Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
Page 21 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 21 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DQ5W:SYSTEM REPAIRS/OBSOL DANIELSON DQOH2M:OH FAILED EQT CHESHIRE/NB ANNUAL DQOH3H:OH FAILED EQUIP HARTFORD AWC-ANNUAL DQOH4D:OH FAILD EQUIPMENT MADISON-ANNUAL DQOH4M:OH FAILD EQUIPMENT E HAMPTON-ANNUAL DQOH4N:OH FAILED EQUIPMENT NEW LONDON - AN DQOH5D:OH FAILED EQUIPMENT DANIELSON-ANNUA DQOH5T:OH FAILED EQUIPMENT TOLLAND ANNUAL FRDQOH:PROJECTION PROJECT - REPAIRS/OBS OH IFOH4D:OH INSPECTION FAILED EQUIPMENT MADI IFOH4M:OH INSPECTION FAILED EQUIPMENT E HA IFOH4N:OH INSPECTION FAILED EQUIPMENT NEW IFOH5D:OH INSPECTION FAILED EQUIPMENT DANI FAILED EQUIPMENT UG-DQ ANNUAL ARUG1B:UG PLANNED OBS ANNUAL NEWTOWN ARUG2M:UG PLANNED OBS ANNUAL CHES ARUG3H:UG PLANNED OBS ANNUAL HARTFORD ARUG4D:UG PLANNED OBS ANNUAL MADISON ARUG4M:UG PLANNED OBS. ANNUAL E Hampton ARUG4N:UG PLANNED OBS ANNUAL NEW LONDON ARUG5D:UG PLANNED OBS ANNUAL DANIELS DQUG2M:UG FAILED EQT CHES/NB ANNUAL DQUG3H:UG FAILED EQUIPMENT HARTFORD ANNUAL DQUG4N:UG FAILED EQUIPMENT NEW LONDON - AN DQUG5D:UG FAILED EQUIPMENT DANIELSON -ANNU Projected 2026 Project Long Description Capital Spend 43,025 SYSTEM REPAIRS/OBSOLETE EQUIPMENT DANIELSON 1,999,870 OVERHEAD FAILED EQUIPMENT CHESHIRE/NB ANNUAL 560,570 OVERHEAD EQUIPMENT FAILED HARTFORD AWC 321,834 OVERHEAD FAILED EQUIPMENT MADISON-ANNUAL 634,032 OVERHEAD FAILED EQUIPMENT EAST HAMPTON-ANNUAL 153,345 OVERHEAD FAILED EQUIPMENT NEW LONDON - ANNUAL 142,292 OVERHEAD FAILED EQUIPMENT DANIELSON-ANNUAL 681,774 OVERHEAD FAILED EQUIPMENT TOLLAND -ANNUAL (2,627,616) PROJECTION PROJECT - REPAIRS/OBSOLETE EQUIPENT OVERHEAD 4,338 OVERHEAD INSPECTION FAILED EQUIPMENT MADISON 8,515 OVERHEAD INSPECTION FAILED EQUIPMENT EAST HAMPTON 31,826 OVERHEAD INSPECTION FAILED EQUIPMENT NEW LONDO 36,124 OVERHEAD INSPECTION FAILED EQUIPMENTDANIELSON 5,711,648 30,142 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEWTOWN 788,059 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL CHESHIRE 1,951,372 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL HARTFORD 158,689 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL MADISON 217,246 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL EAST HAMPTON 265,304 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL NEW LONDON 9,496 UNDERGROUND PLANNED OBSOLETE EQUIPMENT ANNUAL DANIELSON 966,636 UNDERGROUND FAILED EQUIPMENT CHESHIRE/NB ANNUAL 1,305,587 UNDERGROUND FAILED EQUIPMENT HARTFORD ANNUAL 17,037 UNDERGROUND FAILED EQUIPMENT NEW LONDON - ANNUAL 2,080 UNDERGROUND FAILED EQUIPMENT DANIELSON -ANNUALPage 22 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 22 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Emergent Equipment Failures - Substation EMERGENT EQUIPMENT FAILURES - SUBSTATION-L4 CS00709:Enfield 12C Failed Transformer DSEQ26:2026 CT D SS Emergent Annual FREQPFSS:FORECAST PROJ FOR SS FAILED TRANSFO Environmental ENVIRONMENTAL - SUBSTATION CS00245:S Meadow 1A - Replace OCB's CS00422:NW Hartford Bus Rehab Rel. Ph2 FRENVISS:FORECAST PROJ FOR ENVIRON SS PCB TRANSFORMER REPLACEMENT PRGRM 102118:PCB TRANSFORMER REPL PROGRAM Projected 2026 Capital Spend 15,505,106 15,505,106 Project Long Description This project is for the emergent replacement of the 12C-2X transformer and associated equipment at 5,106 Enfield 12C Substation in Enfield, CT This annual is for the replacement or removal of broken or failed