Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
Page 51 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 51 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD01821:Greenwich Ave Structural Upgrade CD02332:Tresser Blvd Duct Bank Projected 2026 Capital Spend Project Long Description The Town of Greenwich is planning a streetscape project along Greenwich Avenue where they will reconstruct sidewalks and completely repave Greenwich Avenue from Putnam Avenue to Railroad Avenue. The Town has made it quite clear to all subsurface utility owners that all underground infrastructure must be installed or upgraded as necessary prior to their planned project. After careful review of Eversource’s existing infrastructure, it was determined that 2 manhole enlargements, 4 service box enlargements, and 5 lateral duct banks should be installed given the opportunity described above. The locations that were chosen for manhole enlargements are locations where there is insufficient room to properly splice and rack the three 27.6 kV feeders within the manhole, and to properly support the secondary mains and limited crab joints. The service box enlargements are required for potential service upgrades. The lateral duct bank extensions are required for two purposes. First, these ducts will accept additional or replacement secondary cable as required for network secondary voltage service. Second, each new duct bank will be extended to a side street where there is the potential to install a primary voltage loop cable that may eventually be used to 903,400 convert the existing network to load loops from the existing open wire overhead distribution system. During a new service project, the contractors encountered blocked/ insufficient conduits between MH#700 and MH#731 on Tresser Blvd when trying to tap 1G02 feeder to the customer’s switchgear on Tresser Blvd. Repairs were attempted but to no avail. Furthermore, blocked ducts were encountered in the past in other sections of the duct bank on Tresser Blvd between Canal Street and Elm Street. A more accessible feeder (1G19) was used to complete the new service project. However, the fear is that should the need arise to install cable in this area in the future, it cannot be done because of issues with the duct bank.This project is being initiated to install a new 8-position 1,000,000 duct bank along Tresser Blvd between Canal Street and Elm Street to facilitate future needs.Page 52 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 52 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02511:Manchester Bridge Conduit Replace CD02580:Stamford Vault 292 Replacement CD02619:Cedar Heights Rd Shallow Duct Bank CD02691:Franklin Drive 1B Duct-bank Repair Substation Reliability GENERAL MODERNIZATION CS00023:GOODWIN LANE 22 - REMOVE SUBSTATION CS00070:Naugatuck 19K - Remove Substation CS00072:Guilford 29F - Remove Substation Projected 2026 Capital Spend Project Long Description The project is for electrical conduit replacement on two Manchester bridges that are over the I-384 1,739,000 highway. The State notified the Civil Engineering team of steel conduit bank deficiencies. This project replaces vault #292 which is in the roadway at the very busy junction of North St. and 625,500 Summer St. in Stamford, CT. An inspection revealed that vault #292 deteriorated extensively. This project has been created to address the shallow duct bank that occurred on Cedar Heights Rd in 30,000 Stamford CT during work performed under CD00728. This project address the replacement of deteriorated steel conduits that are location within an existing duct-bank with a horizontal 2 x 4 array on Main Street in Torrington, CT. This duct-bank spans the Naugatuck River and is located under the bridge. These conduits presently penetrates through a concrete support structure of the bridge which is adjacent to manholes MH# 9 and MH# 21 and has a span length of 110' with very limited room. The age of the duct-bank is over 65 years old and due to its exposure to a harsh environment, these conduits within the duct-bank have deteriorated to the point of either having large, elongated holes in their perimeter or they have 1,000 deteriorated to the point of becoming separated into two pieces. 35,164,001 11,183,000 This project is to complete equipment removals, environmental monitoring, remediation, and site 25,665 restoration for the de-energized Goodwin Lane 22 substation located in East Hartford, CT. This project is to perform control house demolition, concrete foundation and pad removal, soil excavation, environmental remediation, groundwater monitoring, civil removal work, and site 42,775 restoration for the de-energized Naugutuck 19K substation located in Naugutuck, CT. This project is to complete site removals and environmental remediation for the de-energized 32,200 Guilford 29F substation located in Guilford, CT.Page 53 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 53 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00105:Meadow 28J - Remove Substation CS00119:Oakville 17Q - Remove Deenergized S CS00269:Race Hill 15D - Remove S/S CS00412:Newtown 12N Station