGRAM | 360-CD00987 CD00988 | Shift Eqpt - Frontier Reject Poles | Operations | POLE INTEGRITY PROGRAM | 361-CD00988 CD00991 | Flax Hill New Feeder 24A19 | Operations | New Customer | 362-CD00991 CD00994 | Switchgear Replacement at Electric | Operations | Network Reliability | 363-CD00994 CD00997 | Colonial Drive Cable Replacement | Operations | URD/DB Cable Reliability | 364-CD00997 CD01004 | Improve Customer Zone Count 7A71, 7 | Operations | SMART SWITCHES PROGRAM | 365-CD01004 CD01005 | Mitigate Osprey Outages Eastern Reg | Operations | Environmental | 366-CD01005 CD01006 | Smart Switch Program 6A3 | Operations | SMART SWITCHES PROGRAM | 367-CD01006 * | CD01007 | Smart Switches Program 11H76 | Operations | SMART SWITCHES PROGRAM | 368-CD01007 CD01008 | 12B35 Smart Switch | Operations | SMART SWITCHES PROGRAM | 369-CD01008 CD01009 | 15C8, 13B10, 13B21 New Loops | Operations | Regulatory Commitments-Other | 370-CD01009 CD01010 | Scitico 27H8 Contingency Overload | Operations | Peak Load/Capacity | 371-CD01010
  2. Part 10 of 78

    CD01012 | 14H3 Smart Switch | Operations | SMART SWITCHES PROGRAM | 372-CD01012 CD01013 | 24A14 - Putnam Rd Ext New Canaan Cb | Operations | URD/DB Cable Reliability | 373-CD01013 CD01014 | Cromwell Hills URD DB Cable Rpl Rd | Operations | URD/DB Cable Reliability | 374-CD01014 CD01015 | Middletown_Cedar Village_DB Cbl Rpl | Operations | URD/DB Cable Reliability | 375-CD01015 CD01017 | 12B37-2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 376-CD01017 CD01019 | 131 Hollow Tree Ridge Rd., Reloc Fa | Operations | New Customer | 377-CD01019 CD01021 | 49S2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 378-CD01021 CD01023 | 21P4 Smart Switch | Operations | SMART SWITCHES PROGRAM | 379-CD01023 CD01024 | Norwalk 9S 5kV Elimination | Operations | Distribution Line Reliability | 380-CD01024 CD01026 | Beacon Falls 11N83 & 11N84 Reliab | Operations | RIGHT OF WAY LINES | 381-CD01026 CD01031 | 4C19 Smart Switch | Operations | SMART SWITCHES PROGRAM | 382-CD01031 CD01032 | 3R01 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 383-CD01032 CD01036 | 11J41-71S Smart Switch Prog 2018 | Operations | SMART SWITCHES PROGRAM | 384-CD01036 CD01037 | TDRP Tunnel 12S4 | Operations | Regulatory Commitments-Other | 385-CD01037 CD01038 | Green Hill 30R Balancing | Operations | Peak Load/Capacity | 386-CD01038 CD01039 | Mystic 13K1 TDRP | Operations | Regulatory Commitments-Other | 387-CD01039 CD01040 | Smart Switch 3A12 | Operations | SMART SWITCHES PROGRAM | 388-CD01040 CD01045 | TDRP 2017 Project_Dooley 30K11 | Operations | Regulatory Commitments-Other | 389-CD01045 CD01046 | TDRP 2017 Project_Dooley 30K13 | Operations | Regulatory Commitments-Other | 390-CD01046 CD01047 | Lakeview 31A Contingency Loading | Operations | Peak Load/Capacity | 391-CD01047 CD01048 | Mianus 16Q Contingency Load Relief | Operations | Peak Load/Capacity | 392-CD01048 CD01050 | Atlantic Station South Tower | Operations | New Customer | 393-CD01050 CD01053 | Install SWGR For Meriden Common PH2 | Operations | New Customer | 394-CD01053 | 394-CD01053-SP01 | 394-CD01053-SP02 CD01056 | 3A11/49S1-New Recloser Loop Scheme | Operations | Distribution Line Reliability | 395-CD01056 CD01057 | W. Hyderdale Dr Gosh DB Cable Repl | Operations | URD/DB Cable Reliability | 396-CD01057 CD01059 | Stamford New Service – 245 Atlantic | Operations | New Customer | 397-CD01059 CD01060 | West Ave OH Relocation | Operations | Line Relocations/Act of Public Authority | 398-CD01060 CD01061 | May St Naugatuck Extend 3 phase | Operations | New Customer | 399-CD01061 CD01062 | New Service Kesser Torah Estates | Operations | New Customer | 400-CD01062 CD01065 | Mystic 13K4 OL Upon Loss of A3 Bus | Operations | Peak Load/Capacity | 401-CD01065 CD01066 | Rockville 14W Cable Upgrades & Offl | Operations | Peak Load/Capacity | 402-CD01066 CD01067 | Replace Tri-colored Netwk Secondary | Operations | Regulatory Commitments-Other | 403-CD01067 CD01071 | 13F66 & 68 Loop Scheme Modification | Operations | Distribution Line Reliability | 404-CD01071 CD01077 | CT Studio South Windsor | Operations | New Customer | 405-CD01077 CD01082 | 5R4 Robin Dr Bark DB Cable Replac | Operations | URD/DB Cable Reliability | 406-CD01082 * | CD01087 | Hytone Farm | Operations | New Customer | 407-CD01087 * | CD01091 | Back up for Buckingham 31K | Operations | ISLANDED SUBSTATION PROGRAM | 408-CD01091 CD01092 | Replace Duct Bank - Reserve Rd., Ht | Operations | Network Reliability | 409-CD01092 CD01093 | Alternate Source For Essex 16M | Operations | ISLANDED SUBSTATION PROGRAM | 410-CD01093 CD01094 | 14S&39M Stranded Substation Backup | Operations | ISLANDED SUBSTATION PROGRAM | 411-CD01094 CD01095 | Load Relief 48C9 Contingency Overlo | Operations | Peak Load/Capacity | 412-CD01095 CD01097 | 21H15-Automatic Zone Alternate Sour | Operations | SMART SWITCHES PROGRAM | 413-CD01097 CD01102 | CDOT 152-158 Route 85 Waterford | Operations | Line Relocations/Act of Public Authority | 414-CD01102