equipment not identified specifically during the budget cycle but are identified through monitoring the system throughout the 2,500,000 year. Work materializes due to inspections, system events, etc. 13,000,000 PROJECT FOR SUBSTATION FAILED EQUIPMENT 5,165,000 4,965,000 4,735,175 South Meadow 1A - Replace 38 Oil Circuit Breakers with vacuum breakers. This project is the second phase of bus rehabilitation at the Northwest Hartford 2N distribution 13 substation located in Hartford, CT to replace aging reactors and switches. 229,812 FORECAST PROJECT FOR SUBSTATION ENVIRONMENTAL PROJECTS 200,000 This program funds the replacement of transformers that have a high content of polychlorinated biphenyls (PCBs). PCBs are harmful to humans and the environment. If a transformer with PCBs leaks, or spills for any reason (car accident, etc) then the PCBs can enter the environment and cause damage. PCBs were used in transformers as an insulating means but have been phased out due to their health and environmental risks. This project pertains to high volume work orders not to exceed $500K and covers the entire state of CT. Capital work orders initiated against this annual project must include total costs less than or equal to $500K. Any work order exceeding $500K will require a 200,000 separate Project Authorization Form (PAF) and Delegation of Authority (DOA) approval.Page 23 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 23 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Insurance Claim/Keep Cost INSURANCE CLAIM/KEEP COST-L4 FRINS9A:PROJECTION PROJECT FOR 9A INSURANCE INSDB2M:DB INSURANCE CLAIM CHESHIRE/N.B. AN INSDB3H:DB INSURANCE CLAIM HARTFORD ANNUAL INSDB4D:DB INSURANCE CLAIM MADISON ANNUAL INSDB4M:DB INSURANCE CLAIM E HAMPTON ANNUA INSDB4N:DB INSURANCE CLAIM NEW LONDON ANNUA INSDB5D:DB INSURANCE CLAIM DANIELSON ANNUAL INSDB5W:DB INSURANCE CLAIM DANIELSON ANNU INSOH1B:OH INSURANCE CLAIM NEWTOWN-ANNUAL INSOH1N:OH INSURANCE CLAIM NORWALK-ANNUAL INSOH1S:OH INSURANCE CLAIM STAMFORD-ANNUAL INSOH2L:INS CLAIM TORR-ANNUAL INSOH2M:INS CLAIM CHES/NB-ANNUAL INSOH2W:INS CLAIMWTBY-ANNUAL INSOH3H:OH INSURANCE CLAIM HARTFORD ANNUAL INSOH4D:OH INSURANCE CLAIM MADISON - ANNUAL INSOH4M:OH INSURANCE CLAIM MIDDLETOWN - ANN INSOH4N:OH INSURANCE CLAIM NEW LONDON - ANN INSOH5D:OH INSURANCE CLAIM DANIELSON-ANNUAL INSOH5T:OH INSURANCE CLAIM TOLLAND ANNUAL INSOH5W:OH INSURANCE CLAIM DANIELSON-ANNU INSUG4D:UG INSURANCE CLAIM MADISON - ANNUAL INSUG4M:UG INSURANCE CLAIM E Hampton- ANN Projected 2026 Project Long Description Capital Spend 8,800,000 8,800,000 13,171 PROJECTION PROJECT FOR 9A INSURANCE CLAIMS 209,307 DIRECT BURIED INSURANCE CLAIM CHESHIRE/N.B. ANNUAL 209,307 DIRECT BURIED INSURANCE CLAIM HARTFORD ANNUAL 28,347 DIRECT BURIED INSURANCE CLAIM MADISON ANNUAL 21,827 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 76,038 DIRECT BURIEDINSURANCE CLAIM NEW LONDON ANNUAL 93,387 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 43,829 DIRECT BURIED INSURANCE CLAIM DANIELSON ANNUAL 1,101,714 DIRECT BURIED INSURANCE CLAIM NEWTOWN ANNUAL 604,363 OVERHEAD INSURANCE CLAIM NORWALK-ANNUAL 659,167 OVERHEAD INSURANCE CLAIM STAMFORD-ANNUAL 802,664 OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL 840,393 OVERHEAD INSURANCE CLAIM CHESHIRE-ANNUAL 732,092 OVERHEAD INSURANCE CLAIM TORRINGTON-ANNUAL 840,393 OVERHEAD INSURANCE CLAIM HARTFORD-ANNUAL 390,285 OVERHEAD INSURANCE CLAIM MADISON - ANNUAL 368,935 OVERHEAD INSURANCE CLAIM