Modernization CS00450:Clayton CT 21W Remove 21W-1X XF CS00451:Carver 19R-1X and Oil Removal CS00490:Farmington 23L Remove SS CS00541:Card 11F Battery Monitor CS00567:Berlin 6A Replace Switch CS00569:RBIP - Rplc Battery Install Program Projected 2026 Capital Spend Project Long Description This project is to complete equipment and structure removals, environmental monitoring, remediation, and site restoration for the de-energized Meadow 28J substation located in Branford, 68,440 CT. This project is to perform soil excavations, environmental remediation, concrete foundation and pad removal, shed removal, and site restoration for the de-energized Oakville 17Q substation located in 316,535 Watertown, CT. This project is to complete removals, environmental remediation, and site restoration for the de51,330 energized Race Hill 15D substation located in Madison, CT. This project is to replace nine 23kV oil circuit breakers (OCBs) at Newtown 12M substation located in Newtown, CT. The OCBs may cause harm to the environment if leakage occurs, or spills occur 75,556 during maintenance. This project is to decommission and retire the de-energized Clayton Court 21W substation located in 316,535 New Britain, CT. This project is to complete equipment removals and to complete environmental testing for the de42,775 energized Carver 19R substation in New Britain, CT. This project is to complete the equipment removal and environmental assessments for the de598,850 energized Farmington 23L substation located in New Britain, CT. 74,248 Card 11F Battery Monitor This project is to replace failing Motor Operated Disconnect (MOD) Switches and obsolete load tap changer (LTC) controls at the Berlin 6A substation, located in Berlin, CT. Replacement of these (61,853) switches and LTC controls will improve system reliability and operator safety. This project is establishing a program that will replace aging substation batteries and chargers across the Eversource system. Proactively replacing older substation batteries will ensure the continued 539,204 reliabile operation of Distribution substations.Page 54 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 54 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00605:Baldwin 13F SS Access Upgrade CS00608:Flax Hill 24A Battery Monitor CS00610:Shaws Hill 24H Battery Monitor CS00612:Thomaston 2B Battery Monitor CS00613:West Side 7A Battery Monitor CS00625:S. Meadow 1A Equipment Removal CS00634:N Canaan 5L Rplc Recloser & Feeder CS00637:Ridgefield 22N Add Feeders CS00651:Riverside 2R RBI Rls Projected 2026 Project Long Description Capital Spend 539,204 This project upgrades physical access to the Baldwin 13F substation, located in Waterbury, CT. 74,248 Flax Hill 24A Battery Monitor 99,913 Shaws Hill 24H Battery Monitor 74,248 Thomaston 2B Battery Monitor 106,757 West Side 7A Battery Monitor This project is for the removal of the de-energized 1A112-1X and1A101/111-1X transformers at 121,749 South Meadow 1A Substation, located in Hartford, CT. This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset 96,984 conditions. This project is expanding the existing 13.8kV switchgear and adding two new feeders to the Ridgefield 22N substation, located in Ridgefield, CT. The expanded switchgear and new feeders will relieve overloading on the existing feeders and are needed to supply the existing and future projected 2,809,010 load. This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Riverside Drive 2R substation, located in East Hartford, CT. Proactively replacing the battery and 552,336 charger system will ensure continued reliable operation of the substation and Distribution System.Page 55 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 55 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category Projected 2026 Capital Spend Project Long Description CS00652:Westport 27F RBI Rls This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Westport 27K substation, located in Westport, CT. Proactively replacing the battery and charger 426,028 system will ensure continued reliable operation of the substation and Distribution System. CS00653:Beacon Falls 11N RBI Rls This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Beacon Falls 11N substation, located in Beacon Falls, CT. Proactively replacing the battery and 397,253 charger system will ensure continued reliable operation of the substation and Distribution System. CS00654:Portland 21H RBI Rls CS00673:Van Dyke 12 Rplc Upgrd Cap Bank CS00681:Portland 21H ElectroMech Relay REL CS00682:Portland 21H H14-1X H15-1X Removals This project is to replace the substation batteries and charger, install a heating, ventilation, and air conditioning (HVAC) system, along with a new exhaust fan, intake louver, hydrogen detection system, smoke detectors, and strobe lights to the Relay and Control Enclosure (R&CE) at the Portland 21H substation, located in Portland, CT. Proactively replacing the battery and charger 640,187 system will ensure continued reliable operation of the substation and Distribution System. This project will replace the 1215 1K, 1215-2K, and 1215-3K 6MVAR open air capacitor banks at Van Dyke 12 substation