Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Application supplement

Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3

Files3

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 41 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 41 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00383:Hopewell 22R Replace Xfrmr CS00392:Beacon Falls 11N Replace Xfrmr CS00603:West Side 7A SS Overload CS00636:Saybrook 22D Conversion CS00676:UConn System Upgrade #900 CS00683:Berlin 6A Incr Capacity CS00703:Westbrook 20S Conversion FROVRLSS:FORECAST PROJ FOR OVERLOAD SUBSTATI Regulatory Commitments-ED Regulatory Commitments-Other 4.8KV GROUNDING Projected 2026 Capital Spend Project Long Description This project addresses the current and future distribution load growth at Hopewell 22R Substation located in Glastonbury, CT. It replaces the 2X and 3X transformers with the Eversource 62.5 MVA 5,152,198 standard. This project replaces the Beacon Falls substation 1X and 2X transformers with the Eversource 62.5 (206,940) MVA standard. This project addresses substation capacity deficiencies at the 115-13.2kV West Side Substation 387 located in Middletown, CT. To convert both the 22D-1X and 22D-2X from 27-6.kV to 23kV at Saybrook, the taps inside the transformers will need to be changes. This will require draining the oil, changing taps, and refilling 515,160 oil. The lightning arresters and potential transformers will also need to be removed and replaced. The objectives are to reliably and cose-effectively accommodate the near term and long term UConn 3,522,819 peak load forecasts and address asset condition concerns. This project will increase the load carrying capacity (LCC) of Berlin 6A substation. It will replace the 52 year-old 46.7 MVA 6A-1X and the 50 year-old 46.7 MVA 6A-2X to increase the substation LCC by replacing them with two 115-13.8kV 62.5 MVA transformers and associated transformer 13,003,731 foundations. This project is to support the conversion of Westbrook 20S substation, located in Westbrook, CT, 52,166 from 27.6kV to 23kV. 1,699,091 FORECAST PROJECT FOR SUBSTATION OVERLOADS 6,100,001 6,100,001 500,000
  2. Page 42 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 42 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category 468601:4.8KV GROUNDING FOR CODE COMPLIANCE TRMSN DISTR RELIABILTY PERFRM CD02192:12J5 - Reliability Improvements CD02193:12J4 WPC - Reliability Improvement CD02207:11C14 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CORRECT GROUNDING ON 4.8KV DELTA EQUIPMENT IN THE STATE OF 500,000 CONNECTICUT TO BRING TO PRESENT CODE, AS REQUIRED BY DPUC ORDER. 5,600,000 As part of Eversource’s plan to address the worst performing circuits (WPC) in Connecticut, project 146,300 CD02192 was created to focus on the high impact zones of the 12J5 circuit. CD02193 focuses on infrastructure replacement to improve the reliability of the 12J4 circuit.The 12J4 is a 13.8 kV circuit out of Mansfield 12J, serving 3143 customers in Ashford and Willington. The 12J4 was ranked #9 on the worst performing circuits list in CT. CD02193 addresses the five 528,200 high impact zones on the 12J4 where Eversource has experienced outages within the past four years. CD02207 focuses on infrastructure replacement and creating a loop to improve the reliability of the 11C14 circuit.The 11C14 is a 23 kV circuit out of Haddam 11C, serving 3052 customers in Chester, Haddam, Higganum, Killingworth, and Middletown. The 11C14 was ranked #1 on the worst performing circuits list in CT. CD02207 addresses high impact zones on the 11C14 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive 562,002 vegetation trimming.
  3. Page 43 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 43 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02208:15L68 WPC Reliability Improvement CD02213:12Y9 WPC Reliability Improvement Projected 2026 Capital Spend Project Long Description CD02208 focuses on infrastructure replacement and vegetation management, which includes trimming and removals.The 15L68 is a 23 kV circuit out of Bokum 15L in Old Saybrook which is split between the Madison and New London districts and supplies a total of 5,184 customers. The district jurisdictional boundary is the Connecticut River. The 15L68 serves 2,309 customers in the Madison district and supplies the towns of Old Saybrook, Essex, Deep River, Ivoryton, and Westbrook. In the New London district, the 15L68 serves 2,875 customers and supplies the towns of Lyme, Old Lyme, East Lyme, Hadlyme, and East Haddam. The 15L68 was ranked #5 on the worst performing circuits list in CT. CD02208 addresses three high impact zones on the 15L68 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as 1,723,901 extensive vegetation trimming. Project CD02213 focuses on infrastructure replacement to improve the reliability of the 12Y9 circuit.The 12Y9 is a 13.8 kV circuit out of the Rocky River 12Y S/S and serves 2,758 customers in Sherman and New Milford. The 12J5 was ranked #7 on the worst performing circuits list in CT. CD02213 addresses four high impact zones on the 12Y9 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes 848,300 to increase reliability and ampacity as well as extensive vegetation trimming.