MIDDLETOWN-ANNUAL 434,976 OVERHEAD INSURANCE CLAIM NEW LONDON-ANNUAL 327,522 OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL 988,697 OVERHEAD INSURANCE CLAIM TOLLAND-ANNUAL 2,180 OVERHEAD INSURANCE CLAIM DANIELSON-ANNUAL 2,159 UNDERGROUND INSURANCE CLAIM MADISON-ANNUAL 2,355 UNDERGROUND INSURANCE CLAIM EAST HAMPTON-ANNUALPage 24 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 24 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category INSUG4N:UG INSURANCE CLAIM NEW LONDON - ANN INSUG5D:UG INSURANCE CLAIM DANIELSON-ANNUAL Lighting NON ROADWAY LIGHTING - DA ANNUAL DA3L:NON-ROADWAY LIGHTING CT ROADWAY LIGHTING - D7 ANNUAL D73L:ROADAY LIGHTING CT FRD7:PROJECTION PROJECT D7 ROADWAY LIGHT Line Relocations/Act of Public Authority LINE RELOCATIONS-DH ANNUAL DH1B:LINE RELOCATIONS NEWTOWN DH1N:LINE RELOCATIONS NORWALK DH1S:LINE RELOCATIONS STAMFORD DH2L:LINE RELOCATIONS TORR CLP DH2M:LINE RELOCATIONS CHESHIRE/N.B. DH2W:LINE RELOCATIONS WATERBURY DH3H:LINE RELOCATIONS HARTFORD DH4D:LINE RELOCATIONS MADISON DH4M:LINE RELOCATIONS E Hampton DH4N:LINE RELOCATIONS N LONDON DH5D:LINE RELOCATIONS DANIELSON DH5T:LINE RELOCATIONS TOLLAND FRDH:PROJECTION PROJECT FOR DH ANNUAL LINE RELOCATIONS/ACT OF PUBLIC AUTHORITY-L4 Projected 2026 Project Long Description Capital Spend 4,710 UNDERGROUND INSURANCE CLAIM NEW LONDON-ANNUAL 2,182 UNDERGROUND INSURANCE CLAIM DANIELSON-ANNUAL 3,000,000 1,253,713 1,253,713 NON-ROADWAY LIGHTING REPAIRS 1,746,287 1,752,505 REPAIR ROADWAY LIGHTING (6,218) PROJECTION PROJECT D7 ROADWAY LIGHTING 20,400,211 3,800,000 318,346 LINE RELOCATIONS ANNUAL NEWTOWN 335,270 LINE RELOCATIONS ANNUAL NORWALK 692,254 LINE RELOCATIONS ANNUAL STAMFORD 227,529 LINE RELOCATIONS ANNUAL TORRINGTON 382,292 LINE RELOCATIONS ANNUAL CHESHIRE/NEW BRITAIN 326,601 LINE RELOCATIONS ANNUAL WATERBURY 382,292 LINE RELOCATIONS ANNUAL HARTFORD 246,405 LINE RELOCATIONS ANNUAL MADISON 218,058 LINE RELOCATIONS ANNUAL EAST HAMPTON 150,408 LINE RELOCATIONS ANNUAL NEW LONDON 185,129 LINE RELOCATIONS ANNUAL DANIELSON 359,804 LINE RELOCATIONS ANNUAL TOLLAND (24,388) PROJECTION PROJECT FOR LINE RELOCATIONS 6,000,000Page 25 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 25 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01603:CDOT 80-128 I-84 Ex17 Line Relocati CD02453:Replace Center St Bridge, Meriden CD02495:CDOT #320-008 Windsor Locks RR CD02503:Chestnut Hill Rd Reconstruction Projected 2026 Capital Spend Project Long Description This project is being established to cover the costs associated with relocation of electric facilities in conflict with state highway project 80-128 in the town of Middlebury, CT. The scope includes relocation of the Bunker Hill 12B33 backbone with 3,125’ of 3 phase 556 TW, to be routed onto a new road, Chase Parkway Extension, to be built as part of the state highway project. The project 490,800 also includes several small laterals with 1 # 1/0 TW totaling 1,600’. This project is a line relocation for a bridge replacement on Center St, Meriden and to replace the 480,002 PMH5 pair maual switch gear with an ISG auto pair. This project is for the relocation of electrical facilities along Main St in Windsor Locks to the opposite side of Rt 159 to accommodate for the expansion of the railroad facilities along the state road. The railroad is adding another track in its ROW and has requested Eversource to relocate its facilities to the opposite side of the road to allow for adequate clearances from the railroad