Application supplement
Exhibit CLP-Additions-6 Supplemental 3 and Exhibit CLP-Additions-4 Supplemental 3
Files3
Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
PDF · 155 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdfRead the text of Docket No. 26-05-10 Exhibit CLP-Additions-6 Supplemental Filing November 18 2026.pdf
CLP-ADDITIONS-4 Supplemental 3.pdf
PDF · 2.2 MB · 73 pagesText searchable
Download CLP-ADDITIONS-4 Supplemental 3.pdfRead the text of CLP-ADDITIONS-4 Supplemental 3.pdf
CLP-ADDITIONS-4 Supplemental 3.xlsx
Excel · 658 KBText searchable
Download CLP-ADDITIONS-4 Supplemental 3.xlsxRead the text of CLP-ADDITIONS-4 Supplemental 3.xlsx
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 5 of 77
CD00627 | State Project 135-287: RT 106 Recon | Operations | Line Relocations/Act of Public Authority | 165-CD00627 CD00628 | Greenwich 28F Ducts & cables | Operations | Peak Load/Capacity | 166-CD00628 CD00630 | SR Highway Xings Upgd-Cheshire | Operations | STRUCTURAL AND ELECTRICAL | 167-CD00630 CD00631 | SR Highway Xings Upgrades-Hartford | Operations | STRUCTURAL AND ELECTRICAL | 168-CD00631 CD00632 | SR Highway Xings Upgrades-Simsbury | Operations | STRUCTURAL AND ELECTRICAL | 169-CD00632 CD00633 | SR Highway Xings Upgrades-Danielson | Operations | STRUCTURAL AND ELECTRICAL | 170-CD00633 CD00634 | SR Highway Xings Upgrades-Madison | Operations | STRUCTURAL AND ELECTRICAL | 171-CD00634 CD00635 | SR Highway Xings Upgrade-New London | Operations | STRUCTURAL AND ELECTRICAL | 172-CD00635 CD00636 | SR Highway Xings Upgrades-Tolland | Operations | STRUCTURAL AND ELECTRICAL | 173-CD00636 CD00637 | SR Highway Xings Upgrade-E. Hampton | Operations | STRUCTURAL AND ELECTRICAL | 174-CD00637 CD00638 | SR Highway Xings Upgrades-Newtown | Operations | STRUCTURAL AND ELECTRICAL | 175-CD00638 CD00639 | SR Highway Xings Upgrades-Norwalk | Operations | STRUCTURAL AND ELECTRICAL | 176-CD00639 CD00640 | SR Highway Xings Upgrades-Stamford | Operations | STRUCTURAL AND ELECTRICAL | 177-CD00640 CD00641 | SR Highway Xings Upgrades-Waterbury | Operations | STRUCTURAL AND ELECTRICAL | 178-CD00641 CD00643 | 12J4 System Resiliency - LT_Fuse 53 | Operations | STRUCTURAL AND ELECTRICAL | 179-CD00643 CD00644 | Meadow 28J Retirement - Convert 28J | Operations | SUBSTATION FLOOD MITIGATION | 180-CD00644 CD00645 | New Service-260 Long Ridge Rd Stmfd | Operations | New Customer | 181-CD00645 CD00646 | Mystic 13K8 Contingency Overload | Operations | Distribution Line Reliability | 182-CD00646 CD00647 | Meadow 28J - 28J1 Conversion | Operations | SUBSTATION FLOOD MITIGATION | 183-CD00647 CD00651 | Hi/Low Removal 12F51/24F3 Meriden | Operations | Regulatory Commitments-Other | 184-CD00651 CD00652 | Reconfig 11J43 behind Meadow 28J1 | Operations | SUBSTATION FLOOD MITIGATION | 185-CD00652 CD00653 | Phoenix Crossing, Blmfld | Operations | New Customer | 186-CD00653 CD00654 | Eliminate 4.8 kV 12F-6X Islanded SS | Operations | Distribution Line Reliability | 187-CD00654 | 187-CD00654-SP01 | 187-CD00654-SP02 | 187-CD00654-SP03 CD00659 | 2016 POLE INTEGRITY PROGRAM - SR | Operations | POLE INTEGRITY PROGRAM | 188-CD00659 CD00663 | Niagara Bottling Plant | Operations | New Customer | 189-CD00663 CD00664 | Bradley Airport Roadway Relocation | Operations | Line Relocations/Act of Public Authority | 190-CD00664 CD00665 | 14L Bus Fault & Customer Zone Reduc | Operations | SMART SWITCHES PROGRAM | 191-CD00665 CD00667 | 24A16 Auto Loop | Operations | Distribution Line Reliability | 192-CD00667 CD00668 | 14N3 - System Resiliency - Winchest | Operations | STRUCTURAL AND ELECTRICAL | 193-CD00668 CD00669 | Create an auto loop 30K11 with 7A8 | Operations | Regulatory Commitments-Other | 194-CD00669 CD00672 | NewSvc - Isaac St, Nrwlk - POKO Dev | Operations | New Customer | 195-CD00672 CD00676 | 22E36 Spacer Cable Spreader Replace | Operations | Distribution Line Reliability | 196-CD00676 CD00679 | Uncasville 1Q6 Smart Switch Proposa | Operations | SMART SWITCHES PROGRAM | 197-CD00679 CD00680 | Terryville 21Q S/S Elimination | Operations | Distribution Line Reliability | 198-CD00680 * | CD00681 | 13H1 - 2017 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 199-CD00681 CD00683 | 14L Bus Fault & Cust Zone Reduction | Operations | SMART SWITCHES PROGRAM | 200-CD00683 * | CD00686 | 25G2 - 2017 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 201-CD00686 CD00687 | 21H9 - 2017 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 202-CD00687 CD00689 | Road Widening Pepper St Monroe | Operations | Line Relocations/Act of Public Authority | 203-CD00689 CD00690 | Saybrook Station Street Lighting | Operations | New Customer | 204-CD00690Part 6 of 77
