  1. Page 34 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 34 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02648:1679 King St, Enfield NS CD02667:Nordic Spa Portland CT CD02682:11H77 Contingency Overload NS CD02721:25 Holy Dr, Newington NS CD02747:1499 Silas Deane Hwy, Rocky Hill NS CD02755:Install New Service & Repl. Swgr FRNEWSVC:FORECAST PROJECT FOR NEW SERVICE Distributed Generation Projected 2026 Capital Spend Project Long Description This project is being established account for the costs associated with a new service. A 420,000 ft2 warehouse is being constructed at 1679 King St, Enfield with cold storage, automation, and robotics for an estimated 8.6 MVA load. The existing electrical facilities along King St do not have the capacity to serve this size load. Also, due to the size of the projected load, 2 circuits will be required 4,257,501 to supply the facility. Project CD02667 was established to address a Nordic Spa new service coming on the 21H15 circuit 5,855,661 in Portland CT. The purpose of the project is to address the circuit overload which occurs during contingency with the 7L90 circuit in New Britain. The 11H77 circuit feeds 2,574 customers out of the Blackrock substation in New Britain. During contingency with the 7L90 circuit, the 11H77 circuit picks up the 7L90-72S Zone through the 7L90-92T. This brings the normal rating of the 11H77 circuit to 121% 167,500 and emergency rating to 87%. This project is for a 10 MVA new service. The site is currently supplied by the 4A1 circuit. The 10 MVA load will be supplied by switch gear, fed by the 4A1 and 4A11 from the Newington 4A 1,003,900 substation. Both circuits can now supply 5 MVA, but neither can back up the other in contingency. CD02747 is created to provide power to an Electric Vehicle (EV) charging station, at 1499 Silas Deane Hwy in Rocky Hill, CT on the 3R03 circuit. The 3R03 circuit does not have capacity to 123,000 support the requested 2,700 KVA load addition. Project CD02755 has been established to address new service to two rehabilitated office buildings in Norwalk. These offices 201 and 101 Merritt 7 will be converted to residential buildings consisting 30,000 of 150 units in each building for a total of 300 new residential customers. (8,432,519) FORECAST PROJECT FOR BUDGETING NEW SERVICE 1,010,802
  2. Page 35 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 35 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DISTRIBUTED GENERATION-L4 CD02167:Endurant, N.Colony Rd, Meriden Peak Load / Capacity-ED Distribution Line Capacity OVERLOADS-SPECIFIC PROJECTS Projected 2026 Capital Spend 1,010,802 Project Long Description This project was established for Endurant Meriden, which is in the Central Division, in the Cheshire AWC, in the town of Meriden.Endurant Meriden is proposing a 4.9 MW battery energy storage system (BESS) at 508A N Colony Road, Meriden CT which is currently fed from the Hanover St 12F44 feeder. This BESS will adhere to a charging schedule to prevent exceeding the thermal limits of any conductors on the Eversource distribution system. A distribution impact study determined that the proposed battery has no negative impact on voltage or thermal violations on the distribution 1,010,800 system if the battery adheres to the charge and discharge limits. 55,793,998 19,399,999 17,400,000
  3. Page 36 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 36 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01451:Ridgefield 22N Contingency Overload CD02381:Convert 15L46 to 23kV & getaway wor Projected 2026 Capital Spend Project Long Description This project has been established to address the contingency overloads on several circuits at the Ridgefield 22N S/S. This proposal involves the 22N2, 22N3, 22N4 & 22N5 circuits. Substation Project CS00637 was established to create two additional breaker positions at Ridgefield to help alleviate the current overloads at Ridgefield 22N.The 22N2 feeds 1679 customers in the Ridgefield area. The circuit has a peak load of 250A and a summer normal rating of 450A. The 22N2 exceeds it summer normal rating for a 22N A2 bus fault in which the 22N4 & 22N5 loses power and the 22N2 picks up some of their load. The 22N2-2 zone has 815 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3 feeds 1,992 customers in the Ridgefield/Wilton area. The circuit has a peak load of 422A and a summer normal rating of 490A. This puts the 22N3 at 86% of normal load. The 22N3 exceeds it summer normal rating for the contingent loss of the 22N4 or the 22N7. The 22N3-2 zone has 698 customers which exceeds Eversource’s 500 customer per zone planning criteria. The 22N3-91T loop scheme is currently disabled during summer peak periods to guard against overloading the circuit. The 22N4 feeds 1,900 customers in the Ridgefield area. The circuit is currently overloaded with a peak load of 378A and a summer normal rating of 423A. This puts the 22N4 at 89% of normal load and exceeds the 80% of UG summer normal criteria. Project CD01558 was created to resolve the UG issues for the 22N4 and 22N1. The portion of the project to replace 750 AL UG cable between MH#10 and riser pole# 550-23 was halted due to leaking transformers and deteriorated structure in Vault#9. Project CD01810 was created to replace the leaking transformers with a UTC, replace the deteriorated structure and replace the remaining 2,975,000 22N4 cable with 1000 CU. 1,349,946 Bokum 15L is being converted from 27.6kV to 23kv and adding more capacity.