located in Hartford, CT with two new 6MVAR metal-enclosed capacitor 432,000 banks to improve asset condition and customer reliability. This project will upgrade existing electromechanical relays currently in operation at the Portland 21H substation located in Portland, CT. All electromechanical and obsolete microprocessor relays 153 will be replaced with microprocessor-based relays. This project is for the removal of the 21H14-1X and 21H15-1X auto transformers at Portland 21H 490,997 substation located in Portland, CT.Page 56 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 56 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00689:CT D-SS AED Install Program CS00694:115 kV Relay & Ctrl Encl Install FRSSGNMZ:FORECAST PROJ FOR SS GEN MODERNIZAT S/S TRANSFORMER RELIABILITY CS00286:Franklin Dr Replace Xfrmr CS00396:Stevenson 14A Upgrade Xfrmr & Swgr CS00404:Todd 30L Mobile Position Projected 2026 Capital Spend Project Long Description This project will install Automated External Defibrillators (AED) in Distribution substation control houses located in Connecticut. An AED is used as a lifesaving device in the event of a heart attack 29,087 or sudden cardiac arrest. This project includes modification of yard manhole, installation of two riser poles, installation of underground duct bank, and modification of the current switchgear to remove Transmission 282,738 protection to be migrated to the new Relay and Control Enclosure. 1,887,845 FORECAST PROJECT FOR SUBSTATION GENERAL MODERNIZATION 12,131,000 This project is for the replacement of the 1B-4X and 1B-5X transformers, the relocation of the 1B4X1-2 circuit switcher, and associated new cabling, steel structures, and foundations at the Franklin Drive 1B substation located in Torrington, CT. The two existing transformers were installed in 1953 5,298,815 and have exceeded a standard transformer's life expectancy. This project is to replace aging equipment and convert the existing 27.6-8.32kV distribution system to a 23kV distribution sstem to provide long term reliable power to distribution loads being fed from 992,511 the Stevenson 14A substation located in Monroe, CT. The project is for the installation of a mobile transformer position and associated feeder activation at 1,629 the Todd 30L Substation in Wolcott, CT.Page 57 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 57 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00533:Salisbury 21J Replace Xfmr CS00544:N Canaan 5L Replace Xfmr CS00606:Glenbrook 1K Replace Transformer CS00665:73MX Mobile Xfmr Refurbishment FRSSXFMR:SS Transformer Reliability Forecast SS DSCADA LTC Controls CS00677:Haddam 11C DSCADA LTC FRSSDSCA:Forecast SS DSCADA LTC Netwk Auto G SUBSTATION RELIABILITY-L4 DSCN26:2026 CT D SS Planned Annual SWITCHGEAR Projected 2026 Capital Spend Project Long Description The project objective is to replace the 13MVA 69kV-13.2kV transformer 21J-1X with a new Eversource standard 40MVA 115/69kV-13.2kV transformer equipped with a modern LTC. The Salisbury 21J-1X is an Eversource standard size transformer which reduces the number of spare transformers required to be available for the Connecticut distribution system.This project will also replace outdated electromechanical protection systems on the 21J-1X transformer and 13.2kV A1 bus to update these systems to the latest Eversource standards.This relaying is 50 years old, is at the end of its service life and total of eight electromechanical relays will be replaced as part of this 31,337 project. This project is for distribution system upgrades at North Canaan 5L substation, located in North Canaan, CT. Distribution upgrades are being performed to address system reliability and asset 94,364 conditions. This project is for the asset condition replacement of the existing 62-year old 115kV:13.2kV, 46.7MVA transformer 1K-2X at Glenbrook substation in Stamford, CT. The transformer is near its 4,859,002 end of life. 1,272,942 This project is to refurbish the 73MX mobile transformer unit. The unit is out of service. (419,600) Substation Transformer Reliability Forecast Project 550,000 This project will replace the Load Tap Changer (LTC) control scheme on the 11C-2X and 11C-3X 1,742 transformers at the Haddam 11C substation located in Haddam, CT. 548,258 Forecast project for DSCADA - LTC Network Auto Grid 2,000,001 This annual is to improve customer reliability for capital work not identified specifically during the 2,000,001 budget cycle but is a result of monitoring the system throughout the year. 9,300,000Page 58 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 58 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CS00189:Triangle 11A - Rpl Bus w/ Swgr CS00491:Chippen Hill 15U Replace SWGR CS00503:E. Meriden 21P Replace SWGR FRSSSWGR:FORECAST PROJECT FOR SS SWITCHGEAR System Resiliency/Expanded Reliability ENHANCED TREE REMOVAL CTREL26:Reliability Tree Removal REL Prgrm ETR2026:Enhanced Tree Removal ETR Program ENHANCED TREE TRIMMING Projected 2026 Capital Spend Project Long Description This project will rebuild the 13.8kV distribution end of the Triangle 11A substation in Danbury, CT by installing