CD00691 | Middletown_Smart Switch Prog_30K16- | Operations | SMART SWITCHES PROGRAM | 205-CD00691 CD00693 | Cromwell_3R06-50Z & 70S SSwitch Pgm | Operations | SMART SWITCHES PROGRAM | 206-CD00693 CD00697 | 12N19 System Resiliency | Operations | STRUCTURAL AND ELECTRICAL | 207-CD00697 CD00698 | 21Y2 Smart Switch RR on 21Y2 Cir | Operations | SMART SWITCHES PROGRAM | 208-CD00698 CD00700 | 12J5 2017 SMART SWITCH PROGRAM | Operations | SMART SWITCHES PROGRAM | 209-CD00700 CD00701 | 3R03 Smart Switch Proposal | Operations | SMART SWITCHES PROGRAM | 210-CD00701 CD00702 | 11F13 Sys Res 2017 Windham/Lebanon | Operations | STRUCTURAL AND ELECTRICAL | 211-CD00702 CD00705 | 22N1 - 2017 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 212-CD00705 CD00707 | 21L2-71S Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 213-CD00707 * | CD00708 | 9L06 2017 SMART SWITCH PROGRAM | Operations | SMART SWITCHES PROGRAM | 214-CD00708 CD00709 | 11Y6 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 215-CD00709 CD00710 | 21H9 Sys Resil Portld/E.Hamp/Colche | Operations | STRUCTURAL AND ELECTRICAL | 216-CD00710 CD00713 | State Project 135-321 - Oaklawn Ave | Operations | Line Relocations/Act of Public Authority | 217-CD00713 CD00714 | 31C1 System Resiliency Newtown | Operations | STRUCTURAL AND ELECTRICAL | 218-CD00714 CD00717 | 3A03 Sys Resil Manchester & Bolton | Operations | STRUCTURAL AND ELECTRICAL | 219-CD00717 CD00718 | 1Q03 Reconductor Jerome and Moxley | Operations | Regulatory Commitments-Other | 220-CD00718 CD00719 | 11Y6 System Resiliency | Operations | STRUCTURAL AND ELECTRICAL | 221-CD00719 CD00720 | 21K8 Sys Resil Southbury | Operations | STRUCTURAL AND ELECTRICAL | 222-CD00720 CD00723 | 12J5 System Resiliency Mansfield | Operations | Regulatory Commitments-Other | 223-CD00723 CD00725 | Glenbrook S/SNew S/Gear Fdr Getaway | Operations | Network Reliability | 224-CD00725 CD00726 | 8A2 Smart Switch Project | Operations | SMART SWITCHES PROGRAM | 225-CD00726 CD00728 | Cedar Heights - Establish new fdr;4 | Operations | Peak Load/Capacity | 226-CD00728 | 226-CD00728-SP03 CD00730 | Colchester 12K Elimination part 2 | Operations | ISLANDED SUBSTATION PROGRAM | 227-CD00730 CD00731 | Manchester 3A CIP wall | Operations | SUBSTATION SECURITY | 228-CD00731 CD00732 | 26E8 Sys Resil Wdstck/Eford/Pmfret | Operations | Distribution Line Reliability | 229-CD00732 CD00737 | Brooklyn 30Y - Loss of 1505 Line | Operations | Distribution Line Reliability | 230-CD00737 CD00738 | ROW Project 14M22/28 - Resiliency | Operations | RIGHT OF WAY LINES | 231-CD00738 CD00739 | CONTINGENCY OVERLOAD FLAX HILL 24A1 | Operations | Peak Load/Capacity | 232-CD00739 CD00741 | 31A6&31A15 Contingency Load Relief | Operations | Peak Load/Capacity | 233-CD00741 CD00742 | 21L8 Smart Switch | Operations | SMART SWITCHES PROGRAM | 234-CD00742 CD00743 | St Hwy Proj #63-703 - Impr to I-91N | Operations | Line Relocations/Act of Public Authority | 235-CD00743 CD00744 | Chippen Hill 15U2 Contingency OL | Operations | Peak Load/Capacity | 236-CD00744 | 236-CD00744-SP01 | 236-CD00744-SP03 CD00745 | Middletown_Remove 7A80 ROW | Operations | RIGHT OF WAY LINES | 237-CD00745 CD00746 | 12H3-4-5 Back-up Step-Transformers | Operations | ISLANDED SUBSTATION PROGRAM | 238-CD00746 CD00748 | 13B25 Smart Switch 2017 | Operations | SMART SWITCHES PROGRAM | 239-CD00748 CD00755 | Middletown_Westlake Dr_Cble Replace | Operations | URD/DB Cable Reliability | 240-CD00755 CD00757 | Uncasville 1Q6-1Q01 Automatic Tie | Operations | Regulatory Commitments-Other | 241-CD00757 CD00758 | N Bloomfield 2A4 Sys Res ROW | Operations | RIGHT OF WAY LINES | 242-CD00758 CD00759 | NB Post Office Switchgear and Loop | Operations | Network Reliability | 243-CD00759 | 243-CD00759-SP01 CD00760 | 9L04 2017 SMART SWITCH PROGRAM | Operations | SMART SWITCHES PROGRAM | 244-CD00760 CD00761 | 9L09 2017 SMART SWITCH PROGRAM | Operations | SMART SWITCHES PROGRAM | 245-CD00761Part 7 of 77
CD00764 | Smart Switches Hopewell 22R2 | Operations | SMART SWITCHES PROGRAM | 246-CD00764 CD00768 | Uncasville 1Q01 Smart Switch Propsl | Operations | SMART SWITCHES PROGRAM | 247-CD00768 CD00772 | Haddam 11C14 Smart Switch Proposal | Operations | SMART SWITCHES PROGRAM | 248-CD00772 CD00773 | Pinnacle Dev - Butler/Quincy St, Nr | Operations | New Customer | 249-CD00773 | 249-CD00773-SP01 CD00775 | Smart Switch for 26E8 Sys Resil | Operations | SMART SWITCHES PROGRAM | 250-CD00775 CD00779 | 31A2 Leefair Condos Cable Rpl & Lp | Operations | URD/DB Cable Reliability | 251-CD00779 CD00780 | Circuit 3505 Park Rd W Htfd Convers | Operations | Network Reliability | 252-CD00780 CD00781 | Eliminate Baldwin 5kV | Operations | Distribution Line Reliability | 253-CD00781 | 253-CD00781-SP01 | 253-CD00781-SP03 CD00785 | Madison Railroad Crossings | Operations | STRUCTURAL AND ELECTRICAL | 254-CD00785 CD00786 | New London Railroad Crossings | Operations | STRUCTURAL AND ELECTRICAL | 255-CD00786 CD00792 | CDOT Proj #137-159 Mystic I-95 Brdg | Operations | Line Relocations/Act of Public Authority | 256-CD00792 CD00793 | CDOT Exit # 43 @ I-84, Park Rd -WHf | Operations | Line Relocations/Act of Public Authority | 257-CD00793 CD00794 | Pawcatuck Solar Center, LLC - 20MW | Operations | New Customer | 258-CD00794 | 258-CD00794-SP03 CD00801 | Tomac 12H 5kV Islanded Substation | Operations | Distribution Line Reliability | 259-CD00801 CD00804 | Stm - Vlt 811 - Repl. Network Xfmrs | Operations | Regulatory Commitments-Other | 260-CD00804 CD00806 | 2017 POLE INTEGRITY PROGRAM | Operations | POLE INTEGRITY PROGRAM | 261-CD00806 CD00807 | Shft Eqpt-Frontier Reject Pole 2017 | Operations | POLE INTEGRITY PROGRAM | 262-CD00807 CD00810 | Williams St 9LSwitchgear/Getaway Ov | Operations | Peak Load/Capacity | 263-CD00810 CD00815 | Line Sensor Replacments | Operations | LINE SENSORS PROGRAM | 264-CD00815 CD00817 | Middletown Town Place DB Cable Repl | Operations | URD/DB Cable Reliability | 265-CD00817 CD00820 | Bethany-11N81 Ringed Spacer Cable R | Operations | Distribution Line Reliability | 266-CD00820 CD00821 | 2018 Smart switch Program 21H13 | Operations | SMART SWITCHES PROGRAM | 267-CD00821 CD00824 | Hartford Road, Bridge Rebuild Manch | Operations | Line Relocations/Act of Public Authority | 268-CD00824 CD00826 | ENHANCEMENT OF 28M4 AND 28M14 FEEDE | Operations | Network Reliability | 269-CD00826 CD00827 | 11F12-11F13 ROW Fault Protection Sc | Operations | Regulatory Commitments-Other | 270-CD00827 CD00830 | Cos Cob 11R53 PILC Cable Replacemen | Operations | Network Reliability | 271-CD00830 CD00832 | Greenwich 27.6KV Stabilization | Operations | Peak Load/Capacity | 272-CD00832 CD00834 | Farmington 1C-Network Monitoring Sy | Operations | Network Reliability | 273-CD00834 CD00840 | Chesire MBI initiative - pole integ | Operations | POLE INTEGRITY PROGRAM | 274-CD00840 CD00841 | Danielson MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 275-CD00841 CD00842 | Windsor Locks 14K6 Overloaded Autos | Operations | Peak Load/Capacity | 276-CD00842 CD00843 | East Hampton MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 277-CD00843 CD00845 | Hartford MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 278-CD00845 CD00847 | New London MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 279-CD00847 CD00848 | Newtown MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 280-CD00848 CD00849 | Norwalk MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 281-CD00849 CD00850 | Stamford MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 282-CD00850 CD00851 | Tolland MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 283-CD00851 CD00852 | Torrington MBI Pole Integrity | Operations | POLE INTEGRITY PROGRAM | 284-CD00852 CD00854 | CDOT 135-325 Main St - Rel Facility | Operations | Line Relocations/Act of Public Authority | 285-CD00854Part 8 of 77
CD00858 | 12H16 Contingency Load Relief | Operations | Peak Load/Capacity | 286-CD00858 CD00860 | 11F10 Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 287-CD00860 CD00861 | Service Change 165 Capital Ave Htfd | Operations | New Customer | 288-CD00861 CD00862 | New Service Grist Mill Village Bd A | Operations | New Customer | 289-CD00862 CD00864 | Reloc Green Hill 30R14&30R15 Getaw | Operations | Peak Load/Capacity | 290-CD00864 CD00865 | Extend 23KV to Supply Niagara Plant | Operations | New Customer | 291-CD00865 CD00870 | 2018 Smart Swch Prog 12F47-74S Zone | Operations | SMART SWITCHES PROGRAM | 292-CD00870 CD00872 | 2018 Smart Switch Program 11H75 Zon | Operations | SMART SWITCHES PROGRAM | 293-CD00872 CD00873 | 1B10 - 2018 Smart Switch Installati | Operations | SMART SWITCHES PROGRAM | 294-CD00873 CD00874 | 2018 Smart Switch Program 11H62 | Operations | SMART SWITCHES PROGRAM | 295-CD00874 CD00876 | 15D1-161R SmartSwitch Pr/30R14-162R | Operations | SMART SWITCHES PROGRAM | 296-CD00876 * | CD00880 | 2018 Smart Switch Program 22R1 | Operations | SMART SWITCHES PROGRAM | 297-CD00880 CD00881 | Noera 13H2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 298-CD00881 CD00882 | 32R1 remove underbridge cable | Operations | Distribution Line Reliability | 299-CD00882 CD00884 | 2018 Smart Switch_Berlin 6A8_Alt. T | Operations | SMART SWITCHES PROGRAM | 300-CD00884 CD00885 | 2018 Smart Switch Program 11Y1 | Operations | SMART SWITCHES PROGRAM | 301-CD00885 CD00886 | 2018 Smart Switch Program 36F2 | Operations | SMART SWITCHES PROGRAM | 302-CD00886 CD00887 | 2018 Smart Switch Program 36F6 | Operations | SMART SWITCHES PROGRAM | 303-CD00887 CD00888 | Re-feed Essex Industrial Park | Operations | POLE INTEGRITY PROGRAM | 304-CD00888 CD00889 | 1B12 - Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 305-CD00889 CD00890 | 2B6 - Smart Switch Installation | Operations | SMART SWITCHES PROGRAM | 306-CD00890 CD00891 | Extend 24J2 - Creation @ 24J5 and 2 | Operations | Peak Load/Capacity | 307-CD00891 | 307-CD00891-SP03 CD00892 | 2018 Smart Switch Program 15C8 | Operations | SMART SWITCHES PROGRAM | 308-CD00892 * | CD00893 | 2018 Smart Switch Program 23Q8 | Operations | SMART SWITCHES PROGRAM | 309-CD00893 CD00897 | Tie Between 21H14 and 22R4 | Operations | SMART SWITCHES PROGRAM | 310-CD00897 CD00898 | Mystic-Shunock Loops For MBI Improv | Operations | Regulatory Commitments-Other | 311-CD00898 CD00899 | 2A14/15 ROW Resiliency | Operations | RIGHT OF WAY LINES | 312-CD00899 