  4. Page 37 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 37 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02440:14R31 ROW Rebuild Projected 2026 Capital Spend Project Long Description CD02440 seeks to address reliability issues and aging infrastructure on the 14R31 ROW near Goshen, CT. The 14R31 circuit is responsible for feeding the 33M1, 33M2, 37J1, & 42J1 circuits, which when combined, serve over 3,100 customers. The identified portion of the 14R31 ROW is comprised of roughly 39,000’ of 3-ph 1/0 ACSR conductor. The identified segment includes 152 poles with an average age of 45 years. The 14R31 ROW has experienced 4 reliability related outages in the last 4 years and has seen multiple instances where the segment of 1/0 ACSR was burnt down 8,862,010 due to overload under contingency.
  5. Page 38 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 38 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend CD02459:Bokum 15L12, 15L68, 15L69 23kv geta 45,644 Project Long Description Bokum 15L substation is going through an expansion to increase capacity. The station voltage is now 27.6 kV, and this project will convert the voltage to 23 kV. The two existing transformers, 15L1X and 15L-2X, will be replaced with 62.5 MVA transformers, a third 62.5 MVA transformer (15L3X) will be added to the bus. All 3 transformers will be 115 kV to 23 kV. The new 15L-3X transformer is on site as well as the 23 kV switchgear, the plan is to energize the new 15L- 3X transformer and build a new duct bank for the 15L12 and 15L68 across Bokum Road and connect the 15L12, 15L68, and 15L69 circuits to their new breaker positions. 15L12 currently comes out of the station at 27.6 kV and gets stepped down to 23 kV through two sets of 3,000 kVA poletop autos on Essex Road. The 15L12 out of the station will be converted to 23 kV and the two sets of 3,000 kVA autos will be removed. The existing getaway cable is 3-1/C 750 kcmil Cu cable in three 3-inch ducts. This cable will be replaced with 1000 kcmil Cu cable. The 15L68 is stepped down from 27.6 kV to 23 kV through a 29 MVA auto inside the station and bifurcates east and north. The 15L68 going east over the Connecticut River to the New London District will remain the 15L68. The 15L68 going north to Deep River will become the 15L69. There is no work required outside the fence on the 15L68 circuit other than replacing the parallel 500 kcmil Cu getaway cable going east with 1000 kcmil Cu. The Bokum 15L substation is in the Madison Area Work Center in the Eastern Region.
