Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 38 of 77
CTSELICON | Norwalk and Newtown SEL ICONs | Operations | DSCADA - RADIO EXPANSION | 451-CTSELICON CTSWITCH24 | CT Electric Training Equipment | Operations | Capital Tool Purchases/Other | 452-CTSWITCH24 CTTENT23 | 2 Tents for Berlin Training Yard | Operations | Capital Tool Purchases/Other | 453-CTTENT23 CTTRNDOBLE | CT Doble Test Kits | Operations | Capital Tool Purchases/Other | 454-CTTRNDOBLE CTTRNSUB | Berlin Training Substation | Operations | Capital Tool Purchases/Other | 455-CTTRNSUB CTTRNSUB24 | Berlin Training Substation 2024 | Operations | Capital Tool Purchases/Other | 456-CTTRNSUB24 | 456-CTTRNSUB24-SP01 | 456-CTTRNSUB24-SP02 | 456-CTTRNSUB24-SP03 D73H19 | ROADWAY LIGHTING HARTFORD | Operations | Lighting | 457-D73H19 DA2M20 | NON-ROADWAY LIGHTING CHESHIRE | Operations | Lighting | 458-DA2M20 DH1B18 | LINE RELOCATIONS NEWTOWN | Operations | Line Relocations/Act of Public Authority | 459-DH1B18 DH1B19 | LINE RELOCATIONS NEWTOWN | Operations | Line Relocations/Act of Public Authority | 460-DH1B19 DH1B21 | LINE RELOCATIONS Newtown | Operations | Line Relocations/Act of Public Authority | 461-DH1B21 DH1S18 | LINE RELOCATIONS Stamford | Operations | Line Relocations/Act of Public Authority | 462-DH1S18 DH1S19 | LINE RELOCATIONS Stamford | Operations | Line Relocations/Act of Public Authority | 463-DH1S19 DH1S21 | Line Relocations - Stamford | Operations | Line Relocations/Act of Public Authority | 464-DH1S21 DH2L21 | Line Relocations - Torrington | Operations | Line Relocations/Act of Public Authority | 465-DH2L21 | 465-DH2L21-SP03 DH2M19 | Line Relocations Cheshire | Operations | Line Relocations/Act of Public Authority | 466-DH2M19 DH2M20 | Line Relocations Cheshire | Operations | Line Relocations/Act of Public Authority | 467-DH2M20 DH2M20A | LINE RELOCATIONS - Cheshire | Operations | Distribution Line Reliability | 468-DH2M20A | 468-DH2M20A-SP01 DH2W19 | Line Relocations Waterbury | Operations | Line Relocations/Act of Public Authority | 469-DH2W19 DH3H17 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 470-DH3H17 DH3H19 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 471-DH3H19 DH3H20 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 472-DH3H20 DH3H21 | Line Relocations Hartford | Operations | Line Relocations/Act of Public Authority | 473-DH3H21 | 473-DH3H21-SP03 DH4D19 | LINE RELOCATIONS Madison | Operations | Line Relocations/Act of Public Authority | 474-DH4D19 DH4M18 | LINE RELOCATIONS East Hampton | Operations | Line Relocations/Act of Public Authority | 475-DH4M18 DH4M19 | LINE RELOCATIONS East Hampton | Operations | Distribution Line Reliability | 476-DH4M19 DH4M20 | LINE RELOCATIONS East Hampton | Operations | Line Relocations/Act of Public Authority | 477-DH4M20 DH5T17 | Line Relocations Tolland | Operations | Line Relocations/Act of Public Authority | 478-DH5T17 DH5T18 | Line Relocations Tolland | Operations | Line Relocations/Act of Public Authority | 479-DH5T18 DH5T20 | Line Relocations - Tolland | Operations | Line Relocations/Act of Public Authority | 480-DH5T20 | 480-DH5T20-SP03 DN1B21 | New/Existing Customers Newtown | Operations | Distribution Line Reliability | 481-DN1B21 DN1N17 | NEW/EXISTING CUSTMRS NORWALK | Operations | New Customer | 482-DN1N17 DN1N18 | NEW/EXISTING CUSTMRS NORWALK | Operations | New Customer | 483-DN1N18 DN1N21 | New/Existing Customers Norwalk | Operations | Distribution Line Reliability | 484-DN1N21 DN1S19 | NEW/EXISTING CUSTMRS STAMFORD | Operations | New Customer | 485-DN1S19 DN1S20 | NEW/EXISTING CUSTMRS STAMFORD | Operations | New Customer | 486-DN1S20 DN1S21 | New/Existing Customers - Stamford | Operations | New Customer | 487-DN1S21 DN2M18 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 488-DN2M18Part 39 of 77
DN2M19 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 489-DN2M19 DN2M20 | New/Existing Customers Cheshire | Operations | Distribution Line Reliability | 490-DN2M20 DN2W20 | NEW/EXISTING CUSTOMERS - Waterbury | Operations | New Customer | 491-DN2W20 DN4N18 | NEW/EXISTING CUSTMRS New London | Operations | New Customer | 492-DN4N18 DN5D18 | NEW/EXISTING CUSTMRS Danielson | Operations | New Customer | 493-DN5D18 DN5T18 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 494-DN5T18 DN5T19 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 495-DN5T19 DN5T20 | New/Existing Customers Tolland | Operations | Distribution Line Reliability | 496-DN5T20 DN5T21 | New/Existing Customers Tolland | Operations | New Customer | 497-DN5T21 | 497-DN5T21-SP03 DQ1N21 | DB Planned OBS - Norwalk | Operations | Distribution Line Reliability | 498-DQ1N21 DQ1S21 | OH Planned OBS Stamford | Operations | Distribution Line Reliability | 499-DQ1S21 DQ2M20 | UG Planned OBS - Cheshire | Operations | Distribution Line Reliability | 500-DQ2M20 DQ5T21 | OH Planned OBS Tolland | Operations | Emergent Equipment Failures | 501-DQ5T21 | 501-DQ5T21-SP03 DQDB2M19 | UG Failed Equipment Cheshire | Operations | Emergent Equipment Failures | 502-DQDB2M19 DQOH5T18 | OH Planned OBS Tolland | Operations | Emergent Equipment Failures | 503-DQOH5T18 DQUG1N18 | UG Planned OBS Norwalk | Operations | Emergent Equipment Failures | 504-DQUG1N18 DQUG3H19 | UG Failed Equipment Hartford | Operations | Emergent Equipment Failures | 505-DQUG3H19 DQUG3H20 | UG Failed Equipment Hartford | Operations | Emergent Equipment Failures | 506-DQUG3H20 DR1B18 | OH RELIAB IMPROVE Newtown | Operations | Distribution Line Reliability | 507-DR1B18 DR1B21 | OH Reliability Improve Newtown | Operations | Distribution Line Reliability | 508-DR1B21 | 508-DR1B21-SP03 DR1N20 | OH RELIAB IMPROVE NORWALK | Operations | Distribution Line Reliability | 509-DR1N20 DR1S18 | OH RELIAB IMPROVE STAMFORD | Operations | Distribution Line Reliability | 510-DR1S18 DR1S21 | OH Reliability Improve Stamford | Operations | Distribution Line Reliability | 511-DR1S21 DR2L20 | OH RELIAB IMPROVE Torrington | Operations | Distribution Line Reliability | 512-DR2L20 | 512-DR2L20-SP03 DR2L21 | OH Reliability Improve Torrington | Operations | Distribution Line Reliability | 513-DR2L21 | 513-DR2L21-SP03 DR2M17 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 514-DR2M17 DR2M19 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 515-DR2M19 DR2M20 | OH Reliability Improvement Cheshire | Operations | Distribution Line Reliability | 516-DR2M20 DR2M20A | OH RELIABILITY IMPROVE Cheshire | Operations | Distribution Line Reliability | 517-DR2M20A DR2W17 | OH Reliability Improve Waterbury | Operations | Distribution Line Reliability | 518-DR2W17 DR3H16 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 519-DR3H16 DR3H18 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 520-DR3H18 DR3H19 | OH Reliability Improvement Hartford | Operations | Distribution Line Reliability | 521-DR3H19 DR3H21 | OH Reliab Improve Hartford | Operations | Distribution Line Reliability | 522-DR3H21 DR3S18 | OH Reliablitiy Improvement Simsbury | Operations | Distribution Line Reliability | 523-DR3S18 DR4D17 | OH RELIAB IMPROVE MADISON | Operations | Distribution Line Reliability | 524-DR4D17 DR4D19 | OH RELIAB IMPROVE MADISON | Operations | Distribution Line Reliability | 525-DR4D19 DR4D21 | OH Reliability Improve Madison | Operations | Distribution Line Reliability | 526-DR4D21 DR4M16 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 527-DR4M16 DR4M17 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 528-DR4M17Part 40 of 77
DR4M18 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 529-DR4M18 DR4M19 | OH RELIAB IMPROVE East Hampton | Operations | Distribution Line Reliability | 530-DR4M19 DR4N20 | OH RELIABILITY IMPROVE New London | Operations | Distribution Line Reliability | 531-DR4N20 DR5D18 | OH RELIAB IMPROVE Danielson | Operations | Distribution Line Reliability | 532-DR5D18 DR5T19 | OH Reliability Improvement Tolland | Operations | Distribution Line Reliability | 533-DR5T19 DR5T21 | OH Reliab Improve Tolland | Operations | Distribution Line Reliability | 534-DR5T21 | 534-DR5T21-SP03 EAST4801P | 2021 4.8KV Delta System Grounding | Operations | Regulatory Commitments-Other | 535-EAST4801P EEC23-28 | Eversource Energy Center 2023-2028 | Operations | UCONN RESILIENT ENERGY CENTER | 536-EEC23-28 | 536-EEC23-28-SP01 * | GREENWICHSR | DSCADA System Res Greenwich | Operations | DSCADA - RADIO EXPANSION | 537-GREENWICHSR | 537-GREENWICHSR-SP01 GRPRLP1619 | SOUTH WINDSOR POST TOP LED REPLACE | Operations | Lighting | 538-GRPRLP1619 * | GRPRLP1620 | SOUTHINGTON POST TOP LED REPLACE | Operations | Lighting | 539-GRPRLP1620 GRPRLP1621 | STONINGTON LED POST TOP REPLACE | Operations | Lighting | 540-GRPRLP1621 GXRS16P | 2016 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 541-GXRS16P GXRS17P | 2017 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 542-GXRS17P GXRS19P | 2019 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 543-GXRS19P GXRS2007P | 2020 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 544-GXRS2007P GXRS2104P | 2021 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 545-GXRS2104P GXRS2208P | 2022 RSO Capitalized Tools | Operations | Capital Tool Purchases/Other | 546-GXRS2208P IFUG3H19 | UG Insp Failed Equipment Hartford | Operations | Emergent Equipment Failures | 547-IFUG3H19 INSOH5T19 | OH Insurance Claim Tolland | Operations | Emergent Equipment Failures | 548-INSOH5T19 IT23426 | CT LI Discount Rate | Shared Services | Information Technology | 549-IT23426 | 549-IT23426-SP01 | 549-IT23426-SP02 IT23440 | CT Bill Redesign | Shared Services | Information Technology | 550-IT23440 IT23454 | CT Electric Vehicle | Shared Services | Information Technology | 551-IT23454 MCRO22NM | Microwave Upgrade New Milford | Operations | Capital Tool Purchases/Other | 552-MCRO22NM MCRO22NT | Microwave Upgrade Newtown | Operations | Capital Tool Purchases/Other | 553-MCRO22NT MCRO22SM | Microwave Upgrade South Mtn | Operations | Capital Tool Purchases/Other | 554-MCRO22SM MCRO22TM | Talcott Mtn Microwave Upgrade | Operations | Capital Tool Purchases/Other | 555-MCRO22TM ML2301 | 2023 CLP-D ML Line of Business | Shared Services | Facilities | 556-ML2301 ML2401 | 2024 Material Logistics LOB CL&P-D | Shared Services | Facilities | 557-ML2401 ML2501 | 2025 Material Logistics LOB CL&P-D | Shared Services | Facilities | 558-ML2501 | 558-ML2501-SP01 | 558-ML2501-SP02 MN21ECAPP | CT Storm Event – July 6, 2021 | Operations | Emergent Equipment Failures | 559-MN21ECAPP MN21KCAPP | CT Tropical Storm Ida – September 1 | Operations | Emergent Equipment Failures | 560-MN21KCAPP MS18CCAPP | CT Nor'easter Event - March 2, 2018 | Operations | Emergent Equipment Failures | 561-MS18CCAPP MS18DCAPP | CT Nor'easter EVent - March 8, 2018 | Operations | Emergent Equipment Failures | 562-MS18DCAPP MS18ECAPP | CT Snow & Wind Event-March 13, 2018 | Operations | Emergent Equipment Failures | 563-MS18ECAPP MS18GCAPP | CT Wind/Rain Storm Event - 5/15/18 | Operations | Emergent Equipment Failures | 564-MS18GCAPP MS18HCAPP | CT Heatwave Event - Jun. 29, 2018 | Operations | Emergent Equipment Failures | 565-MS18HCAPP MS19ACAPP | Rain & Wind Event - Jan. 20, 2019 | Operations | Emergent Equipment Failures | 566-MS19ACAPP MS19CCAPP | CT Wind Event - February 25, 2019 | Operations | Emergent Equipment Failures | 567-MS19CCAPPPart 41 of 77
MS19DCAPP | CT Storm Event March 4, 2019 | Operations | Emergent Equipment Failures | 568-MS19DCAPP MS19GCAPP | CT Wind/Rain Event - Oct. 17, 2019 | Operations | Emergent Equipment Failures | 569-MS19GCAPP MS19HCAPP | CT Wind/Rain Event - oct. 31, 2019 | Operations | Emergent Equipment Failures | 570-MS19HCAPP MS21CCAPP | CT Wind Event – March 2, 2021 | Operations | Emergent Equipment Failures | 571-MS21CCAPP MS21FCAPP | CT Storm Event – July 6, 2021 | Operations | Emergent Equipment Failures | 572-MS21FCAPP MS21HCAPP | CT Storm Elsa – July 9, 2021 | Operations | Emergent Equipment Failures | 573-MS21HCAPP MS21KCAPP | CT Storm Henri – August 21, 2021 | Operations | Emergent Equipment Failures | 574-MS21KCAPP MS21LCAPP | CT Nor’easter – October 25, 2021 | Operations | Emergent Equipment Failures | 575-MS21LCAPP MS21MCAPP | CT Rain/Wind Event - November 12, 2 | Operations | Emergent Equipment Failures | 576-MS21MCAPP MS23BCAPP | CT Wind/Snow Event - Jan. 25, 2023 | Operations | Emergent Equipment Failures | 577-MS23BCAPP SLCAP011P | Street Light Capital Reclassing | Operations | Lighting | 578-SLCAP011P * | SMTNSR | DSCADA System Res South Mountain | Operations | DSCADA - RADIO EXPANSION | 579-SMTNSR STRM22CP | CL&P MAJOR STORMS 2022 | Operations | Emergent Equipment Failures | 580-STRM22CP XTRANCT01 | XTRAN Pilot Project | Operations | Capital Tool Purchases/Other | 581-XTRANCT01 STRM23CP | CT MAJOR STORMS 2023 | Operations | Emergent Equipment Failures | 582-STRM23CP STRM24CP | CT MAJOR STORMS 2024 | Operations | Emergent Equipment Failures | 583-STRM24CP CS00727 | South Meadow 1A DSCADA LTC | Operations | Substation Reliability | 584-CS00727 CS00728 | Canton 5R DSCADA LTC | Operations | Substation Reliability | 585-CS00728 CS00733 | Southington 4C DSCADA LTC | Operations | Substation Reliability | 586-CS00733 CS00730 | Rocky Hill DSCADA LTC | Operations | Substation Reliability | 587-CS00730 CS00431 | Green Hill 30R DSCADA LTC | Operations | Substation Reliability | 588-CS00431 CS00729 | Mianus 16Q DSCADA LTC | Operations | Substation Reliability | 589-CS00729 CTENGCOM | Field Engineer Field Communication | Operations | Capital Tool Purchases/Other | 590-CTENGCOM | 590-CTENGCOM-SP02 | 590-CTENGCOM-SP03 CTETFI23 | CT Electric Training Facility Impro | Shared Services | Facilities | 591-CTETFI23 IT23442 | 2023 LC Modern Desktop - CL&P | Shared Services | Information Technology | 592-IT23442 IT24433 | 2024 LC Modern Desktop - CL&P Distr | Shared Services | Information Technology | 593-IT24433 IT22463 | 2022 LC Modern Desktop - CL&P | Shared Services | Information Technology | 594-IT22463 EV22400 | Multi-Family Dwelling (MUD) | Operations | Grid Modernization | 595-EV22400 GXSGIO24 | 2024 SGIO Capitalized Tools | Operations | Capital Tool Purchases/Other | 596-GXSGIO24-SP01 | 596-GXSGIO24-SP02 Newtown - AHU Replacements (2) | Shared Services | Facilities | 597-247122-SP01 | 597-247122-SP02 Elevator Replacement | Shared Services | Facilities | 598-25767-SP01 25CGMR11 | 2025 CG Equipment CLP Equipment | Shared Services | Capital Tool Purchases/Other | 599-25CGMR11-SP01 CL&P-D Buildings 2026 LOB | Shared Services | Facilities | 600-26703-SP01 | 600-26703-SP02 | 600-26703-SP03 CD01884 | CDOT US Rt 1 Intersection Improv | Operations | Line Relocations/Act of Public Authority | 601-CD01884-SP01 CD02059 | Man to Auto Tuttle Rd Middletown | Operations | Network Reliability | 602-CD02059-SP01 | 602-CD02059-SP02 | 602-CD02059-SP03 CD02105 | VCP, River St, Windsor | Operations | New Customer | 603-CD02105-SP01 CD02124 | VCP Realty, Woodstock | Operations | New Customer | 604-CD02124-SP01 | 604-CD02124-SP02 | 604-CD02124-SP03 CD02213 | 12Y9 WPC Reliability Improvement | Operations | Regulatory Commitments-Other | 605-CD02213-SP01 | 605-CD02213-SP02 | 605-CD02213-SP03 CD02220 | Town of Greenwich – Repl MH Covers | Operations | Network Reliability | 606-CD02220-SP01 | 606-CD02220-SP02 | 606-CD02220-SP03Part 42 of 77
CD02239 | Verogy, Stafford Springs | Operations | New Customer | 607-CD02239-SP01 | 607-CD02239-SP02 | 607-CD02239-SP03 CD02319 | 2025 Eastern Large Customer Zone >1 | Operations | SMART SWITCHES PROGRAM | 608-CD02319-SP01 | 608-CD02319-SP02 | 608-CD02319-SP03 CD02381 | Convert 15L46 to 23kV & getaway wor | Operations | Peak Load/Capacity | 609-CD02381-SP01 | 609-CD02381-SP02 | 609-CD02381-SP03 CD02462 | Tilcon NS on Black Rock 11H Sub | Operations | New Customer | 610-CD02462-SP01 | 610-CD02462-SP02 | 610-CD02462-SP03 CD02513 | Uncasville 1Q01 Getaway Overload Pr | Operations | Peak Load/Capacity | 611-CD02513-SP01 | 611-CD02513-SP02 | 611-CD02513-SP03 CD02545 | 2026 Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 612-CD02545-SP01 | 612-CD02545-SP02 | 612-CD02545-SP03 CD02546 | 2026 Frontier Pole Shifts | Operations | POLE INTEGRITY PROGRAM | 613-CD02546-SP01 | 613-CD02546-SP02 | 613-CD02546-SP03 CD02723 | Town Scorecard – Eastern Region | Operations | Distribution Line Reliability | 614-CD02723-SP01 | 614-CD02723-SP02 | 614-CD02723-SP03 CD02746 | Capital BLVD DB Cable Replacement | Operations | URD/DB Cable Reliability | 615-CD02746-SP01 | 615-CD02746-SP02 CD02766 | CDOT 304-22 Raise MH Water St Nauga | Operations | Line Relocations/Act of Public Authority | 616-CD02766-SP01 CD02779 | Replace Poles 3A09/3A02 ROW | Operations | Peak Load/Capacity | 617-CD02779-SP01 | 617-CD02779-SP02 CD02827 | CDOT 171-499 UG Dev Rte 187 E Granb | Operations | Line Relocations/Act of Public Authority | 618-CD02827-SP01 | 618-CD02827-SP02 | 618-CD02827-SP03 CD02828 | Repl Network Vault 419-65 Garden St | Operations | Network Reliability | 619-CD02828-SP01 | 619-CD02828-SP02 | 619-CD02828-SP03 CD02836 | Sachem Rd, Greenwich - Cable Fault | Operations | Emergent Equipment Failures | 620-CD02836-SP01 CD02840 | 12F43 Emergent Cable Failure | Operations | Emergent Equipment Failures | 621-CD02840-SP01 CS00593 | Rplc Mobile Xfrmr 71MX | Operations | Substation Reliability | 622-CS00593-SP01 | 622-CS00593-SP03 CS00636 | Saybrook 22D Conversion | Operations | Peak Load/Capacity | 623-CS00636-SP01 | 623-CS00636-SP02 | 623-CS00636-SP03 CS00703 | Westbrook 20S Conversion | Operations | Peak Load/Capacity | 624-CS00703-SP01 | 624-CS00703-SP02 | 624-CS00703-SP03 CS00712 | Weston 21M Sound Mitigation | Operations | Substation Reliability | 625-CS00712-SP01 | 625-CS00712-SP02 CS00720 | Rocky Hill 3R Replace ATS | Operations | Emergent Equipment Failures | 626-CS00720-SP01 CTBATT26 | 2026 CT Battery and Charger Repl | Operations | Capital Tool Purchases/Other | 627-CTBATT26-SP01 | 627-CTBATT26-SP02 | 627-CTBATT26-SP03 IT25037 | 2025 Modern Desktop - CL&P Distri | Shared Services | Information Technology | 628-IT25037-SP01 IT25090 | ERP Contractor Storm Manager - CL&P | Shared Services | Information Technology | 629-IT25090-SP01 | 629-IT25090-SP02 | 629-IT25090-SP03 ML2601 | 2026 Material Logistics LOB CL&P-D | Shared Services | Facilities | 630-ML2601-SP01 | 630-ML2601-SP02 | 630-ML2601-SP03 MN25KCP | CL&P Major Storm MN25K011 | Operations | Emergent Equipment Failures | 631-MN25KCP-SP01 MS25ACP | CL&P Major Storm MS25A011 | Operations | Emergent Equipment Failures | 632-MS25ACP-SP01 Chiller/Boiler Replacements | Shared Services | Facilities | 633-25761-SP01 | 633-25761-SP03 Storage Infrastructure | Shared Services | Facilities | 634-26804-SP01 CD01591 | Corbin Drive - Darien - New Service | Operations | New Customer | 635-CD01591-SP01 | 635-CD01591-SP02 | 635-CD01591-SP03 CD02303 | Waterside 22M9 Overload | Operations | Peak Load/Capacity | 636-CD02303-SP01 | 636-CD02303-SP02 CD02470 | 28M1 Contingent Overload | Operations | Peak Load/Capacity | 637-CD02470-SP01 | 637-CD02470-SP02 | 637-CD02470-SP03 CD02473 | 11A55 Contingency Overload | Operations | Peak Load/Capacity | 638-CD02473-SP01 | 638-CD02473-SP02 | 638-CD02473-SP03 CD02618 | 15L69 Contingency Overload | Operations | Peak Load/Capacity | 639-CD02618-SP01 | 639-CD02618-SP02 | 639-CD02618-SP03Part 43 of 77