CD00902 | 3814 Reconduct @ Trader Joe/Phoenix | Operations | New Customer | 313-CD00902 CD00903 | Reconductor Convert Chesnut Hill Rd | Operations | Distribution Line Reliability | 314-CD00903 CD00904 | Bridge Cable Replace - Multiple Loc | Operations | Network Reliability | 315-CD00904 CD00905 | Replace P&LC on 1B06 | Operations | Network Reliability | 316-CD00905 * | CD00906 | 47N2 Smart Switch Assignment | Operations | SMART SWITCHES PROGRAM | 317-CD00906 CD00907 | Wheeler Village Dr., Sog - Install | Operations | URD/DB Cable Reliability | 318-CD00907 CD00908 | 2018 Smart Switch Program 11Y6 | Operations | SMART SWITCHES PROGRAM | 319-CD00908 CD00909 | Reverknolls DB Replacement | Operations | URD/DB Cable Reliability | 320-CD00909 CD00911 | West Goshen 20U Substation Eliminat | Operations | Distribution Line Reliability | 321-CD00911 * | CD00912 | Replace of Underbridge Cable 3A09 | Operations | POLE INTEGRITY PROGRAM | 322-CD00912 CD00916 | South End 1G DG1 Sensors | Operations | Network Reliability | 323-CD00916 * | CD00917 | Uncasville 1Q6 I-395 Brdg Cable Rep | Operations | Network Reliability | 324-CD00917 CD00918 | Northwest Hartford 2N DGI Sensors | Operations | Network Reliability | 325-CD00918 CD00919 | Shepaug 13A Install Regulation | Operations | Peak Load/Capacity | 326-CD00919 CD00922 | Quarry Dock Rd, Cable Replacement | Operations | URD/DB Cable Reliability | 327-CD00922Part 9 of 77
CD00923 | 2018 Smart Switch Program 19Y1 | Operations | SMART SWITCHES PROGRAM | 328-CD00923 CD00924 | Bulls Bridge Distribution wk for T | Operations | Peak Load/Capacity | 329-CD00924 CD00925 | Convert South Leonard Ave 5 kV Feed | Operations | Distribution Line Reliability | 330-CD00925 | 330-CD00925-SP01 | 330-CD00925-SP02 | 330-CD00925-SP03 CD00926 | 13H96-13H99 Recloser Loop Scheme | Operations | SMART SWITCHES PROGRAM | 331-CD00926 CD00928 | Freight 11W DGI Sensors | Operations | Network Reliability | 332-CD00928 | 332-CD00928-SP01 CD00931 | Middletown-Rosecommon Dr_DB Cbl Rep | Operations | URD/DB Cable Reliability | 333-CD00931 CD00932 | CDOT - Norw Westport Ave Rd Widenin | Operations | Line Relocations/Act of Public Authority | 334-CD00932 CD00937 | 12N19 Overload Correction | Operations | Peak Load/Capacity | 335-CD00937 CD00941 | Relocate Bushy Plains Rd Pole line | Operations | Line Relocations/Act of Public Authority | 336-CD00941 CD00942 | CDOT 14-185 Int 95 Brdg over rt 1 | Operations | Line Relocations/Act of Public Authority | 337-CD00942 CD00943 | Black Rock 11H DGI Sensors | Operations | Network Reliability | 338-CD00943 CD00944 | Cos Cob 11R DGI Sensors | Operations | Network Reliability | 339-CD00944 | 339-CD00944-SP01 CD00945 | Farmington 1C DGI Sensors | Operations | Network Reliability | 340-CD00945 | 340-CD00945-SP01 CD00946 | 1K10/13S7 Contingency Overload | Operations | Network Reliability | 341-CD00946 CD00947 | Westside 7A DGI Sensors | Operations | Network Reliability | 342-CD00947 CD00948 | Williams 9L DGI Sensors | Operations | Network Reliability | 343-CD00948 CD00949 | New Customer on 3R12 overload (LNG) | Operations | New Customer | 344-CD00949 * | CD00951 | 725 Bedford Street - New Service | Operations | New Customer | 345-CD00951 CD00954 | Stamford Ice Skating Rink New Serv | Operations | New Customer | 346-CD00954 CD00955 | Westport Overload Project | Operations | Peak Load/Capacity | 347-CD00955 CD00958 | Championship Drive - DB Line Exten | Operations | New Customer | 348-CD00958 CD00959 | New Brtn 5kv Conversion - 21W Porti | Operations | Regulatory Commitments-Other | 349-CD00959 CD00960 | Hillcroft Apartments Create Loop | Operations | URD/DB Cable Reliability | 350-CD00960 CD00964 | 1G28 Contingency Overload | Operations | Peak Load/Capacity | 351-CD00964 | 351-CD00964-SP03 CD00969 | Campville Row pole replacements | Operations | RIGHT OF WAY LINES | 352-CD00969 CD00970 | Back up Westbrook Sub 20S | Operations | ISLANDED SUBSTATION PROGRAM | 353-CD00970 CD00971 | 12J4-12J33 R.O.W. Rebuild | Operations | RIGHT OF WAY LINES | 354-CD00971 CD00976 | Eliminate Manual Switchgear I84 PF | Operations | Network Reliability | 355-CD00976 CD00978 | New Brtn Conv Farmington 23L Sub. | Operations | Regulatory Commitments-Other | 356-CD00978 CD00979 | Convert 19R2 | Operations | Regulatory Commitments-Other | 357-CD00979 CD00984 | 26 Russell St. New Brtn - New Svc | Operations | New Customer | 358-CD00984 CD00986 | Cable inject Trinity Ave, Glastonbu | Operations | URD/DB Cable Reliability | 359-CD00986 CD00987 | Pole Integrity - 2018 | Operations | POLE INTEGRITY PROGRAM | 360-CD00987 CD00988 | Shift Eqpt - Frontier Reject Poles | Operations | POLE INTEGRITY PROGRAM | 361-CD00988 CD00991 | Flax Hill New Feeder 24A19 | Operations | New Customer | 362-CD00991 CD00994 | Switchgear Replacement at Electric | Operations | Network Reliability | 363-CD00994 CD00997 | Colonial Drive Cable Replacement | Operations | URD/DB Cable Reliability | 364-CD00997 CD01004 | Improve Customer Zone Count 7A71, 7 | Operations | SMART SWITCHES PROGRAM | 365-CD01004 CD01005 | Mitigate Osprey Outages Eastern Reg | Operations | Environmental | 366-CD01005 CD01006 | Smart Switch Program 6A3 | Operations | SMART SWITCHES PROGRAM | 367-CD01006 | 367-CD01006-SP03 * | CD01007 | Smart Switches Program 11H76 | Operations | SMART SWITCHES PROGRAM | 368-CD01007 | 368-CD01007-SP03Part 10 of 77