  6. Page 39 of 73Match

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 39 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD02470:28M1 Contingent Overload CD02470 seeks to address a contingent overload within the 28M1-2 zone when supporting the 11A53-70S zone. The 28M1 is fed out of Middle River 28M sub in Danbury CT. The 28M1-2 zone is comprised entirely of 336 AAC T.W. beginning at P#1172 and extends until the 28M1-50Z on P#372. The 336 AAC T.W. serves as the primary limiting factor with a normal limit of 460A and an emergency rating of 520A. Under contingency with the 28M1 picking up the 11A53-70S zone, the 152,900 28M1-2 reaches 104% of its normal limit. CD02473:11A55 Contingency Overload This project was created to address a contingency overload created on the 11A55 breaker zone when recovering the 11A51-70S zone. The 11A55 is fed out of the Triangle 11A substation in Danbury, CT. The existing limiting factor is the 500 CU PILC, from MH 2 to riser pole 8491 on Federal Rd, Danbury, CT. This project will investigate solutions to either redistribute load or increase the 230,800 existing load limit for this zone. CD02513:Uncasville 1Q01 Getaway Overload Pr CD02618:15L69 Contingency Overload FROVRLDS:FORECAST OVERLOADS BUDGET PROJECT VOLTAGE CORRECTION-DK ANNUAL DK1B:MAINTAIN VOLTAGE NEWTOWN The purpose of this project is to prevent a contingency overload on the Uncasville 1Q01 feeder. The contingency overload is caused by a 3.7 MVA load swap between the Williams Street 9L09 feeder and the Uncasville 1Q01 feeder that was requested by Substation Engineering to relieve a capacity issue at Williams 9L substation. This overload will occur on the 1Q01 getaway cable and the 250,500 downstream OH conductors up to a bifurcation point while picking up the 1Q6 during contingency. This project proposes to solve a contingent overload between the Bokum 15L69 circuit and the Haddam 11C12 circuit. A load study showed that the Haddam 11C12 adds a load of 277A and 594,298 causes the Bokum 15L69 ROW to experience a 120% overload at normal and 100% at emergency. 2,938,901 FORECAST BUDGET PROJECT FOR SPECIFIC PROJECT OVERLOADS 2,000,000 85,078 MAINTAIN VOLTAGE ANNUAL NEWTOWN
  7. Page 40 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 40 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DK1N:MAINTAIN VOLTAGE NORWALK DK1S:MAINTAIN VOLTAGE STAMFORD DK2L:MAINTAIM VOLTAGE TORR CLP DK2M:MAINTAIN VOLTAGE CHESHIRE/N.B. DK2W:MAINTAIN VOLTAGE WATERBURY DK3H:MAINTAIN VOLTAGE HARTFORD DK4D:MAINTAIN VOLTAGE MADISON DK4M:MAINTAIN VOLTAGE E Hampton DK4N:MAINTAIN VOLTAGE N LONDON DK5T:MAINTAIN VOLTAGE TOLLAND DK5W:MAINTAIN VOLTAGE DANIELSON FRDK:DKCT Projection Forecast Project Substation Capacity SUBSTATION OVERLOADS-SPEC PROJ CS00364:Falls Village 9A XFMR Reliability CS00365:Bokum 15L Transformer & Reconfig SS CS00382:Southington 4C Add Transformer Projected 2026 Project Long Description Capital Spend 27,178 MAINTAIN VOLTAGE ANNUAL NORWALK 277,746 MAINTAIN VOLTAGE ANNUAL STAMFORD 88,254 MAINTAIN VOLTAGE ANNUAL TORRINGTON 614,708 MAINTAIN VOLTAGE ANNUAL CHESHIRE 121,744 MAINTAIN VOLTAGE ANNUAL WATERBURY 175,631 MAINTAIN VOLTAGE ANNUAL HARTFORD 60,806 MAINTAIN VOLTAGE ANNUAL MADISON 121,685 MAINTAIN VOLTAGE ANNUAL EAST HAMPTON 207,704 MAINTAIN VOLTAGE ANNUAL N LONDON 87,815 MAINTAIN VOLTAGE ANNUAL TOLLAND 209,804 MAINTAIN VOLTAGE ANNUAL DANIELSON (78,154) DKCT Forecast project 36,393,999 36,393,999 The project eliminates the single contingency load loss (SCLL) conditions for Falls Village 9A, Salisbury 21J, and North Canaan 5L, located in Falls Village, Salisbury, and North Canaan, CT, 2,294,831 respectively. The project converts Bokum 15L substation from a 27.6kV to 23kV and adds a third transformer and 10,591,613 switchgear, including primary and secondary line protection. This project adds a third 115-13.8kV transformer rated 62.5MVA to Southington 4C Substation to address potential load growth that could result in future overloading of the existing bulk (231,059) transformers.