  3. Part 11 of 78

    CD01103 | Triangle 11A72 Auto Loop Scheme Ins | Operations | SMART SWITCHES PROGRAM | 415-CD01103 CD01105 | Stone Gate Circle DB Reconductori | Operations | URD/DB Cable Reliability | 416-CD01105 CD01107 | Heritage Village Southbury Reliabil | Operations | Distribution Line Reliability | 417-CD01107 CD01109 | CDOT 155-171 | Operations | Line Relocations/Act of Public Authority | 418-CD01109 CD01111 | Tie Between 22R1 and 22R6 | Operations | Regulatory Commitments-Other | 419-CD01111 CD01113 | ASML Facility Expansion | Operations | New Customer | 420-CD01113 CD01114 | Plymouth Industrial Park | Operations | URD/DB Cable Reliability | 421-CD01114 CD01116 | Economy Spring New Service Aircraft | Operations | New Customer | 422-CD01116 CD01117 | Stmfrd – Greenwich Ave – Rel. Facil | Operations | Line Relocations/Act of Public Authority | 423-CD01117 CD01119 | Stamford New Service – 885 Washingt | Operations | New Customer | 424-CD01119 CD01120 | Cromwell Hills UG FI Repl | Operations | URD/DB Cable Reliability | 425-CD01120 CD01121 | 302P Switchgear Automation | Operations | Network Reliability | 426-CD01121 CD01122 | 1205 Feeder - Eliminate Redundant C | Operations | Network Reliability | 427-CD01122 CD01123 | Center Street 24F Islanded Substati | Operations | Distribution Line Reliability | 428-CD01123 * | CD01126 | 14M7 Loop Scheme and Reliability Up | Operations | RECLOSER CONTROL PROGRAM | 429-CD01126 CD01128 | L&M Hospital New Service Switchgear | Operations | New Customer | 430-CD01128 CD01129 | Pole Integrity - 2019 | Operations | POLE INTEGRITY PROGRAM | 431-CD01129 CD01132 | Triangle 11A Repl Cables for SS wor | Operations | Network Reliability | 432-CD01132 | 432-CD01132-SP01 | 432-CD01132-SP02 CD01136 | Willow Springs Condos Cable Replace | Operations | URD/DB Cable Reliability | 433-CD01136 * | CD01140 | 3A03 Contingency Overload | Operations | Peak Load/Capacity | 434-CD01140 CD01141 | Bloom CT Clean Energy Company | Operations | New Customer | 435-CD01141 CD01142 | Shift Eqpt-Frontier Rejects - 2019 | Operations | POLE INTEGRITY PROGRAM | 436-CD01142 CD01144 | Reroute 35L9 and 35L10 getaways | Operations | Network Reliability | 437-CD01144 CD01145 | Reconductor Chapman Ave, Madison | Operations | POLE INTEGRITY PROGRAM | 438-CD01145 CD01154 | 30R9 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 439-CD01154 CD01155 | Branford 11J45 Smart Switch -TOP 20 | Operations | SMART SWITCHES PROGRAM | 440-CD01155 * | CD01158 | SSRK6.18-12H16-2->500-RWO.2 | Operations | SMART SWITCHES PROGRAM | 441-CD01158 CD01159 | Western Reconductoring-Reject Poles | Operations | POLE INTEGRITY PROGRAM | 442-CD01159 CD01161 | SSRK2.18-21K7-2->1000-RWO.3 | Operations | SMART SWITCHES PROGRAM | 443-CD01161 CD01162 | Verogy - Southington | Operations | New Customer | 444-CD01162 | 444-CD01162-SP01 CD01163 | Verogy - East Windsor | Operations | New Customer | 445-CD01163 | 445-CD01163-SP01 CD01165 | Fry Brook 13B25-70S Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 446-CD01165 CD01166 | Middletown Westside 7A79 Westlake R | Operations | URD/DB Cable Reliability | 447-CD01166 CD01167 | Smart Switch 36F6 2019 Program | Operations | Regulatory Commitments-Other | 448-CD01167 CD01170 | LARGE ZONE 12S2 - TOP 20 | Operations | SMART SWITCHES PROGRAM | 449-CD01170 CD01171 | Green Hill 30R9 SmartSwitch-TOP 20 | Operations | SMART SWITCHES PROGRAM | 450-CD01171 CD01173 | Coal Pit Hill Condos | Operations | URD/DB Cable Reliability | 451-CD01173 CD01174 | 11F9 Smart Switch - TOP 20 | Operations | SMART SWITCHES PROGRAM | 452-CD01174 CD01178 | Nutmeg Ln Reconductoring, Newtown | Operations | Distribution Line Reliability | 453-CD01178 CD01184 | Green Hill 30R8 Getaway Replacement | Operations | Network Reliability | 454-CD01184 CD01185 | SSRK614 18-35L8->1000-RWO 3 | Operations | SMART SWITCHES PROGRAM | 455-CD01185 CD01186 | SS Prgm 32R1 & 32R3 Large zone Redu | Operations | Regulatory Commitments-Other | 456-CD01186
  4. Part 12 of 78

