  1. Page 24 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 24 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category INSUG4N:UG INSURANCE CLAIM NEW LONDON - ANN INSUG5D:UG INSURANCE CLAIM DANIELSON-ANNUAL Lighting NON ROADWAY LIGHTING - DA ANNUAL DA3L:NON-ROADWAY LIGHTING CT ROADWAY LIGHTING - D7 ANNUAL D73L:ROADAY LIGHTING CT FRD7:PROJECTION PROJECT D7 ROADWAY LIGHT Line Relocations/Act of Public Authority LINE RELOCATIONS-DH ANNUAL DH1B:LINE RELOCATIONS NEWTOWN DH1N:LINE RELOCATIONS NORWALK DH1S:LINE RELOCATIONS STAMFORD DH2L:LINE RELOCATIONS TORR CLP DH2M:LINE RELOCATIONS CHESHIRE/N.B. DH2W:LINE RELOCATIONS WATERBURY DH3H:LINE RELOCATIONS HARTFORD DH4D:LINE RELOCATIONS MADISON DH4M:LINE RELOCATIONS E Hampton DH4N:LINE RELOCATIONS N LONDON DH5D:LINE RELOCATIONS DANIELSON DH5T:LINE RELOCATIONS TOLLAND FRDH:PROJECTION PROJECT FOR DH ANNUAL LINE RELOCATIONS/ACT OF PUBLIC AUTHORITY-L4 Projected 2026 Project Long Description Capital Spend 4,710 UNDERGROUND INSURANCE CLAIM NEW LONDON-ANNUAL 2,182 UNDERGROUND INSURANCE CLAIM DANIELSON-ANNUAL 3,000,000 1,253,713 1,253,713 NON-ROADWAY LIGHTING REPAIRS 1,746,287 1,752,505 REPAIR ROADWAY LIGHTING (6,218) PROJECTION PROJECT D7 ROADWAY LIGHTING 20,400,211 3,800,000 318,346 LINE RELOCATIONS ANNUAL NEWTOWN 335,270 LINE RELOCATIONS ANNUAL NORWALK 692,254 LINE RELOCATIONS ANNUAL STAMFORD 227,529 LINE RELOCATIONS ANNUAL TORRINGTON 382,292 LINE RELOCATIONS ANNUAL CHESHIRE/NEW BRITAIN 326,601 LINE RELOCATIONS ANNUAL WATERBURY 382,292 LINE RELOCATIONS ANNUAL HARTFORD 246,405 LINE RELOCATIONS ANNUAL MADISON 218,058 LINE RELOCATIONS ANNUAL EAST HAMPTON 150,408 LINE RELOCATIONS ANNUAL NEW LONDON 185,129 LINE RELOCATIONS ANNUAL DANIELSON 359,804 LINE RELOCATIONS ANNUAL TOLLAND (24,388) PROJECTION PROJECT FOR LINE RELOCATIONS 6,000,000
  2. Page 25 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 25 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01603:CDOT 80-128 I-84 Ex17 Line Relocati CD02453:Replace Center St Bridge, Meriden CD02495:CDOT #320-008 Windsor Locks RR CD02503:Chestnut Hill Rd Reconstruction Projected 2026 Capital Spend Project Long Description This project is being established to cover the costs associated with relocation of electric facilities in conflict with state highway project 80-128 in the town of Middlebury, CT. The scope includes relocation of the Bunker Hill 12B33 backbone with 3,125’ of 3 phase 556 TW, to be routed onto a new road, Chase Parkway Extension, to be built as part of the state highway project. The project 490,800 also includes several small laterals with 1 # 1/0 TW totaling 1,600’. This project is a line relocation for a bridge replacement on Center St, Meriden and to replace the 480,002 PMH5 pair maual switch gear with an ISG auto pair. This project is for the relocation of electrical facilities along Main St in Windsor Locks to the opposite side of Rt 159 to accommodate for the expansion of the railroad facilities along the state road. The railroad is adding another track in its ROW and has requested Eversource to relocate its facilities to the opposite side of the road to allow for adequate clearances from the railroad facilities. Eversource will relocate the 14K6 circuit from the east side of Rt 159 to the west side of the road by rebuilding approximately 3,600 ft of circuit backbone with 477 TW. One manhole outside of Windsor locks 14K substation will need to be relocated due to the proximity with the proposed 1,162,000 railroad track. This will affect the 14K6 and 14K9 getaway cables and associated riser poles. The town of Oxford is realigning Chestnut Tree Hill Road both horizontally and vertically with a full depth reconstruction with an average depth of 20” within the roadway area and additional excavation along the shoulder area for approximately 1.5 miles from the intersection of Chestnut Tree Hill Road Ext to Route 67. Due to road widening, a double circuit pole line, the 11N85 and 1,000,000 11N88 out of Beacon Falls 11N Substation, will need to be relocated along the affected roadway.