  8. Page 41 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 41 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00383:Hopewell 22R Replace Xfrmr CS00392:Beacon Falls 11N Replace Xfrmr CS00603:West Side 7A SS Overload CS00636:Saybrook 22D Conversion CS00676:UConn System Upgrade #900 CS00683:Berlin 6A Incr Capacity CS00703:Westbrook 20S Conversion FROVRLSS:FORECAST PROJ FOR OVERLOAD SUBSTATI Regulatory Commitments-ED Regulatory Commitments-Other 4.8KV GROUNDING Projected 2026 Capital Spend Project Long Description This project addresses the current and future distribution load growth at Hopewell 22R Substation located in Glastonbury, CT. It replaces the 2X and 3X transformers with the Eversource 62.5 MVA 5,152,198 standard. This project replaces the Beacon Falls substation 1X and 2X transformers with the Eversource 62.5 (206,940) MVA standard. This project addresses substation capacity deficiencies at the 115-13.2kV West Side Substation 387 located in Middletown, CT. To convert both the 22D-1X and 22D-2X from 27-6.kV to 23kV at Saybrook, the taps inside the transformers will need to be changes. This will require draining the oil, changing taps, and refilling 515,160 oil. The lightning arresters and potential transformers will also need to be removed and replaced. The objectives are to reliably and cose-effectively accommodate the near term and long term UConn 3,522,819 peak load forecasts and address asset condition concerns. This project will increase the load carrying capacity (LCC) of Berlin 6A substation. It will replace the 52 year-old 46.7 MVA 6A-1X and the 50 year-old 46.7 MVA 6A-2X to increase the substation LCC by replacing them with two 115-13.8kV 62.5 MVA transformers and associated transformer 13,003,731 foundations. This project is to support the conversion of Westbrook 20S substation, located in Westbrook, CT, 52,166 from 27.6kV to 23kV. 1,699,091 FORECAST PROJECT FOR SUBSTATION OVERLOADS 6,100,001 6,100,001 500,000
  9. Page 42 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 42 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category 468601:4.8KV GROUNDING FOR CODE COMPLIANCE TRMSN DISTR RELIABILTY PERFRM CD02192:12J5 - Reliability Improvements CD02193:12J4 WPC - Reliability Improvement CD02207:11C14 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CORRECT GROUNDING ON 4.8KV DELTA EQUIPMENT IN THE STATE OF 500,000 CONNECTICUT TO BRING TO PRESENT CODE, AS REQUIRED BY DPUC ORDER. 5,600,000 As part of Eversource’s plan to address the worst performing circuits (WPC) in Connecticut, project 146,300 CD02192 was created to focus on the high impact zones of the 12J5 circuit. CD02193 focuses on infrastructure replacement to improve the reliability of the 12J4 circuit.The 12J4 is a 13.8 kV circuit out of Mansfield 12J, serving 3143 customers in Ashford and Willington. The 12J4 was ranked #9 on the worst performing circuits list in CT. CD02193 addresses the five 528,200 high impact zones on the 12J4 where Eversource has experienced outages within the past four years. CD02207 focuses on infrastructure replacement and creating a loop to improve the reliability of the 11C14 circuit.The 11C14 is a 23 kV circuit out of Haddam 11C, serving 3052 customers in Chester, Haddam, Higganum, Killingworth, and Middletown. The 11C14 was ranked #1 on the worst performing circuits list in CT. CD02207 addresses high impact zones on the 11C14 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive 562,002 vegetation trimming.
  10. Page 43 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 43 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02208:15L68 WPC Reliability Improvement CD02213:12Y9 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CD02208 focuses on infrastructure replacement and vegetation management, which includes trimming and removals.The 15L68 is a 23 kV circuit out of Bokum 15L in Old Saybrook which is split between the Madison and New London districts and supplies a total of 5,184 customers. The district jurisdictional boundary is the Connecticut River. The 15L68 serves 2,309 customers in the Madison district and supplies the towns of Old Saybrook, Essex, Deep River, Ivoryton, and Westbrook. In the New London district, the 15L68 serves 2,875 customers and supplies the towns of Lyme, Old Lyme, East Lyme, Hadlyme, and East Haddam. The 15L68 was ranked #5 on the worst performing circuits list in CT. CD02208 addresses three high impact zones on the 15L68 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as 1,723,901 extensive vegetation trimming. Project CD02213 focuses on infrastructure replacement to improve the reliability of the 12Y9 circuit.The 12Y9 is a 13.8 kV circuit out of the Rocky River 12Y S/S and serves 2,758 customers in Sherman and New Milford. The 12J5 was ranked #7 on the worst performing circuits list in CT. CD02213 addresses four high impact zones on the 12Y9 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes 848,300 to increase reliability and ampacity as well as extensive vegetation trimming.