facilities. Eversource will relocate the 14K6 circuit from the east side of Rt 159 to the west side of the road by rebuilding approximately 3,600 ft of circuit backbone with 477 TW. One manhole outside of Windsor locks 14K substation will need to be relocated due to the proximity with the proposed 1,162,000 railroad track. This will affect the 14K6 and 14K9 getaway cables and associated riser poles. The town of Oxford is realigning Chestnut Tree Hill Road both horizontally and vertically with a full depth reconstruction with an average depth of 20” within the roadway area and additional excavation along the shoulder area for approximately 1.5 miles from the intersection of Chestnut Tree Hill Road Ext to Route 67. Due to road widening, a double circuit pole line, the 11N85 and 1,000,000 11N88 out of Beacon Falls 11N Substation, will need to be relocated along the affected roadway.Page 26 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 26 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02650:CTDOT 34-324 FRSPRELC:FORECAST PROJECTS FOR SPEC PROJ REL THIRD PARTY ATTACHMENTS 495802:Third Party Attachment Make Ready Meters - Electric METERS - ELECTRIC-L4 CTMTR26:CT Annual Meter Project for 2026 Pre-Cap Line Transformers PRE-CAP LINE TRANSFORMERS-L4 DT7C:TRANSFORMERS CL&P New Customer-ED Customer Driven COMPLEX SERVICE-DN ANNUAL DN1B:NEW/EXISTING CUSTMRS NEWTOWN DN1N:NEW/EXISTING CUSTMRS NORWALK DN1S:NEW/EXISTING CUSTMRS STAMFORD Projected 2026 Capital Spend Project Long Description Project CD02650 was established to address the relocation request of Eversource underground (UG) and overhead (OH) facilities by the city of Danbury. This CTDOT project involves improving traffic conditions on the roadway as well as upgrading the stormwater drainage system along Lee Mac Ave, Shelter Rock Rd, South St, and Coalpit Hill Rd. The following Triangle 11A circuits will have 616,994 sections relocated in order to accomplish this request: 11A50, 11A54, 11A71, and 11A77. 2,250,204 FORECAST PROJECT FOR SPECIFIC PROJECTS FOR RELOCATION 10,600,211 THIS PROJECT TRACKS THE MAKE READY COSTS FOR THE FIBERTECH COMPANIES 10,600,211 TO ATTACH THEIR CABLE TO OUR POLES. 20,478,267 20,478,267 This project is for the purchase of electric meters in Connecticut for 2026. The overall meter capital 20,478,267 program is designed to provide accurate, reliabile, and cost effective metering plant operation. 47,000,000 47,000,000 47,000,000 This project is for the purchase and capitalization of distribution transformers. 73,000,000 71,989,198 44,378,752 6,401,634 NEW/EXISTING CUSTOMERS ANNUAL NEWTOWN 3,815,015 NEW/EXISTING CUSTOMERS ANNUAL NORWALK 4,440,949 NEW/EXISTING CUSTOMERS ANNUAL STAMFORDPage 27 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 27 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DN2L:NEW/EXISTING CUSTMRS TORR CLP DN2M:NEW/EXISTING CUSTMRS CHESHIRE/N.B. DN2W:NEW/EXISTING CUSTMRS WATERBURY DN3H:NEW/EXISTING CUSTMRS HARTFORD DN4D:NEW/EXISTING CUSTMRS MADISON DN4M:NEW/EXISTING CUSTMRS E HAMPTON DN4N:NEW/EXISTING CUSTMRS N LONDON DN5D:NEW/EXISTING CUSTMRS DANIELSON DN5T:NEW/EXISTING CUSTMRS TOLLAND DN5W:NEW/EXISTING CUSTMRS DANIELSON FRDN:Forecast Project Complex Services CUSTOMER DRIVEN-L4 PT4D:TEMPORARY WORK - MADISON PT4M:TEMPORARY WORK - E HAMPTON (HELCO) PT4N:TEMPORARY WORK - NEW LONDON (HELCO) PT5D:TEMPORARY WORK - DANIELSON PT5W:TEMPORARY WORK - DANIELSON PW2M:PRIVATE WORK - CHESHIRE Projected 2026 Project Long