CD02765 | Overloaded Network Xfmrs – N23-1X & | Operations | Peak Load/Capacity | 640-CD02765-SP01 | 640-CD02765-SP02 CD02788 | Replace Aluminum Bus Network Units | Operations | Network Reliability | 641-CD02788-SP01 | 641-CD02788-SP02 | 641-CD02788-SP03 CD02894 | Replace 375C Failed Switchgear | Operations | Emergent Equipment Failures | 642-CD02894-SP01 | 642-CD02894-SP02 | 642-CD02894-SP03 CD02901 | W Cornwall Road DB Cable Replacemen | Operations | URD/DB Cable Reliability | 643-CD02901-SP01 | 643-CD02901-SP02 Waterbury - Freight - Paving | Shared Services | Facilities | 644-26726-SP02 Test Department Renovation | Shared Services | Facilities | 645-26815-SP02 | 645-26815-SP03 CD02007 | 2B5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 646-CD02007-SP02 | 646-CD02007-SP03 CD02283 | VCP 2715 Mountain Rd Suffield | Operations | New Customer | 647-CD02283-SP02 CD02405 | 12C4 Equip Conversion and Replace | Operations | Distribution Line Reliability | 648-CD02405-SP02 | 648-CD02405-SP03 CD02428 | CTEC No Main St, Suffield DG | Operations | New Customer | 649-CD02428-SP02 | 649-CD02428-SP03 CD02440 | 14R31 ROW Rebuild | Operations | Peak Load/Capacity | 650-CD02440-SP02 | 650-CD02440-SP03 CD02538 | 2025 Eastern-New London SS CI Rank | Operations | SMART SWITCHES PROGRAM | 651-CD02538-SP02 | 651-CD02538-SP03 CS00689 | CT D-SS AED Install Program | Operations | Substation Reliability | 652-CS00689-SP02 | 652-CS00689-SP03 Lower Parking Lot Paving | Shared Services | Facilities | 653-26814-SP02 CD02192 | 12J5 - Reliability Improvements | Operations | Regulatory Commitments-Other | 654-CD02192-SP02 | 654-CD02192-SP03 CD02211 | 13K57, 32P3 ROW Removal | Operations | RIGHT OF WAY LINES | 655-CD02211-SP02 CD02793 | Foxwoods SWGR Replacement – 109/110 | Operations | Network Reliability | 656-CD02793-SP02 | 656-CD02793-SP03 CD02834 | BCA TripSavers Central 2026 | Operations | SMART SWITCHES PROGRAM | 657-CD02834-SP02 | 657-CD02834-SP03 CD02835 | BCA TripSavers Eastern 2026 | Operations | SMART SWITCHES PROGRAM | 658-CD02835-SP02 | 658-CD02835-SP03 CD02970 | 1G08 Feeder Lockout | Operations | Emergent Equipment Failures | 659-CD02970-SP02 | 659-CD02970-SP03 CD02102 | C&B Hebron Rd, Marlborough | Operations | New Customer | 660-CD02102-SP02 | 660-CD02102-SP03 CD01357 | 10 or more Wagon Wheel Road | Operations | Regulatory Commitments-Other | 661-CD01357-SP03 CD01429 | Airline Renewables, LLC | Operations | New Customer | 662-CD01429-SP03 CD01472 | 3A07 Smart Switch | Operations | SMART SWITCHES PROGRAM | 663-CD01472-SP03 CD01923 | Lateral Rehab - Hoop Pole Hill Rd | Operations | Distribution Line Reliability | 664-CD01923-SP03 CD01541 | Lodestar, Morris, Lakeside Rd | Operations | New Customer | 665-CD01541-SP03 CD02131 | Black Rock 11H12/31 Cont Overload | Operations | Peak Load/Capacity | 666-CD02131-SP03 CD02214 | 30R8 WPC Reliability Improvement | Operations | Regulatory Commitments-Other | 667-CD02214-SP03 CD02341 | GRE Fawn Meadow Ln Woodbury | Operations | New Customer | 668-CD02341-SP03 CD02433 | GRE Chester St, New London | Operations | New Customer | 669-CD02433-SP03 CD02495 | CDOT #320-008 Windsor Locks RR | Operations | Line Relocations/Act of Public Authority | 670-CD02495-SP03 CD02614 | 1700 Asylum Ave Apts NS | Operations | New Customer | 671-CD02614-SP03 CD02805 | Foxwoods 12S5 Cable Replacement | Operations | Network Reliability | 672-CD02805-SP03 CD02822 | Falls Villa Bare Cu Asset Health 26 | Operations | Distribution Line Reliability | 673-CD02822-SP03 CD02854 | Eaton Recloser Replacements - Centr | Operations | SMART SWITCHES PROGRAM | 674-CD02854-SP03 CS00719 | 63MX Replace LTC Controler | Operations | Emergent Equipment Failures | 675-CS00719-SP03 CD02823 | 14M24 & 14M39 ROW Priority 1 Replac | Operations | RIGHT OF WAY LINES | 676-CD02823-SP03 CD02833 | BCA TripSavers Western 2026 | Operations | SMART SWITCHES PROGRAM | 677-CD02833-SP03 Line Notes:Part 44 of 77
* | Projects under $500K do not require a Supplemental Authorization request. [Sheet: Annual Projects Pre 2022] The Connecticut Light and Power Company d/b/a Eversource Energy Actual Capital Expenditures and In-Service Capital Additions through September 30, 2026 Project Matrix--Pre-2022 Annual Projects (Whole Dollars) Capital Expenditures--Operations | Capital Expenditures--Shared Services | Refer to Exhibit Line No. | Project | Project Description | Organization Category | Project Type | Annual Direct Costs (as of 12/31/2025) | Annual Direct Costs through June 2026 | Annual Direct Costs through August 2026 | Direct Costs September 2026 (as of November 15, 2026) | Total LTD Direct Costs (as of October 15, 2026) | Pre-Construction