  4. Page 44 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 44 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02214:30R8 WPC Reliability Improvement CD02215:35L9 WPC Reliability Improvement FRTDRP:FORECAST PROJECT FOR TDRP PROJS Reliability-ED Distribution Line Reliability RELIABILITY IMPROVE-DR ANNUAL DR1B:OH RELIAB IMPROVE NEWTOWN DR1N:OH RELIAB IMPROVE NORWALK DR1S:OH RELIAB IMPROVE STAMFORD DR2L:OH RELIAB IMPROVE TORR CLP DR2M:OH RELIAB IMPROVE CHESHIRE/N.B DR2W:OH RELIAB IMPROVE WATERBURY DR3H:OH RELIAB IMPROVE HARTFORD Projected 2026 Capital Spend Project Long Description Project CD02214 focuses on infrastructure replacement to improve the reliability of the 30R8 circuit.The 30R8 is a 23 kV circuit out of the Green Hill 30R S/S and serves 3,791 customers in the Killingworth, Madison, and Clinton areas of Connecticut. The 30R8 was ranked #3 on the worst performing circuits list in CT. CD02214 addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor sizes to increase reliability and ampacity as well as extensive 532,929 vegetation trimming. Project CD02215 focuses on infrastructure replacement to improve the reliability of the 35L9 circuit.The 35L9 is a 13.8 kV circuit out of the Stepstone 35L S/S and serves 2,234 customers in Guilford, Connecticut. The 35L9 was ranked #9 on the worst performing circuits list in CT. CD02215 addresses two high impact zones on the 30R8 where Eversource has experienced outages within the past four years. This includes aging infrastructure replacement, upgrading conductor 324,095 sizes to increase reliability and ampacity as well as extensive vegetation trimming. 934,274 FORECAST PROJECTS FOR TDRP PROJECTS 190,264,011 24,000,000 10,000,000 1,366,897 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEWTOWN 619,404 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NORWALK 943,089 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL STAMFORD 1,300,962 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TORRINGTON 751,480 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL CHESHIRE 569,647 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL WATERBURY 751,480 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL HARTFORD
  5. Page 45 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 45 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category DR4D:OH RELIAB IMPROVE MADISON DR4M:OH RELIAB IMPROVE E Hampton DR4N:OH RELIAB IMPROVE NEW LONDON DR5D:OH RELIAB IMPROVE DANIELSON DR5T:OH RELIAB IMPROVE TOLLAND DR5W:OH RELIAB IMPROVE Danielson FRDR:PROJECTION PROJECT DR ANNUAL RELIABILITY IMPROVE SPEC PROJ CD02116:Roxbury Rd Reconductoring Projected 2026 Project Long Description Capital Spend 410,233 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL MADISON 360,038 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL EAST HAMPTON 1,058,938 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL NEW LONDON 360,929 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON 707,275 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL TOLLAND 808,644 OVERHEAD RELIABILITY IMPROVEMENT ANNUAL DANIELSON (9,015) PROJECTION PROJECT DR ANNUAL 12,500,000 CD02116 addresses reliability concerns and aging infrastructure for the 21K2 & 21K3 backbone on Roxbury Rd in Southbury. These circuits both originate at Bates Rock 21K substation and operate at 13.8kV. This segment of double circuit pole line consists of predominately 1970 vintage infrastructure and is responsible for hosting a combined 2250 customers. There have been 3 outages along this segment of the 21K2 and 6 outages on this segment of the 21K3. Additionally, this segment of the 21K3 experienced a burn down due to ringed spacer cable and a lightning strike. The proposed work suggests reconductoring on the 21K2 and 21K3. This work involves reconductoring the 21K2 with 6,800’ of 556 spacer cable from P#S43 to P# S3 and reconductoring the 21K3 with 7,000’ of aerial cable from P#S42 to P# C3798. In addition, the side tap originating at P# S22 will be swapped from the 21K3 to 21K2 circuit creating a complete express for the 21K3 from the station to P#12176. The reconductoring of these segments will increase future reliability and load growth through the replacement of aging infrastructure, existing ringed spacer cable and the installation of 2,690,800 upgraded overhead conductor.
  6. Page 46 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 46 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02405:12C4 Equip Conversion and Replace CD02480:30R15-Reconductor 336 ringed SC wit CD02723:Town Scorecard – Eastern Region CD02749:UCONN Health Protection Coord FRSPRELI:FORECAST SPEC REL IMPROVEMENTS S/S ELIMINATION-LINE WORK Projected 2026 Capital Spend Project Long Description This project adresses deficiencies on the Enfield 12C4 circuit. Ringed spacer cable was found on N. River St., Whitworth St., and Alden Ave. The project replaces this cable prone to failure. To reduce several large customer zones on the 12C4 feeder, a 4.8kV portion of the circuit will be converted to 1,544,499 23kV to allow for recloser installation. The 336 AL spacer cable is vintage and is ringed. This area has very poor reliability and has had eleven (11) interruptions over the last four years. Removing the 336 AL ringed spacer cable and 57,750 installing 477 AL tree wire will improve the performance of this circuit. Project CD02723 was established to address the Town Scorecard Initiative which identifies the top 1,453,437 10 SADI and SAFI worst performing towns in Eversource, CT. Project CD02749 was established to address reliability concerns impacting operations at UConn Health in Farmington, CT. The affected infrastructure is served by the 1C01 overhead feeder, which supplies power to several critical facilities, including UConn Health Center, UConn Health Warehouse, UConn Fire Safety Complex, State of Connecticut Medical Examiner’s Office, Town of Farmington Sewer Pumping Station, and various hospital support buildings, such as parking areas 196,100 and the UConn Health Childcare Center. 6,557,414 FORECAST PROJECT FOR SPECIFIC RELIABILTY IMPROVEMENT PROJECTS 1,500,000