Description Capital Spend 2,831,346 NEW/EXISTING CUSTOMERS ANNUAL TORRINGTON 4,566,196 NEW/EXISTING CUSTOMERS ANNUAL CHESHIRE/NEW BRITAIN 1,911,057 NEW/EXISTING CUSTOMERS ANNUAL WATERBURY 4,566,196 NEW/EXISTING CUSTOMERS ANNUAL HARTFORD 2,616,699 NEW/EXISTING CUSTOMERS ANNUAL MADISON 2,835,476 NEW/EXISTING CUSTOMERS ANNUAL EAST HAMPTON 3,355,918 NEW/EXISTING CUSTOMERS ANNUAL NEW LONDON 2,573,088 NEW/EXISTING CUSTOMERS ANNUAL DANIELSON 4,297,596 NEW/EXISTING CUSTOMERS ANNUAL TOLLAND 174,665 NEW/EXISTING CUSTOMERS ANNUAL DANIELSON (7,082) NEW/EXISTING CUSTOMERS ANNUAL 1,330,858 ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES MADISON 98,126 ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 43,611 DISTRIBUTION FACILITIES EAST HAMPTON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 133,452 DISTRIBUTION FACILITIES NEW LONDON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 65,417 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 37,068 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 223,336 CHESHIREPage 28 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 28 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category PW3H:PRIVATE WORK - HARTFORD PW4D:PRIVATE WORK - MADISON PW4M:PRIVATE WORK - MIDDLETOWN (HELCO) PW4N:PRIVATE WORK - NEW LONDON (HELCO) PW5D:PRIVATE WORK - DANIELSON PW5T:PRIVATE WORK - TOLLAND SIMPLE SERVICE-DV ANNUAL DV2M:SERVICES CHESHIRE/N.B. DV3H:SERVICES HARTFORD DV4M:SERVICES MIDDLETOWN DV4N:SERVICES NEW LONDON DV5T:SERVICES TOLLAND DV5W:SERVICES DANIELSON SPECIFIC PROJECTS-NEW SRVCE Projected 2026 Capital Spend Project Long Description ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 223,336 HARTFORD ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 120,130 MADISON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 37,068 MIDDLETOWN ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES NEW 39,249 LONDON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 136,359 DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 173,706 TOLLAND 2,290,390 582,686 SIMPLE SERVICES ANNUAL CHESHIRE/NEW BRITAIN 291,343 SIMPLE SERVICES ANNUAL HARTFORD 386,582 SIMPLE SERVICES ANNUAL MIDDLETOWN 409,079 SIMPLE SERVICES ANNUAL NEW LONDON 582,686 SIMPLE SERVICES ANNUAL TOLLAND 38,014 SIMPLE SERVICES ANNUAL DANIELSON 23,989,199Page 29 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 29 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00454:Hartford Hospital - Construct New S Projected 2026 Capital Spend Project Long Description The main campus at Hartford Hospital is supplied by a customer owned substation (Substation 1) located on Retreat Avenue near the intersection of Maple Avenue. The substation is located inside a two-story brick building. The top floor of the building contains Eversource equipment consisting of two 23 KV primary feeders (109, 151), two ceiling mounted disconnect switches, and two 23 KV 11 KV, 10/12.5 MVA auto transformers. The first floor of the building contains Hartford Hospital equipment consisting of double-ended 11 KV bus with a normally closed bus tie breaker (such that the 109 and 151 feeders operate in parallel). Other buildings throughout the main campus are supplied by the Hartford Hospital 11 KV distribution feeders. Two of these feeders are stepped down to 4.16 KV to supply a Co-generation facility on campus. Campus peak demand is estimated at 11 MVA and co-gen capability is estimated at 8 MVA.Hartford Hospital is proposing to construct