  3. Page 26 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 26 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02650:CTDOT 34-324 FRSPRELC:FORECAST PROJECTS FOR SPEC PROJ REL THIRD PARTY ATTACHMENTS 495802:Third Party Attachment Make Ready Meters - Electric METERS - ELECTRIC-L4 CTMTR26:CT Annual Meter Project for 2026 Pre-Cap Line Transformers PRE-CAP LINE TRANSFORMERS-L4 DT7C:TRANSFORMERS CL&P New Customer-ED Customer Driven COMPLEX SERVICE-DN ANNUAL DN1B:NEW/EXISTING CUSTMRS NEWTOWN DN1N:NEW/EXISTING CUSTMRS NORWALK DN1S:NEW/EXISTING CUSTMRS STAMFORD Projected 2026 Capital Spend Project Long Description Project CD02650 was established to address the relocation request of Eversource underground (UG) and overhead (OH) facilities by the city of Danbury. This CTDOT project involves improving traffic conditions on the roadway as well as upgrading the stormwater drainage system along Lee Mac Ave, Shelter Rock Rd, South St, and Coalpit Hill Rd. The following Triangle 11A circuits will have 616,994 sections relocated in order to accomplish this request: 11A50, 11A54, 11A71, and 11A77. 2,250,204 FORECAST PROJECT FOR SPECIFIC PROJECTS FOR RELOCATION 10,600,211 THIS PROJECT TRACKS THE MAKE READY COSTS FOR THE FIBERTECH COMPANIES 10,600,211 TO ATTACH THEIR CABLE TO OUR POLES. 20,478,267 20,478,267 This project is for the purchase of electric meters in Connecticut for 2026. The overall meter capital 20,478,267 program is designed to provide accurate, reliabile, and cost effective metering plant operation. 47,000,000 47,000,000 47,000,000 This project is for the purchase and capitalization of distribution transformers. 73,000,000 71,989,198 44,378,752 6,401,634 NEW/EXISTING CUSTOMERS ANNUAL NEWTOWN 3,815,015 NEW/EXISTING CUSTOMERS ANNUAL NORWALK 4,440,949 NEW/EXISTING CUSTOMERS ANNUAL STAMFORD
  4. Page 27 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 27 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DN2L:NEW/EXISTING CUSTMRS TORR CLP DN2M:NEW/EXISTING CUSTMRS CHESHIRE/N.B. DN2W:NEW/EXISTING CUSTMRS WATERBURY DN3H:NEW/EXISTING CUSTMRS HARTFORD DN4D:NEW/EXISTING CUSTMRS MADISON DN4M:NEW/EXISTING CUSTMRS E HAMPTON DN4N:NEW/EXISTING CUSTMRS N LONDON DN5D:NEW/EXISTING CUSTMRS DANIELSON DN5T:NEW/EXISTING CUSTMRS TOLLAND DN5W:NEW/EXISTING CUSTMRS DANIELSON FRDN:Forecast Project Complex Services CUSTOMER DRIVEN-L4 PT4D:TEMPORARY WORK - MADISON PT4M:TEMPORARY WORK - E HAMPTON (HELCO) PT4N:TEMPORARY WORK - NEW LONDON (HELCO) PT5D:TEMPORARY WORK - DANIELSON PT5W:TEMPORARY WORK - DANIELSON PW2M:PRIVATE WORK - CHESHIRE Projected 2026 Project Long Description Capital Spend 2,831,346 NEW/EXISTING CUSTOMERS ANNUAL TORRINGTON 4,566,196 NEW/EXISTING CUSTOMERS ANNUAL CHESHIRE/NEW BRITAIN 1,911,057 NEW/EXISTING CUSTOMERS ANNUAL WATERBURY 4,566,196 NEW/EXISTING CUSTOMERS ANNUAL HARTFORD 2,616,699 NEW/EXISTING CUSTOMERS ANNUAL MADISON 2,835,476 NEW/EXISTING CUSTOMERS ANNUAL EAST HAMPTON 3,355,918 NEW/EXISTING CUSTOMERS ANNUAL NEW LONDON 2,573,088 NEW/EXISTING CUSTOMERS ANNUAL DANIELSON 4,297,596 NEW/EXISTING CUSTOMERS ANNUAL TOLLAND 174,665 NEW/EXISTING CUSTOMERS ANNUAL DANIELSON (7,082) NEW/EXISTING CUSTOMERS ANNUAL 1,330,858 ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY DISTRIBUTION FACILITIES MADISON 98,126 ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 43,611 DISTRIBUTION FACILITIES EAST HAMPTON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 133,452 DISTRIBUTION FACILITIES NEW LONDON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 65,417 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR THE INSTALLATION AND REMOVAL OF TEMPORARY 37,068 DISTRIBUTION FACILITIES DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 223,336 CHESHIRE