Estimated Direct Costs | % of Actual Cost Over or Under (-) Compared to Estimate | Annual Total Costs (as of 12/31/2025) | Annual Total Costs through June 2026 | Annual Total Costs through August 2026 | Direct Costs September 2026 (as of November 15, 2026) | Total LTD Total Costs (as of October 15, 2026) | Pre-Construction Estimated Total Costs | % of Actual Cost Over or Under (-) Compared to Estimate | In-Service Capital Additions | In-Service Capital Additions June 2026 YTD (as of Septmber 15, 2026) | In-Service Capital Additions July & August 2026 (as of October 15, 2026) | In-Service Capital Additions September 2026 (as of November 15, 2026) | Total In-Service Capital Additions | Project Notes / Variance Explanations | CLP-ADDITIONS-6 (July 14, 2026 Filing) | CLP-ADDITIONS-6-Supplemental (September 15, 2026 Filing) | CLP-ADDITIONS-6-Supplemental 2 (October 15, 2026 Filing) | CLP-ADDITIONS-6-Supplemental 3 (November 15, 2026 Filing)* CL&P-D Vehicles | Shared Services | Capitalized Vehicles | 1-18742 18CGVE11 | 2018 CG Vehicles for CT FMW | Shared Services | Capitalized Vehicles | 2-18CGVE11 CL&P Facilities Vehicles | Shared Services | Capitalized Vehicles | 3-19733 CTEDVH20 | CT Electric Distrb Vehicle Purchase | Operations | Capitalized Vehicles | 4-CTEDVH20 | 4-CTEDVH20-SP02 CTEDVH21 | CT Electric Distrib Vehicle Purchas | Operations | Capitalized Vehicles | 5-CTEDVH21 CTFT2020 | CT Field Training Tools & Equipment | Operations | Capital Tool Purchases/Other | 6-CTFT2020 CTFT2021 | CT Field Training Tools & Equipment | Operations | Capital Tool Purchases/Other | 7-CTFT2021 CTMTR17 | CT ANNUAL METER PROJECT FOR 2017 | Operations | Meters - Electric | 8-CTMTR17 CTMTR18 | CT Annual Meter Project for 2018 | Operations | Meters - Electric | 9-CTMTR18 CTMTR19 | CT Annual Meter Project for 2019 | Operations | Meters - Electric | 10-CTMTR19 CTMTR20 | CT Annual Meter Project for 2020 | Operations | Meters - Electric | 11-CTMTR20 CTMTR21 | CT Annual Meter Project for 2021 | Operations | Meters - Electric | 12-CTMTR21 CTRMTR17 | CTRemote Disconnect 2017-2018 | Operations | Meters - Electric | Total direct costs of $39,450,439 on the total project were $1,520,439 and 4% higher than approved direct costs of $37,900,000. A supplemental request is not required per the Project Authorization policy. There was a shift in spending from MA to CT, all within total project approvals. | 13-CTRMTR17 CTROW17 | ETT ROW CLEARING | Operations | ENHANCED TREE TRIMMING | 14-CTROW17 CTTRN18 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 15-CTTRN18 CTTRN19 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 16-CTTRN19 CTTRN20 | CT Training Annual Capital Project | Operations | Capital Tool Purchases/Other | 17-CTTRN20 CTTRN21 | CT Elec Training Annual Cap Project | Operations | Capital Tool Purchases/Other | 18-CTTRN21 DSCN20 | 2020 CT D SS Planned Annual | Operations | Substation Reliability | 19-DSCN20 DSCN21 | 2021 CT D SS Planned Annual | Operations | Substation Reliability | 20-DSCN21 | 20-DSCN21-SP01 DSEQ20 | 2020 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 21-DSEQ20Part 45 of 77
DSEQ21 | 2021 CT D SS Emergent Annual | Operations | Emergent Equipment Failures | 22-DSEQ21 | 22-DSEQ21-SP01 ETR2017 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 23-ETR2017 ETR2018 | Enhanced Tree Removals - CL&P | Operations | ENHANCED TREE REMOVAL | 24-ETR2018 ETR2019 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 25-ETR2019 ETR2020 | ENHANCED TREE REMOVALS - CL&P | Operations | ENHANCED TREE REMOVAL | 26-ETR2020 ETR2021 | Enhanced Tree Removals - CL&P | Operations | ENHANCED TREE REMOVAL | 27-ETR2021 ETT2016 | ENHANCED TREE TRIMMING - LATERAL | Operations | ENHANCED TREE TRIMMING | 28-ETT2016 ETT2017 | ENHANCED TREE TRIMMING - LATERAL | Operations | ENHANCED TREE TRIMMING | 29-ETT2017 ETTCF17 | ETT Customer Focused | Operations | CUSTOMER FOCUS TRIMMING | 30-ETTCF17 ETTCF18 | ETT Customer Focused | Operations | CUSTOMER FOCUS TRIMMING | 31-ETTCF18 ETTCF19 | ETT Customer Focused - 2019 | Operations | CUSTOMER FOCUS TRIMMING | 32-ETTCF19 ETTCF20 | ETT Customer Focused - 2020 | Operations | CUSTOMER FOCUS TRIMMING | 33-ETTCF20 ETTCF21 | ETT Customer Focused - 2021 | Operations | CUSTOMER FOCUS TRIMMING | 34-ETTCF21 GXTD19 | Capital Tools & Equip Maint D S/S | Operations | Capital Tool Purchases/Other | 35-GXTD19 GXTD20 | 2020 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 36-GXTD20 GXTD21 | 2021 CT D SS Capital Tool Annual | Operations | Capital Tool Purchases/Other | 37-GXTD21 2017 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 38-102118 2017 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 39-103353 2017 SUBSTATION METERING | Operations | Substation Reliability | 40-201435 2017 