  7. Page 47 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 47 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00654:Eliminate 4.8 kV 12F-6X Islanded SS FRSSLNWK:S/S Elim-Line Work Forecast Project Network Reliability NETWORK XFMR + PROTECTOR REPL Projected 2026 Capital Spend Project Long Description Hanover 12F-6X Substation is located in Meriden, Connecticut, and consists of a single, 5/6.25 MVA transformer that supplies three, 4.8 kV circuits (12F2, 12F4 and 12F5) and 1,793 customers.The 12F-6X transformer and 4.8 kV switchgear was installed in 1957. If the 5/6.25 MVA transformer were to fail, then 1,793 customers would be out of power for +/- 24 hours until a mobile transformer was installed. There are no other 4.8 kV sources in the area that can be used to restore customers.Hanover 12F-6X Substation and much of its associated overhead distribution system is 60+ years old.1,793 customers on 12F-6X will be converted and transferred to new 13.8 kV circuit 12F50 and existing 13.8 kV circuit 12F52. 700 feet of 1000 MCM Cu and 4,900 feet of 556 AL TW will be installed to create the 12F50 backbone. Twenty, single phase, bare copper laterals with six or fewer transformers will be reconductored with 1/0 ASCR TW and converted to 13.8 kV.New recloser loop schemes will be created to split the number of customers per zone to approximately 500. Three new recloser loop schemes on the 12F50 which will be backed up by the 12F44, 12F52 and 12F55. The three loops will employ multiple reclosers creating six zones to limit the customer count. The six zones will have 142, 226, 241, 477, 479 and 550 customers. A new field tie with the 12F49, and an existing tie with the 12F51, will back up the 453 customers in the first zone of the 12F50.The new feeder, 12F50, will take some load from the 12F55 to mitigate a contingency overload condition that exists on the 12F55.A large, 958 customer zone on the 12F52 will be eliminated by creating a new recloser loop with the 12F50. The resulting zones will have 456 and 502 customers.The replacement of the 12F2, 1000 kcmil AL get-a-way cable (500 feet) with 1000 1,185,600 Cu mitigates a contingency overload on the 12F52. 314,400 FORECAST PROJECTS FOR OVERHEAD WORK TO ELIMINATE SUBSTATIONS. 26,100,000 1,000,000
  8. Page 48 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 48 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD00412:CL&P Repl Net. Xfmrs Blanket UG CABLE & EQUIPMNT REPLACEMNT CD02229:145 PILC Cable Replacement CD02393:NW Hartford 2N18 PILC Cbl Repl FRUGCBLR:FORECAST PROJECT FOR NETWORK CBL RE UG Network Automation CD01276:New Switchgear for SMH Waterbury Projected 2026 Capital Spend Project Long Description This project is for replacement of inoperable/condemned/failed network transformers and network 1,000,000 transformer protectors. 14,187,500 Project CD02229 is being established to replace the remaining paper-insulated lead covered (PILC) cable on the South Meadow 145 circuit. This project is part of an overall strategy to address poor 6,400,000 performing PILC cable in the underground distribution system. Project CD02393 is being established to replace the 19,803’ of paper-insulated lead covered (PILC) cable on the Northwest Hartford 2N18 circuit. This project is part of an overall strategy to address 5,848,300 poor performing PILC cable in the underground distribution system 1,939,200 FORECAST BUDGET PROJ FOR NETWORK CABLE REPLACEMENTS 5,412,500 This project proposes installation of a set of 4-way solid dielectric switchgear on the line side of the existing feed to the existing switchgear at St Mary's Hospital 201B.The existing switchgear at St Mary's Hospital 201B is owned by the customer, but operated by Eversource, based on an agreement made years ago. This switchgear must be operated periodically, since both incoming feeders at St Mary's Hospital 201B are network feeders.Procedure NB-150 (in CT) discourages utility employees from operating customer-ownedhigh-voltage equipment. Because it does not own or maintain this equipment, the utility does not know its condition, nor can the utility be responsible for it. Installation of the new switchgear enables the utility to disconnect, test, and ground its system at switchgear it owns and maintains, without the need to access or operate non-utility-owned 2,289,300 equipment.
  9. Page 49 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 49 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD01537:25 Laurel St Htfd - Automate Svc The primary electric service at 25 Laurel Street in Hartford consists of two manual PMH-5 switches (309B) which serve seven pad-mounted transformers (3,850 KVA Connected) and 607 customers (586 residential / 21 commercial). The manual switches are fed by two underground feeders (47N9 normal, 47N7 - alternate) out of Southwest Hartford 47N substation (23 KV).In the past five years, these customers have experienced three feeder outages averaging approximately 150 minutes/outage.This project proposes to automate the service to this location by replacing the manual switches with automatic switches.The expected benefits upon completion of this project 250,001 include improved reliability and customer satisfaction. CD02059:Man to Auto Tuttle Rd Middletown This project was established to address the manual switchgear at Tuttle Rd., Middletown. This project will replace one of the two existing PMH-9 switchgear units with a new DSCADA capable PME-9 switch, to be operated as a single unit auto-transfer switch. This proposal will automate 121 customers on Tuttle Rd., Middletown.The preferred feeder is the Westside 7A79 circuit and the alternate feeder is the Westside 7A71 circuit. The 7A71 has the capacity to accept the automatic transfer from the 7A79 without causing overload.This project is part of an overall program to eliminate manual switchgear in order to eliminate the need to manually transfer customers to their 224,699 alternative source for loss of the preferred source.
  10. Page 50 of 73