  5. Page 28 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 28 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category PW3H:PRIVATE WORK - HARTFORD PW4D:PRIVATE WORK - MADISON PW4M:PRIVATE WORK - MIDDLETOWN (HELCO) PW4N:PRIVATE WORK - NEW LONDON (HELCO) PW5D:PRIVATE WORK - DANIELSON PW5T:PRIVATE WORK - TOLLAND SIMPLE SERVICE-DV ANNUAL DV2M:SERVICES CHESHIRE/N.B. DV3H:SERVICES HARTFORD DV4M:SERVICES MIDDLETOWN DV4N:SERVICES NEW LONDON DV5T:SERVICES TOLLAND DV5W:SERVICES DANIELSON SPECIFIC PROJECTS-NEW SRVCE Projected 2026 Capital Spend Project Long Description ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 223,336 HARTFORD ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 120,130 MADISON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 37,068 MIDDLETOWN ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES NEW 39,249 LONDON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 136,359 DANIELSON ANNUAL PROJECT FOR WORK PERFORMED ON NON-EVERSOURCE FACILITIES 173,706 TOLLAND 2,290,390 582,686 SIMPLE SERVICES ANNUAL CHESHIRE/NEW BRITAIN 291,343 SIMPLE SERVICES ANNUAL HARTFORD 386,582 SIMPLE SERVICES ANNUAL MIDDLETOWN 409,079 SIMPLE SERVICES ANNUAL NEW LONDON 582,686 SIMPLE SERVICES ANNUAL TOLLAND 38,014 SIMPLE SERVICES ANNUAL DANIELSON 23,989,199
  6. Page 29 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 29 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00454:Hartford Hospital - Construct New S Projected 2026 Capital Spend Project Long Description The main campus at Hartford Hospital is supplied by a customer owned substation (Substation 1) located on Retreat Avenue near the intersection of Maple Avenue. The substation is located inside a two-story brick building. The top floor of the building contains Eversource equipment consisting of two 23 KV primary feeders (109, 151), two ceiling mounted disconnect switches, and two 23 KV 11 KV, 10/12.5 MVA auto transformers. The first floor of the building contains Hartford Hospital equipment consisting of double-ended 11 KV bus with a normally closed bus tie breaker (such that the 109 and 151 feeders operate in parallel). Other buildings throughout the main campus are supplied by the Hartford Hospital 11 KV distribution feeders. Two of these feeders are stepped down to 4.16 KV to supply a Co-generation facility on campus. Campus peak demand is estimated at 11 MVA and co-gen capability is estimated at 8 MVA.Hartford Hospital is proposing to construct a new Substation 1. Previously, the plan was to demolish the existing Hall Wilson Lab building located adjacent to the existing substation and construct a new substation on the vacated site. However, the Hartford City Government prevented the demolition of that building forcing a redesign of the upgrade in 2021. Hartford Hospital plans to replace the two existing 10/12.5 MVA auto transformers with two 15 MVA auto transformers to support future load growth on campus. The land in front of the utility building where the new transformers will be located will be the future site of both Hartford Hospital’s and Eversource’s switch gear and metering. This project proposes to install ISG switchgear and primary metering cabinets to supply the new substation, and to remove all Eversource owned equipment (feeder cables, switches, and transformers) associated with the 91,500 existing substation.