CD01008 | 12B35 Smart Switch | Operations | SMART SWITCHES PROGRAM | 369-CD01008 | 369-CD01008-SP03 CD01009 | 15C8, 13B10, 13B21 New Loops | Operations | Regulatory Commitments-Other | 370-CD01009 | 370-CD01009-SP03 CD01010 | Scitico 27H8 Contingency Overload | Operations | Peak Load/Capacity | 371-CD01010 CD01012 | 14H3 Smart Switch | Operations | SMART SWITCHES PROGRAM | 372-CD01012 CD01013 | 24A14 - Putnam Rd Ext New Canaan Cb | Operations | URD/DB Cable Reliability | 373-CD01013 CD01014 | Cromwell Hills URD DB Cable Rpl Rd | Operations | URD/DB Cable Reliability | 374-CD01014 CD01015 | Middletown_Cedar Village_DB Cbl Rpl | Operations | URD/DB Cable Reliability | 375-CD01015 CD01017 | 12B37-2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 376-CD01017 CD01019 | 131 Hollow Tree Ridge Rd., Reloc Fa | Operations | New Customer | 377-CD01019 CD01021 | 49S2 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 378-CD01021 CD01023 | 21P4 Smart Switch | Operations | SMART SWITCHES PROGRAM | 379-CD01023 | 379-CD01023-SP03 CD01024 | Norwalk 9S 5kV Elimination | Operations | Distribution Line Reliability | 380-CD01024 CD01026 | Beacon Falls 11N83 & 11N84 Reliab | Operations | RIGHT OF WAY LINES | 381-CD01026 CD01031 | 4C19 Smart Switch | Operations | SMART SWITCHES PROGRAM | 382-CD01031 | 382-CD01031-SP03 CD01032 | 3R01 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 383-CD01032 | 383-CD01032-SP03 CD01036 | 11J41-71S Smart Switch Prog 2018 | Operations | SMART SWITCHES PROGRAM | 384-CD01036 CD01037 | TDRP Tunnel 12S4 | Operations | Regulatory Commitments-Other | 385-CD01037 CD01038 | Green Hill 30R Balancing | Operations | Peak Load/Capacity | 386-CD01038 CD01039 | Mystic 13K1 TDRP | Operations | Regulatory Commitments-Other | 387-CD01039 CD01040 | Smart Switch 3A12 | Operations | SMART SWITCHES PROGRAM | 388-CD01040 | 388-CD01040-SP03 CD01045 | TDRP 2017 Project_Dooley 30K11 | Operations | Regulatory Commitments-Other | 389-CD01045 CD01046 | TDRP 2017 Project_Dooley 30K13 | Operations | Regulatory Commitments-Other | 390-CD01046 | 390-CD01046-SP03 CD01047 | Lakeview 31A Contingency Loading | Operations | Peak Load/Capacity | 391-CD01047 | 391-CD01047-SP03 CD01048 | Mianus 16Q Contingency Load Relief | Operations | Peak Load/Capacity | 392-CD01048 | 392-CD01048-SP03 CD01050 | Atlantic Station South Tower | Operations | New Customer | 393-CD01050 CD01053 | Install SWGR For Meriden Common PH2 | Operations | New Customer | 394-CD01053 | 394-CD01053-SP01 | 394-CD01053-SP02 | 394-CD01053-SP03 CD01056 | 3A11/49S1-New Recloser Loop Scheme | Operations | Distribution Line Reliability | 395-CD01056 CD01057 | W. Hyderdale Dr Gosh DB Cable Repl | Operations | URD/DB Cable Reliability | 396-CD01057 CD01059 | Stamford New Service – 245 Atlantic | Operations | New Customer | 397-CD01059 CD01060 | West Ave OH Relocation | Operations | Line Relocations/Act of Public Authority | 398-CD01060 | 398-CD01060-SP03 CD01061 | May St Naugatuck Extend 3 phase | Operations | New Customer | 399-CD01061 CD01062 | New Service Kesser Torah Estates | Operations | New Customer | 400-CD01062 CD01065 | Mystic 13K4 OL Upon Loss of A3 Bus | Operations | Peak Load/Capacity | 401-CD01065 | 401-CD01065-SP03 CD01066 | Rockville 14W Cable Upgrades & Offl | Operations | Peak Load/Capacity | 402-CD01066 | 402-CD01066-SP03 CD01067 | Replace Tri-colored Netwk Secondary | Operations | Regulatory Commitments-Other | 403-CD01067 CD01071 | 13F66 & 68 Loop Scheme Modification | Operations | Distribution Line Reliability | 404-CD01071 CD01077 | CT Studio South Windsor | Operations | New Customer | 405-CD01077 CD01082 | 5R4 Robin Dr Bark DB Cable Replac | Operations | URD/DB Cable Reliability | 406-CD01082 * | CD01087 | Hytone Farm | Operations | New Customer | 407-CD01087 | 407-CD01087-SP03 * | CD01091 | Back up for Buckingham 31K | Operations | ISLANDED SUBSTATION PROGRAM | 408-CD01091Part 11 of 77