    CD01189 | PCB Transformer Replacement Program | Operations | New Customer | 457-CD01189 CD01190 | SSRK128.18.13B9-70S>1,000-RWO.2 | Operations | SMART SWITCHES PROGRAM | 458-CD01190 CD01191 | Middletown_Eastlake Dr_Loop Desig | Operations | URD/DB Cable Reliability | 459-CD01191 | 459-CD01191-SP01 CD01192 | Greenwich – 11R55 – Reconductor A/C | Operations | Distribution Line Reliability | 460-CD01192 CD01193 | DB Cable Replacement South Mill Dr | Operations | URD/DB Cable Reliability | 461-CD01193 CD01194 | 11R51 and 11R52 PILC Cable Replacem | Operations | Network Reliability | 462-CD01194 CD01197 | 9L08-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 463-CD01197 CD01198 | 9L03-2 Smart Switch Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 464-CD01198 CD01199 | 9L06-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 465-CD01199 | 465-CD01199-SP02 CD01200 | 9L05-72S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 466-CD01200 | 466-CD01200-SP02 CD01201 | CDOT Beachside Ave Bridge Rebuild | Operations | URD/DB Cable Reliability | 467-CD01201 CD01203 | 55 Elm St., Hart. - Vault Repairs | Operations | New Customer | 468-CD01203 CD01204 | 11F10 R.O.W Removal | Operations | RIGHT OF WAY LINES | 469-CD01204 CD01206 | Saybrook 22D4-72S Smart Switch Prog | Operations | SMART SWITCHES PROGRAM | 470-CD01206 | 470-CD01206-SP01 CD01207 | Grist Mill Village Building B | Operations | New Customer | 471-CD01207 CD01210 | 12F48 Smart Switches | Operations | SMART SWITCHES PROGRAM | 472-CD01210 CD01211 | Lake Vista, DB Cable Replacement | Operations | URD/DB Cable Reliability | 473-CD01211 CD01212 | Grist Mill Village Building C | Operations | New Customer | 474-CD01212 CD01215 | Greenwich – 22E36 – Reconductor wit | Operations | Distribution Line Reliability | 475-CD01215 CD01217 | 3B13-2 Smart Switch | Operations | SMART SWITCHES PROGRAM | 476-CD01217 CD01218 | 47N8-5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 477-CD01218 CD01219 | 15U2-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 478-CD01219 CD01220 | Berlin_Berlin SS Support for 6A4 & | Operations | Peak Load/Capacity | 479-CD01220 CD01221 | 27H1-72S Smart Switch | Operations | SMART SWITCHES PROGRAM | 480-CD01221 CD01222 | SSRK18.18-9S13-80M->1038-RWO.1 | Operations | SMART SWITCHES PROGRAM | 481-CD01222 CD01223 | Bradley Airport Alternate Supply | Operations | New Customer | 482-CD01223 | 482-CD01223-SP01 CD01237 | Bristol Solar One Interconnection | Operations | New Customer | 483-CD01237 CD01239 | Dayville 24K Islanded Substation | Operations | Regulatory Commitments-Other | 484-CD01239 CD01242 | SR - Litchfield Interconnection | Operations | New Customer | 485-CD01242 | 485-CD01242-SP01 CD01244 | SR N Stonington Interconnection | Operations | New Customer | 486-CD01244 | 486-CD01244-SP01 CD01246 | Fry Brook 13B21/13B27 ROW Pole Repl | Operations | RIGHT OF WAY LINES | 487-CD01246 | 487-CD01246-SP01 * | CD01247 | Branford 11J43 Same Circuit Tie | Operations | SMART SWITCHES PROGRAM | 488-CD01247 CD01250 | 4A9-73S Smart Switch | Operations | SMART SWITCHES PROGRAM | 489-CD01250 * | CD01253 | SSRK82.18-29J2-61R>505-RWO.3 | Operations | SMART SWITCHES PROGRAM | 490-CD01253 CD01257 | Windham_Prospect St_ECSU_Create DB | Operations | URD/DB Cable Reliability | 491-CD01257 CD01260 | CT Lateral Reliability (2019 Group) | Operations | Distribution Line Reliability | 492-CD01260 CD01262 | Greenwich 28F– Rel. Facilities for | Operations | Line Relocations/Act of Public Authority | 493-CD01262 CD01264 | 3A11-71S Manchester Smart Switch | Operations | SMART SWITCHES PROGRAM | 494-CD01264 CD01265 | 2019 Connecticut DB Insp/Fault Indi | Operations | Distribution Line Reliability | 495-CD01265 CD01269 | Man to Auto - 2 N Main St Wtby | Operations | Network Reliability | 496-CD01269 CD01270 | 1291 Albany Ave., Hart. - Replace M | Operations | Distribution Line Reliability | 497-CD01270
  5. Part 13 of 78

    CD01271 | SSRK33.18-22M10-81M=>500-COND.2 | Operations | SMART SWITCHES PROGRAM | 498-CD01271 | 498-CD01271-SP01 CD01272 | Stamford New Service – Charter Comm | Operations | New Customer | There are customer contributions of $7.945 netting the pre-construction estimated direct costs to $443,779. The estimated direct costs excluding the customer contribution is $451,724. Actual direct costs exceed the estimate by 8%. A supplemental request is not required per the Project Authorization policy. | 499-CD01272 CD01273 | 21L1-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 500-CD01273 CD01274 | Newtown 11A73 Smart Switch | Operations | SMART SWITCHES PROGRAM | 501-CD01274 * | CD01280 | Torrington Smart Switch | Operations | SMART SWITCHES PROGRAM | 502-CD01280 CD01282 | SSRK27.18-11S15-2>653-RWO.4 | Operations | SMART SWITCHES PROGRAM | 503-CD01282 * | CD01290 | SSRK28.18-21K11-2>500-RWO.3 | Operations | SMART SWITCHES PROGRAM | 504-CD01290 * | CD01291 | 5 or More Tripp Hollow Rd 30Y10 | Operations | Distribution Line Reliability | 505-CD01291 CD01295 | New Svc CT Rubber Molding Co. Danie | Operations | New Customer | 506-CD01295 CD01296 | 860 Canal Street New Svc Office Bld | Operations | New Customer | 507-CD01296 CD01297 | Parcel 38 – Tresser Blvd Phase 2 | Operations | New Customer | 508-CD01297 CD01298 | CDOT 117-159 Route 35 UG Relocation | Operations | Line Relocations/Act of Public Authority | 509-CD01298 CD01301 | 2020 POLE INTEGRITY | Operations | POLE INTEGRITY PROGRAM | 510-CD01301 CD01302 | 2020 FRONTIER POLE SHIFTS | Operations | POLE INTEGRITY PROGRAM | 511-CD01302 CD01304 | 3A02/3A09 R.O.W. Structure Replacem | Operations | RIGHT OF WAY LINES | 512-CD01304 CD01306 | 11C14 Back up to 600 customers | Operations | Distribution Line Reliability | 513-CD01306 CD01307 | Airline Trail ROW Relocation | Operations | Line Relocations/Act of Public Authority | 514-CD01307 CD01308 | Saybrook 22D Triple Circuit ROW | Operations | RIGHT OF WAY LINES | 515-CD01308 | 515-CD01308-SP01 | 515-CD01308-SP02 CD01310 | Drummers Lane UG Cable Replacement | Operations | URD/DB Cable Reliability | 516-CD01310 CD01312 | Osprey Mitigation 2020 | Operations | Environmental | 517-CD01312 CD01313 | Darien new service - 40 Heights Rd | Operations | New Customer | 518-CD01313 CD01314 | Litchfield Turnpike, Bethany, Recon | Operations | Distribution Line Reliability | 519-CD01314 CD01317 | 32G9-71S Smarth Switch Program | Operations | SMART SWITCHES PROGRAM | 520-CD01317 CD01320 | Deep River Reconductor Kirtland St | Operations | Distribution Line Reliability | 521-CD01320 CD01322 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 522-CD01322 CD01323 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 523-CD01323 CD01327 | Hamilton Ave Wtby Conv to 13.8kV | Operations | New Customer | 524-CD01327 CD01330 | Line Sensor Upgrade | Operations | Reliability - Other | 525-CD01330 CD01333 | Freight 11W76 PILC Cable Replace | Operations | Network Reliability | 526-CD01333 | 526-CD01333-SP01 | 526-CD01333-SP02 CD01334 | Nautilus Drive UG Loop | Operations | URD/DB Cable Reliability | 527-CD01334 CD01335 | Man to Auto-55 W Main & 7 Kendrick | Operations | Network Reliability | 528-CD01335 CD01340 | Yale Ave 25L Islanded Substation | Operations | Distribution Line Reliability | 529-CD01340 CD01343 | 11N81 TDRP 2019 Analysis | Operations | Regulatory Commitments-Other | 530-CD01343 CD01348 | URD Wellington Dr Farmington | Operations | URD/DB Cable Reliability | 531-CD01348 CD01350 | 14L5/L6 Contingency Overload | Operations | New Customer | 532-CD01350 CD01355 | Aquarian 3-Phase Extension | Operations | New Customer | 533-CD01355 CD01358 | Baldwin 13F65 Load Relief | Operations | Peak Load/Capacity | 534-CD01358 CD01360 | Niantic 21Y2 Overload | Operations | Peak Load/Capacity | 535-CD01360 CD01362 | Overload West Brookfield 14H Sub | Operations | Peak Load/Capacity | 536-CD01362
  6. Part 14 of 78

    CD01363 | CD01363 30R10 1st Contingency Overl | Operations | Peak Load/Capacity | 537-CD01363 CD01368 | Stepstone 35L8 - Green Hill 30R14 T | Operations | Distribution Line Reliability | 538-CD01368 CD01369 | 2N10 Contingent Overloads | Operations | Peak Load/Capacity | 539-CD01369 CD01370 | Middletown_Westside 7A81_Low Volt. | Operations | Peak Load/Capacity | 540-CD01370 CD01372 | W Brookfield 14H4 Contingency Ovrld | Operations | Peak Load/Capacity | 541-CD01372 CD01373 | CDOT Project 302-0014 - Glover Ave | Operations | Line Relocations/Act of Public Authority | 542-CD01373 CD01374 | Williams St 9L09 Crystal Ave UG Loo | Operations | URD/DB Cable Reliability | 543-CD01374 CD01377 | Southington 4C12 Contingency Overlo | Operations | Peak Load/Capacity | 544-CD01377 CD01378 | 43F3 Load Relief 90% Normal | Operations | Peak Load/Capacity | 545-CD01378 CD01379 | 5L02 - Relocation of Right of Way | Operations | RIGHT OF WAY LINES | 546-CD01379 CD01380 | CT Lateral Reliab (2020 Grp 5) | Operations | Distribution Line Reliability | 547-CD01380 CD01381 | CT Lateral Relib (2020 Group6 | Operations | Distribution Line Reliability | 548-CD01381 CD01382 | SSRK6.19-11A71-80M->1000-RWO.1 | Operations | SMART SWITCHES PROGRAM | 549-CD01382 CD01383 | Charter Communications Phase 2 | Operations | New Customer | 550-CD01383 CD01384 | Harbor Point P Block Phase 2 | Operations | New Customer | 551-CD01384 CD01385 | Reliability