a new Substation 1. Previously, the plan was to demolish the existing Hall Wilson Lab building located adjacent to the existing substation and construct a new substation on the vacated site. However, the Hartford City Government prevented the demolition of that building forcing a redesign of the upgrade in 2021. Hartford Hospital plans to replace the two existing 10/12.5 MVA auto transformers with two 15 MVA auto transformers to support future load growth on campus. The land in front of the utility building where the new transformers will be located will be the future site of both Hartford Hospital’s and Eversource’s switch gear and metering. This project proposes to install ISG switchgear and primary metering cabinets to supply the new substation, and to remove all Eversource owned equipment (feeder cables, switches, and transformers) associated with the 91,500 existing substation.Page 30 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 30 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD00818:Relocate Meriden Record Journal Sw. Meriden is redeveloping the Meriden Record Journal site to a mixed use of commercial/retail/residential. As part of the redevelopment, the customer has requested that the existing 315D PMH-5 automatic switchgear pair be relocated. As part of the relocation, Eversource will upgrade the switchgear to an ISG 4-way auto pair to provide service to the new development 486,900 and allow for additional underground loops to supply future development in the area. CD00992:New Road in Bristol, Relocate and S The project relocates the four circuits in the duct bank located on private property to the proposed new underground structures on the new road and in the underground structures on Riverside Avenue. We are requesting the City to install 12-conduit duct bank structure in the new road. With this number of conduits, Eversource can supply the new customer load and relocate two of the four circuits out of the private property duct bank. These same circuits would supply the proposed 353,072 switchgear, which will supply the new customers off the new road. CD01506:New Service – 210 Long Ridge Rd 111 A customer will be constructing a new development at 210 Long Ridge Rd in Stamford, CT. The project will consist of a 4-story assisted living facility with 200 individual residential units and a partial garage on the lower level. To serve this load, the customer has requested 4 separate 3000 Amp services at 120/208V. This project will provide electrical service to the new customer by using 418,000 a set of PME-9/12 switchgears fed from the Cedar Heights 4R17 and 4R14 circuits. CD01591:Corbin Drive - Darien - New Service This project is upgrading the 13S5 feeder in Darien and providing service to a new development that is being constructed in the first zone of the feeder. The circuit upgrade is necessary because the added load will cause an overload on the feeder. The new service project consists of 10 3-story and 1 5-story mixed-use buildings and 3 basement level garages. There will be a combination of office, restaurant, and retail spaces on the ground floor and apartments on the 2nd and 3rd floors. One building will consist of 4 townhouses only. The new service will be developed in two phases. Phase 1 will include 3 buildings and Phase 2 will include 7 buildings. Service will be provided using riser 484,800 to pad scheme.
As listed on the current system
Supplement for New App [Filed: 11/18/2026]