  7. Page 30 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 30 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD00818:Relocate Meriden Record Journal Sw. Meriden is redeveloping the Meriden Record Journal site to a mixed use of commercial/retail/residential. As part of the redevelopment, the customer has requested that the existing 315D PMH-5 automatic switchgear pair be relocated. As part of the relocation, Eversource will upgrade the switchgear to an ISG 4-way auto pair to provide service to the new development 486,900 and allow for additional underground loops to supply future development in the area. CD00992:New Road in Bristol, Relocate and S The project relocates the four circuits in the duct bank located on private property to the proposed new underground structures on the new road and in the underground structures on Riverside Avenue. We are requesting the City to install 12-conduit duct bank structure in the new road. With this number of conduits, Eversource can supply the new customer load and relocate two of the four circuits out of the private property duct bank. These same circuits would supply the proposed 353,072 switchgear, which will supply the new customers off the new road. CD01506:New Service – 210 Long Ridge Rd 111 A customer will be constructing a new development at 210 Long Ridge Rd in Stamford, CT. The project will consist of a 4-story assisted living facility with 200 individual residential units and a partial garage on the lower level. To serve this load, the customer has requested 4 separate 3000 Amp services at 120/208V. This project will provide electrical service to the new customer by using 418,000 a set of PME-9/12 switchgears fed from the Cedar Heights 4R17 and 4R14 circuits. CD01591:Corbin Drive - Darien - New Service This project is upgrading the 13S5 feeder in Darien and providing service to a new development that is being constructed in the first zone of the feeder. The circuit upgrade is necessary because the added load will cause an overload on the feeder. The new service project consists of 10 3-story and 1 5-story mixed-use buildings and 3 basement level garages. There will be a combination of office, restaurant, and retail spaces on the ground floor and apartments on the 2nd and 3rd floors. One building will consist of 4 townhouses only. The new service will be developed in two phases. Phase 1 will include 3 buildings and Phase 2 will include 7 buildings. Service will be provided using riser 484,800 to pad scheme.
  8. Page 31 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 31 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01935:Hiawatha Village Westport CD02065:100 Clinton Ave - New Services CD02265:Brainerd Place New Service CD02339:CT Transit-26 Elm Ct-New Service CD02346:35 Bacon Rd, Enfield NS Projected 2026 Capital Spend Project Long Description Hiawatha Lane in Westport CT is a residential area that houses approximately 10 customers. However, beyond this road is a residential complex (Avalon) that has more than 265 residents, also the former Cervalis property. These properties are served by Eversource from the Compo 23K17 feeder and the Norwalk 9S26 feeder.The purpose of this project is to accommodate a new 150-unit 75,000 luxury housing complex that will eliminate the existing 10 houses currently on Hiawatha Lane. 100 Clinton Ave is a new residential development in Stamford, Ct. The new development consists of 2 buildings – Block A and Block B. There will have in total of 471 residential apartments, EV charging stations and parking facilities. The estimated new load is 1.8 MW. Eversource may need to 247,100 upgrade its facilities to serve the customer. Brainerd Place is a new commercial/ residential development in Portland, CT. It is located at the corner of Main Street and Marlborough Road in Portland. The new development will have 25 916,303 commercial areas and 362 residential apartments. The expected new load is 3.8 MW. Eversource is required to provide service to customers in its territory upon request. Based on a new load request of 6.5 MVA from CT Transit for EV bus charging stations, Eversource may need to 234,500 upgrade its facilities to serve the customer. Project CD02346 – 35 Bacon Rd, Enfield New Service was established to cover the costs associated with supplying a new service to the customer. A new 820,000 ft warehouse is being constructed at 35 Bacon Rd, Enfield. The facility will be primary metered and placed in an existing radial primary feed. An additional riser will be constructed beyond the primary meter to create a looped supply. An estimated 4,700 ft of 4/0 Al cable to be installed by Eversource after the customer constructs the infrastructure. Work will consist of installing primary cable and a new loop supplying the new 452,900 primary meter connected to the 2 existing transformers.