CD01092 | Replace Duct Bank - Reserve Rd., Ht | Operations | Network Reliability | 409-CD01092 CD01093 | Alternate Source For Essex 16M | Operations | ISLANDED SUBSTATION PROGRAM | 410-CD01093 CD01094 | 14S&39M Stranded Substation Backup | Operations | ISLANDED SUBSTATION PROGRAM | 411-CD01094 CD01095 | Load Relief 48C9 Contingency Overlo | Operations | Peak Load/Capacity | 412-CD01095 CD01097 | 21H15-Automatic Zone Alternate Sour | Operations | SMART SWITCHES PROGRAM | 413-CD01097 | 413-CD01097-SP03 CD01102 | CDOT 152-158 Route 85 Waterford | Operations | Line Relocations/Act of Public Authority | 414-CD01102 CD01103 | Triangle 11A72 Auto Loop Scheme Ins | Operations | SMART SWITCHES PROGRAM | 415-CD01103 | 415-CD01103-SP03 CD01105 | Stone Gate Circle DB Reconductori | Operations | URD/DB Cable Reliability | 416-CD01105 CD01107 | Heritage Village Southbury Reliabil | Operations | Distribution Line Reliability | 417-CD01107 CD01109 | CDOT 155-171 | Operations | Line Relocations/Act of Public Authority | 418-CD01109 CD01111 | Tie Between 22R1 and 22R6 | Operations | Regulatory Commitments-Other | 419-CD01111 CD01113 | ASML Facility Expansion | Operations | New Customer | 420-CD01113 CD01114 | Plymouth Industrial Park | Operations | URD/DB Cable Reliability | 421-CD01114 CD01116 | Economy Spring New Service Aircraft | Operations | New Customer | 422-CD01116 CD01117 | Stmfrd – Greenwich Ave – Rel. Facil | Operations | Line Relocations/Act of Public Authority | 423-CD01117 | 423-CD01117-SP03 CD01119 | Stamford New Service – 885 Washingt | Operations | New Customer | 424-CD01119 CD01120 | Cromwell Hills UG FI Repl | Operations | URD/DB Cable Reliability | 425-CD01120 CD01121 | 302P Switchgear Automation | Operations | Network Reliability | 426-CD01121 CD01122 | 1205 Feeder - Eliminate Redundant C | Operations | Network Reliability | 427-CD01122 CD01123 | Center Street 24F Islanded Substati | Operations | Distribution Line Reliability | 428-CD01123 * | CD01126 | 14M7 Loop Scheme and Reliability Up | Operations | RECLOSER CONTROL PROGRAM | 429-CD01126 CD01128 | L&M Hospital New Service Switchgear | Operations | New Customer | 430-CD01128 | 430-CD01128-SP03 CD01129 | Pole Integrity - 2019 | Operations | POLE INTEGRITY PROGRAM | 431-CD01129 | 431-CD01129-SP03 CD01132 | Triangle 11A Repl Cables for SS wor | Operations | Network Reliability | 432-CD01132 | 432-CD01132-SP01 | 432-CD01132-SP02 | 432-CD01132-SP03 CD01136 | Willow Springs Condos Cable Replace | Operations | URD/DB Cable Reliability | 433-CD01136 * | CD01140 | 3A03 Contingency Overload | Operations | Peak Load/Capacity | 434-CD01140 CD01141 | Bloom CT Clean Energy Company | Operations | New Customer | 435-CD01141 CD01142 | Shift Eqpt-Frontier Rejects - 2019 | Operations | POLE INTEGRITY PROGRAM | 436-CD01142 CD01144 | Reroute 35L9 and 35L10 getaways | Operations | Network Reliability | 437-CD01144 CD01145 | Reconductor Chapman Ave, Madison | Operations | POLE INTEGRITY PROGRAM | 438-CD01145 CD01154 | 30R9 Smart Switch Program | Operations | SMART SWITCHES PROGRAM | 439-CD01154 CD01155 | Branford 11J45 Smart Switch -TOP 20 | Operations | SMART SWITCHES PROGRAM | 440-CD01155 * | CD01158 | SSRK6.18-12H16-2->500-RWO.2 | Operations | SMART SWITCHES PROGRAM | 441-CD01158 CD01159 | Western Reconductoring-Reject Poles | Operations | POLE INTEGRITY PROGRAM | 442-CD01159 CD01161 | SSRK2.18-21K7-2->1000-RWO.3 | Operations | SMART SWITCHES PROGRAM | 443-CD01161 CD01162 | Verogy - Southington | Operations | New Customer | 444-CD01162 | 444-CD01162-SP01 CD01163 | Verogy - East Windsor | Operations | New Customer | 445-CD01163 | 445-CD01163-SP01 CD01165 | Fry Brook 13B25-70S Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 446-CD01165 CD01166 | Middletown Westside 7A79 Westlake R | Operations | URD/DB Cable Reliability | 447-CD01166 | 447-CD01166-SP03 CD01167 | Smart Switch 36F6 2019 Program | Operations | Regulatory Commitments-Other | 448-CD01167Part 12 of 77
CD01170 | LARGE ZONE 12S2 - TOP 20 | Operations | SMART SWITCHES PROGRAM | 449-CD01170 CD01171 | Green Hill 30R9 SmartSwitch-TOP 20 | Operations | SMART SWITCHES PROGRAM | 450-CD01171 CD01173 | Coal Pit Hill Condos | Operations | URD/DB Cable Reliability | 451-CD01173 CD01174 | 11F9 Smart Switch - TOP 20 | Operations | SMART SWITCHES PROGRAM | 452-CD01174 CD01178 | Nutmeg Ln Reconductoring, Newtown | Operations | Distribution Line Reliability | 453-CD01178 CD01184 | Green Hill 30R8 Getaway Replacement | Operations | Network Reliability | 454-CD01184 CD01185 | SSRK614 18-35L8->1000-RWO 3 | Operations | SMART SWITCHES PROGRAM | 455-CD01185 | 455-CD01185-SP03 CD01186 | SS Prgm 32R1 & 32R3 Large zone Redu | Operations | Regulatory Commitments-Other | 456-CD01186 CD01189 | PCB Transformer Replacement Program | Operations | New Customer | 457-CD01189 CD01190 | SSRK128.18.13B9-70S>1,000-RWO.2 | Operations | SMART SWITCHES PROGRAM | 458-CD01190 CD01191 | Middletown_Eastlake Dr_Loop Desig | Operations | URD/DB Cable Reliability | 459-CD01191 | 459-CD01191-SP01 CD01192 | Greenwich – 11R55 – Reconductor A/C | Operations | Distribution Line Reliability | 460-CD01192 CD01193 | DB Cable Replacement South Mill Dr | Operations | URD/DB Cable Reliability | 461-CD01193 CD01194 | 11R51 and 11R52 PILC Cable Replacem | Operations | Network Reliability | 462-CD01194 CD01197 | 9L08-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 463-CD01197 | 463-CD01197-SP03 CD01198 | 9L03-2 Smart Switch Large Zone Redu | Operations | SMART SWITCHES PROGRAM | 464-CD01198 | 464-CD01198-SP03 CD01199 | 9L06-70S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 465-CD01199 | 465-CD01199-SP02 | 465-CD01199-SP03 CD01200 | 9L05-72S Smart Switch Large Zone Re | Operations | SMART SWITCHES PROGRAM | 