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 41-495802 CD00412 (CDNXANNL) | 2017 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 42-CD00412 (CDNXANNL) CDMHANNL | 2017 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 43-CDMHANNL CSTMER (CDCDANNL) | 2017 Customer | Operations | New Customer | 44-CSTMER (CDCDANNL) DB_CABLE (101395) | 2017 DB Cable | Operations | URD/DB Cable Reliability | 45-DB_CABLE (101395) DSEQ | 2017 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 46-DSEQ EFO_TLS (GXCOCT) | 2017 EFO Tools | Operations | Capital Tool Purchases/Other | 47-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2017 Emergent Line | Operations | Emergent Equipment Failures | 48-EMRGNTLN (CDEMANNL) INSCLMCST (CTINS24) | 2017 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 49-INSCLMCST (CTINS24) IT1DWANA | 2017 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 50-IT1DWANA LIGHTNG (D7DA24) | 2017 Lighting | Operations | Lighting | 51-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2017 Line Relocations | Operations | Line Relocations/Act of Public Authority | 52-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2017 Line Reliability | Operations | Distribution Line Reliability | 53-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2017 Voltage Corrections | Operations | Peak Load/Capacity | 54-VLT_CORR (CDDKANNL) DT7C | 2017 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 55-DT7C LVEHPUR | 2017 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 56-LVEHPUR 2018 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 57-102118 2018 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 58-103353 2018 SUBSTATION METERING | Operations | Substation Reliability | 59-201435 2018 CL&P - FEEDER METERING PROJECT | Operations | Substation Reliability | 60-401051 468601 (CD48KVAN24) | 2018 4.8KV GROUNDING FOR CODE COMPLIANCE | Operations | Regulatory Commitments-Other | 61-468601 (CD48KVAN24) 2018 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 62-495802Part 46 of 77
CD00258 | 2018 LINE RECLOSER CONTROL PROG | Operations | RECLOSER CONTROL PROGRAM | 63-CD00258 CD00412 (CDNXANNL) | 2018 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 64-CD00412 (CDNXANNL) CSTMER (CDCDANNL) | 2018 Customer | Operations | New Customer | 65-CSTMER (CDCDANNL) DB_CABLE (101395) | 2018 DB Cable | Operations | URD/DB Cable Reliability | 66-DB_CABLE (101395) DSCN | 2018 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 67-DSCN DSEQ | 2018 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 68-DSEQ EFO_TLS (GXCOCT) | 2018 EFO Tools | Operations | Capital Tool Purchases/Other | 69-EFO_TLS (GXCOCT) EMRGNTLN (CDEMANNL) | 2018 Emergent Line | Operations | Emergent Equipment Failures | 70-EMRGNTLN (CDEMANNL) GXCOTRBL | 2018 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 71-GXCOTRBL INSCLMCST (CTINS24) | 2018 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 72-INSCLMCST (CTINS24) IT1DWANA | 2018 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 73-IT1DWANA LIGHTNG (D7DA24) | 2018 Lighting | Operations | Lighting | 74-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2018 Line Relocations | Operations | Line Relocations/Act of Public Authority | 75-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2018 Line Reliability | Operations | Distribution Line Reliability | 76-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2018 Voltage Corrections | Operations | Peak Load/Capacity | 77-VLT_CORR (CDDKANNL) DT7C | 2018 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 78-DT7C LVEHPUR | 2018 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 79-LVEHPUR 2019 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 80-102118 2019 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 81-103353 2019 SUBSTATION METERING | Operations | Substation Reliability | 82-201435 2019 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 83-495802 CD00412 (CDNXANNL) | 2019 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 84-CD00412 (CDNXANNL) CDMHANNL | 2019 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 85-CDMHANNL CSTMER (CDCDANNL) | 2019 Customer | Operations | New Customer | The New Customer category in total was on budget for the year as overages in Customer Annuals were offset by lower spending for specific Customer projects. | 86-CSTMER (CDCDANNL) DB_CABLE (101395) | 2019 DB Cable | Operations | URD/DB Cable Reliability | 87-DB_CABLE (101395) DSCN | 2019 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 88-DSCN DSEQ | 2019 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 89-DSEQ EMRGNTLN (CDEMANNL) | 2019 Emergent Line | Operations | Emergent Equipment Failures | 90-EMRGNTLN (CDEMANNL) GXCOTRBL | 2019 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 91-GXCOTRBL INSCLMCST (CTINS24) | 2019 