Greenwich Network N-2 | Operations | Distribution Line Reliability | 552-CD01385 | 552-CD01385-SP01 | 552-CD01385-SP02 CD01386 | 2020 CT DB Insp/Fault Ind Repl | Operations | URD/DB Cable Reliability | 553-CD01386 CD01388 | Greenwich-11R55-reconductor A/C | Operations | Distribution Line Reliability | 554-CD01388 CD01390 | DG - LSE Enfield LEG-25504 | Operations | New Customer | 555-CD01390 CD01393 | CD01393 Wind Colebrook South | Operations | New Customer | 556-CD01393 CD01398 | Town of Norfolk, 599 Greenwoods Rd | Operations | New Customer | 557-CD01398 | 557-CD01398-SP01 CD01399 | Cobb Road LLC | Operations | New Customer | 558-CD01399 | 558-CD01399-SP01 CD01406 | Central Line Sensors 3G to 4G | Operations | Reliability - Other | 559-CD01406 CD01407 | Eastern Line Sensor 3G to 4G | Operations | Reliability - Other | 560-CD01407 CD01412 | C-Tec Solar Berlin Landfill | Operations | New Customer | 561-CD01412 | 561-CD01412-SP01 CD01428 | 1K06/ 13S10 Contingency Overload | Operations | Network Reliability | 562-CD01428 CD01430 | Gateway Commons Phase 2 | Operations | New Customer | 563-CD01430 CD01436 | 2020 CT Trip Saver Program | Operations | Distribution Line Reliability | 564-CD01436 CD01452 | Impact - Lodestart N Canaan | Operations | New Customer | 565-CD01452 CD01459 | Thompson Land Trust - NS | Operations | New Customer | 566-CD01459 | 566-CD01459-SP01 CD01461 | Verogy, 669 Platt Road, Watertown | Operations | New Customer | 567-CD01461 CD01463 | Man to Auto - 1 School St Waterbury | Operations | Network Reliability | 568-CD01463 CD01465 | Cedar Heights Rd Bridge CDOT 135 | Operations | Line Relocations/Act of Public Authority | 569-CD01465 | 569-CD01465-SP01 | 569-CD01465-SP02 CD01466 | SSRK622.19-30R9-61R->1024.RWO.2 | Operations | SMART SWITCHES PROGRAM | 570-CD01466 CD01470 | DG Verogy Burlington | Operations | New Customer | 571-CD01470 | 571-CD01470-SP01 CD01473 | DG Impact Study Verogy Enfield | Operations | New Customer | 572-CD01473 CD01478 | 11N88 Seymour Smart Switch | Operations | SMART SWITCHES PROGRAM | 573-CD01478 CD01480 | Main St Bridge Replacement in Stamf | Operations | Line Relocations/Act of Public Authority | 574-CD01480 CD01489 | Convert-Reloc Step-Crown St 12F55 | Operations | Peak Load/Capacity | 575-CD01489 * | CD01492 | Tunnel 12S1 – Convert Preston Road | Operations | Substation Reliability | 576-CD01492 CD01497 | CTDOT #135-340 - Summer St Intersec | Operations | Line Relocations/Act of Public Authority | 577-CD01497
  7. Part 15 of 78

    CD01501 | Bristol Hospital Expansion | Operations | Line Relocations/Act of Public Authority | 578-CD01501 CD01503 | CDOT 96-204 – Intersection Improvem | Operations | Line Relocations/Act of Public Authority | 579-CD01503 CD01504 | CORRECT OVERLOADS AT 17R AND PEPPER | Operations | Peak Load/Capacity | 580-CD01504 CD01508 | Middletown Pole Rejects Reconductor | Operations | POLE INTEGRITY PROGRAM | 581-CD01508 CD01509 | New Service O&G | Operations | New Customer | 582-CD01509 CD01510 | 27H1 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 583-CD01510 CD01511 | UCONN High Capacity Feeder | Operations | New Customer | 584-CD01511 CD01512 | Westbrook Village URD and System Im | Operations | New Customer | 585-CD01512 CD01514 | Americold New Svc NW Dr. Plainville | Operations | New Customer | 586-CD01514 | 586-CD01514-SP01 * | CD01521 | Newtown Pole Replacements and Recon | Operations | POLE INTEGRITY PROGRAM | 587-CD01521 CD01522 | SSRK21.19-12Y15-2-894-RWO.3 | Operations | SMART SWITCHES PROGRAM | 588-CD01522 CD01523 | CDOT 42-317 Rte 2, East Hartford | Operations | Line Relocations/Act of Public Authority | 589-CD01523 CD01524 | Smart Switch 14L3 | Operations | SMART SWITCHES PROGRAM | 590-CD01524 CD01525 | Smart Switch 24H4 | Operations | SMART SWITCHES PROGRAM | 591-CD01525 CD01526 | 5 Nabby Rd – DB Cable Replacement | Operations | URD/DB Cable Reliability | 592-CD01526 CD01527 | 47N3-80M Smart Switch | Operations | SMART SWITCHES PROGRAM | 593-CD01527 CD01534 | State Pier Offshore Wind | Operations | New Customer | 594-CD01534 CD01536 | Falls Village 4L07-5L Express Feede | Operations | Peak Load/Capacity | 595-CD01536 | 595-CD01536-SP01 | 595-CD01536-SP02 CD01537 | 25 Laurel St Htfd - Automate Svc | Operations | Network Reliability | 596-CD01537 | 596-CD01537-SP01 CD01540 | SSRK001-19-26E9-72S->575-RWO#1 | Operations | Regulatory Commitments-Other | 597-CD01540 CD01544 | Peaceable 12N17 / 12N14 Overload | Operations | Peak Load/Capacity | 598-CD01544 CD01546 | Convert 20H | Operations | Regulatory Commitments-Other | 599-CD01546 | 