466-CD01200 | 466-CD01200-SP02 | 466-CD01200-SP03 CD01201 | CDOT Beachside Ave Bridge Rebuild | Operations | URD/DB Cable Reliability | 467-CD01201 CD01203 | 55 Elm St., Hart. - Vault Repairs | Operations | New Customer | 468-CD01203 CD01204 | 11F10 R.O.W Removal | Operations | RIGHT OF WAY LINES | 469-CD01204 CD01206 | Saybrook 22D4-72S Smart Switch Prog | Operations | SMART SWITCHES PROGRAM | 470-CD01206 | 470-CD01206-SP01 CD01207 | Grist Mill Village Building B | Operations | New Customer | 471-CD01207 CD01210 | 12F48 Smart Switches | Operations | SMART SWITCHES PROGRAM | 472-CD01210 CD01211 | Lake Vista, DB Cable Replacement | Operations | URD/DB Cable Reliability | 473-CD01211 CD01212 | Grist Mill Village Building C | Operations | New Customer | 474-CD01212 CD01215 | Greenwich – 22E36 – Reconductor wit | Operations | Distribution Line Reliability | 475-CD01215 CD01217 | 3B13-2 Smart Switch | Operations | SMART SWITCHES PROGRAM | 476-CD01217 CD01218 | 47N8-5 Smart Switch | Operations | SMART SWITCHES PROGRAM | 477-CD01218 CD01219 | 15U2-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 478-CD01219 CD01220 | Berlin_Berlin SS Support for 6A4 & | Operations | Peak Load/Capacity | 479-CD01220 | 479-CD01220-SP03 CD01221 | 27H1-72S Smart Switch | Operations | SMART SWITCHES PROGRAM | 480-CD01221 CD01222 | SSRK18.18-9S13-80M->1038-RWO.1 | Operations | SMART SWITCHES PROGRAM | 481-CD01222 CD01223 | Bradley Airport Alternate Supply | Operations | New Customer | 482-CD01223 | 482-CD01223-SP01 CD01237 | Bristol Solar One Interconnection | Operations | New Customer | 483-CD01237 CD01239 | Dayville 24K Islanded Substation | Operations | Regulatory Commitments-Other | 484-CD01239 CD01242 | SR - Litchfield Interconnection | Operations | New Customer | 485-CD01242 | 485-CD01242-SP01 | 485-CD01242-SP03 CD01244 | SR N Stonington Interconnection | Operations | New Customer | 486-CD01244 | 486-CD01244-SP01 CD01246 | Fry Brook 13B21/13B27 ROW Pole Repl | Operations | RIGHT OF WAY LINES | 487-CD01246 | 487-CD01246-SP01 * | CD01247 | Branford 11J43 Same Circuit Tie | Operations | SMART SWITCHES PROGRAM | 488-CD01247Part 13 of 77
CD01250 | 4A9-73S Smart Switch | Operations | SMART SWITCHES PROGRAM | 489-CD01250 * | CD01253 | SSRK82.18-29J2-61R>505-RWO.3 | Operations | SMART SWITCHES PROGRAM | 490-CD01253 CD01257 | Windham_Prospect St_ECSU_Create DB | Operations | URD/DB Cable Reliability | 491-CD01257 CD01260 | CT Lateral Reliability (2019 Group) | Operations | Distribution Line Reliability | 492-CD01260 CD01262 | Greenwich 28F– Rel. Facilities for | Operations | Line Relocations/Act of Public Authority | 493-CD01262 CD01264 | 3A11-71S Manchester Smart Switch | Operations | SMART SWITCHES PROGRAM | 494-CD01264 | 494-CD01264-SP03 CD01265 | 2019 Connecticut DB Insp/Fault Indi | Operations | Distribution Line Reliability | 495-CD01265 CD01269 | Man to Auto - 2 N Main St Wtby | Operations | Network Reliability | 496-CD01269 CD01270 | 1291 Albany Ave., Hart. - Replace M | Operations | Distribution Line Reliability | 497-CD01270 CD01271 | SSRK33.18-22M10-81M=>500-COND.2 | Operations | SMART SWITCHES PROGRAM | 498-CD01271 | 498-CD01271-SP01 CD01272 | Stamford New Service – Charter Comm | Operations | New Customer | There are customer contributions of $7.945 netting the pre-construction estimated direct costs to $443,779. The estimated direct costs excluding the customer contribution is $451,724. Actual direct costs exceed the estimate by 8%. A supplemental request is not required per the Project Authorization policy. | 499-CD01272 CD01273 | 21L1-70S Smart Switch | Operations | SMART SWITCHES PROGRAM | 500-CD01273 CD01274 | Newtown 11A73 Smart Switch | Operations | SMART SWITCHES PROGRAM | 501-CD01274 * | CD01280 | Torrington Smart Switch | Operations | SMART SWITCHES PROGRAM | 502-CD01280 CD01282 | SSRK27.18-11S15-2>653-RWO.4 | Operations | SMART SWITCHES PROGRAM | 503-CD01282 * | CD01290 | SSRK28.18-21K11-2>500-RWO.3 | Operations | SMART SWITCHES PROGRAM | 504-CD01290 * | CD01291 | 5 or More Tripp Hollow Rd 30Y10 | Operations | Distribution Line Reliability | 505-CD01291 CD01295 | New Svc CT Rubber Molding Co. Danie | Operations | New Customer | 506-CD01295 CD01296 | 860 Canal Street New Svc Office Bld | Operations | New Customer | 507-CD01296 CD01297 | Parcel 38 – Tresser Blvd Phase 2 | Operations | New Customer | 508-CD01297 CD01298 | CDOT 117-159 Route 35 UG Relocation | Operations | Line Relocations/Act of Public Authority | 509-CD01298 CD01301 | 2020 POLE INTEGRITY | Operations | POLE INTEGRITY PROGRAM | 510-CD01301 | 510-CD01301-SP03 CD01302 | 2020 FRONTIER POLE SHIFTS | Operations | POLE INTEGRITY PROGRAM | 511-CD01302 CD01304 | 3A02/3A09 R.O.W. Structure Replacem | Operations | RIGHT OF WAY LINES | 512-CD01304 CD01306 | 11C14 Back up to 600 customers | Operations | Distribution Line Reliability | 513-CD01306 CD01307 | Airline Trail ROW Relocation | Operations | Line Relocations/Act of Public Authority | 514-CD01307 | 514-CD01307-SP03 CD01308 | Saybrook 