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 50 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CD02092:Make 13H93 & 13H94 Non-Network This project is being established to convert the Noera 13H93 and 13H94 feeders into non-network feeders. This will allow the 13H93 and 13H94 feeders to have multi-grounded primary connections, such as automatic switchgear or line-to-ground connected load, without the exposure of high voltage that can happen if a network feeder were to fault and a network protector failed to open.The Palace Theater 225P and UCONN 256D switchgear are both automatic switchgear that have the Noera 13H94 circuit as the alternate source. Under a separate project, the preferred source to these switchgear locations will become a non-network feeder via transfer to the Freight 11W44 circuit.The scope of this project includes transferring the two existing network transformers on the N185 network from the 13H94 & 13H93 to the Freight 11W43 and 11W76 respectively. This will require extending the 11W76 to manhole 147 on E Main St., a distance of 1,320’. The total load on the N185 network is less than 300kVA. The 11W43 and 11W76 has the capacity to accept the added 402,800 load without causing overload. CD02107:Switch Gear Autom 21P1 Kirkland Pl This project replaces a manual PMH 3 pair switch gear, located on Kirtland Place, Meriden, with an automatic PME 5 pair. PMH gear is live front while PME switch gear is dead front and is DSCADA capable offering both safety and operational flexibility.The switch gear is fed by the East Meriden 683,100 21P1 and the backup is the 21P4. 121 customers are fed from this switchgear. CD02543:Chelsea Piers Switchgear Isolation UNDERGROUND STRUCTURE ISSUE 101610:REPAIR & REPL OF CL&P UG STRUCTURES This project addresses single point failures on feeders (Glenbrook 1K08 & 1K18) feeding NBC. A splice failed on the overhead system on Maher Rd causing an outage at the NBC facility during the Olympics. On post event investigation, it was deemed necessary to eliminate single point failures by isolating customer owned switchgear feeding Chelsea Piers with Vista Green 422’s to avoid future 1,562,600 failures. 5,500,001 REPAIR & REPLACE MANHOLE AND VAULT (STRUCTURE) ROOFS AND DUCTLINE 1,201,100 DUE TO OBSOLESCENCE &/OR WEAR & TEAR.
1 part match

As listed on the current system

Supplement for New App [Filed: 11/18/2026]

This filing on the current system (opens in a new tab)