new enclosed, double bus, metal clad switchgear. The rehabilitation of the substation is required to replace aging substation equipment, address bus clearance needs, and update protection and control relays and System Control and Data Acquisition (DSCADA) interfaces for metering, 5,703,046 control, and monitoring. The project will replace the existing metal clad switchgear at the Chippen Hill substation located in Bristol, CT. The switchgear is being replaced to due to the history of operational and maintenance 1,627,104 issues caused by a sunken foundation which made the switchgear come out of alignment. This project is for the replacement of the 13.8kV switchgear with associated circuit breakers, protection relays, conduits, cabling, and foundations at East Meriden 21P substation. The foundation has begun to sink unevenly causing the switchgear to come out of alignment. This has 1,704,750 caused difficulties when racking circuit breakers in and out of the cubicles. 265,099 FORECAST PROJECT FOR SUBSTATION SWITCHGEAR RELAY 79,000,010 26,000,000 The project focuses on removal of trees in poor performing isolated device zones to improve system 12,000,000 reliability and resiliency. The ETR project strategically removes trees to proactively improve system reliability and mitigate long term costs for the distribution cycle trimming programs. Tree removals, in conjunction with 14,000,000 cycle pruning, drive improved reliability performance. 2,000,000Page 59 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 59 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category ETTCF26:ETT Customer Focused 2026 POLE INTEGRITY PROGRAM CD02444:2025 Pole Integrity CD02449:2025 Frontier Pole Shifts CD02545:2026 Pole Integrity Projected 2026 Capital Spend Project Long Description The Customer Focus Enhanced Tree Trimming project addresses system reliability by providing greater clearances and removing risk limbs and trees that are outside of the normal maintenance trim 2,000,000 zone in areas of emergent reliability concerns. 18,500,000 This initiative replaces or reinforces wood poles found during the annual pole inspections that cannot remain in service due to loss of strength from decay or insect infestation. This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe weather and or storm 3,079,200 damages. The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource equipment onto Frontier Defective Pole Replacements. As Frontier replaces defective poles, Eversource will receive an 300,000 automatic design request through Notify to create a WR for the equipment transfer. This project captures the cost necessary to replace wooden poles that were found during the 2025 annual pole inspections. These poles cannot remain in service due to loss of strength from decay or insect infestation.This initiative also captures the replacement of leaning poles that were identified during the pole inspection process, and they are prone to failure posing a risk to public safety and the system’s reliability. Leaning pole locations are created when soil disturbances and pole attachments affect the original pole’s orientation because of accumulation of moisture in the ground, severe 12,499,999 weather and or storm damages. PPage 60 of 73
Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Exhibit CLP-ADDITIONS-4 Supplemental 3 Page 60 of 73 The Connecticut Light and Power Company d/b/a Eversource Energy Projected 2026 Capital Spend by Project (Whole Dollars) Project Number/Description by Category CD02546:2026 Frontier Pole Shifts RIGHT OF WAY LINES CD01246:Fry Brook 13B21/13B27 ROW Pole Repl Projected 2026 Capital Spend Project Long Description The Frontier Pole Shifts project supports the 45-day PURA mandated timeframe for Eversource transfers to new pole sets. This project includes the transfer of Eversource facilities onto Frontier Defective Poles that will be replaced in the year 2026.As Frontier replaces defective poles, Eversource will receive an automatic design request through Notify to create a WR for the 2,620,800 equipment transfer. 12,000,000 The Fry Brook 13B21/13B27 ROW is an approximately 3-mile express feed from the substation to the towns of Plainfield and Killingly. 13B21 serves 3,607 customers and 13B27 serves 1,963 customers. For a double circuit fault from the substation to Plainfield Road 100% of customers are automatically restored. This is accomplished via ties with 13B10, 15C8 and 30Y10. While travelling along I-395 several crossarms were observed to be cocked and/or racked and upon a physical walk through, much more damage was recorded. A majority of the poles are 66+ years old and most crossarms were replaced in 1973. All crossarms are installed with bow braces. The project will perform 100% pole and conductor replacement from the substation to the Moosup 19Y Substation north of Route 14.The aim of this project is to install a new double circuit pole line adjacent to the existing pole line where easement restrictions allow, with all new 50-foot class 1 64,664 poles, 556 ACSR TW and 2/2/2 construction.
As listed on the current system
Supplement for New App [Filed: 11/18/2026]