22D Triple Circuit ROW | Operations | RIGHT OF WAY LINES | 515-CD01308 | 515-CD01308-SP01 | 515-CD01308-SP02 | 515-CD01308-SP03 CD01310 | Drummers Lane UG Cable Replacement | Operations | URD/DB Cable Reliability | 516-CD01310 CD01312 | Osprey Mitigation 2020 | Operations | Environmental | 517-CD01312 CD01313 | Darien new service - 40 Heights Rd | Operations | New Customer | 518-CD01313 CD01314 | Litchfield Turnpike, Bethany, Recon | Operations | Distribution Line Reliability | 519-CD01314 CD01317 | 32G9-71S Smarth Switch Program | Operations | SMART SWITCHES PROGRAM | 520-CD01317 CD01320 | Deep River Reconductor Kirtland St | Operations | Distribution Line Reliability | 521-CD01320 CD01322 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 522-CD01322 CD01323 | CT Lateral Reliability (2019 Group | Operations | Distribution Line Reliability | 523-CD01323 CD01327 | Hamilton Ave Wtby Conv to 13.8kV | Operations | New Customer | 524-CD01327 CD01330 | Line Sensor Upgrade | Operations | Reliability - Other | 525-CD01330Part 14 of 77
CD01333 | Freight 11W76 PILC Cable Replace | Operations | Network Reliability | 526-CD01333 | 526-CD01333-SP01 | 526-CD01333-SP02 | 526-CD01333-SP03 CD01334 | Nautilus Drive UG Loop | Operations | URD/DB Cable Reliability | 527-CD01334 CD01335 | Man to Auto-55 W Main & 7 Kendrick | Operations | Network Reliability | 528-CD01335 CD01340 | Yale Ave 25L Islanded Substation | Operations | Distribution Line Reliability | 529-CD01340 | 529-CD01340-SP03 CD01343 | 11N81 TDRP 2019 Analysis | Operations | Regulatory Commitments-Other | 530-CD01343 CD01348 | URD Wellington Dr Farmington | Operations | URD/DB Cable Reliability | 531-CD01348 CD01350 | 14L5/L6 Contingency Overload | Operations | New Customer | 532-CD01350 CD01355 | Aquarian 3-Phase Extension | Operations | New Customer | 533-CD01355 CD01358 | Baldwin 13F65 Load Relief | Operations | Peak Load/Capacity | 534-CD01358 CD01360 | Niantic 21Y2 Overload | Operations | Peak Load/Capacity | 535-CD01360 CD01362 | Overload West Brookfield 14H Sub | Operations | Peak Load/Capacity | 536-CD01362 CD01363 | CD01363 30R10 1st Contingency Overl | Operations | Peak Load/Capacity | 537-CD01363 CD01368 | Stepstone 35L8 - Green Hill 30R14 T | Operations | Distribution Line Reliability | 538-CD01368 | 538-CD01368-SP03 CD01369 | 2N10 Contingent Overloads | Operations | Peak Load/Capacity | 539-CD01369 CD01370 | Middletown_Westside 7A81_Low Volt. | Operations | Peak Load/Capacity | 540-CD01370 CD01372 | W Brookfield 14H4 Contingency Ovrld | Operations | Peak Load/Capacity | 541-CD01372 | 541-CD01372-SP03 CD01373 | CDOT Project 302-0014 - Glover Ave | Operations | Line Relocations/Act of Public Authority | 542-CD01373 CD01374 | Williams St 9L09 Crystal Ave UG Loo | Operations | URD/DB Cable Reliability | 543-CD01374 CD01377 | Southington 4C12 Contingency Overlo | Operations | Peak Load/Capacity | 544-CD01377 CD01378 | 43F3 Load Relief 90% Normal | Operations | Peak Load/Capacity | 545-CD01378 | 545-CD01378-SP03 CD01379 | 5L02 - Relocation of Right of Way | Operations | RIGHT OF WAY LINES | 546-CD01379 | 546-CD01379-SP03 CD01380 | CT Lateral Reliab (2020 Grp 5) | Operations | Distribution Line Reliability | 547-CD01380 CD01381 | CT Lateral Relib (2020 Group6 | Operations | Distribution Line Reliability | 548-CD01381 CD01382 | SSRK6.19-11A71-80M->1000-RWO.1 | Operations | SMART SWITCHES PROGRAM | 549-CD01382 CD01383 | Charter Communications Phase 2 | Operations | New Customer | 550-CD01383 CD01384 | Harbor Point P Block Phase 2 | Operations | New Customer | 551-CD01384 CD01385 | Reliability Greenwich Network N-2 | Operations | Distribution Line Reliability | 552-CD01385 | 552-CD01385-SP01 | 552-CD01385-SP02 | 552-CD01385-SP03 CD01386 | 2020 CT DB Insp/Fault Ind Repl | Operations | URD/DB Cable Reliability | 553-CD01386 CD01388 | Greenwich-11R55-reconductor A/C | Operations | Distribution Line Reliability | 554-CD01388 CD01390 | DG - LSE Enfield LEG-25504 | Operations | New Customer | 555-CD01390 CD01393 | CD01393 Wind Colebrook South | Operations | New Customer | 556-CD01393 CD01398 | Town of Norfolk, 599 Greenwoods Rd | Operations | New Customer | 557-CD01398 | 557-CD01398-SP01 CD01399 | Cobb Road LLC | Operations | New Customer | 558-CD01399 | 558-CD01399-SP01 CD01406 | Central Line Sensors 3G to 4G | Operations | Reliability - Other | 559-CD01406 CD01407 | Eastern Line Sensor 3G to 4G | Operations | Reliability - Other | 560-CD01407 CD01412 | C-Tec Solar Berlin Landfill | Operations | New Customer | 561-CD01412 | 561-CD01412-SP01 CD01428 | 1K06/ 13S10 Contingency Overload | Operations | Network Reliability | 562-CD01428 | 562-CD01428-SP03 CD01430 | Gateway Commons Phase 2 | Operations | New Customer | 563-CD01430 CD01436 | 2020 CT Trip Saver Program | Operations | Distribution Line Reliability | 564-CD01436 CD01452 | Impact - Lodestart N Canaan | Operations | New Customer | 565-CD01452 | 565-CD01452-SP03
As listed on the current system
Supplement for New App [Filed: 11/18/2026]