  9. Page 32 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 32 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02383:7A79 – Newfield Street – New Servic CD02423:XL Center Service Upgrade Projected 2026 Capital Spend Project Long Description Newfield Street is a new residential development in Middletown, CT. It is located on Newfield Street, across from Congdon Street in Middletown. The new development will have 488 residential 224,349 apartments. The expected new load is 1.7 MW. Project CD02423 – XL Center Service Upgrade – is established to provide additional power to this 1,216,410 existing customer. The new load is projected at 3MVA. A developer is rehabbing five existing mixed use buildings on Colony St, Meriden. The buildings will have apartments on upper floors and retail at street level. The buildings are currently fed by the N194 network in Meriden. CD02437:Colony St, Meriden Mixed Use Dev 190,001 CD02462:Tilcon NS on Black Rock 11H Sub CD02497:New Service Uline Plainfield CD02505:Tomasso Loon Lake Rd Plainville NS The buildings will be all electric for heating, cooling, water heating and cooking. Heating will be a combination of heat pumps and resistance elements. Tilcon at Loon Lake Road in Plainville is requesting a new 5 MVA service. They are requesting a 500,000 primary meter service with one connection point. Uline J6 is a new commercial warehouse building located on Plainfield Pike, Plainfield, CT. The current construction design has projected a new load of 2679kW, or 71 Amps, which will be added to circuits 13B10 and 13B21 out of Frybrook 13B substation. Without system upgrades, the existing 13B10 and 13B21 circuits in the area do not have the capacity to support this commercial 46,320 warehouse. Tomasso has purchased 95 areas off Look Lake Road in Plainville. Their plan is to install 30,000 approximately six buildings for a total estimated load of 21 MVA.
  10. Page 33 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 33 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend CD02522:6A3 New Load Berlin Tpke 30,000 CD02528:74 Broad St– New Service CD02572:Amazon Distribution Warehouse Wtbry CD02573:Refeed 490 Capital Ave, Hartford CD02614:1700 Asylum Ave Apts NS Project Long Description A large mixed use development is being built on the Berlin Tpke on the 6A3. Developer provided loads are as follows: club house (110 kVA), hotel or bank (230 kVA), retail (125 kVA), and five apartment buildings (591 kVA each). The total load is 3,420 kVA. The first phase includes the club house (110kVA) and two apartment buildings (591kVA each). A new customer will be constructing a new 8-story residential/commercial building at 74 Broad St, Stamford, CT. The building will consist of 280 residential apartment units. Spaces for parking garage, amenities, restaurant will be located throughout the footprint of the building. The total area of the building is 435,269 sf.To serve the building load the customer is requesting a total of (4) 3,000A 120/208V residential services for the base building loads and commercial spaces. The customer’s load letter estimates their demand to be 3.3 MVA.Eversource is required to provide service to customers in its territory upon request and may need to upgrade/extend its facilities to 30,000 serve the customer. This project is being established to cover the costs associated with providing service to the new proposed Amazon Distribution Warehouse which will be located in the city of Waterbury. The 13,468,300 preliminary anticipated load is estimated to be about 9.6 MW. Project CD02573 is established to provide a new Distribution service to the customer, Capital District Energy Commission (CDEC). Currently, CDEC is connected to the Transmission System, but Eversource Transmission project 144531 removes the supply to the customer with a completion 765,700 date of Q4 2026. This project will determine the distribution design for supplying this customer. Project CD02614 – 1700 Asylum Ave Apartments - is established to provide power to a new 723,001 customer. This customer has a projected load of 3.76MVA.