599-CD01546-SP01 CD01547 | Newtown 12M4 TDRP | Operations | Regulatory Commitments-Other | 600-CD01547 CD01549 | Haynes New Service | Operations | New Customer | 601-CD01549 CD01551 | 2021 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 602-CD01551 | 602-CD01551-SP01 | 602-CD01551-SP02 CD01558 | Ridgefield 22N4 & 22N1 Normal Overl | Operations | Peak Load/Capacity | 603-CD01558 CD01559 | 11W47 PILC Cable Replacement | Operations | Network Reliability | 604-CD01559 CD01561 | 2021 CT DB Insp/Fault Indicator Rep | Operations | URD/DB Cable Reliability | 605-CD01561 CD01562 | 1st Stamford Pl Switchgear Replace | Operations | Network Reliability | 606-CD01562 CD01563 | Sherwood Isle Connector Duct Damage | Operations | Peak Load/Capacity | 607-CD01563 CD01564 | Convert Thomaston Ave Wtby for NS | Operations | New Customer | 608-CD01564 CD01566 | DG - Impact Study Canterbury School | Operations | New Customer | 609-CD01566 CD01567 | Riverbank Rd CDOT 135-328 | Operations | Line Relocations/Act of Public Authority | 610-CD01567 | 610-CD01567-SP01 CD01568 | Reconductor Portions of 11A58 & 11A | Operations | Peak Load/Capacity | 611-CD01568 CD01569 | Green Hill 30R ROW | Operations | RIGHT OF WAY LINES | 612-CD01569 CD01571 | 2022 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 613-CD01571 CD01576 | 47N3 Contingency Overload | Operations | Peak Load/Capacity | 614-CD01576 CD01577 | 13F71 Contingency Load Relief | Operations | Peak Load/Capacity | 615-CD01577 CD01585 | 2021 TripSaver Program | Operations | Distribution Line Reliability | 616-CD01585 CD01593 | UCONN Medical Center | Operations | Network Reliability | 617-CD01593 CD01594 | Haddam Qtr Solar | Operations | New Customer | 618-CD01594 | 618-CD01594-SP01 CD01602 | New Svc-451 Steamboat Rd Greenwich | Operations | New Customer | 619-CD01602
  8. Part 16 of 78

    CD01607 | Hartford Reverse Risers Rebuilds | Operations | Distribution Line Reliability | 620-CD01607 CD01612 | Sandy Hook 37F3 Reliability Improve | Operations | Distribution Line Reliability | 621-CD01612 * | CD01621 | Mitigate Historical Osprey Outages | Operations | Distribution Line Reliability | 622-CD01621 CD01633 | CDOT L034- White St Road Widening | Operations | Line Relocations/Act of Public Authority | 623-CD01633 | 623-CD01633-SP01 CD01634 | Columbia 20Y1 TDRP_2020 | Operations | Regulatory Commitments-Other | 624-CD01634 | 624-CD01634-SP01 CD01636 | Columbia 20Y2 2020 TDRP | Operations | Regulatory Commitments-Other | 625-CD01636 | 625-CD01636-SP01 CD01643 | Clark Indust. Park - DB Cable Repla | Operations | URD/DB Cable Reliability | 626-CD01643 CD01644 | 14M39 TDRP | Operations | Regulatory Commitments-Other | 627-CD01644 CD01647 | 17R11 TDRP | Operations | Regulatory Commitments-Other | 628-CD01647 CD01649 | CD01649 21H9 2020 TDRP | Operations | Regulatory Commitments-Other | 629-CD01649 CD01650 | 30Y10 TDRP | Operations | Regulatory Commitments-Other | 630-CD01650 CD01651 | Hidden Point Farms 3 Phase Extensio | Operations | Line Relocations/Act of Public Authority | 631-CD01651 CD01652 | Reconductor Ringed portion of 11A53 | Operations | Distribution Line Reliability | 632-CD01652 CD01653 | 21K3 Ringed Spacer Cable Replacemen | Operations | Distribution Line Reliability | 633-CD01653 CD01663 | CDOT 135-331 High Ridge Rd Bridge | Operations | Line Relocations/Act of Public Authority | 634-CD01663 * | CD01665 | 31C1 Treasure Hill Rd Rel. Improve | Operations | Distribution Line Reliability | 635-CD01665 CD01667 | 13H91 Replace Ringed Spacer Cable | Operations | Distribution Line Reliability | 636-CD01667 CD01668 | CD01668 21H8 2020 TDRP | Operations | Regulatory Commitments-Other | 637-CD01668 CD01669 | CT Helper Organization Replace OWS | Operations | Distribution Line Reliability | 638-CD01669 CD01671 | Repl H-Frames In 21P ROW | Operations | RIGHT OF WAY LINES | 639-CD01671 CD01674 | 21K3 Ringed Spacer Cable Replacemen | Operations | Distribution Line Reliability | 640-CD01674 CD01677 | New Circuit 14K8 | Operations | New Customer | 641-CD01677 | 641-CD01677-SP01 CD01678 | 2021 ROW P1 and P2 Pole Replacement | Operations | RIGHT OF WAY LINES | 642-CD01678 | 642-CD01678-SP01 CD01679 | Island Wood Estates, Columbia DB lo | Operations | URD/DB Cable Reliability | 643-CD01679 CD01685 | TDRP Shunock 32P4 | Operations | Regulatory Commitments-Other | 644-CD01685 CD01687 | ROW 032 Remediation | Operations | RIGHT OF WAY LINES | 645-CD01687 CD01688 | Stone Bridge Rd 3/5/10 Or More | Operations | Distribution Line Reliability | 646-CD01688 CD01691 | NBC Tap Rebuild Farmington 1C19 | Operations | Distribution Line Reliability | 647-CD01691 CD01693 | Relocate 36F5 Auto-Transformers D | Operations | Peak Load/Capacity | 648-CD01693 CD01694 | Repl Sw 630 Rex Forge Southington | Operations | Network Reliability | 649-CD01694 CD01697 | Beacon Falls 11N83 and 11N84 Reliab | Operations | Distribution Line Reliability | 650-CD01697 CD01698 | Kingfisher Lane Backyard Feed | Operations | Distribution Line Reliability | 651-CD01698 CD01701 | ROW 039 Remediation | Operations | RIGHT OF WAY LINES | 652-CD01701 CD01702 | 21L1 Repl Ringer Spacer Cable | Operations | Distribution Line Reliability | 653-CD01702 CD01713 | CT Backbone Reliability | Operations | Distribution Line Reliability | 654-CD01713 CD01714 | New Service Gateway Moodus Outpost | Operations | New Customer | 655-CD01714 CD01715 | Richter Dr DB Cable Replacement | Operations | URD/DB Cable Reliability | 656-CD01715 CD01724 | Farmington 1C Offload Newington 4A | Operations | Peak Load/Capacity | 657-CD01724 CD01730 | Ringed Portions of Norwalk 9S43 | Operations | Distribution Line Reliability | 658-CD01730 CD01735 | Pompey Hollow DB Rebuild | Operations | Distribution Line Reliability | 659-CD01735
  9. Part 17 of 78

    CD01742 | 2N14 & 3B06 Pole Reloc (ROW 12&13) | Operations | RIGHT OF WAY LINES | 660-CD01742 CD01743 | DB Cable Repl Ledgewood Rd Canton | Operations | URD/DB Cable Reliability | 661-CD01743 * | CD01746 | Miller Road 3/5/10 or More | Operations | Distribution Line Reliability | 662-CD01746 CD01752 | 4R09 TDRP | Operations | Regulatory Commitments-Other | 663-CD01752 CD01753 | 2022/2023 ROW Priority 3 Poles | Operations | RIGHT OF WAY LINES | 664-CD01753 | 664-CD01753-SP01 CD01755 | Gales Ferry 11B New Switchgear | Operations | Peak Load/Capacity | 665-CD01755 | 665-CD01755-SP01 CD01756 | Sandy Lane Village DB Cable Replace | Operations | URD/DB Cable Reliability | 666-CD01756 CD01759 | Noera 13H93 PILC Cable Replacement | Operations | Network Reliability | 667-CD01759 CD01761 | New Service Murdock Ave | Operations | New Customer | 668-CD01761 CD01766 | 1K16 PILC Cable Replacement | Operations | Network Reliability | 669-CD01766 CD01770 | Rocky River 12Y8 2020 TDRP | Operations | Regulatory Commitments-Other | 670-CD01770 CD01774 | Viper Switch Installations | Operations | SMART SWITCHES PROGRAM | 671-CD01774 | 671-CD01774-SP01 | 671-CD01774-SP02 CD01776 | Indepence Solar- New Lond-Colcheste | Operations | New Customer | 672-CD01776 | 672-CD01776-SP01 CD01778 | Hollis Dr DB Replacement | Operations | URD/DB Cable Reliability | 673-CD01778 CD01780 | 24F1 Replace Ringed Spacer Cable | Operations | Distribution Line Reliability | 674-CD01780 CD01781 | 5R4 Install New SR and MR | Operations | Distribution Line Reliability | 675-CD01781 CD01783 | 1K14 PILC Cable Replacement | Operations | Network Reliability | 676-CD01783 CD01788 | Rob Rider Road DB Replacement 12N14 | Operations | URD/DB Cable Reliability | 677-CD01788 CD01789 | CT Lateral Reliability - 2021 | Operations | Distribution Line Reliability | 678-CD01789 CD01794 | 22N7/12N15 Contingency Overload | Operations | Peak Load/Capacity | 679-CD01794 CD01796 | Torrington/Falls Village Lateral Re | Operations | Distribution Line Reliability | 680-CD01796 CD01797 | 11S13 South St. Roxbury - Reliabili | Operations | Distribution Line Reliability | 681-CD01797 CD01801 | 7L85 Install RR and MR on East St | Operations | Distribution Line Reliability | 682-CD01801 CD01804 | Reliability MR Project 3A12 | Operations | Distribution Line Reliability | 683-CD01804 CD01805 | LOTCIP #L107-0001 / 26N2 Hawley Rd. | Operations | Line Relocations/Act of Public Authority | 684-CD01805 CD01810 | Vault#9 Prospect St, Ridgefield UCT | Operations | Network Reliability | 685-CD01810 CD01814 | Islanded 24R Wolcott-Alternate Srcs | Operations | Distribution Line Reliability | 686-CD01814 | 686-CD01814-SP01 CD01821 | Greenwich Ave Structural Upgrade | Operations | Network Reliability | 687-CD01821 | 687-CD01821-SP01 | 687-CD01821-SP02 CD01822 | School House Rd 16S Inst B/Up Steps | Operations | Distribution Line Reliability | 688-CD01822 CD01823 | Verogy, Thrall Rd, East Windsor | Operations | New Customer | 689-CD01823 | 689-CD01823-SP01 CD01835 | Winsted Equipmt Encl Replmt | Operations | Capital Tool Purchases/Other | 690-CD01835 CD01838 | 12J4-4101 Large Zone | Operations | SMART SWITCHES PROGRAM | 691-CD01838 CD01843 | 14K6 Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 692-CD01843 CD01846 | 2022 Osprey Outage Mitigation | Operations | Distribution Line Reliability | 693-CD01846 CD01850 | ROW 005 P3 Remediation | Operations | RIGHT OF WAY LINES | 694-CD01850 CD01858 | CD01858 Elmdale Road 3/5/10 or More | Operations | Distribution Line Reliability | 695-CD01858 CD01867 | 2024 ROW Priority 3 Poles | Operations | RIGHT OF WAY LINES | 696-CD01867 CS00002 | TRACY 14M - ADD 3RD XF & SWGR | Operations | Peak Load/Capacity | 697-CS00002 CS00028 | SS DC BATTERY VOLT MONITOR | Operations | Substation Reliability | 698-CS00028 CS00031 | GLSTNVRY - HOPEWELL 22R- Inst Disc | Operations | Substation Reliability | 699-CS00031