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 92-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2019 Lighting | Operations | Lighting | 93-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2019 Line Relocations | Operations | Line Relocations/Act of Public Authority | 94-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2019 Line Reliability | Operations | Distribution Line Reliability | 95-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2019 Voltage Corrections | Operations | Peak Load/Capacity | 96-VLT_CORR (CDDKANNL) DT7C | 2019 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 97-DT7C LVEHPUR | 2019 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 98-LVEHPUR 2020 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 99-102118 2020 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 100-103353Part 47 of 77
2020 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 101-495802 CD00412 (CDNXANNL) | 2020 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 102-CD00412 (CDNXANNL) CDMHANNL | 2020 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 103-CDMHANNL CSTMER (CDCDANNL) | 2020 Customer | Operations | New Customer | 104-CSTMER (CDCDANNL) DB_CABLE (101395) | 2020 DB Cable | Operations | URD/DB Cable Reliability | 105-DB_CABLE (101395) DSEQ | 2020 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 106-DSEQ EMRGNTLN (CDEMANNL) | 2020 Emergent Line | Operations | Emergent Equipment Failures | 107-EMRGNTLN (CDEMANNL) GXCOTRBL | 2020 TOOLS/EQUIPMENT TROUBLE SHOOTER ORG | Operations | Capital Tool Purchases/Other | 108-GXCOTRBL INSCLMCST (CTINS24) | 2020 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 109-INSCLMCST (CTINS24) LIGHTNG (D7DA24) | 2020 Lighting | Operations | Lighting | 110-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2020 Line Relocations | Operations | Line Relocations/Act of Public Authority | 111-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2020 Line Reliability | Operations | Distribution Line Reliability | 112-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2020 Voltage Corrections | Operations | Peak Load/Capacity | 113-VLT_CORR (CDDKANNL) DT7C | 2020 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 114-DT7C LVEHPUR | 2020 CT Elec Vehicle Purchases Distrib | Operations | Capitalized Vehicles | 115-LVEHPUR 2021 2021 PCB TRANSFORMER REPL PROGRAM | Operations | Environmental | 116-102118 2021 CL&P REPLACE LEAKING SPLICES | Operations | Network Reliability | 117-103353 2021 Third Party Attachment Make Ready | Operations | Line Relocations/Act of Public Authority | 118-495802 CD00412 (CDNXANNL) | 2021 CL&P Repl Net. Xfmrs Blanket | Operations | Network Reliability | 119-CD00412 (CDNXANNL) CDMHANNL | 2021 REPAIR & REPL OF CL&P UG STRUCTURES | Operations | Network Reliability | 120-CDMHANNL CSTMER (CDCDANNL) | 2021 Customer | Operations | New Customer | 121-CSTMER (CDCDANNL) DB_CABLE (101395) | 2021 DB Cable | Operations | URD/DB Cable Reliability | 122-DB_CABLE (101395) DSCN | 2021 DIST S/S OBSOLESENCE ANNUAL - GEN. | Operations | Substation Reliability | 123-DSCN DSEQ | 2021 CLP DIST.SS FAILED EQUIPMENT ANNUAL | Operations | Emergent Equipment Failures | 124-DSEQ EMRGNTLN (CDEMANNL) | 2021 Emergent Line | Operations | Emergent Equipment Failures | 125-EMRGNTLN (CDEMANNL) GECNCLP | 2021 CT TRANSPORTATION TOOLS | Operations | Capital Tool Purchases/Other | 126-GECNCLP GXENG | 2021 Capital Tools for Engineering Org | Operations | Capital Tool Purchases/Other | 127-GXENG INSCLMCST (CTINS24) | 2021 Insurance Claims / Keep Cost | Operations | Emergent Equipment Failures | 128-INSCLMCST (CTINS24) IT1DWANA | 2021 TELECOM -WAN ANNUALS - CLP | Operations | Capital Tool Purchases/Other | 129-IT1DWANA LIGHTNG (D7DA24) | 2021 Lighting | Operations | Lighting | 130-LIGHTNG (D7DA24) LN_RELO (CDDHANNL) | 2021 Line Relocations | Operations | Line Relocations/Act of Public Authority | 131-LN_RELO (CDDHANNL) LN_RLBLTY (CDDRANNL) | 2021 Line Reliability | Operations | Distribution Line Reliability | 132-LN_RLBLTY (CDDRANNL) VLT_CORR (CDDKANNL) | 2021 Voltage Corrections | Operations | Peak Load/Capacity | 133-VLT_CORR (CDDKANNL) DT7C | 2021 TRANSFORMERS CL&P | Operations | Pre-Cap Line Transformers | 134-DT7C Line Notes: Pre 2022 Project Specific and Annual tabs differ from Post 2022 formats, with Operations and Shared Services presented in separate columns to reflect differing reporting methods (direct costs vs total). * There are no new documentations to be provided for this Supplemental Filing [Sheet: Annual Projects Post 2022] The Connecticut Light and Power Company d/b/a Eversource Energy Actual Capital Expenditures and In-Service Capital Additions through September 30, 2026
As listed on the current system
Supplement for New App [Filed: 11/18/2026]