  10. Part 18 of 78

    CS00034 | MIDDLE RIVER 28M - REPLACE CULVERT | Operations | Substation Reliability | 700-CS00034 CS00050 | Annunciator replacement program | Operations | Substation Reliability | 701-CS00050 CS00053 | Plnfld Frybrook 13B - Add 13B8 Feed | Operations | Peak Load/Capacity | 702-CS00053 CS00061 | Scitico 27H - Install 3rd XF & PCE | Operations | Peak Load/Capacity | 703-CS00061 CS00063 | Farmington 1C - Bus Rehab | Operations | Substation Reliability | 704-CS00063 CS00075 | Bokum 15L - Repl 8 - 27.6 kV Brkrs | Operations | Environmental | 705-CS00075 CS00076 | Bokum 15L - Bus Rehab | Operations | Substation Reliability | 706-CS00076 CS00077 | Sys Resil - Ckt Bkr Auto 2016 - Pt | Operations | SS CIRCUIT BREAKER AUTOMATION | 707-CS00077 CS00078 | Farmington 1C - Replace 10 Oil Brea | Operations | Environmental | 708-CS00078 CS00079 | Sys Resil - Ckt Bkr Auto 2016 - Pt | Operations | SS CIRCUIT BREAKER AUTOMATION | 709-CS00079 CS00084 | Manchester 3A - Replace 3A-3X | Operations | Substation Reliability | 710-CS00084 CS00086 | Monroe - Stevenson 14A - Repl 2 OCB | Operations | Environmental | 711-CS00086 CS00089 | Monroe -Stevenson 14A - Bus Rehab | Operations | Substation Reliability | 712-CS00089 CS00090 | DSCADA LTC Controls | Operations | Substation Reliability | 713-CS00090 CS00094 | Dnlsn - Frybrook 13B - Repl 7 OCB's | Operations | Environmental | 714-CS00094 CS00095 | Dnlsn - Frybrook 13B - Bus Rehab | Operations | Substation Reliability | 715-CS00095 CS00097 | Enfield 12C - Replace OCB's | Operations | Environmental | 716-CS00097 CS00098 | Manchester SS PhysicalSecurity-2016 | Operations | SUBSTATION SECURITY | 717-CS00098 CS00099 | Shepaug 13A - OCB Replacement | Operations | Environmental | 718-CS00099 CS00103 | Bloomfield 3B - Replace 3B-2X | Operations | Substation Reliability | 719-CS00103 CS00104 | Bloomfield 3B - Repl high side MOD' | Operations | Substation Reliability | 720-CS00104 CS00107 | Air Circuit Breaker Replacements | Operations | Substation Reliability | 721-CS00107 CS00110 | Bokum 15L - 1X and 2X LTC mech rebu | Operations | Emergent Equipment Failures | 722-CS00110 CS00112 | Riverside 2R - Replace 3 OCB's | Operations | Environmental | 723-CS00112 CS00114 | Manchester 3A - OCB Replacement | Operations | Environmental | 724-CS00114 CS00115 | Newington 4A - Replace 4A-1X | Operations | Substation Reliability | 725-CS00115 CS00117 | Newington 4A - Replace 4A-3X | Operations | Substation Reliability | 726-CS00117 CS00124 | Portland 21H - OCB replacement | Operations | Environmental | 727-CS00124 CS00127 | Rocky Hill 3R - OCB Replacement | Operations | Environmental | 728-CS00127 CS00128 | Rocky Hill 3R - Bus Rehab | Operations | Substation Reliability | 729-CS00128 CS00137 | South Meadow 1A - Netw Monitoring S | Operations | Substation Reliability | 730-CS00137 CS00138 | Northwest Hart 2N - Netw Monitoring | Operations | Substation Reliability | 731-CS00138 CS00141 | Carmel Hill 11S - New Feeder | Operations | STRUCTURAL AND ELECTRICAL | 732-CS00141 CS00144 | Center 24F - Replace Disconnect Swi | Operations | Emergent Equipment Failures | 733-CS00144 CS00145 | Bloomfield 3B- Battery replacement | Operations | Substation Reliability | 734-CS00145 CS00146 | Establish New Circuit at South Mead | Operations | Peak Load/Capacity | 735-CS00146 CS00152 | S/S Recloser Auto - Torrington 2016 | Operations | Substation Reliability | 736-CS00152 CS00156 | Southington 4C-Barrier Protection | Operations | SUBSTATION SECURITY | 737-CS00156 CS00157 | Cos Cob 11R - Station Service Upgd | Operations | Substation Reliability | 738-CS00157 CS00159 | Bokum 15L - Replace LTC Controls | Operations | Emergent Equipment Failures | 739-CS00159 CS00160 | Freight 11W -Network Monitoring Sys | Operations | Substation Reliability | 740-CS00160 CS00161 | Blair 15M - Recloser Automation | Operations | RECLOSER CONTROL PROGRAM | 741-CS00161 CS00166 | Mansfield 12J Expansion | Operations | Peak Load/Capacity | 742-CS00166 | 742-CS00166-SP01

As listed on the current system